Running Procedure: Voestalpine Tubulars GMBH & Co KG Voestalpine Tubulars GMBH & Co KG
Running Procedure: Voestalpine Tubulars GMBH & Co KG Voestalpine Tubulars GMBH & Co KG
VAF ® Rev.: 0
This document contains the recommended practices for the installation of voestalpine tubulars proprietary
connections. This is not comprehensive and is meant only as general guidance, based on best industry practices.
The user assumes all responsibility for the safe and effective implementation of these practices. Further, it is the
user’s responsibility to provide competent and knowledgeable personnel, as well as appropriate and well
maintained equipment. Equipment manuals must be followed. In case of conflict safety has priority.
Lable
API-modified running compound with known
friction factor between0,8 and 1,2 is recommended.
Dope shall be applied uniform on pin and box as a
thin layer (thread profile shall be visible after final
Load as shown on lable is the maximum load application of dope).
allowed to apply. It does not consider specific
safety limits
MAXIMUM
OPTIMUM Final Torque
MINIMUM
Torque on shoulder
Torque on shoulder
= Final Torque – Shouldering Torque
= Delta Torque
TURN
Design1
Design 2
Grind to smooth
Remove with Grind to smooth surface with Grind to smooth surface
Pin face 9 N/A surface with emery
abrassive fleece emery paper with file and emery paper
paper
Grind to smooth
Remove with Grind to smooth surface with Grind to smooth surface
Nose radius 9-2 N/A surface with emery
abrassive fleece emery paper with file and emery paper
paper
Remove with Remove rust with abrassive Grind to smooth surface Grind to smooth surface
Radius 1-5 N/A
abrassive fleece fleece. Pitting is accepted. with emery paper with file and emery paper
General: On phosphated
Remove with Grind to smooth surface Grind to smooth surface Grind to smooth surface with
Torque shoulder 1
abrassive fleece with emery paper
N/A
with emery paper file and emery paper
surfaces, the phosphate layer
shall not be removed excessively
Seal 2
Remove with
abrassive fleece
Re-cut Box N/A
Remove with abrassive
fleece
Re-cut Box by hand – repair (except area 7,8
and 10). Minor removal is
Remove with
Remove rust with acceptable as it is.
Clearence 3 abrassive fleece. Pitting N/A Accepted Accepted
abrassive fleece
is accepted.
Heavier removal can be accepted
Remove with Grind to smooth surface Grind to smooth surface Grind to smooth surface with
Thread length 4
abrassive fleece with emery paper with emery paper
Accepted
file and emery paper after approval by voestalpine
Remove rust with
Tubulars specialists. Phosphate
Cylindrical section 5
Remove with
abrassive fleece. Pitting N/A
Grind to smooth surface Grind to smooth surface with and/or corrosion protection spray
abrassive fleece with emery paper file and emery paper
is accepted. should be applied (time for drying
Remove with
Remove rust with shall be given).
Run out 7 abrassive fleece. Pitting Accepted Accepted Accepted
abrassive fleece
is accepted.
Remove with Remove with abrassive Grind to smooth surface Grind to smooth surface with
Chamfer 9 N/A
abrassive fleece fleece with emery paper file and emery paper
0,5m