Physical Configuration Audit

This document provides a checklist for conducting a physical configuration audit. The checklist contains 11 items that should be verified as part of the audit, including the approved configuration item specification, test procedures and reports, manuals, change records, and documentation of previous reviews. Team members and the project manager must sign off to indicate if the results satisfy requirements or if there are still deficiencies. The summary concludes by noting the source document for the checklist.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
291 views1 page

Physical Configuration Audit

This document provides a checklist for conducting a physical configuration audit. The checklist contains 11 items that should be verified as part of the audit, including the approved configuration item specification, test procedures and reports, manuals, change records, and documentation of previous reviews. Team members and the project manager must sign off to indicate if the results satisfy requirements or if there are still deficiencies. The summary concludes by noting the source document for the checklist.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

This document was developed for use by programs assigned to the Business and Enterprise Systems Directorate

(AFLCMC/HI), and does not constitute official issuance of DoD or AF policy.


File: Physical Configuration Audit Checklist Last updated: 24 September 2018

Physical Configuration Audit Checklist

Do you have? Yes No NA


1. Approved final draft of the configuration item (CI) specification
2. A list of approved changes to the configuration item
3. Test procedures and associated test data
4. Minutes from the Test Readiness Review (TRR) I, TRR II (if Limited Deployment was
conducted), and Operational Test Readiness Review (OTRR) (if Operational Test and
Evaluation (OT&E) was conducted)
5. Manuscript copy of all CI manuals (i.e. RS, ITP, ITD, OM, UM, etc.).
6. Version Description Document Form
7. Current set of listings and updated design descriptions or other means of design portrayal
for each CI.
8. FCA report, if applicable
9. Integrated Test Report (ITR) and OT&E Report (if OT&E was conducted)
10. All open Action Items from previous reviews
11. All PCA procedure tasks accomplished.
Signature of PCA Team Members: Date:
__________________________________ ______________
__________________________________ ______________
__________________________________ ______________
__________________________________ ______________
__________________________________ ______________
__________________________________ ______________
__________________________________ ______________
__________________________________ ______________
Check one:
Results reviewed satisfy the requirements and are accepted (See attached comments).
Results reviewed do not satisfy requirements (See attached comments and list of deficiencies).

Project Manager: _________________________________________________ Date: __________________

Source: Adapted from Military Handbook Configuration Management Guidance, MIL-HDBK-61A