AQPP Check List New
AQPP Check List New
AQPP Check List New
New development ( )
Part Number :
Engineering Level :
Project / Model
Drawing Release Date :
Supplier Name :
Project Launch Date
Location :
APQP Initiation Date : Volume / Month
Progress Update
S.No Activities Responsibility Target
Y N
7 Process FMEA
18 Fitment Trails
Members
Designation
Members
Designation
Signature &
PPAP Date
Alternate sourcing ( )
Actual
LMW TMD
Revision : 1
Annexure - A
1. Identify significant characteristics (a) Product b)Process (Machining / Heat treatment /Welding /
Surface protection) c) EEC parameters etc.
S.No. Characteristics Operation (Stage) Control Mechanism
Aesthetics: Agreement on Surface finish, Appearance ,Abnormalities and Assy related like
Gap,Mismatch,Eveness and eccentric etc
Revalidation Frequency
7. Sub-contracting requirements
Method
Supplier identification
Location
Traceability
Type of strapping:
Annexure D
SAMPLE SUBMISSION LEVEL AND CONDITIONS
CASTINGS
Balooned Drawing
Sample Size - 6 Nos.from Each Cavity including one Marked Casting per Cavity
Tensile Report
GEARS
Balooned Drawing
MACHINED PARTS
Balooned Drawing
SHEET METAL
Balooned Drawing
Child Parts
2 BIN
Balooned Drawing
Child Parts
Rubber Parts : 3 discs approx 25 mm dia & Test slab 100 X 100 mm
PROPRIETORY
TAFE Approved Drawing
Balooned Drawing
SN Description Details
1 Customer Complaint
3 Line Stoppage
4 CQA
5 CRA
6 RFT
7 DOT
Remarks
Quality Agreement
1
Inspection reports : To be submitted along with each consignment as per the Approved Final Inspection
Standard
2 Performance and Endurance Tests : To be done and reports to be submitted once in a Year
4 iMaRQ : Min 70 % (Audit frequency 1 / year). Below 70 % ( Audit frequency as per TAFE decision)
5 To be Self Certified after trouble free supplies of 3 lots & 300 Nos.
6 Sub supplier / Process / Major tooling / Location change - Re ISIR & PPAP Approval is Mandatory
8
For Significant characteristics Any one of the following Control Mechanism to be established a) Poka Yoke b)
SPC or Control Charts c) 100% Inspection
9 Availability of Final Inspection area, Inspection tables etc, separate gauges for Final Inspection etc.
10
11
12
13
14
15
16
17
Points discussed during AQP initiation / Review
Part Name :
Part Number :
Supplier Name :
10
11
12
13
14
15
16
Gauge Verification Report
New development ( )
Alternate sourcing ( )
Project / Model
OK / Not OK Remark