0% found this document useful (0 votes)
101 views

Advanced Concrete Design Project

This document lists the team members for Group 1 of the Concrete Design Project: Grant Haralson, Ben Williams, Mackenzie Thering, and Nicolas Hoyos. It also provides an index of design criteria and reinforced concrete drawings for the project.

Uploaded by

api-459677152
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
101 views

Advanced Concrete Design Project

This document lists the team members for Group 1 of the Concrete Design Project: Grant Haralson, Ben Williams, Mackenzie Thering, and Nicolas Hoyos. It also provides an index of design criteria and reinforced concrete drawings for the project.

Uploaded by

api-459677152
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 57

Team Members

5/14/2020 8:15:08 PM
Group 1 Grant Haralson
Ben Williams
Cover Sheet
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.000
Sanjiv R H-K Scale
C.101 Applied Loads C.313 Distributed Loads - Grid Line 3 & Grid Line C C.508 Slab Design - Levels 2, 3, 4 Plan
C.201 Tributary Areas - Level 1 C.314 Distributed Loads - Grid Line 4 & Grid Line D C.509 Slab Design - Levels 2, 3, 4 Calculations
C.202 Tributary Areas - Mezzanine C.315 Distributed Loads - Grid Line 5 & Grid Line E C.510 Slab Design - Levels 2, 3, 4 Calculations
C.203 Tributary Areas - Levels 2, 3, 4 C.316 Distributed Loads - Grid Line F C.511 Slab Design - Levels 2, 3, 4 Section
C.204 Tributary Areas - Level 5 C.401 Member Design - Typical Circular Column C.512 Slab Design - Levels 2, 3, 4 Calculations
C.205 Tributary Areas - Roof C.402 Member Design - Typical Rectangular Column C.513 Slab Design - Levels 2, 3, 4 Section
C.301 Distributed Loads - Level 1 C.403 Member Design - Corner Circular Column C.514 Slab Design - Level 5 Plan
C.302 Distributed Loads - Level 1 Cont. C.404 Member Design - Atrium Circular Column C.515 Slab Design - Level 5 Section
C.303 Distributed Loads - Mezzanine C.405 Member Design - Typical Beam C.516 Slab Design - Level 5 Section
C.304 Distributed Loads - Mezzanine Cont. C.406 Member Design - Typical Beam Cont. C.517 Slab Design - Roof Plan
C.305 Distributed Loads - Levels 2, 3, 4 C.407 Member Design - Typical Beam Cont. C.518 Slab Design - Roof Calculations
C.306 Distributed Loads - Levels 2, 3, 4 Cont. C.501 Slab Design - Level 1 Plan C.519 Slab Design - Roof Calculations
C.307 Distributed Loads - Level 5 C.502 Slab Design - Level 1 Section C.520 Slab Design - Roof Section
C.308 Distributed Loads - Level 5 Cont. C.503 Slab Design - Level 1 Section C.521 Slab Design - Roof Calculations
C.309 Distributed Loads - Roof C.504 Slab Design - Mezzanine Plan C.522 Slab Design - Roof Section
C.310 Distributed Loads - Roof Cont. C.505 Slab Design - Mezzanine Section C.601 Wall Design
C.311 Distributed Loads - Grid Line 1 & Grid Line A C.506 Slab Design - Mezzanine Section C.602 Wall Design Cont.
C.312 Distributed Loads - Grid Line 2 & Grid Line B C.507 Slab Design - Mezzanine Section C.701 Foundation Design
C.702 Foundation Design Cont.
DESIGN CRITERIA D. WIND LOADS REINFORCED CONCRETE
1. WIND PRESSURES ARE BASED ON THE PROVISIONS OF THE
A. GENERAL BUILDING CODE AMERICAN SOCIETY OF CIVIL ENGINEERS, MINIMUM DESIGN A. CLASSES OF CONCRETE
1. THE CONSTRUCTION DOCUMENTS ARE BASED ON THE LOADS FOR BUILDINGS AND OTHER STRUCTURES, ASCE 7-10 1. CONCRETE USED FOR SHALLOW FOUDATIONS AND SLAB-ON-
REQUIREMENTS OF THE INTERNATIONAL BUILDING CODE 2015. AND THE FOLLOWING CRITERIA: GRADE SHOULD HAVE A MINIMUM COMPRESSIVE STRENGTH
B. DEAD LOADS A. ULTIMATE DESIGN WIND SPEED: 115 MPH OF 3000 PSI AT 28 DAYS.
1. A TYPICAL ALLOWANCE OF 30 PSF HAS BEEN MADE FOR B. BUILDING RISK CATEGORY: II 2. CONCRETE USED FOR FLOOR AND ROOF SLABS SHOULD
HANGING CEILING AND MECHANICAL EQUIPMENT SUCH AS C. WIND EXPOSURE CATEGORY: B HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI AT 28
DUCT WORK AND SPRINKLER PIPES FOR EACH FLOOR. E. SNOW LOADS DAYS.
2. AN ALLOWANCE OF 40 PSF HAS BEEN MADE FOR MECHANICAL 1. SNOW LOADS ARE BASED ON THE AMERICAN SOCIETY OF CIVIL 3. CONCRETE USED FOR SHEAR WALLS SHOULD HAVE A
EQUIPMENT FOR THE ROOF. ENGINEERS, MINIMUM DESIGN LOADS FOR BUILDINGS AND MINIMUM COMPRESSIVE STRENGTH OF 5000 PSI AT 28 DAYS.
3. THE SELF-WEIGHT OF THE SLAB WAS CALCULATED ASSUMING OTHER STRUCTURES, ASCE 7-10. 4. CONCRETE USED FOR COLUMNS AND BEAMS SHOULD HAVE A
A SLAB DEPTH OF 8 IN AND A DENSITY OF 150 PCF. F. BUILDING MOVEMENT AND DEFLECTIONS MINIMUM COMPRESSIVE STRENGTH OF 5000 PSI AT 28 DAYS.
A. DLSLAB = 8 IN (12 IN / 1 FT) 150 PCF = 100 PSF 1. FLOOR DEFLECTIONS: THE FOLLOWING PROVISION FOR 5. ALL CONCRETE MIXES SHOULD HAVE A DESNISTY OF 145 PCF
4. AN ADDITION WALL LOAD OF 120 PLF WAS APPLIED TO ALL SUPERIMPOSED LOAD DEFLECTIONS SHALL BE MADE IN THE UNLESS OTHERWISE NOTED.
EDGE BEAMS. DESIGN, FABRICATION, AND ERECTION OF ALL PARTITIONS, B. REINFORCING STEEL
C. LIVE LOADS GLASS WALLS, AND OTHER ELEMENTS ATTACHED TO THE 1. ALL REINFORCING STEEL WITH BAR SIZES FROM NO. 7 TO NO.
1. IN AREAS WITH PARTITIONS SUBJECT TO CHANGE, AN STRUCTURE: 18 SHALL CONFORM TO ASTM A 615, GRADE 75. ALL OTHER
ALLOWANCE OF 10 PSF HAS BEEN MADE FOR PARTITIONS AS A A. TYPICAL FLOOR MEMBERS: SPAN/360 BUT NOT LESS BAR SIZES SHALL CONFORM TO ASTM A 615, GRADE 60.
UNIFORMILY DISTRIBUTED LIVE LOAD WHERE THE LIVE LOAD THAN 3/8" C. REINFORCING STEEL COVERAGE
AS STATED BELOW IS 80 PSF OR LESS. B. TYPICAL ROOF MEMBERS: SPAN/360 BUT NOT LESS THAN 1. COVER IN STRUCTURAL MEMBERS NOT SPECIFIED IN THE
2. DESIGN LIVE LOADS ARE BASED ON THE MORE RESTRICTIVE 3/8" DETAILS SHALL CONFORM TO THE REQUIREMENTS OF ACI 318.
OF THE UNIFORM LISTED BELOW OR THE CONCENTRATED SUPERIMPOSED LOAD DEFLECTION IS DEFINED AS ALL 2. THE REINFORCING STEEL DETAILER SHALL ADJUST
LOAD LISTED ACTING OVER AN AREA 2.5 SF. DEFLECTION ANTICIPATED TO OCCUR AFTER THE CLADDING HAS REINFORCING STEEL CAGE SIZES AT INTERSECTING
A. OFFICE: 50 PSF, 2000 LBS BEEN ERECTED. THE RELATIVE DEFLECTION ABOVE DOES NOT STRUCTURAL MEMBERS AS REQUIRED TO ALLOW CLEARANCE
B. ROOF: 20 PSF INCLUDE THE FLOOR DEFLECTION CAUSED BY THE WIEGHT OF FOR INTERSECTING REINFORCING BAR LAYERS WITH MINIMUM
THE CLADDING ITSELF OR THE DEAD LOAD DEFLECTION OF SPECIFIED COVER.
FLOOR FRAMING ITSELF.

Team Members

5/14/2020 8:15:09 PM
Group 1 Grant Haralson
Ben Williams
General Notes
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.001
Sanjiv R H-K Scale
L = 87 ft

Velocity Pressure Applied Wind Load


q = 0.00256 kz kzt kd v2 16.9 PSF (7 FT) = 118 PLF
q = 0.00256(1.175)(1.0)(0.85)(115 mph)2 W 16.9 PSF (15.25 FT) = 258 PLF

B = 59 ft
q = 33.81 psf 16.9 PSF (16.5 FT) = 279 PLF
16.9 PSF (18.25 FT) = 308 PLF
kd is the directionality factor found in Table 26.6-1 16.9 PSF (20 FT) = 338 PLF
kzt is the topographic factor factor found in Fig. 26.8-1 16.9 PSF (10 FT) = 169 PLF
v is the design wind velocity found in Fig. 26.5-1A
L / B = 1.47
kz is the velocity pressure exposure coefficient found in Table 27.3-1 -20.5 PSF (7.5 FT) = -154 PLF
-20.5 PSF (15 FT) = -308 PLF
Design Wind Pressure B = 87 ft -20.5 PSF (14 FT) = -287 PLF
p = q G Cp - qi (GCpi) -20.5 PSF (14.5 FT) = -297 PLF
-20.5 PSF (8 FT) = -164 PLF
Windward Wall
p = (33.81)(0.85)(0.8) - (33.81)(+0.18) = 16.9 -26.2 PSF (7 FT) = -183 PLF
-26.2 PSF (15.25 FT) = -400 PLF

L = 59 ft
p = (33.81)(0.85)(0.8) - (33.81)(-0.18) = 16.9
-26.2 PSF (16.5 FT) = -432 PLF
Leeward Wall -26.2 PSF (18.25 FT) = -478 PLF
p = (33.81)(0.85)(-0.5) - (33.81)(+0.18) = -20.5 -26.2 PSF (20 FT) = -524 PLF
L / B = 0.68
p = (33.81)(0.85)(-0.5) - (33.81)(-0.18) = -8.28 -26.2 PSF (10 FT) = -262 PLF

Side Walls
p = (33.81)(0.85)(-0.7) - (33.81)(+0.18) = -26.2 W
p = (33.81)(0.85)(-0.7) - (33.81)(-0.18) = -14.03

G is the gust effect factor Additional Applied Loads


Cp is the external pressure coefficient found in Figure 27.4-1 Roof Superimposed Dead Load: 40 PSF
GCpi is the internal pressure coefficient Floor Superimposed Dead Load: 30 PSF
q = qz for the windward wall Slab Dead Load: 8 in x 1 ft/12in x 150 PCF = 100 PSF
q = qh for the leeward wall and side walls Live Load: 50 PSF + 10 PSF = 60 PSF
qi = qh for positive internal pressure evaluation Roof Live Load: 20 PSF
Snow Load: 30 PSF

Team Members

5/14/2020 8:15:09 PM
Group 1 Grant Haralson
Ben Williams
Applied Loads
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.101
Sanjiv R H-K Scale
Tw = L1 / 2
Triangle
wmax = q x (L1 / 2)
L1

E
D2 GB9 GB18 GB27 GB36 GB45

D1

16' - 0"

GB13

GB22

GB31

GB40

GB49
GB4
Tw = L2 / 2

Trapezoid
wmax = q x (L2 / 2)

D
L1 GB8 GB17 GB26 GB35 GB44

13' - 0"

GB12

GB21

GB30

GB39

GB48
GB3
D2
D1

C
GB7 GB16 GB25 GB34 GB43
Tw = L1 / 2 + L2 / 2

Triangle+Trapezoid

15' - 0"

GB11

GB20

GB29

GB38

GB47
L2 / 2 + D1

GB2
wmax = q x (L1 / 2 + L2 / 2)
w2 = q x (L2 / 2 + D1)

B
GB6 GB15 GB24 GB33 GB42
L1

15' - 0"

GB10

GB19

GB28

GB37

GB46
GB1
Cantilever
A
wmax = q x (A / L1)
A

3/32" = 1'-0"
GB5 GB14 GB23 GB32 GB41

L1 14' - 0" 16' - 6" 16' - 6" 20' - 0" 20' - 0"

Level 1
4

6
1

5
3
Load Distribution Typologies
1/8" = 1'-0"

1
Team Members

5/14/2020 8:15:10 PM
Group 1 Grant Haralson
Ben Williams
Tributary Areas - Level 1
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.201
Sanjiv R H-K Scale As indicated
Tw = L1 / 2
Triangle
wmax = q x (L1 / 2)
L1

E
D2 B147 B155 B169

D1

B142

B151

B157

B164

B173
G4
Tw = L2 / 2

Trapezoid
wmax = q x (L2 / 2)

D
L1 B146 B154 B160

B180
B141

G3
D2
D1

C
B145 B167
Tw = L1 / 2 + L2 / 2

Triangle+Trapezoid

B179
L2 / 2 + D1

B140

B162

B171
wmax = q x (L1 / 2 + L2 / 2)

G2
w2 = q x (L2 / 2 + D1)

B
B144 B153 B166
L1

B178
B139

B148

B156
G1
Cantilever
A
wmax = q x (A / L1)
A

3/32" = 1'-0"
B143 B152 B158 B165 B174

Mezzanine
L1

6
1

5
3
Load Distribution Typologies
1/8" = 1'-0"

1
Team Members

5/14/2020 8:15:11 PM
Group 1 Grant Haralson
Ben Williams
Tributary Areas - Mezzanine
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.202
Sanjiv R H-K Scale As indicated
Tw = L1 / 2
Triangle
wmax = q x (L1 / 2)
L1

E
D2 B9 B17 B31

D1

B13

B19

B26

B35
B4
Tw = L2 / 2

Trapezoid
wmax = q x (L2 / 2)

D
L1 B8 B16 B22 B30 B39

B42
B12

B25

B34
B3
D2
D1

C
B7 B29 B38
Tw = L1 / 2 + L2 / 2

Triangle+Trapezoid

B41
L2 / 2 + D1

B11

B24

B33
B2
wmax = q x (L1 / 2 + L2 / 2)
w2 = q x (L2 / 2 + D1)

B
B6 B15 B21 B28 B37

L1

B40
B10

B18

B23

B32
Cantilever B1
A
A

wmax = q x (A / L1)

3/32" = 1'-0"
B5 B14 B20 B27 B36

L1

Level 2
4

6
1

5
3
Load Distribution Typologies

1
1/8" = 1'-0"

Team Members

5/14/2020 8:15:12 PM
Group 1 Grant Haralson
Ben Williams
Tributary Areas - Levels 2, 3, 4
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.203
Sanjiv R H-K Scale As indicated
Tw = L1 / 2
Triangle
wmax = q x (L1 / 2)
L1

E
D2 B51 B60 B77 B86

D1

B46

B55

B64

B72

B81

B90
Tw = L2 / 2

Trapezoid
wmax = q x (L2 / 2)

D
L1 B50 B59 B68 B76 B85

B89
B45

B54

B71

B80
B63
D2
D1

C
B49 B58 B67 B75 B84
Tw = L1 / 2 + L2 / 2

Triangle+Trapezoid

B62

B88
L2 / 2 + D1

B44

B53

B70

B79
wmax = q x (L1 / 2 + L2 / 2)
w2 = q x (L2 / 2 + D1)

B
B48 B57 B66 B74 B83

L1

B87
B43

B52

B61

B69

B78
Cantilever
A
A

wmax = q x (A / L1)

3/32" = 1'-0"
B47 B56 B65 B73 B82

L1

Level 5
4

6
1

5
3
Load Distribution Typologies

1
1/8" = 1'-0"

Team Members

5/14/2020 8:15:12 PM
Group 1 Grant Haralson
Ben Williams
Tributary Areas - Level 5
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.204
Sanjiv R H-K Scale As indicated
Tw = L1 / 2
Triangle
wmax = q x (L1 / 2)
L1

E
B99 B108 B125 B134
D2
D1

B103

B112

B120

B129

B138
B94
Tw = L2 / 2

Trapezoid
wmax = q x (L2 / 2)

D
B98 B107 B116 B124 B133
L1

B137
B102

B119

B128
B111
B93
D2
D1

C
B97 B106 B115 B123 B132
Tw = L1 / 2 + L2 / 2

Triangle+Trapezoid

B110

B136
B101

B118

B127
B92
L2 / 2 + D1

wmax = q x (L1 / 2 + L2 / 2)
w2 = q x (L2 / 2 + D1)

B
B96 B105 B114 B122 B131

L1

B135
B100

B109

B117

B126
Cantilever B91
A

3/32" = 1'-0"
A
wmax = q x (A / L1) B95 B104 B113 B121 B130

L1

Roof
4

6
1

5
3
Load Distribution Typologies

1
1/8" = 1'-0"

Team Members

5/14/2020 8:15:13 PM
Group 1 Grant Haralson
Ben Williams
Tributary Areas - Roof
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.205
Sanjiv R H-K Scale As indicated
DISTRIBUTED LOAD
LIVE DEAD
LOAD LOAD
TRIBUTARY TRIBUTARY LIVE DEAD
AREA
BEAM SHAPE AREA L1 L2 L3 LOAD LOAD Tw D1 D2 Wmax W2 Wmax W2
SF FT FT FT PSF PSF FT FT FT K/FT K/FT K/FT K/FT
GB1 Trapezoid 61 15.0 14.0 0.0 60 130 7.00 7.00 8.00 0.420 0.000 0.910 0.000
GB2 Trapezoid 56 15.0 14.0 0.0 60 130 7.00 7.00 8.00 0.420 0.000 0.910 0.000
GB3 Triangle 42 13.0 14.0 0.0 60 130 6.50 0.00 13.00 0.390 0.000 0.845 0.000
GB4 Trapezoid 69 16.0 14.0 0.0 60 130 7.00 7.00 9.00 0.420 0.000 0.910 0.000
GB5 Triangle 55 14.0 15.0 0.0 60 130 7.00 0.00 14.00 0.420 0.000 0.910 0.000
GB6 Triangle+Triangle 110 14.0 15.0 15.0 60 130 14.00 0.00 14.00 0.840 0.000 1.820 0.000
GB7 Triangle+Trapezoid 109 14.0 15.0 13.0 60 130 13.50 6.50 7.50 0.810 0.780 1.755 1.690
GB8 Triangle+Trapezoid 109 14.0 13.0 16.0 60 130 13.50 6.50 7.50 0.810 0.780 1.755 1.690
GB9 Triangle 55 14.0 16.0 0.0 60 130 7.00 0.00 14.00 0.420 0.000 0.910 0.000
GB10 Triangle+Trapezoid 119 15.0 14.0 16.5 60 130 14.50 7.00 8.00 0.870 0.840 1.885 1.820
GB11 Triangle+Trapezoid 113 15.0 14.0 16.5 60 130 14.50 7.00 8.00 0.870 0.840 1.885 1.820
GB12 Triangle+Triangle 85 13.0 14.0 16.5 60 130 13.00 0.00 13.00 0.780 0.000 1.690 0.000
GB13 Triangle+Trapezoid 138 16.0 14.0 16.5 60 130 15.00 7.00 9.00 0.900 0.840 1.950 1.820
GB14 Trapezoid 71 16.5 15.0 0.0 60 130 7.50 7.50 9.00 0.450 0.000 0.975 0.000
GB15 Trapezoid+Trapezoid 132 16.5 15.0 15.0 60 130 15.00 7.50 9.00 0.900 0.000 1.950 0.000
GB16 Trapezoid+Trapezoid 133 16.5 15.0 13.0 60 130 14.00 7.50 9.00 0.840 0.000 1.820 0.000
GB17 Triangle+Trapezoid 94 16.5 13.0 16.0 60 130 14.75 6.50 10.00 0.885 0.780 1.918 1.690
GB18 Triangle 68 16.5 16.0 0.0 60 130 8.25 0.00 16.50 0.495 0.000 1.073 0.000
GB19 Triangle+Triangle 123 15.0 16.5 16.5 60 130 15.00 0.00 15.00 0.900 0.000 1.950 0.000
GB20 Triangle+Triangle 113 15.0 16.5 16.5 60 130 15.00 0.00 15.00 0.900 0.000 1.950 0.000
GB21 Triangle+Triangle 85 13.0 16.5 16.5 60 130 13.00 0.00 13.00 0.780 0.000 1.690 0.000
GB22 Trapezoid+Trapezoid 139 16.0 16.5 16.5 60 130 16.50 8.25 7.75 0.990 0.000 2.145 0.000
GB23 Trapezoid 71 16.5 15.0 0.0 60 130 7.50 7.50 9.00 0.450 0.000 0.975 0.000
GB24 Trapezoid+Trapezoid 132 16.5 15.0 15.0 60 130 15.00 7.50 9.00 0.900 0.000 1.950 0.000
GB25 Trapezoid+Trapezoid 133 16.5 15.0 13.0 60 130 14.00 7.50 9.00 0.840 0.000 1.820 0.000
GB26 Triangle+Trapezoid 133 16.5 13.0 16.0 60 130 14.75 6.50 10.00 0.885 0.780 1.918 1.690
GB27 Triangle 68 16.5 16.0 0.0 60 130 8.25 0.00 16.50 0.495 0.000 1.073 0.000
GB28 Triangle+Triangle 126 15.0 16.5 20.0 60 130 15.00 0.00 15.00 0.900 0.000 1.950 0.000
GB29 Triangle+Triangle 113 15.0 16.5 20.0 60 130 15.00 0.00 15.00 0.900 0.000 1.950 0.000
GB30 Triangle+Triangle 85 13.0 16.5 20.0 60 130 13.00 0.00 13.00 0.780 0.000 1.690 0.000

Team Members

5/14/2020 8:15:13 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Level 1
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.301
Sanjiv R H-K Scale
DISTRIBUTED LOAD
LIVE DEAD
LOAD LOAD
TRIBUTARY TRIBUTARY LIVE DEAD
AREA
BEAM SHAPE AREA L1 L2 L3 LOAD LOAD Tw D1 D2 Wmax W2 Wmax W2
SF FT FT FT PSF PSF FT FT FT K/FT K/FT K/FT K/FT
GB31 Triangle+Trapezoid 139 16.0 16.5 20.0 60 130 16.25 8.25 7.75 0.975 0.990 2.113 2.145
GB32 Trapezoid 95 20.0 15.0 0.0 60 130 7.50 7.50 12.50 0.450 0.000 0.975 0.000
GB33 Trapezoid+Trapezoid 189 20.0 15.0 15.0 60 130 15.00 7.50 12.50 0.900 0.000 1.950 0.000
GB34 Trapezoid+Trapezoid 182 20.0 15.0 13.0 60 130 14.00 7.50 12.50 0.840 0.000 1.820 0.000
GB35 Trapezoid+Trapezoid 185 20.0 13.0 16.0 60 130 14.50 6.50 13.50 0.870 0.000 1.885 0.000
GB36 Trapezoid 97 20.0 16.0 0.0 60 130 8.00 8.00 12.00 0.480 0.000 1.040 0.000
GB37 Triangle+Triangle 123 15.0 20.0 20.0 60 130 15.00 0.00 15.00 0.900 0.000 1.950 0.000
GB38 Triangle+Triangle 113 15.0 20.0 20.0 60 130 15.00 0.00 15.00 0.900 0.000 1.950 0.000
GB39 Triangle+Triangle 85 13.0 20.0 20.0 60 130 13.00 0.00 13.00 0.780 0.000 1.690 0.000
GB40 Triangle+Triangle 139 16.0 20.0 20.0 60 130 16.00 0.00 16.00 0.960 0.000 2.080 0.000
GB41 Trapezoid 100 20.0 15.0 0.0 60 130 7.50 7.50 12.50 0.450 0.000 0.975 0.000
GB42 Trapezoid+Trapezoid 199 20.0 15.0 15.0 60 130 15.00 7.50 12.50 0.900 0.000 1.950 0.000
GB43 Trapezoid+Trapezoid 190 20.0 15.0 13.0 60 130 14.00 7.50 12.50 0.840 0.000 1.820 0.000
GB44 Trapezoid+Trapezoid 195 20.0 13.0 16.0 60 130 14.50 6.50 13.50 0.870 0.000 1.885 0.000
GB45 Trapezoid 103 20.0 16.0 0.0 60 130 8.00 8.00 12.00 0.480 0.000 1.040 0.000
GB46 Triangle 61 15.0 20.0 0.0 60 130 7.50 0.00 15.00 0.450 0.000 0.975 0.000
GB47 Triangle 56 15.0 20.0 0.0 60 130 7.50 0.00 15.00 0.450 0.000 0.975 0.000
GB48 Triangle 42 13.0 20.0 0.0 60 130 6.50 0.00 13.00 0.390 0.000 0.845 0.000
GB49 Triangle 69 16.0 20.0 0.0 60 130 8.00 0.00 16.00 0.480 0.000 1.040 0.000

Team Members

5/14/2020 8:15:13 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Level 1 Cont.
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.302
Sanjiv R H-K Scale
DISTRIBUTED LOAD
LIVE DEAD
LOAD LOAD
TRIBUTARY LIVE DEAD
TRIBUTARY AREA OF
BEAM AREA SHAPE AREA CANTILEVER L1 L2 L3 LOAD LOAD Tw D1 D2 Wmax W2 Wmax W2
SF SF FT FT FT PSF PSF FT FT FT K/FT K/FT K/FT K/FT
B139 None 0 0 15.0 14.0 0.0 60 130 0.00 0.00 15.00 0.000 0.000 0.000 0.000
B140 None 0 0 15.0 14.0 0.0 60 130 0.00 0.00 15.00 0.000 0.000 0.000 0.000
B141 None 0 0 13.0 14.0 0.0 60 130 0.00 0.00 13.00 0.000 0.000 0.000 0.000
B142 None 0 0 16.0 14.0 0.0 60 130 0.00 0.00 16.00 0.000 0.000 0.000 0.000
B143 None 32 0 14.0 15.0 0.0 60 130 0.00 0.00 14.00 0.000 0.000 0.000 0.000
B144 None 63 0 14.0 15.0 15.0 60 130 0.00 0.00 14.00 0.000 0.000 0.000 0.000
B145 None 56 0 14.0 15.0 13.0 60 130 0.00 6.50 7.50 0.000 0.000 0.000 0.000
B146 None 60 0 14.0 13.0 16.0 60 130 0.00 6.50 7.50 0.000 0.000 0.000 0.000
B147 None 32 0 14.0 16.0 0.0 60 130 0.00 0.00 14.00 0.000 0.000 0.000 0.000
B148 Rectangle 64 0 15.0 14.0 16.5 60 130 3.50 0.00 0.00 0.210 0.000 0.455 0.000
B149 Rectangle+Cantilever 116 60 15.0 14.0 16.5 60 130 3.50 7.00 0.00 0.450 0.240 0.695 0.520
B150 Rectangle+Cantilever 98 49 13.0 14.0 16.5 60 130 3.50 0.00 0.00 0.436 0.226 0.681 0.490
B151 Rectangle 68 0 16.0 14.0 16.5 60 130 3.50 0.00 0.00 0.210 0.000 0.455 0.000
B152 None 0 0 16.5 15.0 0.0 60 130 0.00 0.00 16.50 0.000 0.000 0.000 0.000
B153 Cantilever 84 84 16.5 15.0 15.0 60 130 0.00 0.00 16.50 0.305 0.000 0.662 0.000
B154 Cantilever 64 64 16.5 13.0 16.0 60 130 0.00 0.00 16.50 0.233 0.000 0.504 0.000
B155 None 0 0 16.5 16.0 0.0 60 130 0.00 0.00 16.50 0.000 0.000 0.000 0.000
B156 Triangle 58 15.0 16.5 16.5 60 130 7.50 0.00 15.00 0.450 0.000 0.975 0.000
B157 None 0 16.0 16.5 16.5 60 130 0.00 0.00 16.00 0.000 0.000 0.000 0.000
B158 Trapezoid 76 16.5 15.0 0.0 60 130 7.50 7.50 9.00 0.450 0.000 0.975 0.000
B159 Trapezoid+Cantilever 148 80 16.5 15.0 15.0 60 130 7.50 0.00 16.50 0.741 0.291 1.605 0.630
B160 Cantilever 62 62 16.5 13.0 16.0 60 130 0.00 0.00 16.50 0.225 0.000 0.488 0.000
B161 Triangle+Triangle 130 15.0 16.5 20.0 60 130 15.00 0.00 15.00 0.900 0.000 1.950 0.000
B162 Cantilever 98 98 15.0 16.5 20.0 60 130 0.00 0.00 15.00 0.392 0.000 0.849 0.000
B163 Triangle+Cantilever 103 58 13.0 16.5 20.0 60 130 6.50 0.00 13.00 0.658 0.268 1.425 0.580
B164 Triangle 69 16.0 16.5 20.0 60 130 8.00 0.00 16.00 0.480 0.000 1.040 0.000
B165 Trapezoid 96 20.0 15.0 0.0 60 130 7.50 7.50 12.50 0.450 0.000 0.975 0.000
B166 Trapezoid+Cantilever 111 16 20.0 15.0 15.0 60 130 7.50 0.00 20.00 0.498 0.048 1.079 0.104
B167 Trapezoid 89 20.0 15.0 13.0 60 130 7.50 7.50 12.50 0.450 0.000 0.975 0.000
B168 Trapezoid+Trapezoid 197 20.0 13.0 16.0 60 130 14.50 6.50 13.50 0.870 0.000 1.885 0.000

Team Members

5/14/2020 8:15:14 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Mezzanine
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.303
Sanjiv R H-K Scale
DISTRIBUTED LOAD
LIVE DEAD
LOAD LOAD
TRIBUTARY LIVE DEAD
TRIBUTARY AREA OF
BEAM AREA SHAPE AREA CANTILEVER L1 L2 L3 LOAD LOAD Tw D1 D2 Wmax W2 Wmax W2
SF SF FT FT FT PSF PSF FT FT FT K/FT K/FT K/FT K/FT
B169 Trapezoid 108 20.0 16.0 0.0 60 130 8.00 8.00 12.00 0.480 0.000 1.040 0.000
B170 Triangle+Triangle 126 15.0 20.0 20.0 60 130 15.00 0.00 15.00 0.900 0.000 1.950 0.000
B171 Triangle+Cantilever 59 3 15.0 20.0 20.0 60 130 7.50 0.00 15.00 0.462 0.012 1.001 0.026
B172 Triangle+Triangle 91 13.0 20.0 20.0 60 130 13.00 0.00 13.00 0.780 0.000 1.690 0.000
B173 Triangle 69 16.0 20.0 20.0 60 130 8.00 0.00 16.00 0.480 0.000 1.040 0.000
B174 Trapezoid 100 20.0 15.0 0.0 60 130 7.50 7.50 12.50 0.450 0.000 0.975 0.000
B175 Trapezoid+Trapezoid 203 20.0 15.0 15.0 60 130 15.00 7.50 12.50 0.900 0.000 1.950 0.000
B176 Trapezoid+Trapezoid 196 20.0 15.0 13.0 60 130 14.00 7.50 12.50 0.840 0.000 1.820 0.000
B177 Trapezoid 94 20.0 13.0 16.0 60 130 6.50 6.50 13.50 0.390 0.000 0.845 0.000
B178 Triangle 61 15.0 20.0 0.0 60 130 7.50 0.00 15.00 0.450 0.000 0.975 0.000
B179 Triangle 56 15.0 20.0 0.0 60 130 7.50 0.00 15.00 0.450 0.000 0.975 0.000
B180 Triangle 45 13.0 20.0 0.0 60 130 6.50 0.00 13.00 0.390 0.000 0.845 0.000
G1 Rectangle 56 15.0 14.0 0.0 60 130 3.50 0.00 0.00 0.210 0.000 0.455 0.000
G2 Rectangle 56 15.0 14.0 0.0 60 130 3.50 0.00 15.00 0.210 0.000 0.455 0.000
G3 Rectangle 49 13.0 14.0 0.0 60 130 3.50 0.00 13.00 0.210 0.000 0.455 0.000
G4 Rectangle 60 16.0 14.0 0.0 60 130 3.50 0.00 16.00 0.210 0.000 0.455 0.000
G5 None 0 20.0 0.0 0.0 60 130 0.00 0.00 20.00 0.000 0.000 0.000 0.000

Team Members

5/14/2020 8:15:14 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Mezzanine Cont.
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.304
Sanjiv R H-K Scale
DISTRIBUTED LOAD
LIVE DEAD
LOAD LOAD
TRIBUTARY TRIBUTARY LIVE DEAD
AREA AREA OF
BEAM SHAPE AREA CANTILEVER L1 L2 L3 LOAD LOAD Tw D1 D2 Wmax W2 Wmax W2
SF SF FT FT FT PSF PSF FT FT FT K/FT K/FT K/FT K/FT
B1 Trapezoid 61 0 15.0 14.0 0.0 60 130 7.00 7.00 8.00 0.420 0.000 0.910 0.000
B2 Trapezoid 56 0 15.0 14.0 0.0 60 130 7.00 7.00 8.00 0.420 0.000 0.910 0.000
B3 Triangle 42 0 13.0 14.0 0.0 60 130 6.50 0.00 13.00 0.390 0.000 0.845 0.000
B4 Trapezoid 69 0 16.0 14.0 0.0 60 130 7.00 7.00 9.00 0.420 0.000 0.910 0.000
B5 Triangle 52 0 14.0 15.0 0.0 60 130 7.00 0.00 14.00 0.420 0.000 0.910 0.000
B6 Triangle+Triangle 104 0 14.0 15.0 15.0 60 130 14.00 0.00 14.00 0.840 0.000 1.820 0.000
B7 Triangle+Trapezoid 109 0 14.0 15.0 13.0 60 130 13.50 6.50 7.50 0.810 0.780 1.755 1.690
B8 Triangle+Trapezoid 109 0 14.0 13.0 16.0 60 130 13.50 6.50 7.50 0.810 0.780 1.755 1.690
B9 Triangle 55 0 14.0 16.0 0.0 60 130 7.00 0.00 14.00 0.420 0.000 0.910 0.000
B10 Triangle+Trapezoid 119 0 15.0 14.0 16.5 60 130 14.50 7.00 8.00 0.870 0.840 1.885 1.820
B11 Triangle+Cantilever 120 64 15.0 14.0 16.5 60 130 7.50 0.00 15.00 0.706 0.256 1.530 0.555
B12 Triangle+Cantilever 96 53 13.0 14.0 16.5 60 130 6.50 0.00 13.00 0.635 0.245 1.375 0.530
B13 Triangle+Trapezoid 138 0 16.0 14.0 16.5 60 130 15.00 7.00 9.00 0.900 0.840 1.950 1.820
B14 Trapezoid 71 0 16.5 15.0 0.0 60 130 7.50 7.50 9.00 0.450 0.000 0.975 0.000
B15 Trapezoid+Cantilever 145 81 16.5 15.0 15.0 60 130 7.50 0.00 16.50 0.745 0.295 1.613 0.638
B16 Trapezoid+Cantilever 131 59 16.5 13.0 16.0 60 130 6.50 0.00 16.50 0.605 0.215 1.310 0.465
B17 Trapezoid 72 0 16.5 16.0 0.0 60 130 8.00 8.00 8.50 0.480 0.000 1.040 0.000
B18 Triangle+Triangle 123 0 15.0 16.5 16.5 60 130 15.00 0.00 15.00 0.900 0.000 1.950 0.000
B19 Triangle 69 0 16.0 16.5 16.5 60 130 8.00 0.00 16.00 0.480 0.000 1.040 0.000
B20 Trapezoid 71 0 16.5 15.0 0.0 60 130 7.50 7.50 9.00 0.450 0.000 0.975 0.000
B21 Trapezoid+Cantilever 145 81 16.5 15.0 15.0 60 130 7.50 0.00 16.50 0.745 0.295 1.613 0.638
B22 Cantilever 62 62 16.5 13.0 16.0 60 130 0.00 0.00 16.50 0.225 0.000 0.488 0.000
B23 Triangle+Triangle 123 0 15.0 16.5 20.0 60 130 15.00 0.00 15.00 0.900 0.000 1.950 0.000
B24 Triangle+Cantilever 120 64 15.0 16.5 20.0 60 130 7.50 0.00 15.00 0.706 0.256 1.530 0.555
B25 Triangle+Cantilever 103 58 13.0 16.5 20.0 60 130 6.50 0.00 13.00 0.658 0.268 1.425 0.580
B26 Triangle 69 0 16.0 16.5 20.0 60 130 8.00 0.00 16.00 0.480 0.000 1.040 0.000
B27 Trapezoid 95 0 20.0 15.0 0.0 60 130 7.50 7.50 12.50 0.450 0.000 0.975 0.000
B28 Trapezoid+Trapezoid 189 0 20.0 15.0 15.0 60 130 15.00 7.50 12.50 0.900 0.000 1.950 0.000
B29 Trapezoid+Trapezoid 182 0 20.0 15.0 13.0 60 130 14.00 7.50 12.50 0.840 0.000 1.820 0.000
B30 Trapezoid+Trapezoid 196 0 20.0 13.0 16.0 60 130 14.50 6.50 13.50 0.870 0.000 1.885 0.000

Team Members

5/14/2020 8:15:14 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Levels 2, 3, 4
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.305
Sanjiv R H-K Scale
DISTRIBUTED LOAD POINT LOAD
LIVE DEAD
LIVE DEAD
LOAD LOAD LOAD LOAD
TRIBUTARY TRIBUTARY LIVE DEAD
AREA AREA OF
BEAM SHAPE AREA CANTILEVER L1 L2 L3 LOAD LOAD Tw D1 D2 Wmax W2 Wmax W2 P P
SF SF FT FT FT PSF PSF FT FT FT K/FT K/FT K/FT K/FT K K
B31 Trapezoid 108 0 20.0 16.0 0.0 60 130 8.00 8.00 12.00 0.480 0.000 1.040 0.000 0.000 0.000
B32 Triangle+Triangle 123 0 15.0 20.0 20.0 60 130 15.00 0.00 15.00 0.900 0.000 1.950 0.000 0.000 0.000
B33 Triangle+Triangle 113 0 15.0 20.0 20.0 60 130 15.00 0.00 15.00 0.900 0.000 1.950 0.000 0.000 0.000
B34 Triangle+Triangle 88 0 13.0 20.0 20.0 60 130 13.00 0.00 13.00 0.780 0.000 1.690 0.000 0.000 0.000
B35 Triangle 69 0 16.0 20.0 20.0 60 130 8.00 0.00 16.00 0.480 0.000 1.040 0.000 0.000 0.000
B36 Trapezoid 100 0 20.0 15.0 0.0 60 130 7.50 7.50 12.50 0.450 0.000 0.975 0.000 0.000 0.000
B37 Trapezoid+Trapezoid 199 0 20.0 15.0 15.0 60 130 15.00 7.50 12.50 0.900 0.000 1.950 0.000 0.000 0.000
B38 Trapezoid+Trapezoid 193 0 20.0 15.0 13.0 60 130 14.00 7.50 12.50 0.840 0.000 1.820 0.000 0.000 0.000
B39 Trapezoid 94 0 20.0 13.0 16.0 60 130 6.50 6.50 13.50 0.390 0.000 0.845 0.000 0.000 0.000
B40 Triangle 61 0 15.0 20.0 0.0 60 130 7.50 0.00 15.00 0.450 0.000 0.975 0.000 0.000 0.000
B41 Triangle 56 0 15.0 20.0 0.0 60 130 7.50 0.00 15.00 0.450 0.000 0.975 0.000 0.000 0.000
B42 Triangle 46 0 13.0 20.0 0.0 60 130 6.50 0.00 13.00 0.390 0.000 0.845 0.000 0.000 0.000

Team Members

5/14/2020 8:15:14 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Levels 2, 3, 4 Cont.
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.306
Sanjiv R H-K Scale
DISTRIBUTED LOAD
LIVE DEAD
LOAD LOAD
TRIBUTARY TRIBUTARY LIVE DEAD
AREA
BEAM SHAPE AREA L1 L2 L3 LOAD LOAD Tw D1 D2 Wmax W2 Wmax W2
SF FT FT FT PSF PSF FT FT FT K/FT K/FT K/FT K/FT
B43 Trapezoid 61 15.0 14.0 0.0 60 130 7.00 7.00 8.00 0.420 0.000 0.910 0.000
B44 Trapezoid 56 15.0 14.0 0.0 60 130 7.00 7.00 8.00 0.420 0.000 0.910 0.000
B45 Triangle 42 13.0 14.0 0.0 60 130 6.50 0.00 13.00 0.390 0.000 0.845 0.000
B46 Trapezoid 69 16.0 14.0 0.0 60 130 7.00 7.00 9.00 0.420 0.000 0.910 0.000
B47 Triangle 55 14.0 15.0 0.0 60 130 7.00 0.00 14.00 0.420 0.000 0.910 0.000
B48 Triangle+Triangle 110 14.0 15.0 15.0 60 130 14.00 0.00 14.00 0.840 0.000 1.820 0.000
B49 Triangle+Trapezoid 109 14.0 15.0 13.0 60 130 13.50 6.50 7.50 0.810 0.780 1.755 1.690
B50 Triangle+Trapezoid 109 14.0 13.0 16.0 60 130 13.50 6.50 7.50 0.810 0.780 1.755 1.690
B51 Triangle 55 14.0 16.0 0.0 60 130 7.00 0.00 14.00 0.420 0.000 0.910 0.000
B52 Triangle+Trapezoid 119 15.0 14.0 16.5 60 130 14.50 7.00 8.00 0.870 0.840 1.885 1.820
B53 Triangle+Trapezoid 112 15.0 14.0 16.5 60 130 14.50 7.00 8.00 0.870 0.840 1.885 1.820
B54 Triangle+Triangle 85 13.0 14.0 16.5 60 130 13.00 0.00 13.00 0.780 0.000 1.690 0.000
B55 Triangle+Trapezoid 138 16.0 14.0 16.5 60 130 15.00 7.00 9.00 0.900 0.840 1.950 1.820
B56 Trapezoid 71 16.5 15.0 0.0 60 130 7.50 7.50 9.00 0.450 0.000 0.975 0.000
B57 Trapezoid+Trapezoid 132 16.5 15.0 15.0 60 130 15.00 7.50 9.00 0.900 0.000 1.950 0.000
B58 Trapezoid+Trapezoid 133 16.5 15.0 13.0 60 130 14.00 7.50 9.00 0.840 0.000 1.820 0.000
B59 Trapezoid+Trapezoid 137 16.5 13.0 16.0 60 130 14.50 6.50 10.00 0.870 0.000 1.885 0.000
B60 Trapezoid 72 16.5 16.0 0.0 60 130 8.00 8.00 8.50 0.480 0.000 1.040 0.000
B61 Triangle+Triangle 123 15.0 16.5 16.5 60 130 15.00 0.00 15.00 0.900 0.000 1.950 0.000
B62 Triangle+Triangle 113 15.0 16.5 16.5 60 130 15.00 0.00 15.00 0.900 0.000 1.950 0.000
B63 Triangle+Triangle 85 13.0 16.5 16.5 60 130 13.00 0.00 13.00 0.780 0.000 1.690 0.000
B64 Triangle 67 16.0 16.5 16.5 60 130 8.00 0.00 16.00 0.480 0.000 1.040 0.000
B65 Trapezoid 71 16.5 15.0 0.0 60 130 7.50 7.50 9.00 0.450 0.000 0.975 0.000
B66 Trapezoid+Trapezoid 132 16.5 15.0 15.0 60 130 15.00 7.50 9.00 0.900 0.000 1.950 0.000
B67 Trapezoid+Trapezoid 133 16.5 15.0 13.0 60 130 14.00 7.50 9.00 0.840 0.000 1.820 0.000
B68 Trapezoid 70 16.5 13.0 16.0 60 130 6.50 6.50 10.00 0.390 0.000 0.845 0.000
B69 Triangle+Triangle 126 15.0 16.5 20.0 60 130 15.00 0.00 15.00 0.900 0.000 1.950 0.000
B70 Triangle+Triangle 113 15.0 16.5 20.0 60 130 15.00 0.00 15.00 0.900 0.000 1.950 0.000
B71 Triangle+Triangle 85 13.0 16.5 20.0 60 130 13.00 0.00 13.00 0.780 0.000 1.690 0.000
B72 Triangle 69 16.0 16.5 20.0 60 130 8.00 0.00 16.00 0.480 0.000 1.040 0.000

Team Members

5/14/2020 8:15:14 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Level 5
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.307
Sanjiv R H-K Scale
DISTRIBUTED LOAD
LIVE DEAD
LOAD LOAD
TRIBUTARY TRIBUTARY LIVE DEAD
AREA
BEAM SHAPE AREA L1 L2 L3 LOAD LOAD Tw D1 D2 Wmax W2 Wmax W2
SF FT FT FT PSF PSF FT FT FT K/FT K/FT K/FT K/FT
B73 Trapezoid 95 20.0 15.0 0.0 60 130 7.50 7.50 12.50 0.450 0.000 0.975 0.000
B74 Trapezoid+Trapezoid 189 20.0 15.0 15.0 60 130 15.00 7.50 12.50 0.900 0.000 1.950 0.000
B75 Trapezoid+Trapezoid 182 20.0 15.0 13.0 60 130 14.00 7.50 12.50 0.840 0.000 1.820 0.000
B76 Trapezoid+Trapezoid 189 20.0 13.0 16.0 60 130 14.50 6.50 13.50 0.870 0.000 1.885 0.000
B77 Trapezoid 101 20.0 16.0 0.0 60 130 8.00 8.00 12.00 0.480 0.000 1.040 0.000
B78 Triangle+Triangle 123 15.0 20.0 20.0 60 130 15.00 0.00 15.00 0.900 0.000 1.950 0.000
B79 Triangle+Triangle 113 15.0 20.0 20.0 60 130 15.00 0.00 15.00 0.900 0.000 1.950 0.000
B80 Triangle+Triangle 85 13.0 20.0 20.0 60 130 13.00 0.00 13.00 0.780 0.000 1.690 0.000
B81 Triangle+Triangle 139 16.0 20.0 20.0 60 130 16.00 0.00 16.00 0.960 0.000 2.080 0.000
B82 Trapezoid 100 20.0 15.0 0.0 60 130 7.50 7.50 12.50 0.450 0.000 0.975 0.000
B83 Trapezoid+Trapezoid 199 20.0 15.0 15.0 60 130 15.00 7.50 12.50 0.900 0.000 1.950 0.000
B84 Trapezoid+Trapezoid 191 20.0 15.0 13.0 60 130 14.00 7.50 12.50 0.840 0.000 1.820 0.000
B85 Trapezoid+Trapezoid 195 20.0 13.0 16.0 60 130 14.50 6.50 13.50 0.870 0.000 1.885 0.000
B86 Trapezoid 103 20.0 16.0 0.0 60 130 8.00 8.00 12.00 0.480 0.000 1.040 0.000
B87 Triangle 61 15.0 20.0 0.0 60 130 7.50 0.00 15.00 0.450 0.000 0.975 0.000
B88 Triangle 56 15.0 20.0 0.0 60 130 7.50 0.00 15.00 0.450 0.000 0.975 0.000
B89 Triangle 42 13.0 20.0 0.0 60 130 6.50 0.00 13.00 0.390 0.000 0.845 0.000
B90 Triangle 69 16.0 20.0 0.0 60 130 8.00 0.00 16.00 0.480 0.000 1.040 0.000

Team Members

5/14/2020 8:15:14 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Level 5 Cont.
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.308
Sanjiv R H-K Scale
DISTRIBUTED LOAD
LIVE DEAD SNOW
LOAD LOAD LOAD
TRIBUTARY TRIBUTARY LIVE DEAD SNOW
AREA
BEAM SHAPE AREA L1 L2 L3 LOAD LOAD LOAD Tw D1 D2 Wmax W2 Wmax W2 Wmax W2
SF FT FT FT PSF PSF PSF FT FT FT K/FT K/FT K/FT K/FT K/FT K/FT
B91 Trapezoid 61 15.0 14.0 0.0 20 140 30 7.00 7.00 8.00 0.140 0.000 0.980 0.000 0.210 0.000
B92 Trapezoid 56 15.0 14.0 0.0 20 140 30 7.00 7.00 8.00 0.140 0.000 0.980 0.000 0.210 0.000
B93 Triangle 42 13.0 14.0 0.0 20 140 30 6.50 0.00 13.00 0.130 0.000 0.910 0.000 0.195 0.000
B94 Trapezoid 69 16.0 14.0 0.0 20 140 30 7.00 7.00 9.00 0.140 0.000 0.980 0.000 0.210 0.000
B95 Triangle 55 14.0 15.0 0.0 20 140 30 7.00 0.00 14.00 0.140 0.000 0.980 0.000 0.210 0.000
B96 Triangle+Triangle 110 14.0 15.0 15.0 20 140 30 14.00 0.00 14.00 0.280 0.000 1.960 0.000 0.420 0.000
B97 Triangle+Trapezoid 109 14.0 15.0 13.0 20 140 30 13.50 6.50 7.50 0.270 0.260 1.890 1.820 0.405 0.390
B98 Triangle+Trapezoid 109 14.0 13.0 16.0 20 140 30 13.50 6.50 7.50 0.270 0.260 1.890 1.820 0.405 0.390
B99 Triangle 55 14.0 16.0 0.0 20 140 30 7.00 0.00 14.00 0.140 0.000 0.980 0.000 0.210 0.000
B100 Triangle+Trapezoid 119 15.0 14.0 16.5 20 140 30 14.50 7.00 8.00 0.290 0.280 2.030 1.960 0.435 0.420
B101 Triangle+Trapezoid 112 15.0 14.0 16.5 20 140 30 14.50 7.00 8.00 0.290 0.280 2.030 1.960 0.435 0.420
B102 Triangle+Triangle 85 13.0 14.0 16.5 20 140 30 13.00 0.00 13.00 0.260 0.000 1.820 0.000 0.390 0.000
B103 Triangle+Trapezoid 138 16.0 14.0 16.5 20 140 30 15.00 7.00 9.00 0.300 0.280 2.100 1.960 0.450 0.420
B104 Trapezoid 71 16.5 15.0 0.0 20 140 30 7.50 7.50 9.00 0.150 0.000 1.050 0.000 0.225 0.000
B105 Trapezoid+Trapezoid 132 16.5 15.0 15.0 20 140 30 15.00 7.50 9.00 0.300 0.000 2.100 0.000 0.450 0.000
B106 Trapezoid+Trapezoid 133 16.5 15.0 13.0 20 140 30 14.00 7.50 9.00 0.280 0.000 1.960 0.000 0.420 0.000
B107 Triangle+Trapezoid 137 16.5 13.0 16.0 20 140 30 14.75 6.50 10.00 0.295 0.260 2.065 1.820 0.443 0.390
B108 Triangle 72 16.5 16.0 0.0 20 140 30 8.25 0.00 16.50 0.165 0.000 1.155 0.000 0.248 0.000
B109 Triangle+Triangle 123 15.0 16.5 16.5 20 140 30 15.00 0.00 15.00 0.300 0.000 2.100 0.000 0.450 0.000
B110 Triangle+Triangle 113 15.0 16.5 16.5 20 140 30 15.00 0.00 15.00 0.300 0.000 2.100 0.000 0.450 0.000
B111 Triangle+Triangle 85 13.0 16.5 16.5 20 140 30 13.00 0.00 13.00 0.260 0.000 1.820 0.000 0.390 0.000
B112 Triangle 67 16.0 16.5 16.5 20 140 30 8.00 0.00 16.00 0.160 0.000 1.120 0.000 0.240 0.000
B113 Trapezoid 71 16.5 15.0 0.0 20 140 30 7.50 7.50 9.00 0.150 0.000 1.050 0.000 0.225 0.000
B114 Trapezoid+Trapezoid 132 16.5 15.0 15.0 20 140 30 15.00 7.50 9.00 0.300 0.000 2.100 0.000 0.450 0.000
B115 Trapezoid+Trapezoid 133 16.5 15.0 13.0 20 140 30 14.00 7.50 9.00 0.280 0.000 1.960 0.000 0.420 0.000
B116 Trapezoid 70 16.5 13.0 16.0 20 140 30 6.50 6.50 10.00 0.130 0.000 0.910 0.000 0.195 0.000
B117 Triangle+Triangle 126 15.0 16.5 20.0 20 140 30 15.00 0.00 15.00 0.300 0.000 2.100 0.000 0.450 0.000
B118 Triangle+Triangle 113 15.0 16.5 20.0 20 140 30 15.00 0.00 15.00 0.300 0.000 2.100 0.000 0.450 0.000
B119 Triangle+Triangle 85 13.0 16.5 20.0 20 140 30 13.00 0.00 13.00 0.260 0.000 1.820 0.000 0.390 0.000
B120 Triangle 69 16.0 16.5 20.0 20 140 30 8.00 0.00 16.00 0.160 0.000 1.120 0.000 0.240 0.000

Team Members

5/14/2020 8:15:14 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Roof
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.309
Sanjiv R H-K Scale
DISTRIBUTED LOAD
LIVE DEAD SNOW
LOAD LOAD LOAD
TRIBUTARY TRIBUTARY LIVE DEAD SNOW
AREA
BEAM SHAPE AREA L1 L2 L3 LOAD LOAD LOAD Tw D1 D2 Wmax W2 Wmax W2 Wmax W2
SF FT FT FT PSF PSF PSF FT FT FT K/FT K/FT K/FT K/FT K/FT K/FT
B121 Trapezoid 95 20.0 15.0 0.0 20 140 30 7.50 7.50 12.50 0.150 0.000 1.050 0.000 0.225 0.000
B122 Trapezoid+Trapezoid 189 20.0 15.0 15.0 20 140 30 15.00 7.50 12.50 0.300 0.000 2.100 0.000 0.450 0.000
B123 Trapezoid+Trapezoid 182 20.0 15.0 13.0 20 140 30 14.00 7.50 12.50 0.280 0.000 1.960 0.000 0.420 0.000
B124 Trapezoid+Trapezoid 189 20.0 13.0 16.0 20 140 30 14.50 6.50 13.50 0.290 0.000 2.030 0.000 0.435 0.000
B125 Trapezoid 101 20.0 16.0 0.0 20 140 30 8.00 8.00 12.00 0.160 0.000 1.120 0.000 0.240 0.000
B126 Triangle+Triangle 123 15.0 20.0 20.0 20 140 30 15.00 0.00 15.00 0.300 0.000 2.100 0.000 0.450 0.000
B127 Triangle+Triangle 113 15.0 20.0 20.0 20 140 30 15.00 0.00 15.00 0.300 0.000 2.100 0.000 0.450 0.000
B128 Triangle+Triangle 85 13.0 20.0 20.0 20 140 30 13.00 0.00 13.00 0.260 0.000 1.820 0.000 0.390 0.000
B129 Triangle+Triangle 139 16.0 20.0 20.0 20 140 30 16.00 0.00 16.00 0.320 0.000 2.240 0.000 0.480 0.000
B130 Trapezoid 100 20.0 15.0 0.0 20 140 30 7.50 7.50 12.50 0.150 0.000 1.050 0.000 0.225 0.000
B131 Trapezoid+Trapezoid 199 20.0 15.0 15.0 20 140 30 15.00 7.50 12.50 0.300 0.000 2.100 0.000 0.450 0.000
B132 Trapezoid+Trapezoid 191 20.0 15.0 13.0 20 140 30 14.00 7.50 12.50 0.280 0.000 1.960 0.000 0.420 0.000
B133 Trapezoid+Trapezoid 195 20.0 13.0 16.0 20 140 30 14.50 6.50 13.50 0.290 0.000 2.030 0.000 0.435 0.000
B134 Trapezoid 103 20.0 16.0 0.0 20 140 30 8.00 8.00 12.00 0.160 0.000 1.120 0.000 0.240 0.000
B135 Triangle 100 15.0 20.0 0.0 20 140 30 7.50 0.00 15.00 0.150 0.000 1.050 0.000 0.225 0.000
B136 Triangle 56 15.0 20.0 0.0 20 140 30 7.50 0.00 15.00 0.150 0.000 1.050 0.000 0.225 0.000
B137 Triangle 42 13.0 20.0 0.0 20 140 30 6.50 0.00 13.00 0.130 0.000 0.910 0.000 0.195 0.000
B138 Triangle 69 16.0 20.0 0.0 20 140 30 8.00 0.00 16.00 0.160 0.000 1.120 0.000 0.240 0.000

Team Members

5/14/2020 8:15:14 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Roof Cont.
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.310
Sanjiv R H-K Scale
A B C D E 1 2 3 4 5 6

0.980 k/ft 0.980 k/ft 0.910 k/ft 0.980 k/ft 0.980 k/ft 1.050 k/ft 1.050 k/ft 1.050 k/ft 1.050 k/ft
0.210 k/ft
B91 0.210 k/ft
B92 0.195 k/ft
B93 0.210 k/ft
B94 0.210 k/ft
B95 0.225 k/ft
B104 0.225 k/ft
B113 0.225 k/ft
B121 0.225 k/ft
B130 Roof
72' - 0"

0.120 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft
0.120 k/ft
0.120 k/ft

0.120 k/ft
1.030 k/ft 1.030 k/ft 0.965 k/ft 1.030 k/ft 1.030 k/ft 1.095 k/ft 1.095 k/ft 1.095 k/ft 1.095 k/ft
0.420 k/ft 0.420 k/ft 0.390 k/ft 0.420 k/ft 0.420 k/ft 0.450 k/ft 0.450 k/ft 0.450 k/ft 0.450 k/ft
B43 B44 B45 B46 B47 B56 B65 B73 B82 Level 5
60' - 0"

0.120 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft
0.120 k/ft
0.120 k/ft

0.120 k/ft

1.030 k/ft 1.030 k/ft 0.965 k/ft 1.030 k/ft 1.030 k/ft 1.095 k/ft 1.095 k/ft 1.095 k/ft 1.095 k/ft
0.420 k/ft 0.420 k/ft 0.390 k/ft 0.420 k/ft 0.420 k/ft 0.450 k/ft 0.450 k/ft 0.450 k/ft 0.450 k/ft
Level 4
B1 B2 B3 B4 B5 B14 B20 B27 B36 48' - 0"

0.120 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft
0.120 k/ft

0.120 k/ft

0.120 k/ft

1.030 k/ft 1.030 k/ft 0.965 k/ft 1.030 k/ft 1.030 k/ft 1.095 k/ft 1.095 k/ft 1.095 k/ft 1.095 k/ft
0.420 k/ft 0.420 k/ft 0.390 k/ft 0.420 k/ft 0.420 k/ft 0.450 k/ft 0.450 k/ft 0.450 k/ft 0.450 k/ft
Level 3
B1 B2 B3 B4 B5 B14 B20 B27 B36 36' - 0"

0.120 k/ft
0.120 k/ft
0.120 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft
0.120 k/ft

0.120 k/ft

1.030 k/ft 1.030 k/ft 0.965 k/ft 1.030 k/ft 1.030 k/ft 1.095 k/ft 1.095 k/ft 1.095 k/ft 1.095 k/ft
0.420 k/ft 0.420 k/ft 0.390 k/ft 0.420 k/ft 0.420 k/ft 0.450 k/ft 0.450 k/ft 0.450 k/ft 0.450 k/ft
B1 B2 B3 B4 B5 B14 B20 B27 B36 Level 2
24' - 0"

0.120 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft
1.095 k/ft 1.095 k/ft 1.095 k/ft
0.450 k/ft 0.450 k/ft 0.450 k/ft
B139 B140 B141 B142 B143 B152 B158 B165 B174 Mezzanine
12' - 0"

GB5 GB14 GB23 GB32 GB41 Level 1


0' - 0"

Grid Line A Grid Line 1


2 1
3/32" = 1'-0" 3/32" = 1'-0"

Team Members

5/14/2020 8:15:16 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Grid Line 1 & Grid
Line number
A
Project Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.311
Sanjiv R H-K Scale 3/32" = 1'-0"
A B C D E 1 2 3 4 5 6
2.030 k/ft 2.030 k/ft 2.140 k/ft 1.960 k/ft 2.100 k/ft 2.100 k/ft 2.100 k/ft 2.100 k/ft
1.820 k/ft

0.435 k/ft 0.435 k/ft 0.390 k/ft 0.450 k/ft 0.420 k/ft 0.450 k/ft 0.450 k/ft 0.450 k/ft 0.450 k/ft
B100 B101 B102 B103 B96 B105 B114 B122 B131 Roof
72' - 0"

1.885 k/ft 1.885 k/ft 1.950 k/ft 1.820 k/ft 1.950 k/ft 1.950 k/ft 1.950 k/ft 1.950 k/ft
1.690 k/ft
0.870 k/ft 0.870 k/ft 0.780 k/ft 0.900 k/ft 0.840 k/ft 0.900 k/ft 0.900 k/ft 0.900 k/ft 0.900 k/ft

B52 B53 B54 B55 B48 B57 B66 B74 B83 Level 5
60' - 0"

0.638 k/ft

0.638 k/ft

0.638 k/ft
0.555 k/ft

0.555 k/ft
1.885 k/ft 1.950 k/ft 1.820 k/ft 1.950 k/ft 1.950 k/ft
1.530 k/ft 1.375 k/ft 1.613 k/ft 1.613 k/ft
0.870 k/ft 0.706 k/ft 0.900 k/ft 0.840 k/ft 0.745 k/ft 0.745 k/ft 0.900 k/ft 0.900 k/ft
0.635 k/ft
Level 4
B10 B11 0.530 k/ft B12 B13 B6 B15 B21 B28 B37 48' - 0"

0.530 k/ft

0.638 k/ft

0.638 k/ft

0.638 k/ft
0.555 k/ft

0.555 k/ft

1.885 k/ft 1.950 k/ft 1.820 k/ft 1.950 k/ft 1.950 k/ft
1.530 k/ft 1.375 k/ft 1.613 k/ft 1.613 k/ft
0.870 k/ft 0.706 k/ft 0.900 k/ft 0.840 k/ft 0.745 k/ft 0.745 k/ft 0.900 k/ft 0.900 k/ft
0.635 k/ft
Level 3
B10 B11 B12 B13 B6 B15 B21 B28 B37 36' - 0"
0.530 k/ft

0.530 k/ft

0.638 k/ft

0.638 k/ft

0.638 k/ft
0.555 k/ft

0.555 k/ft

1.885 k/ft 1.950 k/ft 1.820 k/ft 1.950 k/ft 1.950 k/ft
1.530 k/ft 1.375 k/ft 1.613 k/ft 1.613 k/ft
0.870 k/ft 0.706 k/ft 0.900 k/ft 0.840 k/ft 0.745 k/ft 0.745 k/ft 0.900 k/ft 0.900 k/ft
0.635 k/ft
B10 B11 B12 B13 B6 B15 B21 B28 B37 Level 2
24' - 0"
0.530 k/ft

0.530 k/ft

0.638 k/ft

0.638 k/ft
0.695 k/ft 1.950 k/ft
1.613 k/ft
0.681 k/ft 1.079 k/ft 0.900 k/ft
0.455 k/ft 0.849 k/ft 0.455 k/ft 0.745 k/ft
0.392 k/ft 0.436 k/ft 0.662 k/ft 0.498 k/ft
0.210
B148 k/ft 0.210
B151 k/ft B144 0.305
B153 k/ft B166 Mezzanine
12' - 0"

0.104 k/ft

0.104 k/ft
0.450 k/ft

GB10 GB11 GB12 GB13 GB6 GB15 GB24 GB33 GB42 Level 1
0' - 0"

Grid Line B Grid Line 2


2 1
3/32" = 1'-0" 3/32" = 1'-0"

Team Members

5/14/2020 8:15:18 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Grid Line 2 & Grid
Line number
B
Project Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.312
Sanjiv R H-K Scale 3/32" = 1'-0"
A B C D E 1 2 3 4 5 6
2.100 k/ft 2.100 k/ft 1.820 k/ft 1.960 k/ft 1.960 k/ft 1.960 k/ft 1.960 k/ft
1.120 k/ft 0.980 k/ft
0.450 k/ft 0.450 k/ft 0.390 k/ft 0.420 k/ft 0.420 k/ft 0.420 k/ft 0.420 k/ft
B109 B110 B111 0.240 k/ft
B112 0.210 k/ft
B97 B106 B115 B123 B132 Roof
72' - 0"

1.950 k/ft 1.950 k/ft 1.690 k/ft 1.755 k/ft 1.820 k/ft 1.820 k/ft 1.820 k/ft 1.820 k/ft
0.900 k/ft 0.900 k/ft 1.040 k/ft 0.810 k/ft 0.840 k/ft 0.840 k/ft 0.840 k/ft 0.840 k/ft
0.780 k/ft
0.480 k/ft
B61 B62 B63 B64 B49 B58 B67 B75 B84 Level 5
60' - 0"

1.950 k/ft 1.755 k/ft 1.820 k/ft 1.820 k/ft


0.900 k/ft 1.040 k/ft 0.810 k/ft 0.840 k/ft 0.840 k/ft
0.480 k/ft
Level 4
B18 B19 B7 B29 B38 48' - 0"

1.950 k/ft 1.755 k/ft 1.820 k/ft 1.820 k/ft


0.900 k/ft 1.040 k/ft 0.810 k/ft 0.840 k/ft 0.840 k/ft
0.480 k/ft
Level 3
B18 B19 B7 B29 B38 36' - 0"

1.950 k/ft 1.755 k/ft 1.820 k/ft 1.820 k/ft


0.900 k/ft 1.040 k/ft 0.810 k/ft 0.840 k/ft 0.840 k/ft
0.480 k/ft
B18 B19 B7 B29 B38 Level 2
24' - 0"

1.820 k/ft
0.975 k/ft 0.975 k/ft 0.840 k/ft
0.450 k/ft 0.450 k/ft
B156 B157 B145 B167 Mezzanine
12' - 0"

GB19 GB20 GB21 GB22 GB7 GB16 GB25 GB34 GB43 Level 1
0' - 0"

Grid Line C Grid Line 3


2 1
3/32" = 1'-0" 3/32" = 1'-0"
Team Members

5/14/2020 8:15:20 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Grid Line 3 & Grid
Line number
C
Project Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.313
Sanjiv R H-K Scale 3/32" = 1'-0"
A B C D E 1 2 3 4 5 6
2.100 k/ft 2.100 k/ft 1.820 k/ft 1.890 k/ft 2.065 k/ft 2.030 k/ft 2.030 k/ft
1.120 k/ft 0.910 k/ft
0.450 k/ft 0.450 k/ft 0.390 k/ft 0.405 k/ft 0.443 k/ft 0.435 k/ft 0.435 k/ft
B117 B118 B119 0.240 k/ft
B120 B98 B107 0.195 k/ft
B116 B124 B133 Roof
72' - 0"

1.950 k/ft 1.950 k/ft 1.690 k/ft 1.755 k/ft 1.885 k/ft 1.885 k/ft 1.885 k/ft

0.900 k/ft 0.900 k/ft 1.040 k/ft 0.810 k/ft 0.870 k/ft 0.845 k/ft 0.870 k/ft 0.870 k/ft
0.780 k/ft
0.480 k/ft 0.390 k/ft
B69 B70 B71 B72 B50 B59 B68 B76 B85 Level 5
60' - 0"

0.580 k/ft
0.555 k/ft

0.580 k/ft

0.465 k/ft

0.465 k/ft
1.950 k/ft 1.755 k/ft 1.885 k/ft

0.120 k/ft

0.120 k/ft
1.530 k/ft 1.425 k/ft

0.555
1.310 k/ft
0.900 k/ft 1.040 k/ft 0.810 k/ft 0.870 k/ft 0.965 k/ft
0.706 k/ft 0.658 k/ft 0.480 k/ft 0.605 k/ft 0.488 k/ft 0.390 k/ft
0.225 k/ft Level 4
B23 B24 B25 B26 B8 B16 B22 B30 B39 48' - 0"

0.580 k/ft
0.555 k/ft

0.580 k/ft

0.465 k/ft

0.465 k/ft
1.950 k/ft 1.755 k/ft 1.885 k/ft

0.120 k/ft

0.120 k/ft
1.530 k/ft 1.425 k/ft
0.555

1.310 k/ft
0.900 k/ft 1.040 k/ft 0.810 k/ft 0.870 k/ft 0.965 k/ft
0.706 k/ft 0.658 k/ft 0.480 k/ft 0.605 k/ft 0.488 k/ft 0.390 k/ft
0.225 k/ft Level 3
B23 B24 B25 0.580 k/ft B26 B8 B16 B22 B30 B39 36' - 0"
0.555 k/ft

0.580 k/ft

0.465 k/ft

0.465 k/ft
1.950 k/ft 1.755 k/ft 1.885 k/ft

0.120 k/ft

0.120 k/ft
1.530 k/ft 1.425 k/ft
0.555

1.310 k/ft
0.900 k/ft 1.040 k/ft 0.810 k/ft 0.870 k/ft 0.965 k/ft
0.706 k/ft 0.658 k/ft 0.480 k/ft 0.605 k/ft 0.488 k/ft 0.390 k/ft
B23 B24 B25 B26 B8 B16 0.225
B22k/ft B30 B39 Level 2
24' - 0"
0.580 k/ft

0.580 k/ft

1.950 k/ft 1.885 k/ft

0.120 k/ft

0.120 k/ft
1.425 k/ft
0.900 k/ft 0.849 k/ft 1.040 k/ft 0.870 k/ft 0.965 k/ft
0.392 k/ft 0.658 k/ft 0.480 k/ft 0.504 k/ft 0.488 k/ft 0.390 k/ft
B162 B164 B146 0.233
B154 k/ft 0.225
B160 k/ft Mezzanine
12' - 0"

GB28 GB29 GB30 GB31 GB8 GB17 GB26 GB35 GB44 Level 1
0' - 0"

Grid Line D Grid Line 4


2 1
3/32" = 1'-0" 3/32" = 1'-0"
Team Members

5/14/2020 8:15:22 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Grid Line 4 & Grid
Line number
D
Project Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.314
Sanjiv R H-K Scale 3/32" = 1'-0"
A B C D E 1 2 3 4 5 6
2.100 k/ft 2.100 k/ft 2.240 k/ft
1.820 k/ft
0.980 k/ft 1.120 k/ft 1.240 k/ft 1.240 k/ft
0.450 k/ft 0.450 k/ft 0.390 k/ft 0.480 k/ft
B126 B127 B128 B129 0.210 k/ft
B99 0.240 k/ft
B108 0.240 k/ft
B125 0.240 k/ft
B134 Roof
72' - 0"

1.950 k/ft 1.950 k/ft 2.080 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft
1.690 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft
0.960 k/ft 1.030 k/ft 1.160 k/ft 1.160 k/ft 1.160 k/ft
0.900 k/ft 0.900 k/ft 0.780 k/ft
0.420 k/ft 0.480 k/ft 0.480 k/ft 0.480 k/ft
B78 B79 B80 B81 B51 B60 B77 B86 Level 5
60' - 0"

1.950 k/ft 1.950 k/ft 1.690 k/ft

0.120 k/ft

0.120 k/ft
0.120 k/ft
0.120 k/ft

0.120 k/ft
1.040 k/ft 1.030 k/ft 1.160 k/ft 1.160 k/ft
0.900 k/ft 0.900 k/ft 0.780 k/ft
0.480 k/ft 0.420 k/ft 0.480 k/ft 0.480 k/ft
Level 4
B32 B33 B34 B35 B9 B17 B31 48' - 0"

1.950 k/ft 1.950 k/ft

0.120 k/ft

0.120 k/ft
1.690 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft
1.040 k/ft 1.030 k/ft 1.160 k/ft 1.160 k/ft
0.900 k/ft 0.900 k/ft 0.780 k/ft
0.480 k/ft 0.420 k/ft 0.480 k/ft 0.480 k/ft
Level 3
B32 B33 B34 B35 B9 B17 B31 36' - 0"

1.950 k/ft 1.950 k/ft

0.120 k/ft

0.120 k/ft
1.690 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft
1.040 k/ft 1.030 k/ft 1.160 k/ft 1.160 k/ft
0.900 k/ft 0.900 k/ft 0.780 k/ft
0.480 k/ft 0.420 k/ft 0.480 k/ft 0.480 k/ft
B32 B33 B34 B35 B9 B17 B31 Level 2
24' - 0"

1.950 k/ft 1.690 k/ft

0.120 k/ft

0.120 k/ft
1.001 k/ft 1.040 k/ft 1.160 k/ft
0.900 k/ft 0.780 k/ft
0.462 k/ft 0.480 k/ft 0.480 k/ft
B171 B173 B147 B155 B169 Mezzanine
12' - 0"

GB37 GB38 GB39 GB40 GB9 GB18 GB27 GB36 GB45 Level 1
0' - 0"

Grid Line E Grid Line 5


2 1
3/32" = 1'-0" 3/32" = 1'-0"

Team Members

5/14/2020 8:15:24 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Grid Line 5 & Grid
Line number
E
Project Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.315
Sanjiv R H-K Scale 3/32" = 1'-0"
A B C D E

1.050 k/ft 1.050 k/ft 0.910 k/ft 1.120 k/ft


0.225 k/ft
B135 0.225 k/ft
B136 0.195 k/ft
B137 0.240 k/ft
B138 Roof
72' - 0"

0.120 k/ft
0.120 k/ft

0.120 k/ft

0.120 k/ft

0.120 k/ft
1.095 k/ft 1.095 k/ft 0.965 k/ft 1.160 k/ft
0.450 k/ft 0.450 k/ft 0.390 k/ft 0.480 k/ft
B87 B88 B89 B90 Level 5
60' - 0"

0.120 k/ft
0.120 k/ft

0.120 k/ft

0.120 k/ft
1.095 k/ft 1.095 k/ft 0.965 k/ft
0.450 k/ft 0.450 k/ft 0.390 k/ft
Level 4
B40 B41 B42 48' - 0"

0.120 k/ft
0.120 k/ft

0.120 k/ft

0.120 k/ft
1.095 k/ft 1.095 k/ft 0.965 k/ft
0.450 k/ft 0.450 k/ft 0.390 k/ft
Level 3
B40 B41 B42 36' - 0"

0.120 k/ft
0.120 k/ft

0.120 k/ft

0.120 k/ft
1.095 k/ft 1.095 k/ft 0.965 k/ft
0.450 k/ft 0.450 k/ft 0.390 k/ft
B40 B41 B42 Level 2
24' - 0"

0.120 k/ft
0.120 k/ft

0.120 k/ft

0.120 k/ft
1.095 k/ft 1.095 k/ft 0.965 k/ft
0.450 k/ft 0.450 k/ft 0.390 k/ft
B178 B179 B180 Mezzanine
12' - 0"

GB46 GB47 GB48 GB49 Level 1


0' - 0"

Grid Line F
1
3/32" = 1'-0"

Team Members

5/14/2020 8:15:25 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Grid Line F
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.316
Sanjiv R H-K Scale 3/32" = 1'-0"
Column F3 - Level 1
Load Combination Mux Muy Mu Pu
Knowns Assumptions 1.4DL -0.8967 k-ft 24.0930 k-ft 24.1097 k-ft -206.315 k
Sway Frame D = 16 in 1.2DL+1.6LL+0.5SL -1.1863 k-ft 31.7832 k-ft 31.8053 k-ft -241.268 k
r = 0.85 k = 1.0 1.2DL+1.6SL+1.0LL -1.0199 k-ft 27.6248 k-ft 27.6436 k-ft -222.173 k
Φ = 0.75 f'c = 5 ksi 1.2DL+1.6SL+0.5W 23.3835 k-ft 20.6209 k-ft 31.1771 k-ft -181.952 k
k = 1.0 fy = 60 ksi 1.2DL+1.0W+1.0LL+0.5SL 46.8884 k-ft 27.5104 k-ft 54.3631 k-ft -215.478 k
Lu = 12 ft 0.9DL+1.0W 46.9191 k-ft 15.3878 k-ft 49.3789 k-ft -130.264k
Cc = 1.5 in
Column F2 - Level 1
Calculations
klu/r = (1.0)(12 ft)/0.85 = 14.118 ft Load Combination Mux Muy Mu Pu
klu/r < 22 so slenderness can be ignored 1.4DL 1.3644 k-ft 20.1483 k-ft 20.1944 k-ft -236.596 k
1.2DL+1.6LL+0.5SL 1.7100 k-ft 26.6892 k-ft 26.7439 k-ft -276.036 k
ps,min = 0.45(AgAoh-1)(f'c/fy) = 0.45(201.06 in2/132.73 in2-1)(5 ksi/60 ksi) = 1.2DL+1.6SL+1.0LL 1.5378 k-ft 23.1612 k-ft 23.2122 k-ft -254.217 k
0.0193 1.2DL+1.6SL+0.5W 20.2551 k-ft 17.3136 k-ft 26.6464 k-ft -212.191 k
Ag = πD2/4 = (16 in)2/4 = 201.06 in2 1.2DL+1.0W+1.0LL+0.5SL 41.3432 k-ft 23.2342 k-ft 47.4246 k-ft -254.150 k
Aoh = πDc2/4 = (13 in)2/4 = 132.73 in2 0.9DL+1.0W 41.9301 k-ft 13.0291 k-ft 43.9078 k-ft -156.854 k
Dc = 16 in - 2(1.5 in) = 13 in
ps = VsVc = 4Asp/Dcs
s < 4Asp/psDc = 4(0.11 in2)/(0.0193)(13 in) = 1.75 in

276.036 k < (0.75)(0.85)[0.85(5 ksi)(201.06 in2-Ast)+(60 ksi)(Ast)]


γ = [D - 2Cc] / D = [(16 in) - 2 (1.5 in)] / (16 in) = 0.8125 → use γ = 0.75
For the case of maximum moment:
ΦPn/Ag = 215.478 k / 201.06 in2 = 1.1 ksi
ΦMn/Agh = 54.3631 k-ft / [(201.06 in2)(16 in)] = 0.2 ksi

11 1/4"
8 #5 Bars

16"
from interation diagram ρg = 0.01
For the case of maximum axial load: No. 3 Spiral @ 1.75"
ΦPn/Ag = 276.036 k / 201.06 in2 = 1.4 ksi
ΦMn/Agh = 26.7439 k-ft / [(201.06 in2)(16 in)] = 0.1 ksi
from interation diagram ρg = 0.01
As = ρg x Ag = 0.01 (201.06 in2) = 2.01in2 → use 8 #5
sc-c = 2πr / n = [2 π(16 in - 2(1.5 in))(0.5)] / 8 = 5.1 in
sclear = 5.1 in - 0.625 in = 4.48 in

1 1/2"
sclear > 1.5 dbar = 1.5 (0.625) = 0.9375 in

Team Members

5/14/2020 8:15:25 PM
Group 1 Grant Haralson
Ben Williams
Member Design - Typical Circular
Column
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.401
Sanjiv R H-K Scale 3" = 1'-0"
Load Combination Max Moment Max Shear
1.4DL -93.103 k-in 409.53 k
1.2DL+1.6LL+0.5SL -122.191 k-in 491.72 k
1.2DL+1.6SL+1.0LL -106.474 k-in 450.47 k
1.2DL+1.6SL+0.5W 709.692 k-in 365.73 k
1.2DL+1.0W+1.0LL+0.5SL 1439.291 k-in 441.45 k
Knowns 0.9DL+1.0W 1390.569 k-in 264.07 k
Sway Frame 20"

Lu = 12 ft
1 3/4" 15"
Assumptions
Preliminary size is 20” diameter based on SAP model

Calculations
Ic = 0.70Ig,c = 0.70bh3/12 = 0.70(20 in)(20 in)3/12 = 9333.33 in4
ΨA = ∑(Ic/Lc)/∑(Ib/Lb) = (9333.33 in4/144 in)/(2(8352 in4/180 in))
ΨA = 1.30
ΨB = ∑(Ic/Lc)/∑(Ib/Lb) = 2(9333.33 in4/144 in)/(2(8352 in4/180 in))
ΨB = 2.59
k = 1.35
klu/r = (1.35)(124 in))/(0.3*20 in) = 27.9 > 22 so slenderness cannot be ignored
Pc (axis B) = π20.4EI/(klu)2 = π20.4(4031 ksi)(13333.33 in4)/(1.35*144 in)2 = 5614 k 8 no. 7 Bars
∑Pc = 114280 k No. 3 Ties @ 14"
∑Pu (U = 1.2D + 1.6S + 0.5W) = 6350 k

20"
δs (U = 1.2D + 1.6S + 0.5W) = 1/(1 - ∑Pu/(0.75∑Pc) = 1/(1 - (6350 k)/(0.75*114280 k)) = 1.08
Mu (U = 1.2D + 1.6S + 0.5W) = Mns + δsMs = 2.249 + (1.08)(655.027) k-in = 709.692 k-in
From R-5-60-0.75, ρg = 0.01 for U = 1.2D + 1.0W + 1.0L + 0.5S,
Ast = ρgAg = (0.01)(20 in)2 = 4.0 in2 → use 8 No. 7 bars (Ast = 4.08 in2)
ρg = Ast/Ag = (4.08 in2)/(20 in)2 = 0.012, okay (> 0.01, < 0.08)
Use no. 3 tie
stie = min(16db, 48dt, h) = min(16(0.875 in), 48(0.375 in), 20 in) = 14 in
clear cover = (h - γh - db - 2dt)/2 = (20 - 0.75*20 - 0.875 - 2*0.375 in)/2 = 1.69 in > 1.5 in, good
sc1 = (h - 2*cover - 2dt - 3db)/2 = (20 - 2*1.69 - 2*0.375 - 2*0.875)/2 = 6.63 in > 6 in, need
additional ties
sc1 = 6.63 in > max(1 in, db = 0.875 in), spacing okay

Team Members

5/14/2020 8:15:25 PM
Group 1 Grant Haralson
Ben Williams
Member Design - Typical Rectangular
Column
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.402
Sanjiv R H-K Scale 3" = 1'-0"
Load Combination Max Moment Max Shear
1.4DL 169.66 k-in 109.00 k
1.2DL+1.6LL+0.5SL 220.77 k-in 103.53 k
1.2DL+1.6SL+1.0LL 190.84 k-in 103.05 k
Knowns 1.2DL+1.6SL+0.5W 1118.169 k-in 98.88 k
1.2DL+1.0W+1.0LL+0.5SL 2211.812 k-in 102.92 k
Sway Frame
0.9DL+1.0W 2142.226 k-in 72.76 k
Lu = 58 ft

Assumptions 18"

Preliminary size is 18” diameter based on SAP model


2 1/2" 10 3/4"
Assumed column has pinned bottom connection

Sample Calculations
Ic = 0.70Ig,c = 0.70πD4/64 = 0.70π(18 in)4/64 = 3607 in4
ΨA = 10 (pinned end)
ΨB = ∑(Ic/Lc)/∑(Ib/Lb) = ((3607 in4/720 in) + (19354 in4/144 in))/(8352 in4/192 in)
ΨB = 3.2
k = 2.3
klu/r = (2.3)(696 in))/(0.25*18 in) = 356 > 22 so slenderness cannot be ignored
Pc (axis B) = π20.4EI/(klu)2 = π20.4(4031 ksi)(27648 in4)/(1.6*144 in)2 = 8287 k
∑Pc = 208642 k 8 No. 9
∑Pu (U = 1.2D + 1.6S + 0.5W) = 6350 k No. 4 tie @ 1.5"
δs (U = 1.2D + 1.6S + 0.5W) = 1/(1 - ∑Pu/(0.75∑Pc) = 1/(1 - (6350 k)/(0.75*208642 k)) = 1.04
Mu (U = 1.2D + 1.6S + 0.5W) = Mns + δsMs = 58.38 + (1.04)(1016.78) k-in = 1118.169 k-in
From C-5-60-0.6, ρg = 0.03 for U = 1.2D + 1.0W + 1.0L + 0.5S,
Ast = ρgAg = (0.03)π(18 in)2/4 = 7.63 in2 → use 8 No. 9 bars (Ast = 8.00 in2)
Try no. 4 spiral at 1.5"
ρs = 4π(ds)2/(4*(Dc = γD +db + 2ds)s) = 4π(0.5 in)2/(4(0.6*18 + 1.128 + 2*0.5 in)(1.5 in)) = 0.041
ρs,min = 0.45((D/Dc)2 - 1)f'c/fy = 0.45((18/12.928)2 - 1)(5 ksi)/(60 ksi) = 0.035, okay
sc = s - ds = 1.5 - 0.5 in = 1.0 in, okay (>= 1 in, <= 3 in)

Team Members

5/14/2020 8:15:26 PM
Group 1 Grant Haralson
Ben Williams
Member Design - Corner Circular
Column
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.403
Sanjiv R H-K Scale 3" = 1'-0"
Knowns Load Combination Max Moment Max Shear
Sway Frame 1.4DL -58.696 k-in 194.36 k
Lu = 58 ft 1.2DL+1.6LL+0.5SL -86.510 k-in 197.18 k
1.2DL+1.6SL+1.0LL -70.815 k-in 194.92 k
1.2DL+1.6SL+0.5W 918.650 k-in 178.69 k
Assumptions 1.2DL+1.0W+1.0LL+0.5SL 1840.263 k-in 188.35 k
Preliminary size is 16” diameter based on SAP model 0.9DL+1.0W 1789.647 k-in 126.25 k

16"
Sample Calculations
2 1/8" 9 5/8"
Ic = 0.70Ig,c = 0.70πD4/64 = 0.70π(16 in)4/64 = 2252 in4
ΨA = ∑(Ic/Lc)/∑(Ib/Lb) = (2252 in4/720 in)/((8352 in4/180 in) + (8352 in4/156 in))
ΨA = 0.03
ΨB = ∑(Ic/Lc)/∑(Ib/Lb) = ((2252 in4/720 in) + (19354 in4/144 in))/((8352 in4/180 in) + (8352 in4/156 in))
ΨB = 1.38
k = 1.3
klu/r = (1.3)(696 in))/(0.25*16 in) = 226.2 > 22 so slenderness cannot be ignored
Pc (axis B) = π20.4EI/(klu)2 = π20.4(4031 ksi)(27648 in4)/(1.6*144 in)2 = 8287 k
∑Pc = 208642 k
∑Pu (U = 1.2D + 1.6S + 0.5W) = 6350 k 8 no. 10 Bars
δs (U = 1.2D + 1.6S + 0.5W) = 1/(1 - ∑Pu/(0.75∑Pc) = 1/(1 - (6350 k)/(0.75*208642 k)) = 1.04 No. 4 Spiral @ 2.0"
Mu (U = 1.2D + 1.6S + 0.5W) = Mns + δsMs = 24.82 + (1.04)(857.56) k-in = 918.650 k-in
From C-5-60-0.6, ρg = 0.045 for U = 1.2D + 1.0W + 1.0L + 0.5S,
Ast = ρgAg = (0.045)π(16 in)2/4 = 9.04 in2 → use 8 No. 10 bars (Ast = 10.16 in2)
Try no. 4 spiral at 2.0"
ρs = 4π(ds)2/(4*(π(Dc = γD +db + 2ds)2/4)s) = 4π(0.5 in)2/(4(π(0.6*16 + 1.27 + 2*0.5 in)2/4)(2 in)) = 0.033
ρs,min = 0.45((D/Dc)2 - 1)f'c/fy = 0.45((16/11.87)2 - 1)(5 ksi)/(60 ksi) = 0.031, okay
sc = s - ds = 2 - 0.5 in = 1.5 in, okay (> 1 in, < 3 in)

Team Members

5/14/2020 8:15:26 PM
Group 1 Grant Haralson
Ben Williams
Member Design - Atrium Circular Column
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.404
Sanjiv R H-K Scale 3" = 1'-0"
Knowns ΦMn = ΦAsfy(d - β1c/2)
Mu = 1231.6 k-in ΦMn = (0.9)(2.41 in2)(60 ksi)(21.5625 - 0.80*3.54/2 in)
Vu = 25.6 k ΦMn = 2621.87 k-in > Mu = 1231.6 k-in
β1 = 0.80
Check As,max, As,min, and sc,min 12"

Assumptions
As,max = 0.75*0.85*β1f'cbd(87/(87 + fy))/fy
Preliminary size is b = 12” & h = 24" As,max = 0.75*0.85(0.80)(5 ksi)(12 in)(21.5625 in)*
Assume normal weight concrete (87 ksi/(87 + 60 ksi))/(60 ksi)
Assume No. 4 tie As,max = 6.51 in2 > As = 2.41 in2, okay 2 No. 5
Torsion cracks θ = 45°
As,min = (bd/fy)max(3sqrt(f'c), 200)
Calculations As,min = ((12 in)(21.5625 in)/(60000 psi))*

9 1/1 6"
max(3sqrt(5000 psi), 200 psi)
Flexure Design As,min = 0.91 in2 < As = 2.41 in2, okay

Guess As until ΦMn > Mu and Φ = 0.9 sc,min = max(1 in, dbar) = max(1 in, 0.875 in)
Successful guess is 4 No. 7 (As = 2.41 in2) sc,min = 1 in

24"
*this will change with torsion calculations sc = (b - 2*cover - 2*dtie - 4dbar)/3 2 No. 5
sc = (12 - 3 - 2*0.5 - 4*0.875 in)/3
Check that Φflexure = 0.9 sc = 1.5 in > sc,min = 1 in, okay
c = Asfy/(0.85f'cbβ1) *sc will change with torsional reinforcement
c = (2.41 in2)(60 ksi)/((0.85)(5 ksi)(12 in)(0.80)) No. 4 tie @ 5 in.
c = 3.54 in
Shear Design
d = h - cover - dtie - 0.5dbar
d = 24 - 1.5 - 0.5 - 0.5*(7/8) in ΦVc = Φ2λsqrt(f'c)bd = 2*1.0sqrt(5000 psi)(12 in)(21.5625 in) 4 No. 8
d = 21.5625 in ΦVc = 27.4 k > Vu = 25.6 k

ε = 0.003(d - c)/c Check that ΦVc/2 > Vu


ε = 0.003(21.5625 - 3.54 in)/(3.54 in) ΦVc/2 = (27.4 k)/2
ε = 0.015 > 0.005, so Φflexure = 0.9 ΦVc/2 = 13.7 k < Vu = 25.6 k 1 1/2" 1 1/3"

Steel yields as well Thus need minimum shear reinforcement

Team Members

5/14/2020 8:15:26 PM
Group 1 Grant Haralson
Ben Williams
Member Design - Typical Beam
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.405
Sanjiv R H-K Scale 3" = 1'-0"
Av/smin = (b/fy)max(0.75sqrt(f'c), 50) ΦTth > Tu, need torsional reinforcement Φ(2λsqrt(f'c) + 8sqrt(f'c)) =
Av/smin = (12 in/60000 psi)max(0.75sqrt(5000 psi), 50) ΦTth = Φλsqrt(f'c)(Acp2/pcp) 0.75(2(1.0)sqrt(5000 psi) + 8sqrt(5000 psi)) =
Av/smin = 0.0106 in2/in (= Av/s) 530.3 psi
Acp = bh = (12 in)(24 in)
Choose No. 4 stirrup Acp = 288 in2 459.3 psi < 530.3 psi, so size is adequate
S = 2abar/(Av/s) = 2(0.2 in2)/(0.0106 in2/in)
S = 37.7 in pcp = 2(b + h) = 2(12 + 24 in) Torsion Stirrups
pcp = 72 in
Check maximum allowable steel strength and stirrup spacing At/s = Tutan(θ)/(Φ2Aofy)
ΦTth = 0.75(1.0)sqrt(5000 psi)(288 in2)2/(72 in)
Vs = (Av/s)fyd = (0.0106 in2/in)(60 ksi)(21.5625 in) ΦTth = 61.1 k-in < Tu = 399.2 k-in Ao = 0.85Aoh = 0.85(174.25 in2)
Vs = 13.71 k Thus need reinforcement Ao = 148.11 in2

Vs,max = 8sqrt(f'c)bd = 8sqrt(5000 psi)(12 in)(21.5625 in) Determine concrete section adequacy At/s = (399.2 k-in)tan(45°)/(0.75*2(148.11 in2)(60 ksi))
Vs,max = 146.4 k > Vs = 13.71 k, okay if sqrt((Vu/(bd))2 + (Tuph/(1.7Aoh2))2) < At/s = 0.0299 in2/in (for one leg of stirrups)
Φ2λsqrt(f'c) + 8sqrt(f'c), then size is okay
Max Spacing depends on if Vs < 0.5Vs,max Recall Av/s = 0.0106 in2/in
x1 = b - 2*cover - dtie = 12 - 3 - 0.5 in
0.5Vs,max = 0.5*(146.4 k) x1 = 8.5 in Thus Atotal/s = Av/s + 2At/s
0.5Vs,max = 73.2 k > Vs = 13.71 k Atotal/s = 0.0106 in2/in + 2*0.0299 in2/in
y1 = h - 2*cover - dtie = 24 - 3 - 0.5 in Atotal/s = 0.0704 in2/in
Thus y1 = 20.5 in
Smax = min(d/2, 24 in) = min(21.5625/2, 24 in) Atotal/smin = (b/fy)max(0.75sqrt(f'c), 50)
Smax = 10.8 in > S = 37.7 in Aoh = x1y1 = (8.5 in)(20.5 in) Atotal/smin = (12 in/60000 psi)max(0.75sqrt(5000 psi), 50)
Use S = 10.5 in Aoh = 174.25 in2 Atotal/smin = 0.0106 in2/in < Atotal/s = 0.0704 in2/in, okay

Use No. 4 stirrups at S = 10.5 in. ph = 2(x1 + y1) = 2(8.5 + 20.5 in) Use No. 4 ties
ph = 58 in
S = 2abar/(Atotal/s) = 2(0.2 in2)/(0.0704 in2/in)
Torsion Design sqrt((Vu/(bd))2 + (Tuph/(1.7Aoh2))2) = S = 5.68 in
Do for Mezzanine Beam along D axis between axises 2 & 3 sqrt((25600 lb/((12 in)(21.5625 in)))2 +
(Refer to Design Plans) ((399200 lb-in)(58 in)/(1.7(174.25 in2)2))2) = Smax = min(ph/8, 12 in, Smax,v) = min(58/8, 12, 10.8 in)
459.3 psi Smax = 7.25 > S = 5.68 in
Tu = Fr = (quxy)(x/2) = (0.252 ksf)(16.5 ft)(4 ft)(4/2 ft)(12 in/ft)
Tu = 399.2 k-in Use No. 4 closed stirrups at S = 5 in.

Team Members

5/14/2020 8:15:27 PM
Group 1 Grant Haralson
Ben Williams
Member Design - Typical Beam Cont.
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.406
Sanjiv R H-K Scale
Longitudinal Reinforcement

Al = (At/s)ph = (0.0299 in2/in)(58 in)


Al = 1.73 in2

Al,min = (5Acpsqrt(f'c)/fy) - min((At/s)ph, 25bph/fy)


Al,min = (5(288 in2)sqrt(5000 psi)/60000 psi) - min(1.73 in2, 25(12 in)(58 in)/60000 psi)
Al,min = 1.41 in2 < Al = 1.73 in2
Thus Al = 1.73 in2

Distribute reinforcement in top, middle, and bottom layers evenly.


Bottom reinforcement will add on to exising flexural reinforcement.

Atop = Amiddle = Al/3 = (1.73 in2)/3


Atop = Amiddle = 0.577 in2 → 2 No. 5 each (As = 0.62 in2)
Abottom = Al/3 + As,flex = 0.577 + 2.41 in2
Abottom = 2.99 in2 → 4 No. 8 (As = 3.16 in2)

Check minimum bar diameter


db,min = max(0.042S, 0.375 in) = max(0.042*5 in, 0.375 in)
db,min = 0.375 in < db = 0.625 in, okay

Check maximum perimeter bar spacing and ensure it is less than 12 inches.
Maximum spacing occurs between top and middle layers.
sc,perimeter = h/2 - 1.5db - cover - dtie = 24/2 - 1.5(0.625) - 1.5 - 0.5 in
sc,perimeter = 9.0625 in < 12 in, okay Load Combination Max Moment Max Shear
1.4DL -88.1579 k-ft 22.081k
Check minimum bottom bar spacing 1.2DL+1.6LL+0.5SL -107.8028 k-ft 26.517 k
sc = (b - 2*cover - 2*dtie - 4db)/3 = (12 - 2*1.5 - 2*0.5 - 4*1)/3 in 1.2DL+1.6SL+1.0LL -94.2204 k-ft 23.559 k
sc = 1.33 in 1.2DL+1.6SL+0.5W -96.0576 k-ft 23.775 k
sc,min = max(1 in, db) = max(1, 0.625 in) 1.2DL+1.0W+1.0LL+0.5SL -103.3003 k-ft 21.814 k
sc,min = 1 in < sc = 1.83 in, okay 0.9DL+1.0W -85.8005 k-ft 16.359 k
1.2DL+1.6LL+0.5SL -106.6056 k-ft 26.827 k
Use 2 No. 5 on the top, 2 No. 5 in the middle, and 4 No. 8 on the bottom 1.2DL+1.0W+1.0LL+0.5SL -97.7110 k-ft 25.245 k
for longitudinal reinforcement 0.9DL+1.0W -84.0524 k-ft 19.158 k

Team Members

5/14/2020 8:15:27 PM
Group 1 Grant Haralson
Ben Williams
Member Design - Typical Beam Cont.
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.407
Sanjiv R H-K Scale
#4 @ 13" (B) E.W.

E
D
#4 @ 13" (T)

#4 @ 13" (T)
B
A

Note:
See Slab Design - Levels 2, 3, 4 for #4 @ 13" (T) #4 @ 13" (T)
example calculations

Slab Depth = 8 in 1 2 3 4 5 6

Team Members

5/14/2020 6:30:14 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Level 1 Plan
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.501
Sanjiv R H-K Scale 1/8" = 1'-0"
A B C D E

6" 6"
#4 @1' - 1" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1"
#4 @1' - 1"

41" 35" 35" 35" 30" 30" 37" 43"

#4 @ 13" (B) E.W.

Level 1 Middle Strip (EW)


2
1/4" = 1'-0"

A B C D E
8" 8"

#4 @1' - 1" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1"


#4 @1' - 1"

53" 45" 45" 45" 38" 38" 49" 57"

#4 @ 13" (B) E.W.

Level 1 Column Strip (EW)


1
1/4" = 1'-0"

Team Members

5/14/2020 6:30:14 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Level 1 Section
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.502
Sanjiv R H-K Scale 1/4" = 1'-0"
1 2 3 4 5 6
6" 6"
#4 @1' - 1" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1"

38" 32" 44" 44" 44" 44" 48" 48" 48" 54"

#4 @ 13" (B) E.W.


Level 1 Middle Strip (NS)
2
3/16" = 1'-0"

1 2 3 4 5 6
6" 8"
#4 @1' - 1" #4 @1' - 1" #4 @1' - 1"
#4 @1' - 1" #4 @1' - 1" #4 @1' - 1"

50" 44" 53" 53" 53" 53" 65" 65" 65" 71"

#4 @ 13" (B) E.W.


Level 1 Column Strip (NS)
1
3/16" = 1'-0"

Team Members

5/14/2020 6:30:15 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Level 1 Section
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.503
Sanjiv R H-K Scale 3/16" = 1'-0"
E
One-Way Slab Design
tslab = 8 in

#4 @ 13" (B) E.W.


Design slab in 12-inch strips and treat
as a beam. Assume ends are simply
supported. Slab width is 7 feet.

Minimum Slab Thickness:

D
tmin = ℓ/20 = (7*12 in)/20
tmin = 4.2 inches

Use tslab,one-way = 9 inches


Then with a 0.75 in. clear cover and
assuming no. 4 bar, d = 8 in

Mu = quℓ2/8 C
Mu = (0.252 ksf)(7 ft)2/8
Mu = 1.54 k-ft/ft

ρ = 0.85f'c/fy(1 - sqrt(1 -
2Mu/(Φwmd20.85f'c)))
ρ = 0.85(3 ksi)/(60 ksi)(1 - sqrt(1 -
B

2*1.54 k-ft/ft/(0.9*
(8 in)20.85(3 ksi))))
ρ = 0.00045

Check that Φ = 0.9


c = ρdfy/(0.85f'cβ1)
c = 0.00045(8 in)(60 ksi)/(0.852*3 ksi)
c = 0.10 in
A

ε = 0.003(d - c)/c

#4 @ 13" (T)

#4 @ 13" (T)

#4 @ 13" (T)

#4 @ 13" (T)
ε = 0.003(8 - 0.10 in)/(0.10 in)
ε = 0.24 >> 0.005, Φ = 0.9

6
1

5
3
Team Members

5/14/2020 6:30:15 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Mezzanine Plan
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.504
Sanjiv R H-K Scale 1/8" = 1'-0"
As = ρbd = 0.00045(12 in)(8 in)
As = 0.043 in2
Transverse Reinforcement
ρmin = 0.0018
As,min = ρminbtslab,one-way = 0.0018(12 in)(9 in) ρmin = 0.0018
As,min = 0.19 in2 > As = 0.043 in2 As,min = ρminbtslab,one-way = 0.0018(12 in)(9 in)
Thus As = 0.19 in2 As,min = 0.19 in2

Use no. 4 bars Use no. 3 bars 2

S = babar/As = (12 in)(0.20 in2)/(0.19 in2) S = babar/As = (12 in)(0.11 in2)/(0.19 in2) 6" 6"

S = 12.6 in S = 6.9 in #4 @1' - 0"

Max Spacing Max Spacing


Smax = min(3tslab,one-way, 18) = min(3*9, 18) = min(27, 18 in) Smax = min(5tslab,one-way, 18) = min(5*9, 18) = min(45, 18 in)
Smax = 18 in > S = 12.6 in Smax = 18 in > S = 6.9 in
Mezzanine One-Way Primary
Use No. 4 bars @ S = 12" for primary reinforcement Use No. 3 bars @ S = 6" for transverse reinforcement 2
1/4" = 1'-0"

A B C D E

8" 8"

#3 @6"

Mezzanine One-Way Transverse


1
1/4" = 1'-0"

Team Members

5/14/2020 6:30:16 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Mezzanine Section
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.505
Sanjiv R H-K Scale 1/4" = 1'-0"
Shear Design 2) Check E-W Shear Line ΦVc = Φkdboλ*sqrt(f'c)
where k = min(4, 4 + αsd/bo)
One-Way Shear for Column 6A (from Design Plans) x = B/2 - c/2 - d = 20*12/2 - 24/2 - 7 in k = min(4, 4 + (20)(8 in)/(32 in)) = min(4, 5)
*note tslab = 8 in, thus d = 7 in x = 101 in k=4

Corner Column Vu = quLx = (0.252 ksf)(15*12/2 in)(101 in)(1 ft2/144 in2) ΦVc = 0.75*4*(8 in)(32 in)(1.0)sqrt(3000 psi)
1) Check N-S Shear Line Vu = 15.91 k ΦVc = 42.07 k

x = L/2 - c/2 - d = (15*12)/2 - (24)/2 - 7 in ΦVc = Φ2dLλ*sqrt(f'c) Vu = qu(BL - (c/2 + d/2)2)


x = 71 in ΦVc = 0.75*2*(7 in)(15*12/2 in)(1.0)sqrt(3000 psi) Vu = (0.252 ksf)((15*20*144/4 - (24/2 + 8/2)2 in2)
ΦVc = 51.76 k > Vu = 15.91 k → good Vu = 18.45 k < ΦVc = 42.07 k → good
Vu = quBx = (0.252 ksf)(20*12/2 in)(71 in)(1 ft2/144 in2)
Vu = 14.91 k Punching Shear Check
β = c1/c2 = (24 in)/(24 in) = 1 < 2, do not need β shear
ΦVc = Φ2dBλ*sqrt(f'c) factor
ΦVc = 0.75*2*(7 in)(20*12/2 in)(1.0)sqrt(3000 psi)
ΦVc = 69.01 k > Vu = 14.91 k → good bo = 2*(c/2 + d/2) = 24 + 8 in
bo = 32 in

A B C D
8" 8"

#4 @1' - 1" #4 @1' - 1" #4 @1' - 1"


#4 @1' - 1"

53" 33" 33" #4 @ 13" (B) E.W. 33" 28" 36"

Mezzanine Column Strip (EW)


1
3/8" = 1'-0"

Team Members

5/14/2020 6:30:16 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Mezzanine Section
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.506
Sanjiv R H-K Scale 3/8" = 1'-0"
A B C D
6" 6"

#4 @1' - 1" #4 @1' - 1"


#4 @1' - 1" #4 @1' - 1"

41" 35" 35" 35" 30" 36"

#4 @ 13" (B) E.W.

Mezzanine Middle Strip (EW)


3
3/8" = 1'-0"

3 4 5 6
6" 6"
#4 @1' - 1" #4 @1' - 1" #4 @1' - 1"
#4 @1' - 1"

50" 44" 48" 45" 48" 54"


#4 @ 13" (B) E.W.

Mezzanine Middle Strip (NS)


2
1/4" = 1'-0"

3 4 5 6
6" 8"
#4 @1' - 1" #4 @1' - 1" #4 @1' - 1"
#4 @1' - 1"

59" 53" 65" 65" 65" 71"


#4 @ 13" (B) E.W.

Mezzanine Column Strip (NS)


1
1/4" = 1'-0"

Team Members

5/14/2020 6:30:17 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Mezzanine Section
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.507
Sanjiv R H-K Scale As indicated
E
Slab Design: Panel Bounded by
Axises A, B, 1, and 2, design for
EW and NS. These calculations are
based off preliminary sizes of
beams and columns.

Initial Column Size = 24" x 24"


Initial Beam Size = 12" x 24"

D
Slab Depth = 8"

#4 @ 13" (T)
Factored Loading:

#4 @ 13" (B) E.W.


qu = max(1.4D, 1.2D + 1.6L)
qu = max(1.4*130,
1.2*130 + 1.6*60 psf)

C
qu = 252 psf

Edge Beam Torsional Constant:


#4 @ 13" (T)
C = Σ(1 - 0.63x/y)x3y/3

First need to get clear flange width


wf = min(hclear web, 4dslab)
wf = min(16, 4*8 in)
B

wf = 16 in

2 combinations, do both
C = (1 - 0.63*12/24)12324/3 +
(1 - 0.63*8/16)8316/3 in4
C = 11339.95 in4

C = (1 - 0.63*12/16)12316/3 +
A

(1 - 0.63*8/28)8328/3 in4
C = 8779.95 in4
#4 @ 13" (T)

#4 @ 13" (T)

Thus C = 11339.95 in4

6
1

5
3 Team Members

5/14/2020 6:30:18 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Levels 2, 3, 4 Plan
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.508
Sanjiv R H-K Scale 1/8" = 1'-0"
East-West Column Strip Percentages M-ve,ext,m = (1 - 0.927)(0.16)(Mo)
-ve exterior M-ve,ext,m = (0.073*0.16*894.35 k-in)
l1 = 180 in; l2 = 168 in l2/l1 = 168 in/180 in M-ve,ext,m = 10.45 k-in
ln1 = l1 - c = 180 - 24 l2/l1 = 0.933
ln1 = 156 in M-ve,ext,sc = (0.15)(0.927)(0.16)(Mo)
ln2 = 144 in αl2/l1 = (3.33)(0.933) M-ve,ext,sc = (0.15*0.927*0.16*894.35 k-in)
αl2/l1 = 3.1 > 1.0 M-ve,ext,sc = 19.90 k-in
Is = l2tslab3/12 = (168 in)(8 in)3/12
Is = 7168 in4 βt = C/2Is = (11339.95 in4)/(2*7168 in4) M+ve,int,nc = (0.5)(0.15)(0.77)(0.57)(Mo)
βt = 0.79 M+ve,int,nc = (0.5*0.15*0.77*0.57*894.35 k-in)
Strip Widths M+ve,int,nc = 29.44 k-in
wc,north = 0.25min(l1, l2) = 0.25min(180, 168 in) By interpolation, 92.7% of M-ve,ext goes to column strip
wc,north = 42 in M+ve,int,m = (1 - 0.77)(0.57)(Mo)
+ve interior M+ve,int,m = (0.23*0.57*894.35 k-in)
wc,south = 0.25min(l1, l2) + 0.25min(l1, 198in) l2/l1 = 0.933 M+ve,int,m = 117.25 k-in
wc,south = 0.25min(180, 168 in) + 0.25min(180, 198 in) αl2/l1 = 3.1 > 1.0
wc,south = 87 in M+ve,int,sc = (0.15)(0.77)(0.57)(Mo)
By interpolation, 77% of M+ve,int goes to column strip M+ve,int,sc = (0.15*0.77*0.57*894.35 k-in)
wm = l2 - 0.5min(l1, l2) = 168 - 0.5min(180, 168 in) M+ve,int,sc = 58.88 k-in
wm = 84 in -ve interior
l2/l1 = 0.933 M-ve,int,nc = (0.5)(0.15)(0.77)(0.70)(Mo)
Stiffness Ratio: αl2/l1 = 3.1 > 1.0 M-ve,int,nc = (0.5*0.15*0.77*0.70*894.35 k-in)
α = Ib/Is = 23863.22 in4/7168 in4 M-ve,int,nc = 36.15 k-in
α = 3.33 By interpolation, 77% of M-ve,int goes to column strip
M-ve,int,m = (1 - 0.77)(0.70)(Mo)
Assume DDM is applicable, so skip αf1l2 2/α 2 Distribute Moment to Column and Middle Strips M-ve,int,m = (0.23*0.70*894.35 k-in)
f2l1 check
(N Column strip, because it is only on one side of the M-ve,int,m = 143.99 k-in
Mo = qul2ln12/8 = (252 psf)(168 in)(156 in)2/[8*1000*144] column line, receives only half of the moment a full column
Mo = 894.35 k-in strip would receive) M-ve,int,nc = (0.15)(0.77)(0.70)(Mo)
Slabs in column strips will take 15% of column strip M-ve,int,nc = (0.15*0.77*0.70*894.35 k-in)
Distribute Moment → Case E moment when beams are present. M-ve,int,nc = 72.31 k-in
-ve exterior = 16%, +ve interior = 57%, -ve interior = 70%
M-ve,ext,north column strip = (0.5)(0.15)(0.927)(0.16)(Mo)
M-ve,ext,nc = (0.5*0.15*0.927*0.16*894.35 k-in)
M-ve,ext,nc = 9.95 k-in

Team Members

5/14/2020 6:30:18 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Levels 2, 3, 4 Calculations
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.509
Sanjiv R H-K Scale
East-West Reinforcement

Sample calculation for M-ve,int,m = 143.99 k-in

ρ = 0.85f'c/fy(1 - sqrt(1 - 2Mu/(Φwmd20.85f'c)))


ρ = 0.85(3 ksi)/(60 ksi)(1 - sqrt(1 - 2*143.99 k-in/(0.9(84 in)(7 in)20.85(3 ksi))))
ρ = 0.00065

ρg,min = 0.0018
As,min = ρg,minwmtslab = 0.0018(84 in)(8 in)
As,min = 1.21 in2

As = ρwmd = 0.00065(84 in)(7 in)


As = 0.38 in2 < As,min = 1.21 in2
Thus As = 1.21 in2

Check that Φ = 0.9


c = Asfy/(0.85f'cwmβ1) = (1.21 in2)(60 ksi)/((0.85)(3 ksi)(84 in)(0.85))
c = 0.40 in

ε = 0.003(d - c)/c = 0.003(7 - 0.40 in)/(0.40 in)


ε = 0.050 >> 0.005, so Φ = 0.9

Use no. 4 bars

S = wmabar/As = (84 in)(0.2 in2)/(1.21 in2)


S = 13.88 in Slab Depth Check

Max Spacing α = 3.33 > 2.0, thus


Smax = min(3tslab, 18 in) = min(3*8, 18 in) = min(24, 18 in) tslab,min = max(ln1(0.8 + fy/200)/(36 + 9ln1/ln2), 3.5 in)
Smax = 18 in > S = 13.88 in tslab,min = max((156 in)(0.8 + (60 ksi)/200)/(36 + 9((156 in)/(144 in))), 3.5 in) =
tslab,min = max(3.75, 3.5 in)
Use no. 4 bars at S = 13 in tslab,min = 3.75 in < tslab = 8 in, okay

Team Members

5/14/2020 6:30:18 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Levels 2, 3, 4 Calculations
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.510
Sanjiv R H-K Scale
A B C D E
6" 6"
#4 @1' - 1" #4 @1' - 1" #4 @1' - 1"
#4 @1' - 1" #4 @1' - 1"

41" 35" 35" 35" 30" 30" 37" 43"

#4 @ 13" (B) E.W.

Levels 2, 3, 4 Middle Strip (EW)


2
1/4" = 1'-0"

A B C D E
8" 8"
#4 @1' - 1" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1"

53" 45" 45" 45" 38" 38" 49" 57"

#4 @ 13" (B) E.W.

Levels 2, 3, 4 Column Strip (EW)


1
1/4" = 1'-0"

Team Members

5/14/2020 6:30:18 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Levels 2, 3, 4 Section
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.511
Sanjiv R H-K Scale 1/4" = 1'-0"
North-South Column Strip Percentages M-ve,ext,m = (1 - 0.92)(0.16)(Mo)
-ve exterior M-ve,ext,m = (0.08*0.16*816.48 k-in)
l1 = 168 in; l2 = 180 in l2/l1 = 180 in/168 in M-ve,ext,m = 10.45 k-in
ln1 = l1 - c = 168 - 24 l2/l1 = 1.07
ln1 = 144 in M-ve,ext,ec = (0.15)(0.92)(0.16)(Mo)
ln2 = 156 in αl2/l1 = (3.11)(1.07) M-ve,ext,ec = (0.15*0.92*0.16*816.48 k-in)
αl2/l1 = 3.3 > 1.0 M-ve,ext,ec = 18.02 k-in
Is = l2tslab3/12 = (180 in)(8 in)3/12
Is = 7680 in4 βt = C/2Is = (11339.95 in4)/(2*7680 in4) M+ve,int,wc = (0.5)(0.15)(0.729)(0.57)(Mo)
βt = 0.74 M+ve,int,wc = (0.5*0.15*0.729*0.57*816.48 k-in)
Strip Widths M+ve,int,wc = 25.45 k-in
wc,west = 0.25min(l1, l2) = 0.25min(180, 168 in) By interpolation, 92.0% of M-ve,ext goes to column strip
wc,west = 42 in M+ve,int,m = (1 - 0.729)(0.57)(Mo)
+ve interior M+ve,int,m = (0.271*0.57*816.48 k-in)
wc,east = 0.25min(l1, l2) + 0.25min(l1, 180 in) l2/l1 = 1.07 M+ve,int,m = 126.12 k-in
wc,east = 0.25min(180, 168 in) + 0.25min(168, 180 in) αl2/l1 = 3.3 > 1.0
wc,east = 84 in M+ve,int,ec = (0.15)(0.729)(0.57)(Mo)
By interpolation, 72.9% of M+ve,int goes to column strip M+ve,int,ec = (0.15*0.729*0.57*816.48 k-in)
wm = l2 - 0.5min(l1, l2) = 180 - 0.5min(180, 168 in) M+ve,int,ec = 50.89 k-in
wm = 96 in -ve interior
l2/l1 = 1.07 M-ve,int,wc = (0.5)(0.15)(0.729)(0.70)(Mo)
Stiffness Ratio: αl2/l1 = 3.3 > 1.0 M-ve,int,wc = (0.5*0.15*0.729*0.70*816.48 k-in)
α = Ib/Is = 23863.22 in4/7680 in4 M-ve,int,wc = 31.25 k-in
α = 3.11 By interpolation, 72.9% of M-ve,int goes to column strip
M-ve,int,m = (1 - 0.729)(0.70)(Mo)
Assume DDM is applicable, so skip αf1l2 2/α 2 Distribute Moment to Column and Middle Strips M-ve,int,m = (0.271*0.70*816.48 k-in)
f2l1 check
(W Column strip, because it is only on one side of the M-ve,int,m = 154.89 k-in
Mo = qul2ln12/8 = (252 psf)(180 in)(144 in)2/[8*1000*144] column line, receives only half of the moment a full column
Mo = 816.48 k-in strip would receive) M-ve,int,ec = (0.15)(0.729)(0.70)(Mo)
Slabs in column strips will take 15% of column strip M-ve,int,ec = (0.15*0.729*0.70*816.48 k-in)
Distribute Moment → Case E moment when beams are present. M-ve,int,ec = 62.50 k-in
-ve exterior = 16%, +ve interior = 57%, -ve interior = 70%
M-ve,ext,west column strip = (0.5)(0.15)(0.92)(0.16)(Mo)
M-ve,ext,wc = (0.5*0.15*0.92*0.16*816.48 k-in)
M-ve,ext,wc = 9.01 k-in

Team Members

5/14/2020 6:30:19 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Levels 2, 3, 4 Calculations
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.512
Sanjiv R H-K Scale
North-South Reinforcement ε = 0.003(d - c)/c = 0.003(7 - 0.40 in)/(0.40 in)
ε = 0.050 >> 0.005, so Φ = 0.9
Sample calculation for M-ve,int,m = 154.89 k-in Use no. 4 bars
S = wmabar/As = (96 in)(0.2 in2)/(1.38 in2)
ρ = 0.85f'c/fy(1 - sqrt(1 - 2Mu/(Φwmd20.85f'c))) S = 13.91 in
ρ = 0.85(3 ksi)/(60 ksi)(1 - sqrt(1 - 2*154.89 k-in/(0.9(96 in)(7 in)20.85(3 ksi)))) Max Spacing
ρ = 0.00061 Smax = min(3tslab, 18 in) = min(3*8, 18 in) = min(24, 18 in)
ρg,min = 0.0018 Smax = 18 in > S = 13.91 in
As,min = ρg,minwmtslab = 0.0018(96 in)(8 in) Use no. 4 bars at S = 13 in
As,min = 1.38 in2
As = ρwmd = 0.00061(96 in)(7 in) Slab Depth Check
As = 0.41 in2 < As,min = 1.38 in2 α = 3.11 > 2.0, thus
Thus As = 1.38 in2 tslab,min = max(ln1(0.8 + fy/200)/(36 + 9ln2/ln1), 3.5 in)
Check that Φ = 0.9 tslab,min = max((144 in)(0.8 + (60 ksi)/200)/(36 + 9((156 in)/(144 in))), 3.5 in) =
c = Asfy/(0.85f'cwmβ1) = (1.38 in2)(60 ksi)/((0.85)(3 ksi)(96 in)(0.85)) tslab,min = max(3.46, 3.5 in)
c = 0.40 in tslab,min = 3.5 in < tslab = 8 in, okay

1 2 3 4 5 6
6" 6"
#4 @1' - 1" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1"

38" 32" 44" 44" 44" 44" 48" 48" 48" 54"

#4 @ 13" (B) E.W.

Levels 2, 3, 4 Middle Strip (NS)


2
3/16" = 1'-0"

1 2 3 4 5 6
6" #4 @1' - 1" #4 @1' - 1" 8"
#4 @1' - 1" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1"

50" 44" 53" 53" 53" 53" 65" 65" 65" 71"

#4 @ 13" (B) E.W.


Levels 2, 3, 4 Column Strip (NS)
1
3/16" = 1'-0"

Team Members

5/14/2020 6:30:19 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Levels 2, 3, 4 Section
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.513
Sanjiv R H-K Scale 3/16" = 1'-0"
E

#4 @ 12" (B) E.W.


D

#4 @ 12" (T)
C

#4 @ 12" (T)
B

Note:
A

See Slab Design - Levels 2, 3, 4 for


example calculations
#4 @ 12" (T)

#4 @ 12" (T)
Slab Depth = 5 in

6
1

5
3 Team Members

5/14/2020 6:30:20 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Level 5 Plan
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.514
Sanjiv R H-K Scale 1/8" = 1'-0"
A B C D E
6" 6"
#4 @12" #4 @12" #4 @12" #4 @12" #4 @12"

41" 35" 35" 35" 30" 30" 37" 43"

#4 @ 12" (B) E.W.

Level 5 Middle Strip (EW)


2
1/4" = 1'-0"

A B C D E
6" 6"
#4 @12" #4 @12" #4 @12" #4 @12" #4 @12"

53" 47" 47" 47" 40" 40" 51" 57"

#4 @ 12" (B) E.W.

Level 5 Column Strip (EW)


1
1/4" = 1'-0"

Team Members

5/14/2020 6:30:20 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Level 5 Section
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.515
Sanjiv R H-K Scale 1/4" = 1'-0"
1 2 3 4 5 6
6" 6"
#4 @12" #4 @12" #4 @12" #4 @12" #4 @12" #4 @12"

38" 32" 44" 44" 44" 44" 48" 48" 48" 54"

#4 @ 12" (B) E.W.

Level 5 Middle Strip (NS)


2
3/16" = 1'-0"

1 2 3 4 5 6
6" #4 @12" 6"
#4 @12" #4 @12" #4 @12" #4 @12" #4 @12"

50" 44" 53" 53" 53" 53" 65" 65" 65" 71"

#4 @ 12" (B) E.W.

Level 5 Column Strip (NS)


1
3/16" = 1'-0"

Team Members

5/14/2020 6:30:21 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Level 5 Section
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.516
Sanjiv R H-K Scale 3/16" = 1'-0"
E

#4 @ 13" (B) E.W.


D

#4 @ 13" (T)
C
Slab Design: Panel Bounded by
#4 @ 13" (T)
Axises A, B, 1, and 2, design for
EW and NS. These calculations are
based off preliminary sizes of
beams and columns.
B

Initial Column Size = 24" x 24"


Initial Beam Size = 12" x 24"
Slab Depth = 8"

Factored Loading:

qu = max(1.4D, 1.2D + 1.6L + 0.5S,


1.2D + 1.6S + 1.0L)
A

qu = max(1.4*140,
1.2*140 + 1.6*20 +0.5*30,
#4 @ 13" (T)

#4 @ 13" (T)

1.2*140 + 1.6*30 + 1.0*20 psf)


qu = 236 psf

6
1

5
3
Team Members

5/14/2020 6:30:21 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Roof Plan
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.517
Sanjiv R H-K Scale 1/8" = 1'-0"
East-West Column Strip Percentages M-ve,ext,m = (1 - 0.927)(0.16)(Mo)
-ve exterior M-ve,ext,m = (0.073*0.16*837.56 k-in)
l1 = 180 in; l2 = 168 in l2/l1 = 168 in/180 in M-ve,ext,m = 9.78 k-in
ln1 = l1 - c = 180 - 24 l2/l1 = 0.933
ln1 = 156 in M-ve,ext,sc = (0.15)(0.927)(0.16)(Mo)
ln2 = 144 in αl2/l1 = (3.33)(0.933) M-ve,ext,sc = (0.15*0.927*0.16*837.56 k-in)
αl2/l1 = 3.1 > 1.0 M-ve,ext,sc = 18.63 k-in
Is = l2tslab3/12 = (168 in)(8 in)3/12
Is = 7168 in4 βt = C/2Is = (11339.95 in4)/(2*7168 in4) M+ve,int,nc = (0.5)(0.15)(0.77)(0.57)(Mo)
βt = 0.79 M+ve,int,nc = (0.5*0.15*0.77*0.57*837.56 k-in)
Strip Widths M+ve,int,nc = 27.57 k-in
wc,north = 0.25min(l1, l2) = 0.25min(180, 168 in) By interpolation, 92.7% of M-ve,ext goes to column strip
wc,north = 42 in M+ve,int,m = (1 - 0.77)(0.57)(Mo)
+ve interior M+ve,int,m = (0.23*0.57*837.56 k-in)
wc,south = 0.25min(l1, l2) + 0.25min(l1, 198in) l2/l1 = 0.933 M+ve,int,m = 109.80 k-in
wc,south = 0.25min(180, 168 in) + 0.25min(180, 198 in) αl2/l1 = 3.1 > 1.0
wc,south = 87 in M+ve,int,sc = (0.15)(0.77)(0.57)(Mo)
By interpolation, 77% of M+ve,int goes to column strip M+ve,int,sc = (0.15*0.77*0.57*837.56 k-in)
wm = l2 - 0.5min(l1, l2) = 168 - 0.5min(180, 168 in) M+ve,int,sc = 55.14 k-in
wm = 84 in -ve interior
l2/l1 = 0.933 M-ve,int,nc = (0.5)(0.15)(0.77)(0.70)(Mo)
Stiffness Ratio: αl2/l1 = 3.1 > 1.0 M-ve,int,nc = (0.5*0.15*0.77*0.70*837.56 k-in)
α = Ib/Is = 23863.22 in4/7168 in4 M-ve,int,nc = 33.86 k-in
α = 3.33 By interpolation, 77% of M-ve,int goes to column strip
M-ve,int,m = (1 - 0.77)(0.70)(Mo)
Assume DDM is applicable, so skip αf1l2 2/α 2 Distribute Moment to Column and Middle Strips M-ve,int,m = (0.23*0.70*837.56 k-in)
f2l1 check
(N Column strip, because it is only on one side of the M-ve,int,m = 134.85 k-in
Mo = qul2ln12/8 = (236 psf)(168 in)(156 in)2/[8*1000*144] column line, receives only half of the moment a full column
Mo = 837.56 k-in strip would receive) M-ve,int,nc = (0.15)(0.77)(0.70)(Mo)
Slabs in column strips will take 15% of column strip M-ve,int,nc = (0.15*0.77*0.70*837.56 k-in)
Distribute Moment → Case E moment when beams are present. M-ve,int,nc = 67.72 k-in
-ve exterior = 16%, +ve interior = 57%, -ve interior = 70%
M-ve,ext,north column strip = (0.5)(0.15)(0.927)(0.16)(Mo)
M-ve,ext,nc = (0.5*0.15*0.927*0.16*837.56 k-in)
M-ve,ext,nc = 9.32 k-in

Team Members

5/14/2020 6:30:22 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Roof Calculations
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.518
Sanjiv R H-K Scale
East-West Reinforcement

Sample calculation for M-ve,int,m = 134.85 k-in

ρ = 0.85f'c/fy(1 - sqrt(1 - 2Mu/(Φwmd20.85f'c)))


ρ = 0.85(3 ksi)/(60 ksi)(1 - sqrt(1 - 2*134.85 k-in/(0.9(84 in)(7 in)20.85(3 ksi))))
ρ = 0.00061

ρg,min = 0.0018
As,min = ρg,minwmtslab = 0.0018(84 in)(8 in)
As,min = 1.21 in2

As = ρwmd = 0.00061(84 in)(7 in)


As = 0.36 in2 < As,min = 1.21 in2
Thus As = 1.21 in2

Check that Φ = 0.9


c = Asfy/(0.85f'cwmβ1) = (1.21 in2)(60 ksi)/((0.85)(3 ksi)(84 in)(0.85))
c = 0.40 in

ε = 0.003(d - c)/c = 0.003(7 - 0.40 in)/(0.40 in)


ε = 0.050 >> 0.005, so Φ = 0.9

Use no. 4 bars

S = wmabar/As = (84 in)(0.2 in2)/(1.21 in2)


S = 13.88 in Slab Depth Check

Max Spacing α = 3.33 > 2.0, thus


Smax = min(3tslab, 18 in) = min(3*8, 18 in) = min(24, 18 in) tslab,min = max(ln1(0.8 + fy/200)/(36 + 9ln1/ln2), 3.5 in)
Smax = 18 in > S = 13.88 in tslab,min = max((156 in)(0.8 + (60 ksi)/200)/(36 + 9((156 in)/(144 in))), 3.5 in) =
tslab,min = max(3.75, 3.5 in)
Use no. 4 bars at S = 13 in tslab,min = 3.75 in < tslab = 8 in, okay

Team Members

5/14/2020 6:30:22 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Roof Calculations
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.519
Sanjiv R H-K Scale
A B C D E

6" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1" 6"
#4 @1' - 1"

41" 35" 35" 35" 30" 30" 37" 43"

#4 @ 13" (B) E.W.

Roof Middle Strip (EW)


2
1/4" = 1'-0"

A B C D E
#4 @1' - 1" #4 @1' - 1" #4 @1' - 1"
6" #4 @1' - 1" #4 @1' - 1" 8"

53" 47" 47" 47" 40" 40" 51" 57"

#4 @ 13" (B) E.W.

Roof Column Strip (EW)


1
1/4" = 1'-0"

Team Members

5/14/2020 6:30:22 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Roof Section
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.520
Sanjiv R H-K Scale 1/4" = 1'-0"
North-South Column Strip Percentages M-ve,ext,m = (1 - 0.92)(0.16)(Mo)
-ve exterior M-ve,ext,m = (0.08*0.16*764.64 k-in)
l1 = 168 in; l2 = 180 in l2/l1 = 180 in/168 in M-ve,ext,m = 9.79 k-in
ln1 = l1 - c = 168 - 24 l2/l1 = 1.07
ln1 = 144 in M-ve,ext,ec = (0.15)(0.92)(0.16)(Mo)
ln2 = 156 in αl2/l1 = (3.11)(1.07) M-ve,ext,ec = (0.15*0.92*0.16*764.64 k-in)
αl2/l1 = 3.3 > 1.0 M-ve,ext,ec = 16.88 k-in
Is = l2tslab3/12 = (180 in)(8 in)3/12
Is = 7680 in4 βt = C/2Is = (11339.95 in4)/(2*7680 in4) M+ve,int,wc = (0.5)(0.15)(0.729)(0.57)(Mo)
βt = 0.74 M+ve,int,wc = (0.5*0.15*0.729*0.57*764.64 k-in)
Strip Widths M+ve,int,wc = 23.83 k-in
wc,west = 0.25min(l1, l2) = 0.25min(180, 168 in) By interpolation, 92.0% of M-ve,ext goes to column strip
wc,west = 42 in M+ve,int,m = (1 - 0.729)(0.57)(Mo)
+ve interior M+ve,int,m = (0.271*0.57*764.64 k-in)
wc,east = 0.25min(l1, l2) + 0.25min(l1, 180 in) l2/l1 = 1.07 M+ve,int,m = 118.11 k-in
wc,east = 0.25min(180, 168 in) + 0.25min(168, 180 in) αl2/l1 = 3.3 > 1.0
wc,east = 84 in M+ve,int,ec = (0.15)(0.729)(0.57)(Mo)
By interpolation, 72.9% of M+ve,int goes to column strip M+ve,int,ec = (0.15*0.729*0.57*764.64 k-in)
wm = l2 - 0.5min(l1, l2) = 180 - 0.5min(180, 168 in) M+ve,int,ec = 47.66 k-in
wm = 96 in -ve interior
l2/l1 = 1.07 M-ve,int,wc = (0.5)(0.15)(0.729)(0.70)(Mo)
Stiffness Ratio: αl2/l1 = 3.3 > 1.0 M-ve,int,wc = (0.5*0.15*0.729*0.70*764.64 k-in)
α = Ib/Is = 23863.22 in4/7680 in4 M-ve,int,wc = 29.26 k-in
α = 3.11 By interpolation, 72.9% of M-ve,int goes to column strip
M-ve,int,m = (1 - 0.729)(0.70)(Mo)
Assume DDM is applicable, so skip αf1l2 2/α 2 Distribute Moment to Column and Middle Strips M-ve,int,m = (0.271*0.70*764.64 k-in)
f2l1 check
(W Column strip, because it is only on one side of the M-ve,int,m = 145.05 k-in
Mo = qul2ln12/8 = (236 psf)(180 in)(144 in)2/[8*1000*144] column line, receives only half of the moment a full column
Mo = 764.64 k-in strip would receive) M-ve,int,ec = (0.15)(0.729)(0.70)(Mo)
Slabs in column strips will take 15% of column strip M-ve,int,ec = (0.15*0.729*0.70*764.64 k-in)
Distribute Moment → Case E moment when beams are present. M-ve,int,ec = 58.53 k-in
-ve exterior = 16%, +ve interior = 57%, -ve interior = 70%
M-ve,ext,west column strip = (0.5)(0.15)(0.92)(0.16)(Mo)
M-ve,ext,wc = (0.5*0.15*0.92*0.16*764.64 k-in)
M-ve,ext,wc = 8.44 k-in

Team Members

5/14/2020 6:30:22 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Roof Calculations
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.521
Sanjiv R H-K Scale
North-South Reinforcement Use no. 4 bars
S = wmabar/As = (96 in)(0.2 in2)/(1.38 in2)
Sample calculation for M-ve,int,m = 145.05 k-in S = 13.91 in
Max Spacing
ρ = 0.85f'c/fy(1 - sqrt(1 - 2Mu/(Φwmd20.85f'c))) Smax = min(3tslab, 18 in) = min(3*8, 18 in) = min(24, 18 in)
ρ = 0.85(3 ksi)/(60 ksi)(1 - sqrt(1 - 2*145.05 k-in/(0.9(96 in)(7 in)20.85(3 ksi)))) Smax = 18 in > S = 13.91 in
ρ = 0.00057
ρg,min = 0.0018 Use no. 4 bars at S = 13 in
As,min = ρg,minwmtslab = 0.0018(96 in)(8 in)
As,min = 1.38 in2 Slab Depth Check
As = ρwmd = 0.00057(96 in)(7 in)
As = 0.38 in2 < As,min = 1.38 in2 α = 3.11 > 2.0, thus
Thus As = 1.38 in2 tslab,min = max(ln1(0.8 + fy/200)/(36 + 9ln2/ln1), 3.5 in)
Check that Φ = 0.9 tslab,min = max((144 in)(0.8 + (60 ksi)/200)/(36 + 9((156 in)/(144 in))), 3.5 in) =
c = Asfy/(0.85f'cwmβ1) = (1.38 in2)(60 ksi)/((0.85)(3 ksi)(96 in)(0.85)) tslab,min = max(3.46, 3.5 in)
c = 0.40 in tslab,min = 3.5 in < tslab = 8 in, okay
ε = 0.003(d - c)/c = 0.003(7 - 0.40 in)/(0.40 in)
ε = 0.050 >> 0.005, so Φ = 0.9

1 2 3 4 5 6
#4 @1' - 1" #4 @1' - 1" #4 @1' - 1" 6"
6" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1"

38" 32" 44" 44" 44" 44" 48" 48" 48" 54"

#4 @ 13" (B) E.W.

Roof Middle Strip (NS)


2
3/16" = 1'-0"

1 2 3 4 5 6
6" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1"
#4 @1' - 1" #4 @1' - 1" 6"

50" 44" 53" 53" 53" 53" 65" 65" 65" 71"

#4 @ 13" (B) E.W.


Roof Column Strip (NS)
1
3/16" = 1'-0"

Team Members

5/14/2020 6:30:23 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Roof Section
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.522
Sanjiv R H-K Scale 3/16" = 1'-0"
Knowns
Vu = 300 k; β1 = 0.8;
hw = 144 in; lw = 192 in;
Assumptions
Nu = 0 k
d = 0.8lw = 153.6 in 2" 3/4"

Exterior Cover Interior Cover


Calculations S = Ano.4/(Av/s) = 0.2 in2/(0.0201 in2/in) h = 6"
hwall = max(4 in, 0.04min(lw, hw) S = 9.96 in 5 No. 10 5 No. 10
hwall = max(4 in, 0.04min(144, 192 in))
hwall = 5.76 in, round up Smax = min(3h, 18 in, lw/5) = min(3*6, 18, 192/5 in)
hwall = 6 in (< 10 in, use one layer) Smax = 18 in > S = 9.96 in, round down Shear Wall Plan
S = 9 in 2
1/4" = 1'-0"
Maximum Allowable Wall Shear Strength
ρt = Ano.4/(Sh) = 0.2 in2/((9 in)(6 in))
ΦVn,max = Φ10hd*sqrt(f'c) ρt = 0.0037 > ρt,min = 0.0025, okay No. 4 @ Sv = 9"
ΦVn,max = (0.75)10(6 in)(153.6 in)sqrt(5000 psi) 16' - 0"
ΦVn,max = 488.75 k > Vu = 300 k, okay Use No. 4 @ S = 9 in for transverse reinforcement

ΦVc = Φ*3.3hdλsqrt(f'c) Longitudinal Reinforcement


ΦVc = (0.75)3.3(6 in)(153.6 in)sqrt(5000 psi) Use No. 4 bars
ΦVc = 161.29 k < Vu = 300 k,

No. 4 @ Sh = 9"
need shear reinforcement ρl = 0.0025 + 0.5(2.5 - hw/lw)(ρt - 0.0025)
ρl = 0.0025 + 0.5(2.5 - 144 in/192 in)(0.0037 - 0.0025)

12' - 0"
Transverse Shear Reinforcement ρl = 0.00355 > ρl,min = 0.0025, okay
Use No. 4 bars
S = Ano.4/(hρl) = 0.2 in2/((6 in)(0.00355))
Vs = (Vu - ΦVc)/Φ S = 9.38 in
Vs = (300 - 161.29 k)/0.75
Vs = 184.9 k Smax = min(3h, 18 in, lw/3) = min(3*6, 18, 192/3 in)
Smax = 18 in > S = 9.38 in, round down
Av/s = Vs/fyd = (184.9 k)/((60 ksi)(153.6 in)) S = 9 in
Av/s = 0.0201 in2/in
Use No. 4 @ S = 9 in for longitudinal reinforcement Shear Wall Section
1
1/4" = 1'-0"

Team Members

5/14/2020 8:15:27 PM
Group 1 Grant Haralson
Ben Williams
Wall Design
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.601
Sanjiv R H-K Scale 1/4" = 1'-0"
Flexural Reinforcement

Mu = Vuhw = (300 k)(144 in)


Mu = 43200 k-in

ρ = 0.85f'c/fy(1 - sqrt(1 - 2Mu/(Φhd20.85f'c)))


ρ = 0.85(5 ksi)/(60 ksi)(1 - sqrt(1 - 2*43200 k-in/((0.9)(6 in)(153.6 in)2*0.85*(5 ksi))))
ρ = 0.0059

As,flex = ρhd = 0.0059(6 in)(153.6 in)


As,flex = 5.43 in2

Use 5 No. 10 bars (As = 6.35 in2) for flexural reinforcement on each end

Check that Φflexure = 0.9

c = Asfy/(0.85f'chβ1)
c = (6.35 in2)(60 ksi)/((0.85)(5 ksi)(6 in)(0.80))
c = 18.68 in

ε = 0.003(d - c)/c
ε = 0.003(153.6 - 18.68 in)/(18.68 in)
ε = 0.022 >> 0.005, so Φ = 0.9

Cover is 0.75" at all locations except the exterior end where it is 2"

Team Members

5/14/2020 8:15:27 PM
Group 1 Grant Haralson
Ben Williams
Wall Design Cont.
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.602
Sanjiv R H-K Scale
Givens One-Way Shear
qsoil = 6000 psf; γ = 150 pcf;
f'c = 3 ksi; fy = 60 ksi; x = (L - ccolumn)/2 - d = (102 - 16 in)/2 - 20 in
β1 = 0.85; λ = 1.0; x = 23 in
Φshear = 0.75; Φflexure = 0.9;

23 3/4"
20"
ccolumn = 16 in; Pservice = 386.61 k; Vu = Pux/L = (491.72 k)(23 in)/(102 in) No. 4 @ 4"
Pu (U = 1.2D + 1.6L + 0.5S) = 491.72 k Vu = 110.87 k
Column 5B at Ground Level (refer to Design
Plans) ΦVc = Φ2dLsqrt(f'c) = (0.75)(2)(20 in)(102 in)sqrt(3000 psi)
ΦVc = 167.6 k > Vu = 110.87 k
Square Footing Dimensions Foundation Section
2
L = sqrt(Pservice/qsoil) Overall depth with no. 4 bars 3/8" = 1'-0"
L = sqrt(386610 lb/6000 psf) h = d + cover + 1.5db = 20 + 3 + 1.5(0.5 in)
L = 8.03 ft → round up to nearest half-foot h = 23.75 in
Thus L = 8.5
Check Dimensions Again with Self-Weight
Punching Shear Check → guess d L = sqrt((Pservice + γL2h)/qsoil) =
After iteration, d = 20 in. is adequate L = sqrt((386610 + (150 pcf)(8.5 ft)2(23.75/12 ft) lbs)/(6000 psf))
L = 8.25 ft → round up to nearest half-foot 16"
Vu = Pu(1 - ((ccolumn + d)/L)2) Lnew = 8.5 ft == Lold = 8.5 ft → good
Vu = (491.72 k)(1 - ((16 + 20 in)/102 in)2)

8' - 6"

16"
Vu = 430.47 k Flexure

bo = 4(ccolumn + d) = 4(16 + 20 in) Mu = Pu(L - c)2/(8L) = (491.72 k)(102 - 16 in)2/(8*102 in)


bo = 144 in Mu = 4456.82 k-in

β = ccolumn,1/ccolumn,2 = 16 in/16 in = 1 < 2 ρ = 0.85f'c/fy(1 - sqrt(1 - 2Mu/(ΦLd20.85f'c)))


Do not need to use alternate shear factor ρ = 0.85(3 ksi)/(60 ksi)(1 - sqrt(1 - 2*4456.82 k-in/((0.9)(102 in)
(20 in)2*0.85*(3 ksi))))
ΦVc = Φ4dboλsqrt(f'c) ρ = 0.00207 8' - 6"
ΦVc = 0.75(4)(20 in)(144 in)(1.0)sqrt(3000 psi)
ΦVc = 473.23 k > Vu = 430.47 k As,flex = ρLd = 0.00207(102 in)(20 in)
As,flex = 4.22 in2
Foundation Plan
1
3/8" = 1'-0"

Team Members

5/14/2020 8:15:27 PM
Group 1 Grant Haralson
Ben Williams
Foundation Design
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date
C.701
Sanjiv R H-K Scale 3/8" = 1'-0"
ρg,min = 0.0018
As,min = ρg,minLh = 0.0018(102 in)(23.75)
As,min = 4.36 in2 > As,flex = 4.22 in2

Thus As = 4.36 in2

Check that Φflexure = 0.9

c = Asfy/(0.85f'cLβ1) =
c = (4.36 in2)(60 ksi)/((0.85)(3 ksi)(102 in)(0.85))
c = 1.18 in

ε = 0.003(d - c)/c = 0.003(20 - 1.18 in)/1.18 in


ε = 0.048 >> 0.005, so Φ = 0.9

Use no. 4 bars

S = Labar/As = (102 in)(0.2 in2)/(4.36 in2)


S = 4.68 in

Max Spacing
Smax = min(3h, 18 in) = min(3*23.75, 18 in) = min(71.25, 18 in)
Smax = 18 in > S = 4.68 in

Use no. 4 bars at S = 4 in for both directions

Team Members

5/14/2020 8:15:28 PM
Group 1 Grant Haralson
Ben Williams
Foundation Design Cont.
Project number Project Number

Concrete Design Project


Mackenzie Thering
Nicolas Hoyos
Date Issue Date