Advanced Concrete Design Project
Advanced Concrete Design Project
5/14/2020 8:15:08 PM
Group 1 Grant Haralson
Ben Williams
Cover Sheet
Project number Project Number
Team Members
5/14/2020 8:15:09 PM
Group 1 Grant Haralson
Ben Williams
General Notes
Project number Project Number
B = 59 ft
q = 33.81 psf 16.9 PSF (16.5 FT) = 279 PLF
16.9 PSF (18.25 FT) = 308 PLF
kd is the directionality factor found in Table 26.6-1 16.9 PSF (20 FT) = 338 PLF
kzt is the topographic factor factor found in Fig. 26.8-1 16.9 PSF (10 FT) = 169 PLF
v is the design wind velocity found in Fig. 26.5-1A
L / B = 1.47
kz is the velocity pressure exposure coefficient found in Table 27.3-1 -20.5 PSF (7.5 FT) = -154 PLF
-20.5 PSF (15 FT) = -308 PLF
Design Wind Pressure B = 87 ft -20.5 PSF (14 FT) = -287 PLF
p = q G Cp - qi (GCpi) -20.5 PSF (14.5 FT) = -297 PLF
-20.5 PSF (8 FT) = -164 PLF
Windward Wall
p = (33.81)(0.85)(0.8) - (33.81)(+0.18) = 16.9 -26.2 PSF (7 FT) = -183 PLF
-26.2 PSF (15.25 FT) = -400 PLF
L = 59 ft
p = (33.81)(0.85)(0.8) - (33.81)(-0.18) = 16.9
-26.2 PSF (16.5 FT) = -432 PLF
Leeward Wall -26.2 PSF (18.25 FT) = -478 PLF
p = (33.81)(0.85)(-0.5) - (33.81)(+0.18) = -20.5 -26.2 PSF (20 FT) = -524 PLF
L / B = 0.68
p = (33.81)(0.85)(-0.5) - (33.81)(-0.18) = -8.28 -26.2 PSF (10 FT) = -262 PLF
Side Walls
p = (33.81)(0.85)(-0.7) - (33.81)(+0.18) = -26.2 W
p = (33.81)(0.85)(-0.7) - (33.81)(-0.18) = -14.03
Team Members
5/14/2020 8:15:09 PM
Group 1 Grant Haralson
Ben Williams
Applied Loads
Project number Project Number
E
D2 GB9 GB18 GB27 GB36 GB45
D1
16' - 0"
GB13
GB22
GB31
GB40
GB49
GB4
Tw = L2 / 2
Trapezoid
wmax = q x (L2 / 2)
D
L1 GB8 GB17 GB26 GB35 GB44
13' - 0"
GB12
GB21
GB30
GB39
GB48
GB3
D2
D1
C
GB7 GB16 GB25 GB34 GB43
Tw = L1 / 2 + L2 / 2
Triangle+Trapezoid
15' - 0"
GB11
GB20
GB29
GB38
GB47
L2 / 2 + D1
GB2
wmax = q x (L1 / 2 + L2 / 2)
w2 = q x (L2 / 2 + D1)
B
GB6 GB15 GB24 GB33 GB42
L1
15' - 0"
GB10
GB19
GB28
GB37
GB46
GB1
Cantilever
A
wmax = q x (A / L1)
A
3/32" = 1'-0"
GB5 GB14 GB23 GB32 GB41
L1 14' - 0" 16' - 6" 16' - 6" 20' - 0" 20' - 0"
Level 1
4
6
1
5
3
Load Distribution Typologies
1/8" = 1'-0"
1
Team Members
5/14/2020 8:15:10 PM
Group 1 Grant Haralson
Ben Williams
Tributary Areas - Level 1
Project number Project Number
E
D2 B147 B155 B169
D1
B142
B151
B157
B164
B173
G4
Tw = L2 / 2
Trapezoid
wmax = q x (L2 / 2)
D
L1 B146 B154 B160
B180
B141
G3
D2
D1
C
B145 B167
Tw = L1 / 2 + L2 / 2
Triangle+Trapezoid
B179
L2 / 2 + D1
B140
B162
B171
wmax = q x (L1 / 2 + L2 / 2)
G2
w2 = q x (L2 / 2 + D1)
B
B144 B153 B166
L1
B178
B139
B148
B156
G1
Cantilever
A
wmax = q x (A / L1)
A
3/32" = 1'-0"
B143 B152 B158 B165 B174
Mezzanine
L1
6
1
5
3
Load Distribution Typologies
1/8" = 1'-0"
1
Team Members
5/14/2020 8:15:11 PM
Group 1 Grant Haralson
Ben Williams
Tributary Areas - Mezzanine
Project number Project Number
E
D2 B9 B17 B31
D1
B13
B19
B26
B35
B4
Tw = L2 / 2
Trapezoid
wmax = q x (L2 / 2)
D
L1 B8 B16 B22 B30 B39
B42
B12
B25
B34
B3
D2
D1
C
B7 B29 B38
Tw = L1 / 2 + L2 / 2
Triangle+Trapezoid
B41
L2 / 2 + D1
B11
B24
B33
B2
wmax = q x (L1 / 2 + L2 / 2)
w2 = q x (L2 / 2 + D1)
B
B6 B15 B21 B28 B37
L1
B40
B10
B18
B23
B32
Cantilever B1
A
A
wmax = q x (A / L1)
3/32" = 1'-0"
B5 B14 B20 B27 B36
L1
Level 2
4
6
1
5
3
Load Distribution Typologies
1
1/8" = 1'-0"
Team Members
5/14/2020 8:15:12 PM
Group 1 Grant Haralson
Ben Williams
Tributary Areas - Levels 2, 3, 4
Project number Project Number
E
D2 B51 B60 B77 B86
D1
B46
B55
B64
B72
B81
B90
Tw = L2 / 2
Trapezoid
wmax = q x (L2 / 2)
D
L1 B50 B59 B68 B76 B85
B89
B45
B54
B71
B80
B63
D2
D1
C
B49 B58 B67 B75 B84
Tw = L1 / 2 + L2 / 2
Triangle+Trapezoid
B62
B88
L2 / 2 + D1
B44
B53
B70
B79
wmax = q x (L1 / 2 + L2 / 2)
w2 = q x (L2 / 2 + D1)
B
B48 B57 B66 B74 B83
L1
B87
B43
B52
B61
B69
B78
Cantilever
A
A
wmax = q x (A / L1)
3/32" = 1'-0"
B47 B56 B65 B73 B82
L1
Level 5
4
6
1
5
3
Load Distribution Typologies
1
1/8" = 1'-0"
Team Members
5/14/2020 8:15:12 PM
Group 1 Grant Haralson
Ben Williams
Tributary Areas - Level 5
Project number Project Number
E
B99 B108 B125 B134
D2
D1
B103
B112
B120
B129
B138
B94
Tw = L2 / 2
Trapezoid
wmax = q x (L2 / 2)
D
B98 B107 B116 B124 B133
L1
B137
B102
B119
B128
B111
B93
D2
D1
C
B97 B106 B115 B123 B132
Tw = L1 / 2 + L2 / 2
Triangle+Trapezoid
B110
B136
B101
B118
B127
B92
L2 / 2 + D1
wmax = q x (L1 / 2 + L2 / 2)
w2 = q x (L2 / 2 + D1)
B
B96 B105 B114 B122 B131
L1
B135
B100
B109
B117
B126
Cantilever B91
A
3/32" = 1'-0"
A
wmax = q x (A / L1) B95 B104 B113 B121 B130
L1
Roof
4
6
1
5
3
Load Distribution Typologies
1
1/8" = 1'-0"
Team Members
5/14/2020 8:15:13 PM
Group 1 Grant Haralson
Ben Williams
Tributary Areas - Roof
Project number Project Number
Team Members
5/14/2020 8:15:13 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Level 1
Project number Project Number
Team Members
5/14/2020 8:15:13 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Level 1 Cont.
Project number Project Number
Team Members
5/14/2020 8:15:14 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Mezzanine
Project number Project Number
Team Members
5/14/2020 8:15:14 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Mezzanine Cont.
Project number Project Number
Team Members
5/14/2020 8:15:14 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Levels 2, 3, 4
Project number Project Number
Team Members
5/14/2020 8:15:14 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Levels 2, 3, 4 Cont.
Project number Project Number
Team Members
5/14/2020 8:15:14 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Level 5
Project number Project Number
Team Members
5/14/2020 8:15:14 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Level 5 Cont.
Project number Project Number
Team Members
5/14/2020 8:15:14 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Roof
Project number Project Number
Team Members
5/14/2020 8:15:14 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Roof Cont.
Project number Project Number
0.980 k/ft 0.980 k/ft 0.910 k/ft 0.980 k/ft 0.980 k/ft 1.050 k/ft 1.050 k/ft 1.050 k/ft 1.050 k/ft
0.210 k/ft
B91 0.210 k/ft
B92 0.195 k/ft
B93 0.210 k/ft
B94 0.210 k/ft
B95 0.225 k/ft
B104 0.225 k/ft
B113 0.225 k/ft
B121 0.225 k/ft
B130 Roof
72' - 0"
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
1.030 k/ft 1.030 k/ft 0.965 k/ft 1.030 k/ft 1.030 k/ft 1.095 k/ft 1.095 k/ft 1.095 k/ft 1.095 k/ft
0.420 k/ft 0.420 k/ft 0.390 k/ft 0.420 k/ft 0.420 k/ft 0.450 k/ft 0.450 k/ft 0.450 k/ft 0.450 k/ft
B43 B44 B45 B46 B47 B56 B65 B73 B82 Level 5
60' - 0"
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
1.030 k/ft 1.030 k/ft 0.965 k/ft 1.030 k/ft 1.030 k/ft 1.095 k/ft 1.095 k/ft 1.095 k/ft 1.095 k/ft
0.420 k/ft 0.420 k/ft 0.390 k/ft 0.420 k/ft 0.420 k/ft 0.450 k/ft 0.450 k/ft 0.450 k/ft 0.450 k/ft
Level 4
B1 B2 B3 B4 B5 B14 B20 B27 B36 48' - 0"
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
1.030 k/ft 1.030 k/ft 0.965 k/ft 1.030 k/ft 1.030 k/ft 1.095 k/ft 1.095 k/ft 1.095 k/ft 1.095 k/ft
0.420 k/ft 0.420 k/ft 0.390 k/ft 0.420 k/ft 0.420 k/ft 0.450 k/ft 0.450 k/ft 0.450 k/ft 0.450 k/ft
Level 3
B1 B2 B3 B4 B5 B14 B20 B27 B36 36' - 0"
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
1.030 k/ft 1.030 k/ft 0.965 k/ft 1.030 k/ft 1.030 k/ft 1.095 k/ft 1.095 k/ft 1.095 k/ft 1.095 k/ft
0.420 k/ft 0.420 k/ft 0.390 k/ft 0.420 k/ft 0.420 k/ft 0.450 k/ft 0.450 k/ft 0.450 k/ft 0.450 k/ft
B1 B2 B3 B4 B5 B14 B20 B27 B36 Level 2
24' - 0"
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
1.095 k/ft 1.095 k/ft 1.095 k/ft
0.450 k/ft 0.450 k/ft 0.450 k/ft
B139 B140 B141 B142 B143 B152 B158 B165 B174 Mezzanine
12' - 0"
Team Members
5/14/2020 8:15:16 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Grid Line 1 & Grid
Line number
A
Project Project Number
0.435 k/ft 0.435 k/ft 0.390 k/ft 0.450 k/ft 0.420 k/ft 0.450 k/ft 0.450 k/ft 0.450 k/ft 0.450 k/ft
B100 B101 B102 B103 B96 B105 B114 B122 B131 Roof
72' - 0"
1.885 k/ft 1.885 k/ft 1.950 k/ft 1.820 k/ft 1.950 k/ft 1.950 k/ft 1.950 k/ft 1.950 k/ft
1.690 k/ft
0.870 k/ft 0.870 k/ft 0.780 k/ft 0.900 k/ft 0.840 k/ft 0.900 k/ft 0.900 k/ft 0.900 k/ft 0.900 k/ft
B52 B53 B54 B55 B48 B57 B66 B74 B83 Level 5
60' - 0"
0.638 k/ft
0.638 k/ft
0.638 k/ft
0.555 k/ft
0.555 k/ft
1.885 k/ft 1.950 k/ft 1.820 k/ft 1.950 k/ft 1.950 k/ft
1.530 k/ft 1.375 k/ft 1.613 k/ft 1.613 k/ft
0.870 k/ft 0.706 k/ft 0.900 k/ft 0.840 k/ft 0.745 k/ft 0.745 k/ft 0.900 k/ft 0.900 k/ft
0.635 k/ft
Level 4
B10 B11 0.530 k/ft B12 B13 B6 B15 B21 B28 B37 48' - 0"
0.530 k/ft
0.638 k/ft
0.638 k/ft
0.638 k/ft
0.555 k/ft
0.555 k/ft
1.885 k/ft 1.950 k/ft 1.820 k/ft 1.950 k/ft 1.950 k/ft
1.530 k/ft 1.375 k/ft 1.613 k/ft 1.613 k/ft
0.870 k/ft 0.706 k/ft 0.900 k/ft 0.840 k/ft 0.745 k/ft 0.745 k/ft 0.900 k/ft 0.900 k/ft
0.635 k/ft
Level 3
B10 B11 B12 B13 B6 B15 B21 B28 B37 36' - 0"
0.530 k/ft
0.530 k/ft
0.638 k/ft
0.638 k/ft
0.638 k/ft
0.555 k/ft
0.555 k/ft
1.885 k/ft 1.950 k/ft 1.820 k/ft 1.950 k/ft 1.950 k/ft
1.530 k/ft 1.375 k/ft 1.613 k/ft 1.613 k/ft
0.870 k/ft 0.706 k/ft 0.900 k/ft 0.840 k/ft 0.745 k/ft 0.745 k/ft 0.900 k/ft 0.900 k/ft
0.635 k/ft
B10 B11 B12 B13 B6 B15 B21 B28 B37 Level 2
24' - 0"
0.530 k/ft
0.530 k/ft
0.638 k/ft
0.638 k/ft
0.695 k/ft 1.950 k/ft
1.613 k/ft
0.681 k/ft 1.079 k/ft 0.900 k/ft
0.455 k/ft 0.849 k/ft 0.455 k/ft 0.745 k/ft
0.392 k/ft 0.436 k/ft 0.662 k/ft 0.498 k/ft
0.210
B148 k/ft 0.210
B151 k/ft B144 0.305
B153 k/ft B166 Mezzanine
12' - 0"
0.104 k/ft
0.104 k/ft
0.450 k/ft
GB10 GB11 GB12 GB13 GB6 GB15 GB24 GB33 GB42 Level 1
0' - 0"
Team Members
5/14/2020 8:15:18 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Grid Line 2 & Grid
Line number
B
Project Project Number
1.950 k/ft 1.950 k/ft 1.690 k/ft 1.755 k/ft 1.820 k/ft 1.820 k/ft 1.820 k/ft 1.820 k/ft
0.900 k/ft 0.900 k/ft 1.040 k/ft 0.810 k/ft 0.840 k/ft 0.840 k/ft 0.840 k/ft 0.840 k/ft
0.780 k/ft
0.480 k/ft
B61 B62 B63 B64 B49 B58 B67 B75 B84 Level 5
60' - 0"
1.820 k/ft
0.975 k/ft 0.975 k/ft 0.840 k/ft
0.450 k/ft 0.450 k/ft
B156 B157 B145 B167 Mezzanine
12' - 0"
GB19 GB20 GB21 GB22 GB7 GB16 GB25 GB34 GB43 Level 1
0' - 0"
5/14/2020 8:15:20 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Grid Line 3 & Grid
Line number
C
Project Project Number
1.950 k/ft 1.950 k/ft 1.690 k/ft 1.755 k/ft 1.885 k/ft 1.885 k/ft 1.885 k/ft
0.900 k/ft 0.900 k/ft 1.040 k/ft 0.810 k/ft 0.870 k/ft 0.845 k/ft 0.870 k/ft 0.870 k/ft
0.780 k/ft
0.480 k/ft 0.390 k/ft
B69 B70 B71 B72 B50 B59 B68 B76 B85 Level 5
60' - 0"
0.580 k/ft
0.555 k/ft
0.580 k/ft
0.465 k/ft
0.465 k/ft
1.950 k/ft 1.755 k/ft 1.885 k/ft
0.120 k/ft
0.120 k/ft
1.530 k/ft 1.425 k/ft
0.555
1.310 k/ft
0.900 k/ft 1.040 k/ft 0.810 k/ft 0.870 k/ft 0.965 k/ft
0.706 k/ft 0.658 k/ft 0.480 k/ft 0.605 k/ft 0.488 k/ft 0.390 k/ft
0.225 k/ft Level 4
B23 B24 B25 B26 B8 B16 B22 B30 B39 48' - 0"
0.580 k/ft
0.555 k/ft
0.580 k/ft
0.465 k/ft
0.465 k/ft
1.950 k/ft 1.755 k/ft 1.885 k/ft
0.120 k/ft
0.120 k/ft
1.530 k/ft 1.425 k/ft
0.555
1.310 k/ft
0.900 k/ft 1.040 k/ft 0.810 k/ft 0.870 k/ft 0.965 k/ft
0.706 k/ft 0.658 k/ft 0.480 k/ft 0.605 k/ft 0.488 k/ft 0.390 k/ft
0.225 k/ft Level 3
B23 B24 B25 0.580 k/ft B26 B8 B16 B22 B30 B39 36' - 0"
0.555 k/ft
0.580 k/ft
0.465 k/ft
0.465 k/ft
1.950 k/ft 1.755 k/ft 1.885 k/ft
0.120 k/ft
0.120 k/ft
1.530 k/ft 1.425 k/ft
0.555
1.310 k/ft
0.900 k/ft 1.040 k/ft 0.810 k/ft 0.870 k/ft 0.965 k/ft
0.706 k/ft 0.658 k/ft 0.480 k/ft 0.605 k/ft 0.488 k/ft 0.390 k/ft
B23 B24 B25 B26 B8 B16 0.225
B22k/ft B30 B39 Level 2
24' - 0"
0.580 k/ft
0.580 k/ft
0.120 k/ft
0.120 k/ft
1.425 k/ft
0.900 k/ft 0.849 k/ft 1.040 k/ft 0.870 k/ft 0.965 k/ft
0.392 k/ft 0.658 k/ft 0.480 k/ft 0.504 k/ft 0.488 k/ft 0.390 k/ft
B162 B164 B146 0.233
B154 k/ft 0.225
B160 k/ft Mezzanine
12' - 0"
GB28 GB29 GB30 GB31 GB8 GB17 GB26 GB35 GB44 Level 1
0' - 0"
5/14/2020 8:15:22 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Grid Line 4 & Grid
Line number
D
Project Project Number
0.120 k/ft
0.120 k/ft
0.120 k/ft
1.690 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.960 k/ft 1.030 k/ft 1.160 k/ft 1.160 k/ft 1.160 k/ft
0.900 k/ft 0.900 k/ft 0.780 k/ft
0.420 k/ft 0.480 k/ft 0.480 k/ft 0.480 k/ft
B78 B79 B80 B81 B51 B60 B77 B86 Level 5
60' - 0"
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
1.040 k/ft 1.030 k/ft 1.160 k/ft 1.160 k/ft
0.900 k/ft 0.900 k/ft 0.780 k/ft
0.480 k/ft 0.420 k/ft 0.480 k/ft 0.480 k/ft
Level 4
B32 B33 B34 B35 B9 B17 B31 48' - 0"
0.120 k/ft
0.120 k/ft
1.690 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
1.040 k/ft 1.030 k/ft 1.160 k/ft 1.160 k/ft
0.900 k/ft 0.900 k/ft 0.780 k/ft
0.480 k/ft 0.420 k/ft 0.480 k/ft 0.480 k/ft
Level 3
B32 B33 B34 B35 B9 B17 B31 36' - 0"
0.120 k/ft
0.120 k/ft
1.690 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
1.040 k/ft 1.030 k/ft 1.160 k/ft 1.160 k/ft
0.900 k/ft 0.900 k/ft 0.780 k/ft
0.480 k/ft 0.420 k/ft 0.480 k/ft 0.480 k/ft
B32 B33 B34 B35 B9 B17 B31 Level 2
24' - 0"
0.120 k/ft
0.120 k/ft
1.001 k/ft 1.040 k/ft 1.160 k/ft
0.900 k/ft 0.780 k/ft
0.462 k/ft 0.480 k/ft 0.480 k/ft
B171 B173 B147 B155 B169 Mezzanine
12' - 0"
GB37 GB38 GB39 GB40 GB9 GB18 GB27 GB36 GB45 Level 1
0' - 0"
Team Members
5/14/2020 8:15:24 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Grid Line 5 & Grid
Line number
E
Project Project Number
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
1.095 k/ft 1.095 k/ft 0.965 k/ft 1.160 k/ft
0.450 k/ft 0.450 k/ft 0.390 k/ft 0.480 k/ft
B87 B88 B89 B90 Level 5
60' - 0"
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
1.095 k/ft 1.095 k/ft 0.965 k/ft
0.450 k/ft 0.450 k/ft 0.390 k/ft
Level 4
B40 B41 B42 48' - 0"
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
1.095 k/ft 1.095 k/ft 0.965 k/ft
0.450 k/ft 0.450 k/ft 0.390 k/ft
Level 3
B40 B41 B42 36' - 0"
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
1.095 k/ft 1.095 k/ft 0.965 k/ft
0.450 k/ft 0.450 k/ft 0.390 k/ft
B40 B41 B42 Level 2
24' - 0"
0.120 k/ft
0.120 k/ft
0.120 k/ft
0.120 k/ft
1.095 k/ft 1.095 k/ft 0.965 k/ft
0.450 k/ft 0.450 k/ft 0.390 k/ft
B178 B179 B180 Mezzanine
12' - 0"
Grid Line F
1
3/32" = 1'-0"
Team Members
5/14/2020 8:15:25 PM
Group 1 Grant Haralson
Ben Williams
Distributed Loads - Grid Line F
Project number Project Number
11 1/4"
8 #5 Bars
16"
from interation diagram ρg = 0.01
For the case of maximum axial load: No. 3 Spiral @ 1.75"
ΦPn/Ag = 276.036 k / 201.06 in2 = 1.4 ksi
ΦMn/Agh = 26.7439 k-ft / [(201.06 in2)(16 in)] = 0.1 ksi
from interation diagram ρg = 0.01
As = ρg x Ag = 0.01 (201.06 in2) = 2.01in2 → use 8 #5
sc-c = 2πr / n = [2 π(16 in - 2(1.5 in))(0.5)] / 8 = 5.1 in
sclear = 5.1 in - 0.625 in = 4.48 in
1 1/2"
sclear > 1.5 dbar = 1.5 (0.625) = 0.9375 in
Team Members
5/14/2020 8:15:25 PM
Group 1 Grant Haralson
Ben Williams
Member Design - Typical Circular
Column
Project number Project Number
Lu = 12 ft
1 3/4" 15"
Assumptions
Preliminary size is 20” diameter based on SAP model
Calculations
Ic = 0.70Ig,c = 0.70bh3/12 = 0.70(20 in)(20 in)3/12 = 9333.33 in4
ΨA = ∑(Ic/Lc)/∑(Ib/Lb) = (9333.33 in4/144 in)/(2(8352 in4/180 in))
ΨA = 1.30
ΨB = ∑(Ic/Lc)/∑(Ib/Lb) = 2(9333.33 in4/144 in)/(2(8352 in4/180 in))
ΨB = 2.59
k = 1.35
klu/r = (1.35)(124 in))/(0.3*20 in) = 27.9 > 22 so slenderness cannot be ignored
Pc (axis B) = π20.4EI/(klu)2 = π20.4(4031 ksi)(13333.33 in4)/(1.35*144 in)2 = 5614 k 8 no. 7 Bars
∑Pc = 114280 k No. 3 Ties @ 14"
∑Pu (U = 1.2D + 1.6S + 0.5W) = 6350 k
20"
δs (U = 1.2D + 1.6S + 0.5W) = 1/(1 - ∑Pu/(0.75∑Pc) = 1/(1 - (6350 k)/(0.75*114280 k)) = 1.08
Mu (U = 1.2D + 1.6S + 0.5W) = Mns + δsMs = 2.249 + (1.08)(655.027) k-in = 709.692 k-in
From R-5-60-0.75, ρg = 0.01 for U = 1.2D + 1.0W + 1.0L + 0.5S,
Ast = ρgAg = (0.01)(20 in)2 = 4.0 in2 → use 8 No. 7 bars (Ast = 4.08 in2)
ρg = Ast/Ag = (4.08 in2)/(20 in)2 = 0.012, okay (> 0.01, < 0.08)
Use no. 3 tie
stie = min(16db, 48dt, h) = min(16(0.875 in), 48(0.375 in), 20 in) = 14 in
clear cover = (h - γh - db - 2dt)/2 = (20 - 0.75*20 - 0.875 - 2*0.375 in)/2 = 1.69 in > 1.5 in, good
sc1 = (h - 2*cover - 2dt - 3db)/2 = (20 - 2*1.69 - 2*0.375 - 2*0.875)/2 = 6.63 in > 6 in, need
additional ties
sc1 = 6.63 in > max(1 in, db = 0.875 in), spacing okay
Team Members
5/14/2020 8:15:25 PM
Group 1 Grant Haralson
Ben Williams
Member Design - Typical Rectangular
Column
Project number Project Number
Assumptions 18"
Sample Calculations
Ic = 0.70Ig,c = 0.70πD4/64 = 0.70π(18 in)4/64 = 3607 in4
ΨA = 10 (pinned end)
ΨB = ∑(Ic/Lc)/∑(Ib/Lb) = ((3607 in4/720 in) + (19354 in4/144 in))/(8352 in4/192 in)
ΨB = 3.2
k = 2.3
klu/r = (2.3)(696 in))/(0.25*18 in) = 356 > 22 so slenderness cannot be ignored
Pc (axis B) = π20.4EI/(klu)2 = π20.4(4031 ksi)(27648 in4)/(1.6*144 in)2 = 8287 k
∑Pc = 208642 k 8 No. 9
∑Pu (U = 1.2D + 1.6S + 0.5W) = 6350 k No. 4 tie @ 1.5"
δs (U = 1.2D + 1.6S + 0.5W) = 1/(1 - ∑Pu/(0.75∑Pc) = 1/(1 - (6350 k)/(0.75*208642 k)) = 1.04
Mu (U = 1.2D + 1.6S + 0.5W) = Mns + δsMs = 58.38 + (1.04)(1016.78) k-in = 1118.169 k-in
From C-5-60-0.6, ρg = 0.03 for U = 1.2D + 1.0W + 1.0L + 0.5S,
Ast = ρgAg = (0.03)π(18 in)2/4 = 7.63 in2 → use 8 No. 9 bars (Ast = 8.00 in2)
Try no. 4 spiral at 1.5"
ρs = 4π(ds)2/(4*(Dc = γD +db + 2ds)s) = 4π(0.5 in)2/(4(0.6*18 + 1.128 + 2*0.5 in)(1.5 in)) = 0.041
ρs,min = 0.45((D/Dc)2 - 1)f'c/fy = 0.45((18/12.928)2 - 1)(5 ksi)/(60 ksi) = 0.035, okay
sc = s - ds = 1.5 - 0.5 in = 1.0 in, okay (>= 1 in, <= 3 in)
Team Members
5/14/2020 8:15:26 PM
Group 1 Grant Haralson
Ben Williams
Member Design - Corner Circular
Column
Project number Project Number
16"
Sample Calculations
2 1/8" 9 5/8"
Ic = 0.70Ig,c = 0.70πD4/64 = 0.70π(16 in)4/64 = 2252 in4
ΨA = ∑(Ic/Lc)/∑(Ib/Lb) = (2252 in4/720 in)/((8352 in4/180 in) + (8352 in4/156 in))
ΨA = 0.03
ΨB = ∑(Ic/Lc)/∑(Ib/Lb) = ((2252 in4/720 in) + (19354 in4/144 in))/((8352 in4/180 in) + (8352 in4/156 in))
ΨB = 1.38
k = 1.3
klu/r = (1.3)(696 in))/(0.25*16 in) = 226.2 > 22 so slenderness cannot be ignored
Pc (axis B) = π20.4EI/(klu)2 = π20.4(4031 ksi)(27648 in4)/(1.6*144 in)2 = 8287 k
∑Pc = 208642 k
∑Pu (U = 1.2D + 1.6S + 0.5W) = 6350 k 8 no. 10 Bars
δs (U = 1.2D + 1.6S + 0.5W) = 1/(1 - ∑Pu/(0.75∑Pc) = 1/(1 - (6350 k)/(0.75*208642 k)) = 1.04 No. 4 Spiral @ 2.0"
Mu (U = 1.2D + 1.6S + 0.5W) = Mns + δsMs = 24.82 + (1.04)(857.56) k-in = 918.650 k-in
From C-5-60-0.6, ρg = 0.045 for U = 1.2D + 1.0W + 1.0L + 0.5S,
Ast = ρgAg = (0.045)π(16 in)2/4 = 9.04 in2 → use 8 No. 10 bars (Ast = 10.16 in2)
Try no. 4 spiral at 2.0"
ρs = 4π(ds)2/(4*(π(Dc = γD +db + 2ds)2/4)s) = 4π(0.5 in)2/(4(π(0.6*16 + 1.27 + 2*0.5 in)2/4)(2 in)) = 0.033
ρs,min = 0.45((D/Dc)2 - 1)f'c/fy = 0.45((16/11.87)2 - 1)(5 ksi)/(60 ksi) = 0.031, okay
sc = s - ds = 2 - 0.5 in = 1.5 in, okay (> 1 in, < 3 in)
Team Members
5/14/2020 8:15:26 PM
Group 1 Grant Haralson
Ben Williams
Member Design - Atrium Circular Column
Project number Project Number
Assumptions
As,max = 0.75*0.85*β1f'cbd(87/(87 + fy))/fy
Preliminary size is b = 12” & h = 24" As,max = 0.75*0.85(0.80)(5 ksi)(12 in)(21.5625 in)*
Assume normal weight concrete (87 ksi/(87 + 60 ksi))/(60 ksi)
Assume No. 4 tie As,max = 6.51 in2 > As = 2.41 in2, okay 2 No. 5
Torsion cracks θ = 45°
As,min = (bd/fy)max(3sqrt(f'c), 200)
Calculations As,min = ((12 in)(21.5625 in)/(60000 psi))*
9 1/1 6"
max(3sqrt(5000 psi), 200 psi)
Flexure Design As,min = 0.91 in2 < As = 2.41 in2, okay
Guess As until ΦMn > Mu and Φ = 0.9 sc,min = max(1 in, dbar) = max(1 in, 0.875 in)
Successful guess is 4 No. 7 (As = 2.41 in2) sc,min = 1 in
24"
*this will change with torsion calculations sc = (b - 2*cover - 2*dtie - 4dbar)/3 2 No. 5
sc = (12 - 3 - 2*0.5 - 4*0.875 in)/3
Check that Φflexure = 0.9 sc = 1.5 in > sc,min = 1 in, okay
c = Asfy/(0.85f'cbβ1) *sc will change with torsional reinforcement
c = (2.41 in2)(60 ksi)/((0.85)(5 ksi)(12 in)(0.80)) No. 4 tie @ 5 in.
c = 3.54 in
Shear Design
d = h - cover - dtie - 0.5dbar
d = 24 - 1.5 - 0.5 - 0.5*(7/8) in ΦVc = Φ2λsqrt(f'c)bd = 2*1.0sqrt(5000 psi)(12 in)(21.5625 in) 4 No. 8
d = 21.5625 in ΦVc = 27.4 k > Vu = 25.6 k
Team Members
5/14/2020 8:15:26 PM
Group 1 Grant Haralson
Ben Williams
Member Design - Typical Beam
Project number Project Number
Vs,max = 8sqrt(f'c)bd = 8sqrt(5000 psi)(12 in)(21.5625 in) Determine concrete section adequacy At/s = (399.2 k-in)tan(45°)/(0.75*2(148.11 in2)(60 ksi))
Vs,max = 146.4 k > Vs = 13.71 k, okay if sqrt((Vu/(bd))2 + (Tuph/(1.7Aoh2))2) < At/s = 0.0299 in2/in (for one leg of stirrups)
Φ2λsqrt(f'c) + 8sqrt(f'c), then size is okay
Max Spacing depends on if Vs < 0.5Vs,max Recall Av/s = 0.0106 in2/in
x1 = b - 2*cover - dtie = 12 - 3 - 0.5 in
0.5Vs,max = 0.5*(146.4 k) x1 = 8.5 in Thus Atotal/s = Av/s + 2At/s
0.5Vs,max = 73.2 k > Vs = 13.71 k Atotal/s = 0.0106 in2/in + 2*0.0299 in2/in
y1 = h - 2*cover - dtie = 24 - 3 - 0.5 in Atotal/s = 0.0704 in2/in
Thus y1 = 20.5 in
Smax = min(d/2, 24 in) = min(21.5625/2, 24 in) Atotal/smin = (b/fy)max(0.75sqrt(f'c), 50)
Smax = 10.8 in > S = 37.7 in Aoh = x1y1 = (8.5 in)(20.5 in) Atotal/smin = (12 in/60000 psi)max(0.75sqrt(5000 psi), 50)
Use S = 10.5 in Aoh = 174.25 in2 Atotal/smin = 0.0106 in2/in < Atotal/s = 0.0704 in2/in, okay
Use No. 4 stirrups at S = 10.5 in. ph = 2(x1 + y1) = 2(8.5 + 20.5 in) Use No. 4 ties
ph = 58 in
S = 2abar/(Atotal/s) = 2(0.2 in2)/(0.0704 in2/in)
Torsion Design sqrt((Vu/(bd))2 + (Tuph/(1.7Aoh2))2) = S = 5.68 in
Do for Mezzanine Beam along D axis between axises 2 & 3 sqrt((25600 lb/((12 in)(21.5625 in)))2 +
(Refer to Design Plans) ((399200 lb-in)(58 in)/(1.7(174.25 in2)2))2) = Smax = min(ph/8, 12 in, Smax,v) = min(58/8, 12, 10.8 in)
459.3 psi Smax = 7.25 > S = 5.68 in
Tu = Fr = (quxy)(x/2) = (0.252 ksf)(16.5 ft)(4 ft)(4/2 ft)(12 in/ft)
Tu = 399.2 k-in Use No. 4 closed stirrups at S = 5 in.
Team Members
5/14/2020 8:15:27 PM
Group 1 Grant Haralson
Ben Williams
Member Design - Typical Beam Cont.
Project number Project Number
Check maximum perimeter bar spacing and ensure it is less than 12 inches.
Maximum spacing occurs between top and middle layers.
sc,perimeter = h/2 - 1.5db - cover - dtie = 24/2 - 1.5(0.625) - 1.5 - 0.5 in
sc,perimeter = 9.0625 in < 12 in, okay Load Combination Max Moment Max Shear
1.4DL -88.1579 k-ft 22.081k
Check minimum bottom bar spacing 1.2DL+1.6LL+0.5SL -107.8028 k-ft 26.517 k
sc = (b - 2*cover - 2*dtie - 4db)/3 = (12 - 2*1.5 - 2*0.5 - 4*1)/3 in 1.2DL+1.6SL+1.0LL -94.2204 k-ft 23.559 k
sc = 1.33 in 1.2DL+1.6SL+0.5W -96.0576 k-ft 23.775 k
sc,min = max(1 in, db) = max(1, 0.625 in) 1.2DL+1.0W+1.0LL+0.5SL -103.3003 k-ft 21.814 k
sc,min = 1 in < sc = 1.83 in, okay 0.9DL+1.0W -85.8005 k-ft 16.359 k
1.2DL+1.6LL+0.5SL -106.6056 k-ft 26.827 k
Use 2 No. 5 on the top, 2 No. 5 in the middle, and 4 No. 8 on the bottom 1.2DL+1.0W+1.0LL+0.5SL -97.7110 k-ft 25.245 k
for longitudinal reinforcement 0.9DL+1.0W -84.0524 k-ft 19.158 k
Team Members
5/14/2020 8:15:27 PM
Group 1 Grant Haralson
Ben Williams
Member Design - Typical Beam Cont.
Project number Project Number
E
D
#4 @ 13" (T)
#4 @ 13" (T)
B
A
Note:
See Slab Design - Levels 2, 3, 4 for #4 @ 13" (T) #4 @ 13" (T)
example calculations
Slab Depth = 8 in 1 2 3 4 5 6
Team Members
5/14/2020 6:30:14 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Level 1 Plan
Project number Project Number
6" 6"
#4 @1' - 1" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1"
#4 @1' - 1"
A B C D E
8" 8"
Team Members
5/14/2020 6:30:14 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Level 1 Section
Project number Project Number
38" 32" 44" 44" 44" 44" 48" 48" 48" 54"
1 2 3 4 5 6
6" 8"
#4 @1' - 1" #4 @1' - 1" #4 @1' - 1"
#4 @1' - 1" #4 @1' - 1" #4 @1' - 1"
50" 44" 53" 53" 53" 53" 65" 65" 65" 71"
Team Members
5/14/2020 6:30:15 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Level 1 Section
Project number Project Number
D
tmin = ℓ/20 = (7*12 in)/20
tmin = 4.2 inches
Mu = quℓ2/8 C
Mu = (0.252 ksf)(7 ft)2/8
Mu = 1.54 k-ft/ft
ρ = 0.85f'c/fy(1 - sqrt(1 -
2Mu/(Φwmd20.85f'c)))
ρ = 0.85(3 ksi)/(60 ksi)(1 - sqrt(1 -
B
2*1.54 k-ft/ft/(0.9*
(8 in)20.85(3 ksi))))
ρ = 0.00045
ε = 0.003(d - c)/c
#4 @ 13" (T)
#4 @ 13" (T)
#4 @ 13" (T)
#4 @ 13" (T)
ε = 0.003(8 - 0.10 in)/(0.10 in)
ε = 0.24 >> 0.005, Φ = 0.9
6
1
5
3
Team Members
5/14/2020 6:30:15 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Mezzanine Plan
Project number Project Number
S = babar/As = (12 in)(0.20 in2)/(0.19 in2) S = babar/As = (12 in)(0.11 in2)/(0.19 in2) 6" 6"
A B C D E
8" 8"
#3 @6"
Team Members
5/14/2020 6:30:16 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Mezzanine Section
Project number Project Number
Corner Column Vu = quLx = (0.252 ksf)(15*12/2 in)(101 in)(1 ft2/144 in2) ΦVc = 0.75*4*(8 in)(32 in)(1.0)sqrt(3000 psi)
1) Check N-S Shear Line Vu = 15.91 k ΦVc = 42.07 k
A B C D
8" 8"
Team Members
5/14/2020 6:30:16 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Mezzanine Section
Project number Project Number
3 4 5 6
6" 6"
#4 @1' - 1" #4 @1' - 1" #4 @1' - 1"
#4 @1' - 1"
3 4 5 6
6" 8"
#4 @1' - 1" #4 @1' - 1" #4 @1' - 1"
#4 @1' - 1"
Team Members
5/14/2020 6:30:17 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Mezzanine Section
Project number Project Number
D
Slab Depth = 8"
#4 @ 13" (T)
Factored Loading:
C
qu = 252 psf
wf = 16 in
2 combinations, do both
C = (1 - 0.63*12/24)12324/3 +
(1 - 0.63*8/16)8316/3 in4
C = 11339.95 in4
C = (1 - 0.63*12/16)12316/3 +
A
(1 - 0.63*8/28)8328/3 in4
C = 8779.95 in4
#4 @ 13" (T)
#4 @ 13" (T)
6
1
5
3 Team Members
5/14/2020 6:30:18 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Levels 2, 3, 4 Plan
Project number Project Number
Team Members
5/14/2020 6:30:18 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Levels 2, 3, 4 Calculations
Project number Project Number
ρg,min = 0.0018
As,min = ρg,minwmtslab = 0.0018(84 in)(8 in)
As,min = 1.21 in2
Team Members
5/14/2020 6:30:18 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Levels 2, 3, 4 Calculations
Project number Project Number
A B C D E
8" 8"
#4 @1' - 1" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1"
Team Members
5/14/2020 6:30:18 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Levels 2, 3, 4 Section
Project number Project Number
Team Members
5/14/2020 6:30:19 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Levels 2, 3, 4 Calculations
Project number Project Number
1 2 3 4 5 6
6" 6"
#4 @1' - 1" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1"
38" 32" 44" 44" 44" 44" 48" 48" 48" 54"
1 2 3 4 5 6
6" #4 @1' - 1" #4 @1' - 1" 8"
#4 @1' - 1" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1"
50" 44" 53" 53" 53" 53" 65" 65" 65" 71"
Team Members
5/14/2020 6:30:19 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Levels 2, 3, 4 Section
Project number Project Number
#4 @ 12" (T)
C
#4 @ 12" (T)
B
Note:
A
#4 @ 12" (T)
Slab Depth = 5 in
6
1
5
3 Team Members
5/14/2020 6:30:20 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Level 5 Plan
Project number Project Number
A B C D E
6" 6"
#4 @12" #4 @12" #4 @12" #4 @12" #4 @12"
Team Members
5/14/2020 6:30:20 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Level 5 Section
Project number Project Number
38" 32" 44" 44" 44" 44" 48" 48" 48" 54"
1 2 3 4 5 6
6" #4 @12" 6"
#4 @12" #4 @12" #4 @12" #4 @12" #4 @12"
50" 44" 53" 53" 53" 53" 65" 65" 65" 71"
Team Members
5/14/2020 6:30:21 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Level 5 Section
Project number Project Number
#4 @ 13" (T)
C
Slab Design: Panel Bounded by
#4 @ 13" (T)
Axises A, B, 1, and 2, design for
EW and NS. These calculations are
based off preliminary sizes of
beams and columns.
B
Factored Loading:
qu = max(1.4*140,
1.2*140 + 1.6*20 +0.5*30,
#4 @ 13" (T)
#4 @ 13" (T)
6
1
5
3
Team Members
5/14/2020 6:30:21 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Roof Plan
Project number Project Number
Team Members
5/14/2020 6:30:22 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Roof Calculations
Project number Project Number
ρg,min = 0.0018
As,min = ρg,minwmtslab = 0.0018(84 in)(8 in)
As,min = 1.21 in2
Team Members
5/14/2020 6:30:22 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Roof Calculations
Project number Project Number
6" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1" 6"
#4 @1' - 1"
A B C D E
#4 @1' - 1" #4 @1' - 1" #4 @1' - 1"
6" #4 @1' - 1" #4 @1' - 1" 8"
Team Members
5/14/2020 6:30:22 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Roof Section
Project number Project Number
Team Members
5/14/2020 6:30:22 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Roof Calculations
Project number Project Number
1 2 3 4 5 6
#4 @1' - 1" #4 @1' - 1" #4 @1' - 1" 6"
6" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1"
38" 32" 44" 44" 44" 44" 48" 48" 48" 54"
1 2 3 4 5 6
6" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1" #4 @1' - 1"
#4 @1' - 1" #4 @1' - 1" 6"
50" 44" 53" 53" 53" 53" 65" 65" 65" 71"
Team Members
5/14/2020 6:30:23 PM
Group 1 Grant Haralson
Ben Williams
Slab Design - Roof Section
Project number Project Number
No. 4 @ Sh = 9"
need shear reinforcement ρl = 0.0025 + 0.5(2.5 - hw/lw)(ρt - 0.0025)
ρl = 0.0025 + 0.5(2.5 - 144 in/192 in)(0.0037 - 0.0025)
12' - 0"
Transverse Shear Reinforcement ρl = 0.00355 > ρl,min = 0.0025, okay
Use No. 4 bars
S = Ano.4/(hρl) = 0.2 in2/((6 in)(0.00355))
Vs = (Vu - ΦVc)/Φ S = 9.38 in
Vs = (300 - 161.29 k)/0.75
Vs = 184.9 k Smax = min(3h, 18 in, lw/3) = min(3*6, 18, 192/3 in)
Smax = 18 in > S = 9.38 in, round down
Av/s = Vs/fyd = (184.9 k)/((60 ksi)(153.6 in)) S = 9 in
Av/s = 0.0201 in2/in
Use No. 4 @ S = 9 in for longitudinal reinforcement Shear Wall Section
1
1/4" = 1'-0"
Team Members
5/14/2020 8:15:27 PM
Group 1 Grant Haralson
Ben Williams
Wall Design
Project number Project Number
Use 5 No. 10 bars (As = 6.35 in2) for flexural reinforcement on each end
c = Asfy/(0.85f'chβ1)
c = (6.35 in2)(60 ksi)/((0.85)(5 ksi)(6 in)(0.80))
c = 18.68 in
ε = 0.003(d - c)/c
ε = 0.003(153.6 - 18.68 in)/(18.68 in)
ε = 0.022 >> 0.005, so Φ = 0.9
Cover is 0.75" at all locations except the exterior end where it is 2"
Team Members
5/14/2020 8:15:27 PM
Group 1 Grant Haralson
Ben Williams
Wall Design Cont.
Project number Project Number
23 3/4"
20"
ccolumn = 16 in; Pservice = 386.61 k; Vu = Pux/L = (491.72 k)(23 in)/(102 in) No. 4 @ 4"
Pu (U = 1.2D + 1.6L + 0.5S) = 491.72 k Vu = 110.87 k
Column 5B at Ground Level (refer to Design
Plans) ΦVc = Φ2dLsqrt(f'c) = (0.75)(2)(20 in)(102 in)sqrt(3000 psi)
ΦVc = 167.6 k > Vu = 110.87 k
Square Footing Dimensions Foundation Section
2
L = sqrt(Pservice/qsoil) Overall depth with no. 4 bars 3/8" = 1'-0"
L = sqrt(386610 lb/6000 psf) h = d + cover + 1.5db = 20 + 3 + 1.5(0.5 in)
L = 8.03 ft → round up to nearest half-foot h = 23.75 in
Thus L = 8.5
Check Dimensions Again with Self-Weight
Punching Shear Check → guess d L = sqrt((Pservice + γL2h)/qsoil) =
After iteration, d = 20 in. is adequate L = sqrt((386610 + (150 pcf)(8.5 ft)2(23.75/12 ft) lbs)/(6000 psf))
L = 8.25 ft → round up to nearest half-foot 16"
Vu = Pu(1 - ((ccolumn + d)/L)2) Lnew = 8.5 ft == Lold = 8.5 ft → good
Vu = (491.72 k)(1 - ((16 + 20 in)/102 in)2)
8' - 6"
16"
Vu = 430.47 k Flexure
Team Members
5/14/2020 8:15:27 PM
Group 1 Grant Haralson
Ben Williams
Foundation Design
Project number Project Number
c = Asfy/(0.85f'cLβ1) =
c = (4.36 in2)(60 ksi)/((0.85)(3 ksi)(102 in)(0.85))
c = 1.18 in
Max Spacing
Smax = min(3h, 18 in) = min(3*23.75, 18 in) = min(71.25, 18 in)
Smax = 18 in > S = 4.68 in
Team Members
5/14/2020 8:15:28 PM
Group 1 Grant Haralson
Ben Williams
Foundation Design Cont.
Project number Project Number