Bill of Quantities For POP False Ceiling No. Area Name Punning Area Didaction Total Ground Floor

This document provides a bill of quantities for POP false ceiling work for multiple floors of a building. It includes the area names, measurements of false ceiling, vertical panels, cove molding and other details. The summary sheet totals the quantities and costs for materials, labor and rent. The total cost for the POP false ceiling work is estimated to be Rs. 502840 after accounting for labor and rent charges.

Uploaded by

Avinesh Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views6 pages

Bill of Quantities For POP False Ceiling No. Area Name Punning Area Didaction Total Ground Floor

This document provides a bill of quantities for POP false ceiling work for multiple floors of a building. It includes the area names, measurements of false ceiling, vertical panels, cove molding and other details. The summary sheet totals the quantities and costs for materials, labor and rent. The total cost for the POP false ceiling work is estimated to be Rs. 502840 after accounting for labor and rent charges.

Uploaded by

Avinesh Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Bill Of Quantities for POP False Ceiling

No. Area Name Punning area Didaction Total

Ground Floor
1 Living Room 1216 240 976
2 Bedroom-1 539 102 437
3 Bedroom-2 671 104 567
4 Dressing 220 58 162
5 Suite 918 176 742
Total Area- A 2884

First Floor
1 Living Room 1216 310 906
2 Bedroom-1 671 104 567
3 Dressing 220 58 162
4 Bedroom-2 587 101 486

Total Area- B 2121

Second Floor
1 Living Room 1184 285 899
2 Bedroom-1 567 150 417
3 Dressing 220 58 162
4 Bedroom-2 673 121 552

Total Area- C 2030

10% Flucation according to the Site mesurement


Bill Of Quantities for POP False Ceiling

Wall
No. Area Name False Ceiling Vertical Cove Cove Cornice
Cornice

Ground Floor
1 Living Room 221 128 114 114 71
2 Bedroom-1 107 58 51 51 39
3 Bedroom-2 130 71 63 63 45
4 Suite 231 123 101 101 68

Total Area 689 380 329 329 223

First Floor
1 Living Room 264 143 109 109 36
2 Bedroom-1 114 76 59 59 37
3 Bedroom-2 110 56 36 36 33

Total Area 488 275 204 204 106

Second Floor
1 Living Room 237 145 100 100 53
2 Bedroom-1 103 63 55 55 27
3 Bedroom-2 221 69

Total Area 561 208 155 155 149


According to the Site mesurement
Summery Sheet

No. Type Ground Floor First Floor Second Floor Total

False Ceiling 689 488 561 1738


Vertical 380 275 208 863
Cove 329 204 155 688
Cove Cornice 329 204 155 688
Wall Cornice 223 106 149 478
Wall Punning 2649 2121 2030 6800

Total Amount

Labour Extra
Rent

Total

689 90 62010
380 90 34200
329 90 29610
329 55 18095
223 60 13380
2649 19 50331
207626
Rate Amount No.

90 156420 80 139040
90 77670 80 69040
90 61920 80 55040
90 61920 65 44720
65 31070 65 31070
20 136000 20 136000

525000 474910

36000 36000
8000 8000

569000 518910
Summery Sheet

Type Ground Floor First Floor Second Floor Total Rate Amount

False Ceiling 689 488 561 1738 80 139040


Vertical 380 275 208 863 80 69040
Cove 329 204 155 688 80 55040
Cove Cornice 329 204 155 688 55 37840
Wall Cornice 223 106 149 478 60 28680
Wall Punning 2649 2121 2030 6800 19 129200

Total Amount 458840

Labour Extra 36000


Rent 8000

Total 502840
Bill Of Quantities for POP False Ceiling

No. Area Name False Ceiling Vertical Cove

Ground Floor
1 Living Room 375 157 157
2 Bedroom-1 157 33 33
3 Bedroom-2 149 19 19
3 Bedroom-3 136
3 Bedroom-4 196 72 25
4 Kitchen 151 52 0

Total Area 1164 333 234

10% Flucation according to the Site mesurement

1164 55 64020
333 56 18648
234 57 13338

Total 96006