ESTIMATING AND coSTING

286
USERS
ESTIMATE OF SEPTIC TANK FOR 25 for 25 users from
tank with Soak-pit
detailed estimate of a Septic
xample 1.-Prepare a
the given drawings. Fig. 10-1.
brickwork in 1:4 cement mortar
the foundation and floor
Septic tank shall be of first class shall be finished with
12 m m cement plaster
of1:3:6cement concrete. Inside of septic tank with standard water
shallbe with 1:3 mortar mixed
and floor shall be finished with 20 mm cement plaster class brickwork in 1:6
proofing compound. Upper and lower portion
of soak-pit shall be of second slabs and baffle wall
middle portion shall be of drybrickwork. Roof covering as taken
cement mortar and seat muy be
be R.C.C. The length of the connecting pipe from latrine
shall of precast
3 metres. Assume suitable rates.

SEPTIC TANK FOR 25 USERS

sOAK PIT
C. I.Cowl U-Bolt
50mm Dia. C. I. Ventilating pipe 2mm High Remova
7.5cm R.C.C. Slab 30x30cm
v.Bolt 7.5 cm R. C. C. Slab Precast
G.L
G.L s Brick work with
Outlet 1:6 Cement
Inlet 5 mortar 50

100 mm 100 mmDia.


s. W. Pipe S. W. Pipe 300
4 cm R. C. C. 201 100cm
300 cm Long
20 Baffle Dia
Iron Foot Steps 250
140
Slope 1 in 20
. 60
Dry Brick
10- Work
0. 15cm
2 Coarse Sand
1:3:6 C.C.
Brick Work with' Brick Aggregate
1:6 Cement mortar

15cm Coarse Sandy

Iron Foot Step


4cm R.C.C. 100cm Dia
Baffle 90
A -40-
200
ZE
2030. 40 15cm Brick Aggregate

PLAN
unless otherwise Specified,
All Dimensions in Cenfimetre

Fig. 6-1
SEPTIC TANK FOR 25 USERS 287
Details of Measurement and Calculation of
Quantities (Ex. 1)
Item Particulars of
No. items and details
Height Quantity| Explanatory notes
No. Length Breadth|or
of works Depth
m m m

. Earthwork in exca
vation Septic tank 2.80 1.70 1.95 9.28 Ht. = 140 +30 +20+5
Soak-pit up to = 1.95 m

3.00 m depth. ... TX2.002


3.00 9.42
4
TX 1.42
Soak-pit lower X 0.20 0.30 Below dry brickwork
portion 4
Total 19.00 cu m
2. Cement concrete
1:3:6-Floor and
foundation 2.80 1.70 0.20 0.95
Sloping floor 2.002.00 0.90 0.050.09 Average thickness
Total 1.04
10+0 5cm
2
3. First class cu
| brickwork in 1:4
cement mortar in
septic tank-
Long walls-
Ist step 2.60 0.30 0.60 0.94
o
2nd stcp 2.40 0.20 1.15 1.10 C 30140 -60-0
Short walls
Ist step 0.90 0.30 0.60 0.32
2nd step 0.90 0.20 1.15 0.42
4. 2nd class brick Total 2.78 Cu m
work in 1:6cement
mortar in
soak-pit-
Upper portion (TX 1.20) x 0.20 0.50 0.38
Lower portion|(TX1.20x0.20 0.20 0.15 L mean circum.
5. 2nd class dry Total 0.53 cum
brickwork in Soak
pit TX 1.20 x 0.20 2.50 1.88 cum
6. Precast R.C. work
finished smooth in-
cluding steel rein-
forcement complete
laid in position-
Roof cover slab of
septic tank 2.40 1.30 0.075 0.234 7.5 cm thickness
TX 1.404 0.075 0.115
Roof cover slab of 1 x

soak-pit
Baffle wall in septic
tank 1 1.00 0.040.45 0.018
e
Total 0.367 cu m
288 ESTIMATING AND coSTING

Item Particulars of Height


No. items and details
No. Length Breadth or Quantity| Explanatory notes
of works
Depth
m m m
7. 12 mm cement
plaster
1:3 with standard water
proofing compound in
septic tank-
Long walls 2.00 1.70 6.80
Short walls
0.90 1.70 06 Inner face

Total .86
. 20 mm cement sq m
plaster
1:3 with standard water
proofing compound in
floor of septic tank
2.00 0.90 1.80
9. 50 mm size brick Sq m
aggregate
Outer side of soak-pit ..1I(TX1.55x .15 2.50 1.84 |L mean circum.
At bottom of
soak-pit T1.012 X 0.20 0.16
4
Total 2.00 cu m
10. Coarse sand outer side of
soak-pit 1 X1.85 x .15 2.50 2.18 L = mean circum.

11. Iron foot steps of 16 mm cu m


|dia. bar 4 nos.
12. 100 mm dia. S.W. pipe
laying and jointing with
1:3 cement mortar
complete-
Inlet end from latrine to
septic tank 3.00 3.00
Outer end from septic
tank to soak-pit 3.30 3.30
Total 6.3
13. S.W. Tee 100 mm dia. m

with one leg of 40 cm 1 no.


14. S.W Bend 100 mm dia 1 no.
15. 50 mm dia. C.I.
ventilating pipe 2.00 2.00 r m
l6. | 50 mm dia. C.I. cowl at
top ofventilating pipe I no.
SEPTIC TANK FOR 25 USERS 289
Details of Measurement and Caleulation of
Quantities (Ex. 1)
ltem
No. Particulars of items of work Rate Amount
Quantity Unit Per
Rs. P. Rs. P.
1. Earthwork in excavation 19.00 cu m 350.00 %cu m 66.50
2. Cement concrete 1:3:6
in
floor with brick aggregate foundation
and
1.04 cum 300.00 cu n 312.00
3. Ist class brickwork in 1:4 cement
mortar 2.78 cu-m 345.00 cu 959.10
4. 2nd class brickwork in 1:6 cement mortar
0.53 curm 310.00 cu m 164.30
5. 2nd class dry brickwork 1.88 cu m 130.00 cum 244.40
6. Precast R.C.C. work including steel
reinforcement finished complete 0.367 cum 675.00|| cum 247.73
7. 12 mm cement plaster 1:3 with standard
water proofing compound 9.86
**

sqm 9.00| sq m 88.7


8. 20 mm cement plaster 1:3 with standard
water proofing compound 1.80 sq m
15.00| sq m 27.00
9 50 mm size brick aggregate laid in
position 2.000 cu m
100.00|| cu m 200.00
10. Coarse sand laid in position 2.18 cu m 80.00|/ cu m 174.40
1. Iron foot step 4 no. 2.00 no. 8.00
12. 100 dia. S.W.
mm
pipe laid in position
conmplete with jointing 1:l cement mortar 6.30 m 27.00 m 170.10
13. S.W. Tee 100 dia. with
mm one leg of 40
cm long
no. 15.00 no. 15.00
14. S.W. Bend of 10 mm dia. no. 8.00 no. 8.00
15. 50 dia. C.l.
mm
ventilating pipe fitted in
position 2.00 m 10.00 rm 20.00
I6. 50 mm dia. C.l. cowl fixed in position no. 6.00 no. 6.00

Add 5% (3 for
Total 2711.27
Contingencies and 2% for Workcharged Establishment). 135.56
Grand Total 2846.83
Total Cost for Septic tank including Soak Pit for 25 users Say Rs. 2847.00