VP Operations, Planning Manager, VP Production, Production Manager with 29 years experience looking for a Executive position.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as TXT, PDF, TXT or read online from Scribd
Download as txt, pdf, or txt
You are on page 1of 2
Name: Pertti Rinta-Panttila
DOB & place 17th DEC 1954; Jokioinen, Finland
Education : M.Sc (Naval Architect), 1985, Helsinki University of Technology, Finland Graduate from High School 1973 (Forssa, Finland) Total Years of Experience: 30 yrs Citizenship: Citizen of Finland Residency status: US Permanent Resident since 2002 Address: 467 Derwyn Rd; Drexel Hill, PA, 19026; USA Phone: 215-519-2080 Email: [email protected]
Experience/Positions Held/Work History: (list in chronological descending order
) 2007- 2010 Aker Philadelphia Shipyard, VP Engineering, Planning and Quality Responsibility of all Planning, Quality Management and Engineering functions at APSI. Member of Shipyard Executive Group 2006 -2007 Aker Yards Finland, VP Operations Planning Responsible for centralized planning activities in Aker Yards Finland, and for c o-ordinating all AY Fi planning functions, and responsible of planning co-ordina tion within AY Cruise & Ferry Business Area 2005-2006 Aker Finnyards Inc (AFY), Production Planning Manager Responsible for the planning function of AFY Turku yard, and responsible of plan ning co-ordination within AFY. 2003-2004 Kvaerner Masa Yards Inc Finland (KMY), Planning Manager Responsible for the yard planning function of KMY, both Turku and Helsinki yards . 2002-2003 Kvaerner Philadelphia Shipyard Inc (KPSI), VP Planning Responsible for the planning (design, project & detail planning) function of KPS I. Member of Shipyard Executive Group. 2000-2002 KPSI, VP Production Department Responsible for production, planning, IT, & Yard Construction functions. Member of Shipyard Executive group. Managed an organization of 1000 people. Responsible for finalizing the $260M investment project, and continuing facility development. Responsible for the startup of production at KPSI. 1998-2000 KPSI, Planning & IT System Manager Responsible for Planning & IT functions of KPSI. Executive group member Responsible for the KPSI IT-system implementation & development 1994-1998 KMY, Helsinki yard, Production Planning Manager Responsible for the planning of several panamax size Cruise Vessels, for a shipy ard with 2,000 employees & 1,500 subcontractors. KMYH representative in Kvaerner Shipbuilding Production development group. 1989-1994 KMY, Turku yard, Planning Manager, Outfitting Responsible for outfitting planning of several 70,000 -90,000 GT Cruise Vessels, 135,000 m3 LNG vessels, passenger ferries, 85,000 ton tankers etc, for a shipya rd with 3,000 employees & 2,000 subcontractors. Close coordination with new KWW state-of-the-art shipyard project 1993-1996 1988-1989 Wartsila Marine Inc, Turku Shipyard, Design Manager, Cabin area Responsible for large cruise-liner cabin area concept design, detail engineering & planning. 1987-1988 Wartsila Marine Inc, Engineering Office, Design Manager Responsible outfitting and concept and detail design for 75,000 GT cruise liner' s & 275 m long barge carriers. 1980-1987 Valmet Helsinki Shipyard, Planning co-coordinator & Outfitting Deta il Planning Supervisor Responsible for diverse project assignments including Pay Structure Project (PAR AKE) with the Trade Unions, the Shipyard Development Project and several sub-pro jects. Professional Memberships/Accreditations: Finnish Naval Architects (LARADI), Tech nical Academics (TEK/Finland) Kvaerner Senior Management Program / IMD Lausanne Switzerland 1997 Zero Incident Process (ZIP) leadership training / Sentis (Australia), in Philade lphia 2009 Language skills Finnish / native language English / fluent Swedish / good German / decent Russian / basic skills