0% found this document useful (0 votes)
207 views1 page

Sample Schematic Diagram For Building With Combined Tank Sector

Download as pdf or txt
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 1

NC

GV
FREE BOARD (30 - 50 cm) OVER FLOW FREE BOARD (30 - 50 cm) GV
OVER FLOW

FILTERED GRP ROOF WATER TANK RAW GRP ROOF WATER TANK
GV
PG
(0.4 to 0.5 DAY) (0.4 to 0.5 DAY)

P
GV
GV

PRE-FABRICATED TANKS SHALL NOT BE BURIED IN THE GROUND


F
GV (NC) DRAIN OUT PROVISION SHOULD BE PROVIDED FOR ALL TANKS.
DRAIN DRAIN
SERVICE GATE VALVES SHALL BE INSTALLED AT EACH ENTRY & EXIT OF ANY TANK.

PUMPS SHALL BE PROTECTED FROM DIRECT SUN LIGHT.


Roof ROOF LEVEL ROOF LEVEL
G.I FITTINGS ARE PROHIBITED IN THE INTERNAL WATER DISTRIBUTION SYSTEM.

18 ALL WATER TANKS / METERS SHALL BE PLACED 2m AWAY FROM ANY ELECTRIC
EQUIPMENT.

17 ROOF BOOSTER PUMP'S FLOW RATE NEEDS TO BE CALCULATED USING THE LOADING UNITS
WSFU TABLES
METHOD;
FROM ABUITS HEAD
DHABISHOULD BE 1.5 CODE;
PLUMBING TO 2 BARS.
IT'S HEAD = 2 BAR

FROM G.TANK
16
LIFTING PUMP'S FLOW RATE SHOULD BE SELECTED TO FILL THE ROOF TANKS WITHIN 1 TO 2

FEED PIPE
HOURS NOTING THAT IT SHOULD NOT BE LESS THAN THE ROOF BOOSTER PUMP'S FLOW
RATE; ITS HEAD NEEDS TO BE CALCULATED.
15
FILTERED AND UNFILTERED TANKS SHALL BE PROVIDED FOR SAFTEY OF SUPPLY IN CASE
OF ANY MAINTENANCE.
14
METERING SYSTEM SHOULD MATCH WITH THE ELECTRICAL METERING SYSTEM.
13
ALL GENERAL SERVICES SHOULD BE CONNECTED ON ONE METER

12 EACH METER SHOULD HAVE LV BEFORE IT AND GV AFTER IT

FOLWRATE OF THE FILTERATION SYSTEM SHOULD NOT BE LESS THAN LIFTING


HALF OF PUMP'S
THE
FLOWRATE
LIFTING PUMP'S FLOW RATE.

1st

Mezz

GF

IF THE DEMAND IS <= 6000 IMG/DAY,


THE METER SHOULD BE INSTALLED IN GRP BOX

VENT 100 MM
FOR EACH 40M2
ACCESS COVER
(80 X 80 X 20) SAMPLE SCHEMATIC DIAGRAM
GROUND LEVEL
FOR BUILDING WITH COMBINED
H (m) FREE BOARD (30 - 50 cm) TANK
H (m) DOMESTIC RESERVE (IMG)
(1.0 - 1.2 DAYS)

INTERNAL GRP
SECTOR
H (m) FIRE RESERVE (IMG)
LADDER & LINING
SLOPE
(2.5 %
) TO FIRE PUMPS
NOTE: FOR METERS SIZES: AREA (m2) AS PER CIVIL DEFENSE APPROVAL
OWNER
3/4" UP TO 2" SHOULD BE PLACED SUMP PIT
(60X60X20)
IN THE WALL RECESSED GRP BOX NOTE: COMBINED TANK FOR CASES WITH TOTAL
SIZES: 60X30X30 CM FOR 3/4" AND 1" RESERVE LESS THAN 3 DAILY DEMANDS

100X40X30 CM FOR THE 1.5" GI / VERTICAL TURBINE PUMPS ARE NOT ALLOWED
FOR FIRE FIGHTING SYSTEM FOR SUCH CASES
130X50X40 CM FOR THE 2"
WITH GV CHAMBER: 60X60X40 CM REVISION SCALE
FOR BULK METERS > 2" SHALL BE PLACED
IN THE CHAMBER, SIZES AS PER ADWEA ADDC/CSD/WES/D07 1 NTS
STANDARD DRAWING

You might also like