W

Partnership Proposal
Wisesa Group

Wisesa Mining
LEBAK PROJECT

www.medcoenergi.com
The Energy Company of Choice
W
I. Executive Summary
LEBAK Project
No. Description
1. LEGAL IUP Operasi Produksi + CNC + 7,291 ha
2. IUP OP Validity Nov 2019 – Nov 2039
3. Investment $ 42 Mio for 70% Share
Pay Back Period : 5.22 year, IRR 37%, NPV $221 MIO (Excluded
4. Economic Value Acquisition Cost), Reserve Calculation only 365ha (5% from Total IUP
Area), Easy to access, Social Problem = Low, Ready to Mine.
Technical Reserve state by KCMI, CIL Old and Easy Technology for processing
5
Advantage plant (Using Indonesian Gold Expert Only)
OPERATIONAL SUMMARY VALUATION SUMMARY
Mine economic life years 9 Valuation date date 29-Mar-19
Gold produced oz 634,376 WACC (real) % 5.0%
Silver produced oz 7,034,906 Project Economics
Ore tonnes mined - avg Mtpa 3,297,056 NPV US$ million $221
Waste tonnes mined - avg Mtpa 4,617,663 IRR 37%
Ore tonnes milled Mtpa 3,166,301 Pay back period year 5.22
Au grade g/t 0.73 Operating Cost ($/oz)
Ag grade g/t 8.73 Mining cost (incl. rehandle cost) 264
Au recovery % 81% Processing cost 448
Ag recovery % 70% G&A 118
Au price $/oz 1,700 Royalty 49
Ag price $/oz 19 Cash cost 879
Total Capex US$ million 113 incl. silver credit 793
Acquisition cost US$ million 36 2
W
II. Technical Information
Location

Lebak is located on the well endowed Western margin of the Bayah Dome, West Java.
Neighboring operational projects consist of the PT Antam’s Pongkor 3.6 Moz Au and Cibaliung
0.5 Moz Au mines.
East Java 1 Gold Project
The presence of multiple preserved silica sinters across the project indicates the uppermost
parts of the epithermal vein systems remain intact across the 7,291 hectare IUP.

Lebak benefits from:


• Excellent access
• 4-5 hours drive from
International airport
• All season roads
• Major trucking route
• Mains power nearby
• Plentiful year round LEBAK PROJECT
water supply
• Moderate Topography -
Elevation up to 580m
• Local workforce

3
W
II. Technical Information
Geological and Structural Controls
Cisadang Central JORC MIK Resource - BMGS
• Cisadang shows a strong correlation between vein intensity, grade shells and CSAMT
• Advanced understanding of the Geological and Structural controls of the mineralization that has helped target successful
resource infill & extension drilling
• Preserved Hot Spring Mineralization model
• Mineralization is open in a number of directions
W
II. Technical Information
Reserve Statement – Competent Person

Cadangan Terkira Blok Cisadang Central dan Cisadang West by KCMI


(KCMI – Competent Person Indonesia)

Au Ag
Prospek Cut-off Grade Klasifikasi Tonnase
Kadar (g/t) Metal (oz) Kadar (g/t) Metal (oz)
Cisadang
0,4 Terkira 11.825.783 1,07 406.815 14,76 5.611.722
Central
Cisadang
0,4 Terkira 6.614.998 1,07 227.561 14,72 3.130.554
West
Total 18.440.781 1,07 634.376 14,74 8.742.276

5
W
II. Technical Information
Potential Exploration Area

6
W
III. Risk Mapping
Minor and Low Risk
Catastrophic
Major
IMPACT

Moderate

Permitting Resources &


Minor

Reserves Processing
Operation
Social &
Human Resources Community
Insignificant

Rare Unlikely Possible Likely Almost Certain


LIKELIHOOD

7
W

Thank You