1 Introduction
Operation and maintenance of buildings are the longest and most expensive parts of the life
cycle of buildings. They are parts of many processes that must work efficiently, clearly and
sustainably in the long run. The life of buildings is in the order of decades, and throughout
the period it is necessary to maintain a standard for the users of these buildings. Properly
set up facility management processes using efficient and effective methods can help extend
the useful life of buildings and delay their degradation. One of these methods that can be
applied is BIM method, i.e. Building Information Modeling / building management.
BIM is a concept that brings a new look at the life cycle of buildings. BIM method can
be applied in two ways. The first is the implementation of BIM method already in the
construction project, through implementation and then in operation and maintenance. This
can only be applied to new constructions. For buildings that are already built, we need to
implement BIM afterwards. BIM implementation process for existing buildings may vary,
depending on the available documentation, information, software used, data formats, the
level of detail, or the expected benefit. f[1]
The procedures and methods for implementing BIM in these two cases are different. For
already constructed buildings, the data is available at the very beginning of BIM
implementation process, as well as the construction, equipment and overall construction.
*
Corresponding author: [email protected]
© The Authors, published by EDP Sciences. This is an open access article distributed under the terms of the Creative Commons
Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0/).
MATEC Web of Conferences 277, 02022 (2019) https://doi.org/10.1051/matecconf/201927702022
JCMME 2018
Most of the companies that has launched BIM is still focused on implementing this concept
in designing and constructing new buildings. [2]
To optimize the facility management processes it is necessary to provide a detailed
overview of structures and elements, and the general state of the buildings already built.
This guarantees BIM and, if properly managed, guarantees long-term benefits in many
forms. Individual activities of a facility management can be simplified by BIM to achieve
greater work efficiency, reduce time for individual activities and cut down costs. [3]
BIM is also about cooperation. Co-operation and correctly set procedures and processes
already at the implementation stage of BIM can be crucial for the following work and
maintenance of BIM. Just as designers and developers of buildings should communicate
with the end user and facility manager, i.e. to take into account the following stages of the
building life cycle, the future work with BIM model (including maintenance and updates)
should also be made provision for in the creation of an additional BIM model and its
implementation into the facility management. The implementation of BIM should then be
built on that. [4]
Quality records of managed assets’ data are a basic prerequisite for the efficiency and cost-
effectiveness of downstream activities. Quality level of records is a very important element
in any property management. The records should be uniform, comprehensive, clear, of
high-quality and standardized. In the service life cycle of buildings, we assume a long-term
records of assets. That's why their accuracy and up-to-dateness is necessary. [5]
The quality level of the records serves as a prevention of error-making by decisions that
ultimately may have negative impacts due to lack of information and associated poor
evaluation. This creates additional cost items associated with removing or correcting errors.
Data sources should be in the first place verified and up-to-date. For example, the
sources can include:
1. Electronic drawing documentation
2. Digitization of paper drawing documentation
3. Physical data collection on site
4. Suppliers of design services
5. Construction contractors
2
MATEC Web of Conferences 277, 02022 (2019) https://doi.org/10.1051/matecconf/201927702022
JCMME 2018
3
MATEC Web of Conferences 277, 02022 (2019) https://doi.org/10.1051/matecconf/201927702022
JCMME 2018
Fig. 1. 3D graphic model of the MSDK building (author, Autodesk Revit software).
What constitutes BIM is the information. It is important, therefore, that individual elements
of the model should be enriched by the information or be properly interconnected with such
information (figure 2). Some information may be inserted directly into the model, but if
there is much of information to the individual elements it is more appropriate to feed it into
the CAFM system and link it to the graphical model. [2]
Therefore, only basic but important information is included in the model. It may be
information about material, colour, type of equipment, or price. Naturally there is also
information on the dimensions and location of the equipment.
Fig.2. Information in the 3D model of construction for individual elements (Author, Autodesk Revit
software).
4
MATEC Web of Conferences 277, 02022 (2019) https://doi.org/10.1051/matecconf/201927702022
JCMME 2018
continually improving to meet more modern and newly incoming customer requirements. It
could be said that due to the development of systems around the world, we should only
designate true CAFM system only those systems that feature a statistical, dynamic and
output data area. These are, above all, systems that cover all known areas of support
processes.
The CAFM systems’ deployment aims in particular to:
reduce operating costs,
improve the quality of services provided and improve the quality of the
environment,
optimize the relationship between worker, environment and processes,
extend the life of the monitored constructions and objects,
introduce standards, rules and working processes in the given field and in the
system of embedded business logic,
introduce and distribute internal costs and their assignment to departments,
divisions, activities, projects, etc.,
manage and maintain documentation, moves, benchmarking, inventory and
inspection,
prepare for unexpected events and accidents, processes required by legislation
(audits, inspections, ...), sustainable development. [6]
The 3D BIM model itself is not sufficient enough and needs to be linked to the CAFM
system. This allows for the mutual localization of the elements: from the model to the
CAFM system and vice versa, the exchange of information again in both directions, or the
possibility of colouring the search areas. CAFM (Computer Aided Facility Management) is
a facility management system with a wealth of different asset management functions
(reactive and proactive maintenance, planning of activities, inventory of small and
investment assets, migration planning, room reservation, key management, OSH and FS,
waste management etc.).
5
MATEC Web of Conferences 277, 02022 (2019) https://doi.org/10.1051/matecconf/201927702022
JCMME 2018
key management
waste management
OSH and FS
cleaning of spaces and elements
management of held events
room reservations, room occupancy (offices by internal / external staff)
document management system (document administration) [6]
There are many activities falling under facility management. Generally speaking, their
task is to ensure that the subject and its staff are carefree, so they do not have to worry
about dealing with the above-mentioned activities in any way.
In the CAFM system, you need to define the processes to support the respective FM
activity (listed above, but also others that are not mentioned here but are associated with
asset management, operation, and maintenance). The linking of activities and their records
in the CAFM system will ensure greater clarity, traceability and access to follow-up
information (by whom and when the activity is performed, for what purpose, which
documents are attached to the activity, responsible persons or entities contact particulars,
further information on the managed element, etc.).
The optimization involves primarily analysis and evaluation of results / comparison with
the original state. For this purpose it is advisable to pre-determine the quantities that we
will track over time and compare. On this basis, it is possible to define the differences and
clearly define the gaps in the individual processes. You can then optimize these based on
your experience, options and data.
Optimization is a long-term and repetitive process. It is necessary to have the process
set for some time and to monitor and record it in detail. After performing optimization
(change), it is necessary to again analyze and track newly established procedures, which are
then compared with the original ones and their contribution evaluated.
In the long run the overview makes it much easier to evaluate and analyze facility
management processes, track back their workflows, and then optimize them accordingly. [6]
6 Conclusion
On the whole, facility management and use of the BIM model offers clarity: if we have a
large complex and are looking for a specific facility, room or equipment, we can easily
visualize this element or person through the CAFM system and display it in a 3D model.
Realistic graphical depiction will help to avoid lengthy search and visualization during
team work will help without having to physically visit a particular part or equipment.
Other uses may be in the colouring of areas: e.g. planning for cleaning or moving,
reconstruction and upgrading (e.g. colouring of all areas where the floor covering is tiled or
where a non-load-bearing partition of 100 mm thickness is used, etc.).
Using a BIM model interconnected with CAFM system during modernization and
reconstructions we can plan the work activities, the applicable bill of quantities and find out
where the technical building installation systems are concealed in walls, what the properties
of the current structure are, what materials have been used, and much more.
An important element for the operation and collaboration of facility management and
BIM method is the aspect of the data update. BIM itself, if it remains inactive, lacks sense
in the long term. This problem is very common in new constructions, when a BIM model
was created and the data passed to the implementation stage. Based on the BIM concept,
6
MATEC Web of Conferences 277, 02022 (2019) https://doi.org/10.1051/matecconf/201927702022
JCMME 2018
the construction is subsequently implemented, but most of the time the BIM process ends
there and does not continue into the operation and maintenance phase. Which is a problem
that is still very much underestimated. Yet, the operating phase of the construction is the
longest and most costly part of the life cycle during which the wide scope of the BIM
model and data use could be utmost beneficial.
Acknowledgement
This work was supported from the funds of the Students Grant Competition of the VSB –
Technical University of Ostrava. Project registration number is SP SP2018/113.
References
1. BRUMANA R, DELLA TORRE S, PREVITALI M, BARAZZETTI L, CANTINI L,
ORENI D and BANFI F. Generative HBIM modelling to embody complexity (LOD,
LOG, LOA, LOI): surveying, preservation, site intervention—the Basilica di
Collemaggio (L’Aquila). Applied Geomatics. 2018, 10(4), 545-567, DOI:
10.1007/s12518-018-0233-3. ISSN 1866-9298. Available from:
http://link.springer.com/10.1007/s12518-018-0233-3
2. SMITH, DANA K and TARDIF M. Building information modeling: a strategic
implementation guide for architects, engineers, constructors, and real estate asset
managers. Hoboken, NJ: Wiley, 2009, ISBN 978-0-470-25003-7.
3. Černý M a kol. BIM příručka, 1. vydání, Praha, 2013, ISBN 978-80-260-5297-5, s. 80.
4. SANCHEZ A X, HAMPSON K D and VAUX S. Delivering Value with BIM, A
whole-oflife approach. London a New York: Routledge, 2016. ISBN: 978-1-138-
11899-7.
5. EASTMAN Ch, TEICHOLZ P, SACKS R and LISTON K. BIM Handbook, A Guide
to Building Information Modeling for Owners, Managers, Designers, Engineers, and
Contractors. New Jersey: John Wiley & Sons, Inc, 2008. ISBN: 978-0-470-18528-5.
6. Kuda F, Beránková E and Soukup P.. Facility management v kostce pro profesionály i
laiky, nakladatelství FORM Solution, 2012, první vydání, ISBN 978-80905257-0-2.