METHOD STATEMENT
UNDERGROUND WATERPROOFING USING
HDPE WATERPROOFING SYSTEM FROM
FOSROC
REV. #: 02
TABLE OF CONTENTS
1. GENERAL..........................................................................................................................................................2
2. MATERIALS ......................................................................................................................................................4
2. EXECUTION ......................................................................................................................................................6
1. GENERAL
1.1 PURPOSE
The purpose of this method statement is to describe the procedures, sequence and responsibilities
for the installation of HDPE system from Fosroc that are to be executed in underground structure as
per project specification and safety requirements throughout the progress of works.
1.2 SCOPE
The scope of this method statement is to describe how waterproofing materials will be installed
in underground structure as per manufacturer’s recommendations and to detail the methods,
sequence and quality procedures for the application of HDPE FOSROC MEMBRANE system
and related accessories.
This method statement has been issued to ensure that those involved in this activity will do so in
a correct and safe manner.
The content of this method statement is to be fully understood by all those involved in
waterproofing activities.
The waterproofing works will not start until the substrates conditions are satisfactory and
acceptable.
1.3.1 Sub-Contractor:
All waterproofing items including Fosroc membrane & accessories, will be carried out by BMC.
Site Engineer shall be responsible for supervision of construction activities and ensure that work
is done as per specification and approved drawings and all safety measures are
implemented.
The sources, types, qualities, finishes and colors are correct, and match any approved samples.
All accessories and fixings which should be supplied with the goods have been supplied.
SPORTS BOULEVARD – BP2B
METHOD STATEMENT FOR UNDERGROUND Date: FEB. 09, 2022
WATERPROOFING SYSTEM USING HDPE FROM FOSROC Rev.: 03
Ref. No.: TECH-TS-UG-21554-02011 Page | 3 of 9
Sizes and dimensions are correct. Where tolerances of components are critical, measure a
sufficient quantity to ensure compliance.
The delivered quantities are correct, to ensure that shortages do not cause delays in the work.
Any products which have a limited shelf life are not out of date.
Ensure that all trades are provided with necessary details of related types of work. Before starting
each new type or section of work, ensure that:
Previous, related work is appropriately complete, in accordance with the project documents,
to a suitable standard and in a suitable condition to receive the new work.
All necessary preparatory work has been carried out, including provision for services, openings,
supports, fixings, damp proofing, priming and sealing.
The environmental conditions are suitable, particularly that the building is suitably weather tight
when internal components, services and finishes are installed.
Workers must be appropriately skilled, trained and experienced for the type and quality of work.
Take all necessary precautions to prevent damage to the work from sun, rain and other hazards.
Inspect components and products carefully before fixing or using and reject any which are
defective.
Adjust location and fixing of components and products so that joints which are to be finished
with sealant or otherwise left open to view are even and regular.
Ensure that all moving parts operate properly and freely. Do not cut, grind or plane pre-finished
components and products to remedy binding or poor fit without approval.
1.5.1 Conduction of Safety Toolbox Talks and Start Up Cards with the operatives to ensure that the
content of this Method Statement and all hazard control measures are communicated and
understood by the Supervision and Workforce.
1.5.2 The Emergency Procedure related to the project will be communicated to the workforce and
supervision, prior commencement of any work.
1.5.4 Temporary protection to be provided on the area to be waterproofed before and during the
waterproofing.
2. MATERIALS
"Fosroc Membrane HDPE – P (Smooth) RF" from FOSROC, is a HDPE membrane with a release film
over a pressure sensitive adhesive which allows poured concrete to bond fully with the
membrane.
"Fosroc Membrane HDPE – S " from FOSROC, is Post Applied Self Adhesive waterproofing
membrane for vertical reinforced concrete members for below ground structures.
Fosroc® Proofex 3000(for corner reinforcement) is a cold applied, flexible, waterproof, high
performance membrane incorporating a cross laminated HDPE carrier film with a polymer
modified bitumen compound.
Protection board 4mm thick from FOSROC
“Geomatt NPS” separation layer of non-woven geotextile sheet 140gr/sqm
Aluminum metal flashing (1 mm thick X 50 mm total girth).
UV sealant protection Nitoseal MS60
Clamping ring.
Deliver materials to the job site in the manufacturer's original, material wrapped with the
manufacturer's name.
Comply with the manufacturer's written instructions for proper material storage.
SPORTS BOULEVARD – BP2B
METHOD STATEMENT FOR UNDERGROUND Date: FEB. 09, 2022
WATERPROOFING SYSTEM USING HDPE FROM FOSROC Rev.: 03
Ref. No.: TECH-TS-UG-21554-02011 Page | 5 of 9
Any materials that are found to be damaged before installation at the warehouse shall be
removed and replaced at the applicator's expense.
Where approval of a product is specified or requested during the works the establishment of
MAR is obligatory.
Submit a sample, technical data sheet or other evidence of suitability.
Do not confirm orders or use the product until approval of the material / sample has been
obtained.
Retain approved sample in good, clean condition on site.
Ensure that the product used in the works matches the approved material / sample.
Before beginning work, the waterproofing contractor must secure approval from the building
owner's representative for the following:
Permitted for the location of cranes, hoists and chutes for loading and unloading materials to
and from the working site.
c. Conduct Daily Tool Box meeting for mutual understanding of the works and record attendance
of attendees.
d. Conduct regular or daily check of equipment and machineries prior to use of it.
e. A competent Site Supervisor shall be present at all times during the works.
2. EXECUTION
For the application of the HDPE membrane system with thermal jointing,
the substrate needs to have an appropriate concrete surface profile and
sufficient stability to avoid movement during the installation and
subsequent construction works, including concreting. The requirements
for substrates and their preparation include the following:
Install a separation layer of non-woven geotextile “Geomatt NPS” 140gr/sqm, loose laid over
the concrete blinding on horizontal surface, to avoid mechanical abrasion between concrete
substrate and waterproofing membrane.
Single sided shutter vertical walls, apply geotextile 300 gr/sqm as separation.
Install One Layer of “Fosroc Membrane HDPE – P (Smooth) RF” Pre-Applied HDPE Waterproofing
Membrane over separation layer . It is a cold and pre-applied waterproofing system that is
installed as loosely laid, single-ply membranes onto prepared substrates before the steel
reinforcements is fixed and the concrete is poured.
Use HDPE – P Smooth RF membrane sheets for the perimeter edges and connections on the
walls and upstands.
Form internal and external corners by folding the laid out HDPE P membrane used for the
perimeter edges.
SPORTS BOULEVARD – BP2B
METHOD STATEMENT FOR UNDERGROUND Date: FEB. 09, 2022
WATERPROOFING SYSTEM USING HDPE FROM FOSROC Rev.: 03
Ref. No.: TECH-TS-UG-21554-02011 Page | 7 of 9
Lay out the HDPE P membrane sheets in the area (horizontal or vertical) .
After the reinforcement is fixed and before the concrete is poured a final inspection is
recommended to check if there is any damage or other influences that could impair the full-
surface bond formation of the HDPE - P system to the structural concrete.
Roll-ends or cut edges shall be sealed HDPE-P sealed tape. Unroll the membrane and cut 100mm of
release film off the end of the membrane roll Unroll the HDPE-P Sealed Tape onto the membrane and
use roller to press firm to maximise adhesion. Remove the HDPE-P Sealed Tape release film and unroll
the next roll of membrane onto the HDPE-P Sealed Tape.
For isolated footing, HDPE membrane will continue vertically to top of footing
Penetrations through the membrane i.e. pipe entries, shall be made watertight using Fosroc
Membrane HDPE-P (Smooth) RF with the accessories and tape.
Surface Preparation:
1. Remove any weak concrete, high spots/protrusions, cement laitance, existing coatings etc., to
achieve a fine-gripping profile that is clean, dry and free from dirt, grease, oil and any other
form of surface contamination.
2. All substrate surface defects must be repaired using appropriate repair products
3. Corners and edges must be cut or formed / chamfered / smoothened:
4. All concrete surfaces should be shutter finish and free from any type of laitance, dust, dirt,
cavities, projecting nibs or shuttering dowels etc.
5. Make sure that the surface is smooth and doesn’t have any sharp protrusions. Any honey-comb,
or surface defects should be repaired using structural grade Fosroc repair mortar.
6. The concrete should have cured properly; moisture content on the surface will not allow the
membrane to bond properly. The surface must be dry free from contamination, ice and frost.
Moisture content in the concrete shall be less than 5%.
SPORTS BOULEVARD – BP2B
METHOD STATEMENT FOR UNDERGROUND Date: FEB. 09, 2022
WATERPROOFING SYSTEM USING HDPE FROM FOSROC Rev.: 03
Ref. No.: TECH-TS-UG-21554-02011 Page | 8 of 9
7. Priming is generally not required; however, where there is a need, Nitobond AR could be used.
Consult Fosroc local team for more details.
Membrane Installation:
1. Once surface of the concrete is ready for the membrane application, membrane applied by
removing the release film from the HDPE-S and applied gradually on the substrate while
pressing firmly to ensure intactness. Hot-air welding at the overlaps can be used whenever
needed.
2. Adjacent rolls should be applied with an overlap of 75mm. The membrane should be firmly
applied to the substrate rolling with the metal roller with ample amount of pressure, ensuring
proper bonding with the substrate.
3. Roll-end and cut edges should be overlapped at a distance of 100mm using HDPE sealed.
Ensure that all overlap areas are clean free from contamination, moisture and dust, and then
pressing firmly using a roller to ensure intactness.
4. The underside of the lapping succeeding sheet is clean, dry and free from contamination
before attempting to overlap. Roll firmly to ensure a watertight seal.
5. Whenever needed, the membrane can be supported mechanically on the overlap sides, in
which case the overlap shall be made not less than 100mm, and the mechanical fixing shall
be in the middle. The mechanical fixing shall then be covered and overlapped with the
subsequent membrane.
Connections:
The surface of the pre-applied membrane back must be dry, clean and free from any dirt and
contaminants before applying the overlap.
1. All corners must be chamfered, and an angle fillet must be applied to fill in angles.
2. A reinforcing strip of HDPE sealed tape shall be applied on the corners, and then Fosroc
Membrane HDPE-S shall be applied.
3. Alternatively, HDPE-S membrane shall be terminated at the edges and a strip of Proofex 3000
or Proofex 3000MR self-adhesive membrane shall be used to connect the HDPE-S together, by
maintaining an overlap of 200mm at each side of the angle.
4. Intricate details can be dressed using Proofex 3000 or Proofex 3000MR self-adhesive
membranes.
SPORTS BOULEVARD – BP2B
METHOD STATEMENT FOR UNDERGROUND Date: FEB. 09, 2022
WATERPROOFING SYSTEM USING HDPE FROM FOSROC Rev.: 03
Ref. No.: TECH-TS-UG-21554-02011 Page | 9 of 9
Protection:
Upper ends of the waterproofing membranes at vertical walls, shall be mechanically fastened
by means of aluminium strip bar and sealed with UV resistant sealant protection and protect the
membrane with protection board above blockwork.
Membrane rolls whether loose or on pallets have to be stored Horizontal in a shaded area
neatly covered by a thick fabric and tied.
Secure lying manner that will minimize exposure to sunlight & UV.
Excessive exposure to sunlight, UV and other sources of heat will result in Considerable
deterioration of the product and reduce its shelf life.
All personnel involved will use necessary PPE as required such as safety helmets, glasses,
coveralls, shoes, gloves, ear plugs, belts etc.
Every effort shall be made to assure that employees can accomplish their assigned scope of
work safely.
All the workers will have safety indications to increase awareness of health and safety.