Agile SAFe Q & A
Agile SAFe Q & A
Agile SAFe Q & A
Question: 1
A. Transparency
B. Program execution
C. Flow
D. Culture
E. Relentless improvement
Answer: A B
Question: 2
The analyzing step of the Portfolio Kanban system has a new Epic with a completed Lean business
case. What best describes the next step for the Epic?
A. It will remain in the analysing step until one or more Agile Release Trains have the capacity
to implement it
B. It will be moved to the Portfolio Backlog if it receives a 'go' decision from Lean Portfolio
Management
C. It will be implemented if it has the highest weighted shortest job first (WSJF) ranking
D. It will be implemented once the Lean business case is approved by the Epic Owner
Answer: B
Question: 3
Answer: C
Question: 4
Answer: A
Question: 5
pg. 1
Leading SAFe 5.1 Agilest – Certification Dump
Answer: B
Question: 6
Answer: A
Question: 7
A. Portfolio Vision
B. Portfolio Budgets
C. Portfolio Canvas
D. Portfolio Governance
Answer: B
Question: 8
Answer: B
Question: 9
Answer: A
Question: 10
Answer: D
pg. 2
Leading SAFe 5.1 Agilest – Certification Dump
Question: 11
According to SAFe Principle #10, what should the Enterprise do when markets and customers
demand change?
Answer: A
Question: 12
How does SAFe recommend using a second operating system to deliver value?
Answer: B
Question: 13
A. Business Agility
B. Lean Portfolio Management
C. Organizational and Functional Alignment
D. Technical Solution Delivery
Answer: A
Question: 14
Answer: B
Question: 15
Who decides the Team PI Objective Business Value scoring after negotiation?
A. Business Owner
B. The Agile Team
C. The Scrum Team
pg. 3
Leading SAFe 5.1 Agilest – Certification Dump
D. Product Manager
Answer: A
Question: 16
Which core competency of the Lean Enterprise helps drive Built-in Quality practices?
Answer: D
Question: 17
A. Solution Management
B. Lean Portfolio Management
C. Release Train Engineer
D. Product Management
Answer: B
Question: 18
During the PI Planning event, when are planning adjustments agreed upon?
Answer: C
Question: 19
At the end of PI Planning after dependencies are resolved and risks are addressed, a confidence vote
is taken. What is the default method used to vote?
Answer: ??
Question: 20
pg. 4
Leading SAFe 5.1 Agilest – Certification Dump
Answer: D
Question: 21
A. Deliver predictability
B. Release new value to production every day
C. Maintain Iterations as a safe zone for the team
D. Automate the delivery pipeline
Answer: A
Question: 22
What else does the SAFe principle, unlock the intrinsic motivation of knowledge workers, require
besides purpose and mission?
Answer: D
Question: 23
During the final plan review, Program risks are addressed using ROAM. What do the letters in ROAM
represent?
Answer: C
Question: 24
Which two types of decisions should remain centralized even in a decentralized decision-making
environment? (Choose two.)
Answer: C E
Question: 25
pg. 5
Leading SAFe 5.1 Agilest – Certification Dump
Answer: C
Question: 26
Answer: D
Question: 27
Answer: B
Question: 28
What are the top two reasons for adopting Agile in an organization? (Choose two.)
Answer: B C
Question: 29
Answer: A
Question: 30
Which role serves as the servant leader for the Agile Release Train?
A. Business Owner
B. Agile Coach
C. Release Train Engineer
pg. 6
Leading SAFe 5.1 Agilest – Certification Dump
D. Scrum Master
Answer: C
Question: 31
Which pillar in the House of Lean focuses on the Customer being the consumer of the work?
Answer: A
Question: 32
Answer: A
Question: 33
Answer: A C E
Question: 34
What are two ways to describe a cross-functional Agile Team? (Choose two.)
Answer: A E
Question: 35
A. Solution Intent
pg. 7
Leading SAFe 5.1 Agilest – Certification Dump
B. Enterprise Goals
C. Portfolio Vision
D. Strategic Themes
Answer: D
Question: 36
An Enterprise has just adopted the SAFe Implementation Roadmap and is in the process of training
executives, managers, and leaders. What is their next step?
A. Train Lean-Agile change agents to push out the roadmap and build consensus
B. Train the leaders in Portfolio and Product Management to solve problems before fixing
symptoms
C. Perform process mapping on the current state
D. Identify Value Streams and Agile Release Trains to start alignment of the organization
Answer: D
Question: 37
A. ART events run inside the team events, and the team events create a closed-loop system
B. The daily stand-up is an ART event that requires the scrum of scrums and Program Owner
sync involvement in the closed-loop system
C. The Inspect and Adapt is the only ART event required to create a closed-loop system
D. Team events run inside the ART events, and the ART events create a closed-loop system
Answer: D
Question: 38
Which team type is 'organized to assist other teams with specialized capabilities and help them
become more proficient in new technologies'?
A. Platform team
B. Complicated subsystem team
C. Stream-aligned team
D. Enabling team
Answer: D
Question: 39
pg. 8
Leading SAFe 5.1 Agilest – Certification Dump
Question: 40
Which statement is true about a Value Stream that successfully uses Devops?
Answer:
Question: 41
A. Epics
B. Significant dependencies
C. Risks
D. Features
E. Capacity and Load
Answer: B D
Question: 42
Answer: C
Question: 43
SAFe's first Lean-Agile Principle includes "Deliver early and often" and what else?
Answer: C
Question: 44
pg. 9
Leading SAFe 5.1 Agilest – Certification Dump
Question: 46
A. Every iteration
B. Annually
C. On Demand
D. Twice Annually
Answer: A
Question: 47
Answer: B
Question: 48
Answer: A
Question: 49
A. When there is only one day to run PI Planning, so more time is needed to prepare to run it
effectively
B. When Product Owners and Scrum Masters need to coordinate dependencies within the
Agile Release Train
C. When multiple Agile Release Trains working on the same Solution need to align and
coordinate
D. When teams cannot identify and estimate Stories in PI Planning and need more time to
prepare
Answer: C
Question: 50
A. Release on Demand
B. Release continuously
C. Release every Program Increment
D. Release on cadence
pg. 10
Leading SAFe 5.1 Agilest – Certification Dump
Answer: A
Question: 51
The House of Lean is a classic metaphor describing the mindset essential for Lean thinking.
Which one of the four pillars advocates a "Get out of the office" mindset?
Answer: B
Question: 52
A. Story points
B. Ideal time
C. Agile prescribes a No Estimation concept to speed delivery
D. Feature points
Answer: A
Question: 53
Who is responsible for the Solution Backlog?
A. Product Owners
B. Solution Train Engineer
C. Product Management
D. Solution Management
Answer: B
Question: 54
Which statement describes aspects of the team's commitment during PI Planning?
Answer: D
Question: 55
Who has content authority to make decisions at the user story level during PI Planning?
A. Scrum Masters
B. Development Team
C. Release Train Engineer
D. Product Owner
Answer: D
pg. 11
Leading SAFe 5.1 Agilest – Certification Dump
Question: 56
Which practice helps with a test-first mentality?
A. WIP
B. BDD
C. MMF
D. MVP
Answer: D
Question: 57
What is a Minimal Viable Product?
Answer: C
Question: 58
What is a valid reason for moving a PI objective to stretch?
A. The team has high uncertainty about a third-party delivery needed for the objective
B. The team has no more time in the capacity but the objective has high business value
C. The team does not have the knowledge or skills to deliver the objective
D. The team is unsure how to estimate the related stories using story points
Answer: A
Question: 59
What can be used to map the current state of a portfolio?
A. Portfolio Vision
B. Portfolio Kanban
C. Portfolio Canvas
D. Portfolio Backlog
Answer: B
Question: 60
In the Program Kanban some steps have Work-in-Process limits. Why is this necessary?
Answer: A
Question: 61
pg. 12
Leading SAFe 5.1 Agilest – Certification Dump
Answer: C
Question: 62
Answer: C
Question: 63
Answer: A
Question: 64
A. Features
B. User Stories
C. Tasks
D. Epics
__________________________________________________________________________________
Question 1:
Answer: B
Question 2:
pg. 13
Leading SAFe 5.1 Agilest – Certification Dump
Answer: D
Question: 3
A. Continuous integration
B. Continuous exploration, Continuous integration, Continuous deployment
C. Continuous integration and Continuous deployment
D. Continuous exploration, Continuous integration, Continuous deployment and Release on
demand.
Answer: B
Question 4:
A. Epics
B. Enabler features
C. Tasks
D. User stories
E. Spikes
Answer: D E
Question 5:
Answer: B
Question 6:
Answer: B
Question 7:
pg. 14
Leading SAFe 5.1 Agilest – Certification Dump
Within the SAFE Principles (10), what is related to this Principle: #3. “Assume variability, preserve
options”?
Answer: C
Question 8:
Answer: B
Question 9:
Answer: B
Question 10:
Answer: D
Question 11:
What are the necessary solution to deliver a complete enterprise value within the seven code
competencies?
Answer: B
Question: 12:
pg. 15
Leading SAFe 5.1 Agilest – Certification Dump
A. Story estimation
B. Scrum of Scrums
C. ART Sync
D. Strategic theme definition
Answer: C
Question 13:
The Product Backlog contains 60 story points. The Team velocity is around 20 story points per
iteration. How many iterations would it take to finish the backlog?
A. 3 Iterations
B. 2 Iterations
C. 4 Iterations
D. 1 Iterations
Answer: A
Question 14:
Every iteration, the Team build, tests, plans, integrates for an increment. What is missing?
Answer: D
Question 15:
A. Market research
B. Whole Product development
C. User research
D. Design thinking
Answer: D
Question 16:
Answer: B
Question 17:
pg. 16
Leading SAFe 5.1 Agilest – Certification Dump
Question 18:
What is SAFE?
A. SAFE is based of proven, integrated Lean practices and principles, Agile and Devops.
B. SAFE is a tool for budget management
C. SAFE is a framework to implement Devps
Answer: A
Question 19:
A. User stories
B. Benefits
C. Features
D. Capabilities
Answer: D
Question 20:
A. Top 10 features
B. Business context
C. Solution Roadmap
D. A Set of PI Objectives
E. Production/Solution Version
F. Ready Stories
Answer: A B E
Question 21:
Answer: B D
Question 22:
pg. 17
Leading SAFe 5.1 Agilest – Certification Dump
Answer: C D
Question 23:
A. Implement the Epic across the same number of PIs as it took to develop
B. Demonstrate the progress to key stakeholders after first PI and make a decision how to
proceed with the Epic in the second PI.
C. Report percentage completed to the key stakeholders at every PI boundary.
D. Demonstrate the progress to the key stakeholders after two PIs and have them accept the
epic.
Answer: B
Question 24:
Answer: C
Question 25:
A. Lower Quality
B. Longer cycle times
C. Less variability
D. Increased risk
Answer: C
Question 26:
A. TRUE
B. FALSE
Answer: A
Question 27:
A. Scrum of Scrums
pg. 18
Leading SAFe 5.1 Agilest – Certification Dump
B. Retrospective
C. Iteration Planning
D. System Demo
E. Daily stand up
F. Portfolio sync
Answer: B C E
Question 28:
A. Collaboration
B. Adaptation
C. Respect
D. Self-organization
Answer: B
Question 29:
Answer: D
Question 30:
A. Business Owners
B. Scrum Master
C. Product Owner
D. Release Train Engineer
Answer: D
Question 31:
Answer: A
Question: 32
A. Every Iteration
pg. 19
Leading SAFe 5.1 Agilest – Certification Dump
Answer: A
Question: 33
Answer: C
Question: 34
Answer: A
Question: 35
Answer: D
Question: 36
Answer: C
Question: 37
What is the best prioritization when feature requires participation of Lazy suppliers?
pg. 20
Leading SAFe 5.1 Agilest – Certification Dump
Answer: B
Question: 38
A. TRUE
B. FALSE
Answer: B
Question: 39
A. When multiple ARTs working in the same value Stream need to align and coordinate
B. When PO and PM cannot plan content
C. When teams cannot plan Stories in PI planning
D. When stakeholders ask for
Answer: A
Question: 40
Answer: C
Question: 41
Suppose you are increasing or enhancing Enterprise Agility. What is the benefit?
Answer: C
Question: 42
A. Solution Architect/Engineer
B. Value Stream engineer
C. Product Manager
D. Solution Manager
E. Release Train Engineer
Answer: D
pg. 21
Leading SAFe 5.1 Agilest – Certification Dump
Question: 43
Question:44
Answer: B
Question: 45
Answer: C
Question: 46
Answer: C
Question: 47
You are using cumulative flow diagram, select what is defining the average Lead time?
A. A Measure the horizontal distance between arrival and departure lines on a Cumulative flow
Diagram (CFD)
B. Measure the vertical distance between arrival and departure lines on a Cumulative Flow
Diagram (CFD)
Answer: A
Question: 48
In Implementation Roadmap, what is the next step after training of executives, managers & leaders?
pg. 22
Leading SAFe 5.1 Agilest – Certification Dump
Answer: C
Question: 49
Answer: A
Question: 50
A. Innovation
B. Relentless Improvement
C. Respect of people and culture
D. Sustainable shortest lead time, best quality and value
Answer: D
Question: 51
A. Twice Annually
B. On demand
C. Annually
D. Every PI boundary
Answer: D
Question: 52
What is happening when you operate a full utilization of product development process?
Answer: D
Question: 53
A. Reduce Risks
pg. 23
Leading SAFe 5.1 Agilest – Certification Dump
B. Reducing Defects
C. Limiting WIP
D. Getting better Economic Value
Answer: D
Question: 54
During PI Planning what is the Good Answer about the team commitment?
Answer: B
Question: 55
A. Prototype
B. Funnel
C. Analysis
D. Portfolio Backlog
E. Implementation
F. Review
Answer: A
Question: 56
Answer: B
Question: 57
A. Flow
B. Relentless Improvement
C. Cost and budget
D. Value and Lean Agile Leadership
E. Respect for people and culture
F. Innovation
Answer: A B E F
Question: 58
pg. 24
Leading SAFe 5.1 Agilest – Certification Dump
Whenever an Enterprise makes a decision, it deeply considers the effect it will have on its end
users. What is this statement describing?
A. Continuous Exploration
B. Customer Centricity
C. Release on demand
D. Design Thinking
Answer: B
Question: 59
When mapping Value streams what is often the most influential factor to long lead times?
Answer: A
Question: 60
During which stage of the continuous Delivery pipeline should Features be verified in Production
before the business needs them?
A. Continuous Integration
B. Release on demand
C. Continuous Deployment
D. Continuous Exploration
Answer: C
Question: 61
Answer: A
Question: 62
A. Deployment
B. Consistency
C. Variability
D. Release
Answer: C
Question: 63
pg. 25
Leading SAFe 5.1 Agilest – Certification Dump
Which Design Thinking tool helps team understand what a specific user is thinking, hearing and
seeing as they use the product?
A. Empathy maps
B. Personas
C. Customer journey maps
D. Customer experience
Answer: A
Question: 64
The accelerate step for the implementation roadmap is the beginning of another journey that is
based on foundation of what?
A. Relentless improvement
B. Agile Product Delivery
C. Customer Centricity
D. Continuous Delivery
Answer: A
Question: 65
Answer: D
Question: 66
Which SAFe House of Lean pillar addresses moving from Project to Products?
Answer: B
Question: 67
A. Team level
B. Essential level
C. Portfolio level
D. Large Solution level
Answer: A
Question: 68
pg. 26
Leading SAFe 5.1 Agilest – Certification Dump
What are two ways empathetic design impacts Customer Centricity? (Choose two)
Answer: B C
Question: 69
What is one way trains and suppliers can be aligned to a shared Business and technology mission?
A. Build and integrate solution component and Capabilities with Agile Release Trains
B. Build and use a continuous Delivery Pipeline model
C. Use coordinated Vision, backlogs and Roadmaps in a Solution train.
D. Apply Lean-agile practices to coordinate all activities necessary to build a system.
Answer: C
Question: 70
A. Test Team
B. Value stream Leader
C. Scrum Team
D. Dev Team
Answer: D
Question: 71
A. Business Owners
B. Epic Owners
C. Lean portfolio Management
D. Lean Agile Leaders
Answer: C
Question: 72
Answer: A
Question: 73
When expressing Strategic Themes as objectives and key results what are the key results?
pg. 27
Leading SAFe 5.1 Agilest – Certification Dump
A. A set of key performance indicators that measure the performance of Value streams
B. A set of metrics that measure the progress towards the Strategic Theme
C. A memorable description that the portfolio wants to achieve Strategic Themes
D. A set of Lean metrics use to measure the performance of the Portfolio
Answer: B
Question: 74
Answer: C
Question: 75
Answer: C
Question: 76
What aspect of strategy and investment funding involves developing and communicating the
Strategic themes throughout the portfolio?
Answer: B
Question: 77
Agile Release Trains are organized around the ability to deliver what?
A. Product Features
B. Infrastructure Enablers
C. Customer Solutions
D. Tested Non-functional Requirements
Answer: C
Question: 78
pg. 28
Leading SAFe 5.1 Agilest – Certification Dump
Answer: A
Question: 79
Answer: C
Question: 80
Which Two SAFe Configurations are enough to achieve Business Agility? (Choose Two)
A. Essential
B. Program
C. Full
D. Large Solution Portfolio
E. Portfolio
Answer: C E
Question: 81
Enterprise Solution Delivery, Agile Product Delivery and which other competency are part of the
execution side of the SAFe Business Agility Overview?
Answer: A
Question: 82
What is defined as the ability to complete and thrive in the digital age by quickly responding to the
market changes and emerging opportunities with innovative business solutions?
Answer: B
Question: 83
pg. 29
Leading SAFe 5.1 Agilest – Certification Dump
Answer: D
Question: 84
How does SAFe recommend using a Second Operating System to deliver value?
A. Organize the Enterprise around the flow of Value while maintaining the hierarchies
B. Create Teams to focus on innovation and growth and break down the existing organizational
structure
C. Build small networks that focus on the customer needs rather than functional hierarchies
D. Eliminate the functional hierarchies and build the network for efficiency and stability
Answer: A
Question: 85
A. As opportunities
B. As weakness
C. As strengths
D. As threats
Answer: A
Question: 86
Which dimension of enterprise Solution Delivery competency applies Lean-Agile practices to align
and co-ordinate all the activities necessary to specify, architect, design, implement, test, deploy,
evolve and ultimately decommissions solutions?
Answer: C
Question: 87
Which SAFe Core competency describe a set of values and practices that encourage the whole
enterprise to increase knowledge, competence and innovation?
Answer: A
pg. 30
Leading SAFe 5.1 Agilest – Certification Dump
Question: 88
A. Timeboxing
B. Building GNATT charts
C. Test-driven Deployment
D. Batching work for Testing efficiency
E. Making sure requirements are complete prior to development
Answer: A C
Question: 89
Answer: C
Question: 90
A. Scrum Master
B. Product Owner
C. Business Owner
D. Release Train Engineer
Answer: D
Question: 91
The Scrum Master facilitates which Three Events in SAFe? Choose Three)
A. System Demo
B. Retrospective
C. Daily Stand-up
D. Scrum of Scrums
E. Iteration Planning
F. LPM Backlog Refinement
Answer: B C E
Question: 92
How many iteration would it take for a Team with a velocity of 20 story points per iteration to finish
a backlog of 60 story points?
A. 1 Iteration
B. 2 Iteration
C. 3 Iteration
D. 4 Iteration
pg. 31
Leading SAFe 5.1 Agilest – Certification Dump
Answer: C
Question: 93:
A. Vision
B. Ready User stories
C. Program Roadmap
D. Top 10 feature list
E. A set of PI Objectives
Answer: A E
Question: 94
Answer: D
Question: 95
The Three pillars of Scrum are transparency, inspection and what else?
A. Respect
B. Adaption
C. Collaboration
D. Self Organization
Answer: C
Question: 96
In the context of a Team increment, every iteration each team plans, builds, tests, integrates, and?
Answer: A
Question: 97
Answer: D
pg. 32
Leading SAFe 5.1 Agilest – Certification Dump
Question: 98
Answer: A
Question: 99
A servant leader knows that his or her own growth comes from what?
Answer: A
Question: 100
A. Products are more robust when individuals on Teams have specific skillsets
B. Teams are more productive than the same number of individuals
C. Development Team can manage daily interruption
D. Changes in team composition do not impact productivity
Answer: A
Question: 101
A. Every 12 to 16 weeks
B. Every 8 to 12 weeks
C. Every 4 to 6 weeks
D. Every 6 to 8 weeks
Answer: B
Question: 102
Answer: B
Question: 103
pg. 33
Leading SAFe 5.1 Agilest – Certification Dump
How many dimensions does the Team and technical agility competency have?
A. Three
B. Four
C. Five
D. Seven
Answer: A
Question: 104
A. Fishbone analysis
B. Muda elimination
C. Gemba walks
D. Pareto analysis
Answer: C
Question: 105
A. TRUE
B. FALSE
Answer: B
Question: 106
Answer: A
Question: 107
The Teams in Agile Release Train are aligned to a common vision via ….?
A. Solution Backlog
B. Strategic Themes
C. Program Backlog
D. Team Backlog
Answer: C
Question: 108
pg. 34
Leading SAFe 5.1 Agilest – Certification Dump
A. Higher
B. Lower
C. More Important
D. Less Important
Answer: D
Question: 109
A. IP Iteration
B. I&A Event
C. Iteration Retrospective
D. PI Planning
Answer: A
Question: 110
Which component of the Lean Portfolio Management ensures that the entire portfolio is aligned and
funded to create and maintain the solutions needed to meet business targets?
Answer: A
Question: 111
A. Customer centric
B. External, such as Government regulations
C. All of the above
D. Internally created, such as Company’s annual user conference
Answer: B D
Question: 112
A. True
B. False
Answer: A
Question: 113
A. TRUE
pg. 35
Leading SAFe 5.1 Agilest – Certification Dump
B. FALSE
Answer: A
Question: 114
A. Three
B. Four
C. Five
D. Seven
Answer: B
Question: 115
A. Value
B. Innovation
C. Relentless Improvement
D. Flow
Answer: A
Question: 116
A. TRUE
B. FALSE
Answer: B
Question: 117
Which Component of the Continuous Delivery Pipeline takes the changes from the staging
environment and deploy them to Production?
A. Continuous Exploration
B. Release on Demand
C. Continuous Deployment
D. Continuous Integration
Answer: C
Question: 118
A. Self-organising
B. Organized by Scrum Master
C. Organized by Product Owner
D. Organized by Business Owner
Answer: A
pg. 36
Leading SAFe 5.1 Agilest – Certification Dump
Question: 119
In the context of whole Product thinking, which product goes beyond what is expected and enables
competitors to differentiate their offerings?
A. Expected product
B. Augmented product
C. Potential product
D. Generic product
Answer: B
Question: 120
Business Agility is the ability to complete and thrive in the digital age by quickly responding to
market changes and emerging opportunities with innovative, digitally-enabled business solutions?
A. TRUE
B. FALSE
Answer: A
Question: 121
Which phase of the Portfolio Kanban is used to sponsor the epic and define its intent and definition?
A. Analysing
B. The funnel
C. Portfolio Backlog
D. Reviewing
Answer: D
Question: 122
A customer journey map illustrates the experience as a user engages with a Company’s operational
value stream, products and services?
A. TRUE
B. FALSE
Answer: A
Question: 123
In the zone between general solutions and customer solutions are ………………………………………..?
A. Multi-segment solutions
B. Deep and narrow solutions
C. Potential solutions
D. Augmented solutions
Answer: B
Question: 124
pg. 37
Leading SAFe 5.1 Agilest – Certification Dump
ARTs apply cadence and synchronization to help manage the internet variability of research and
development?
A. TRUE
B. FALSE
Answer: A
Question: 125
A. Database
B. Team backlog
C. Solution backlog
D. Program backlog
Answer: D
Question: 126
Enterprise Architect is a role on which Dimensions of Lean Portfolio management? (Choose Two)
Answer: C D
Question: 127
Which design thinking tool enable Teams to understand how the stories in the team backlog support
user objectives?
A. Story map
B. Program backlog
C. Empathy map
D. Customer journey mapping
Answer: A
Question: 128
Which of the below are Core competencies for Business Agility? (Choose Four)
Answer: A B C D
Question: 129
pg. 38
Leading SAFe 5.1 Agilest – Certification Dump
Answer: A
Question: 130
A. Two
B. Three
C. Four
D. Five
Answer: C
Question: 131
By organizing the second operating system around…………… instead of …………………. SAFe offers a way
for enterprises to focus on customers, products, innovation and growth.
A. Products, features
B. Features, components
C. Departments, value streams
D. Value streams, departments
Answer: D
Question: 132
Answer: C
Question: 133
pg. 39
Leading SAFe 5.1 Agilest – Certification Dump
Answer: B C F
Question: 134
Answer: A
Question: 135
Cadence and what other action are the key constructs to delivering continuous value?
A. Execution
B. Synchronization
C. Flexibility
D. Refactoring
Answer: B
Question: 136
A. Six weeks
B. Three Weeks
C. Two weeks
D. Four weeks
Answer: C
Question: 137
What are two critical areas that differentiate Agile from Waterfall development?
A. Architectural runway
B. Staggered integration
C. Incremental delivery of value
D. Face-to-face interaction
E. Fast feedback
Answer: C E
Question: 138
Answer: A
pg. 40
Leading SAFe 5.1 Agilest – Certification Dump
Question: 139
An effective SAFe scrum master helps the team improve on their journey towards technical
excellence through continuous integration, continuous deployment and what else?
Answer: C
Question: 140
During PI planning, which two tasks are part of the Scrum masters role in the first team breakout?
(Choose two)
A. Review and reprioritise the Team backlog as a part of the preparatory work for the second
team breakout
B. Facilitate the coordination with other teams for dependencies
C. Provides clarifications necessary to assist the team with their story estimating and
sequencing
D. Identify as many risks and dependencies as possible for the management review
E. Be involved in the program backlog refinement and preparation
Answer: B D
Question: 141
Answer: D
Question: 142
“Agile Team continuously adapt new circumstances and enhance the methods of value delivery”
A. Continuous Improvement
B. Continuous Delivery
C. Continuous Integration
D. Continuous Deployment
Answer: B
pg. 41
Leading SAFe 5.1 Agilest – Certification Dump
Question: 143
What are two good Scrum Master facilitation practice? (Choose Two)
Answer: C D
Question: 144
Answer: C
Question: 145
What is the main reason why some teams never reach stage 4 (Performing) in the stage of high
performing team?
Answer: D
Question: 146
A. 30-40
B. 50-125
C. 80-100
D. 150-250
Answer: B
Question: 147
The sixth SAFe Agile principle advises to visualise and limit what?
A. Impediments
B. Work Inventory potential (WIP)
C. Work in Production (WIP)
D. Work in progress (WIP)
pg. 42
Leading SAFe 5.1 Agilest – Certification Dump
Answer: D
Question: 148
Which of the below are NOT part of the CALMR approach to DevOps?
A. Authentication
B. Measurement
C. Lean flow
D. Culture
Answer: A
Question: 149
Answer: D
Question: 150
Answer: B
Question: 151
While SAFe advocates for de-centralised decision making, some decision can be centralised. Which
are the common characteristics for these decisions? (Choose Two)
Answer: A D
Question: 152
Which of the following is a fictional character created to represent a user type that might use a sight,
brand or product in a similar way?
A. Persona
B. Character
C. Prototype
D. Actor
pg. 43
Leading SAFe 5.1 Agilest – Certification Dump
Answer: A
Question: 153
A. Scheduled Release
B. Annual Release
C. Release on Demand
D. Quarterly Release
Answer: C
Question: 154
A. Empower employees
B. Start the change immediately and develop the vision later
C. Create short-term wins
D. Anchor new approaches in culture
Answer: A C D
Question: 155
According to Agile Manifesto, the most efficient and effective method of conveying information to
and within a development team is …………………..?
Answer: D
Question: 156
Design thinking goes beyond the traditional focus on the features and functions of a proposed
product and emphasizes understand the problem to be solved.
A. TRUE
B. FALSE
Answer: A
Question: 157
Answer: A
pg. 44
Leading SAFe 5.1 Agilest – Certification Dump
Question: 158
Lean portfolio Management aligns _______________ and ____________ by applying Lean and
System Thinking approaches to strategy and investment funding, Agile portfolio operation and
governance?
A. Budget, execution
B. Strategy, execution
C. Portfolio, program backlog
D. Budget strategy
Answer: B
Question: 159
A. Three
B. Four
C. Five
D. Seven
Answer: B
Question: 160
Who are the ultimate beneficiaries of the value of the business solutions created and maintained by
the portfolio value streams?
A. Customers
B. Release Train engineers
C. Business Owners
D. Executives
Answer: A
Question: 161
Agile Team must contain all the skills required to deliver the increment, this is an example of what?
A. Collaboration
B. Self-organization
C. Cross-functionality
D. Business Agility
Answer: C
Question: 162
A. TRUE
B. FALSE
Answer: B
Question: 163
pg. 45
Leading SAFe 5.1 Agilest – Certification Dump
A. Economic
B. Architectural
C. Learning
D. Customer
Answer: D
Question: 164
Answer: D
Question: 165
A. 2 Days
B. 3 Days
C. 4 Hours
D. 1 Week
Answer: A
Question: 166
A. Program backlog
B. Solution backlog
C. Team backlog
D. Portfolio backlog
Answer: B
Question: 167
Which of the following is a Customer-centric development process that creates desirable products
that are profitable and sustainable over their lifecycle?
Answer: C
pg. 46
Leading SAFe 5.1 Agilest – Certification Dump
Question: 168
Which component of the Continuous Delivery pipeline focuses on creating alignment on what needs
to be built?
A. Release on Demand
B. Continuous Deployment
C. Continuous Integration
D. Continuous Exploration
Answer: D
Question: 169
A. Technical Excellence
B. Alignment
C. Program Execution
D. Transparency
Answer: A
Question: 170
When implementing Test Automation, it is not important to keep test data for automated tests
under version control.
A. TRUE
B. FALSE
Answer: B
Question: 171
A. Funnel
B. In Test
C. Done
D. Portfolio Backlog
Answer: B
Question: 172
The Second SAFe Lean-Agile principle advises to apply what type of thinking?
A. Design Thinking
B. Analytical Thinking
C. Customer-centric Thinking
D. Systems Thinking
Answer: D
pg. 47
Leading SAFe 5.1 Agilest – Certification Dump
Question: 173
DevOps is a set of Tool that enable communication, automation among Development and operation.
A. TRUE
B. FALSE
Answer: B
Question: 174
A _______________ validates that the stories in the backlog supports the steps needed by the user
to accomplish their objective.
A. Empathy Map
B. Customer Journey Map
C. Mind Map
D. Story Map
Answer: D
Question: 175
How often does the innovation and Planning (IP) iteration occur?
Answer: C
Question: 176
Which of the below includes existing code, hardware components, branding guidelines and enables
near-term business Features?
A. Architectural Runway
B. DevSecOps
C. DevOps
D. Continuous Delivery Pipeline
Answer: A
Question: 177
Which Core Business Agility competency describes the critical skills and Lean-agile principles and
practices that high-performing Agile teams and Team and Agile teams used to create high-Quality
solutions for their customers?
A. Lean-Agile Leadership
B. The Team and Technical Agility
C. Agile Product Delivery
D. Continuous Learning culture
pg. 48
Leading SAFe 5.1 Agilest – Certification Dump
Answer: B
Question: 178
Good coaches do not give people the answer, but instead they do what?
Answer: D
Question: 179
Becoming a Coach requires a shift from old behaviours to the new ones. What are three examples of
Old behaviours? (Choose three) Focusing on deadlines Multiple Selection
A. Focusing on Deadlines
B. Driving towards specific outcomes
C. Fixing problem for the Team
D. Facilitating Team problem solving
E. Asking the Team for the answers
F. Focusing on Business Values Delivery
Answer: A B C
Question: 180
Answer: B
Question: 181
A. Agile Team
B. Senior Management
C. Release Train Engineer
D. Scrum Master
Answer: C
Question: 182
A. Teamwork
B. Commitment
C. Transparency
pg. 49
Leading SAFe 5.1 Agilest – Certification Dump
D. Accountability
Answer: A
Question: 183
Scrum Masters help remove impediments, foster an environment for high performing team
dynamics, and what else?
A. Relentlessly Improve
B. Estimate stories
C. Form and re-form Teams
D. Continuously Deliver
Answer: A
Question: 184
What is the name of the event where all team members determine how much of the team’s backlog
they can commit to delivering during an upcoming iteration?
A. Solution Planning
B. Solution Demo
C. Iteration Planning
D. Backlog refinement
Answer: C
Question: 185
A. To iterate on stories
B. To identify acceptance criteria
C. To adjust and identify ways to improve
D. To evaluate metrices
Answer: C
Question: 186
A. Every 6 to 8 Weeks
B. Every 12 to 16 Weeks
C. Every 4 to 6 Weeks
D. Every 8 to 12 Weeks
Answer: D
Question: 187
pg. 50
Leading SAFe 5.1 Agilest – Certification Dump
Answer: C
Question: 188
Answer: A
Question: 189
Answer: C D
Question: 190
Which of the below are dimensions of the Agile Product Delivery competency? (Choose Three)
Answer: A B D
Question: 191
Which event is Synchronises the ART and is attended by Scrum Masters weekly or more frequently?
A. PO Sync
B. Scrum of Scrum
C. Daily Scrum
D. ART Sync
Answer: B
Question: 192
A. Story Map
B. Customer Journey Map
C. Empathy Map
D. Program Backlog
pg. 51
Leading SAFe 5.1 Agilest – Certification Dump
Answer: A
Question: 193
Which event is held at the end of every PI and demonstrates and evaluates the current state of the
solution?
A. IP
B. Iteration retrospective
C. Iteration Review
D. I&AD
Answer: D
Question: 194
A. Iteration Review
B. Iteration Retrospective
C. Daily Stand up
D. Iteration Planning
Answer: A
Question: 195
Which one of the below is not one of the core competencies for Business Agility?
Answer: D
Question: 196
A. Automation
B. Backlog prioritization
C. Integration
D. Marketing
Answer: A C
Question: 197
According to the Agile Manifesto, Responding to Change is more important than _______________?
A. Following a Plan
B. Individual and interaction
C. Customer Collaboration
D. Contract Negotiation
Answer: A
pg. 52
Leading SAFe 5.1 Agilest – Certification Dump
Question: 198
Answer: C
Question: 199
A. Two
B. Three
C. Four
D. Five
Answer: B
Question: 200
A. Epic
B. Feature
C. User Story
D. Capability
Answer: A
Question: 201
A. Shared resources
B. Automated testing
C. Continuous exploration
D. DevOps
Answer: D
Question: 202
Which of the below are dimensions of the Team and Technical Agility Competency? (Choose Three)
A. Technical excellence
B. Agile Teams
C. Team of Agile Teams
D. Built-in-Quality
Answer: B C D
pg. 53
Leading SAFe 5.1 Agilest – Certification Dump
Question: 203
In SAFe Built-in-Quality thinking is organized around five specific aspects “Flow, Architecture and
Design Quality, Code Quality, System Quality.
A. Release Quality
B. Deployment Quality
C. Performance Quality
D. Software Quality
Answer: A
Question: 204
A. Client
B. Staging
C. Production
D. Development
Answer: B
Question: 205
A. True
B. False
Answer: B
Question: 206
The Core SAFe Values are Transparency, Alignment, Program Execution and ______________?
A. Customer Centricity
B. High Quality
C. Built-in Quality
D. Business Agility
Answer: C
Question: 207
Which event is synchronizes the ART and is attended by POs and Pms weekly or more frequently?
A. Scrum of Scrums
B. Daily Scrum
C. ART Sync
D. PO Sync
Answer: D
pg. 54
Leading SAFe 5.1 Agilest – Certification Dump
Question: 208
A. System Team
B. Business Owners
C. Release Trian Engineer
D. Product Management
Answer: B
Question: 209
A. Technical excellence
B. System thinking
C. Second Testing
D. Security Practice
Answer: D
Question: 210
Which of the below is not one of the four activities of Release on Demand?
A. Lean
B. Stabilize and operate
C. Automate
D. Measure
Answer: C
Question: 211
Which od the below are not part of the CALMR approach to DevOps?
A. Measurement
B. Continuous Improvement
C. Lean Flow
D. Automation
Answer: B
Question: 212
Answer: A
pg. 55
Leading SAFe 5.1 Agilest – Certification Dump
Question: 213
What synchronises the Teams in the Agile Release Train in common cadence?
Answer: A
Question: 214
A. 3 – 4 Teams
B. 5 – 12 Teams
C. 10 – 15 Teams
D. 20 – 25 Teams
Answer: B
Question: 215
A. Developer Collaboration
B. Technical Collaboration
C. No Collaboration
D. Contract Negotiation
Answer: D
Question: 216
Which of the below are Core competencies for Business Agility? (Choose Two)
Answer: A C
Question: 217
In SAFe, special time is allocated for innovation and exploration during ___________________?
A. IP Iteration
B. PI Planning
C. I&A Event
D. At the end of each iteration
Answer: A
pg. 56
Leading SAFe 5.1 Agilest – Certification Dump
Question: 218
Answer: D
Question: 219
A. Four
B. Five
C. Ten
D. Twelve
Answer: C
Question: 220
A. Product Management
B. Product Owners
C. Release Train Engineer
D. Business Owners
Answer: A
Question: 221
Answer: B
Question: 222
A. To give the ART numbers a process Tool to keep the train on the Tracks
B. To provide regular predictable dev cadence to produce an increment of value
C. To create a continuous flow of work to support the delivery pipeline
D. To allow the team to perform some final backlog refinement for upcoming iteration planning
Answer: B
pg. 57
Leading SAFe 5.1 Agilest – Certification Dump
Question: 223
The program highlights feature, delivery dates, milestones and what else for Agile Release Train
Teams?
A. Dependencies
B. Timeboxes
C. Requirements
D. Objectives
Answer: B
Question: 224
A. Solution Owner
B. The Team
C. The Product Owner
D. The Scrum Master
Answer: B
Question: 225
The Business must depend on the Team for what in order for the Business to do any meaningful
planning?
A. Team Capabilities
B. Commitment to the Plan
C. A cross-functional skill set
D. Measurements
Answer: B
Question: 226
During PI Planning, who owns the planning for stories into iterations?
A. System Architect
B. Scrum Master
C. Product Management
D. Agile Teams
Answer: D
Question: 227
Each PI Planning Meeting evolves over time and ending PI Planning with Retrospective will help to do
what?
pg. 58
Leading SAFe 5.1 Agilest – Certification Dump
Answer: C
Question: 228
Which type of enabler does a System Architect review during a System Demo?
A. Enabler Features
B. Enabler Capabilities
C. Enabler Portfolio Epics
D. Enabler Stories
Answer: C
Question: 229
Scrum Masters are effective by using Scrum Methods, supporting SAFe Principles and practices and
what else?
Answer: A
Question: 230
Answer: B C
Question: 231
Features lend themselves to the Lean UX process model. They include a description, a benefit
hypothesis and what else?
A. Content readiness
B. Scope and context
C. Acceptance criteria
D. IP outcomes
Answer: C
Question: 232
What is main reason why some teams never reach stage 4 (Performing) in the stage of high
performing teams?
pg. 59
Leading SAFe 5.1 Agilest – Certification Dump
Answer: B
Question: 233
There are two primary aspects of Lean Agile mindset – Lean Thinking and what else?
A. Lean Systems
B. Embracing Agility
C. Systems Engineering
D. Feature Enablement
Answer: B
Question: 234
In SAFe who owns the decision for releasing changes into production?
Answer: D
Question: 235
Becoming a Coach requires a shift from old behaviours to the new ones. What are three examples of
Old behaviours? (Choose three)
Answer: C D E
Question: 236
Scrum Masters are effectively by using Scrum methods, supporting SAFe Principles and practices,
and what else?
pg. 60
Leading SAFe 5.1 Agilest – Certification Dump
Answer: A
Question: 237
In the context of whole Product thinking, which products represents everything that might be done
to attract and keep customers?
A. Augmented Product
B. Generic Product
C. Expected Product
D. Potential Product
Answer: D
Question: 238
Answer: D
Question: 239
A. Four
B. Five
C. Seven
D. Twelve
Answer: A
Question: 240
Which of the below are pillar of the SAFe House of Lean? (Choose Two)
A. Value
B. Flow
C. Lean Agile Leadership
D. Innovation
Answer: B D
Question: 241
What is the design thinking Tool that promotes Customer identification by helping teams develop
deep, shared understanding for others?
A. Personas
B. Empathy Maps
C. Customer Journey Maps
D. Story Maps
pg. 61
Leading SAFe 5.1 Agilest – Certification Dump
Answer: B
Question: 242
A. Five
B. Seven
C. Ten
D. Twelve
Answer: D
Question: 243
A. Design thinking
B. Architectural runway
C. Continuous delivery pipeline
D. SAFe implementation roadmap
Answer: A
Question: 244
_____________ are in the program backlog and they get decomposed in the user stories?
A. Topics
B. Features
C. Tasks
D. Strategic themes
Answer: B
Question: 245
Divergent and Convergent techniques are applied to understand a problem, design a solution and
deliver that solution to the market when __________________ is applied.
A. Design Thinking
B. Kaizen Thinking
C. System Thinking
D. Holistic Thinking
Answer: A
Question: 246
A. Rick reduction
B. Low cost
C. Fast feedback
D. Higher quality
Answer: A C
pg. 62
Leading SAFe 5.1 Agilest – Certification Dump
Question: 247
___________ takes a holistic approach to solution development, incorporating all aspects of system
and its environment into the design, development, deployment and maintenance of the system
itself.
A. System Thinking
B. Architectural runway
C. Customer-centricity
D. Design Thinking
Answer: A
Question: 248
In the safe hierarchy of requirements, ___________________ are between Epics and User stories.
A. Sub-tasks
B. Topics
C. Features
D. User stories
Answer: C
Question: 249
A. True
B. False
Answer: A
Question: 250
A. Identification
B. Validation
C. Testing
D. Prioritization
Answer: D
Question: 251
A. True
B. False
Answer: B
Question: 252
pg. 63
Leading SAFe 5.1 Agilest – Certification Dump
Answer: B
Question: 253
A. Value
B. Flow
C. Innovation
D. Lean Agile Leadership
Answer: D
Question: 254
Customer centric enterprises apply __________________ design throughout the Design process
A. Empathic
B. Complex
C. Whole system
D. Holistic
Answer: A
Question: 255
A. 3 to 9 people
B. 5 to 11 people
C. 7 to 10 people
D. 10 to 15 people
Answer: B
Question: 256
Which phase of the portfolio Kanban is used to capture all new big business or technology ideas?
A. Portfolio Backlog
B. Analysing
C. Reviewing
D. Funnel
Answer: D
pg. 64
Leading SAFe 5.1 Agilest – Certification Dump
Question: 257
A. Three
B. Four
C. Five
D. Seven
Answer: B
Question: 258
Which are the two primary means by which a Customer drives a Value from Products and Solutions?
(Choose Two)
A. Increased popularity
B. Revenue enhancement
C. Cost reduction
D. Cost increase
Answer: B C
Question: 259
Answer: D
Question: 260
Answer: A
Question: 261
Which component of Continuous delivery pipeline focuses on taking features from program backlog
and Implementing them?
A. Release on Demand
B. Continuous integration
C. Continuous Exploration
D. Continuous Deployment
pg. 65
Leading SAFe 5.1 Agilest – Certification Dump
Answer: B
Question: 262
Answer: B
Question: 263
In SAFe, development delivers valuable functionality quickly to satisfy the customer and quality is
added later via refactoring.
A. True
B. False
Answer: B
Question: 264
A. Continuous learning
B. Enterprise solution Delivery
C. Lean-Agile Leadership
D. Agile Product Delivery
Answer: D
Question: 265
A backlog illustrates the total amount of work in process and the state of each work item.
A. True
B. False
Answer: B
Question: 266
pg. 66
Leading SAFe 5.1 Agilest – Certification Dump
Answer: A
Question: 267
A. Three
B. Four
C. Five
D. Seven
Answer: A
Question: 268
A servant leader knows that his or her own growth comes from what?
Answer: A
Question: 269
“Agile Team continuously adapt to new circumstances and enhance the methods of value delivery”
A. Continuous Delivery
B. Continuous Deployment
C. Continuous Improvement
D. Continuous Integration
Answer: C
Question: 270
What is one time when Scrum Master participate but does not necessarily facilitate?
Answer: D
Question: 271
A. PO Sync
B. Iteration Review
C. Daily stand up
D. Scrum of Scrum
pg. 67
Leading SAFe 5.1 Agilest – Certification Dump
Answer: D
Question: 272
During PI Planning, which two tasks are part of the Scrum Master’s Role in the first Team breakout?
(Choose Two)
A. Identify as many tasks and dependencies as possible for the management review
B. Facilitate the co-ordination with other teams for dependencies
C. Be involved in the program backlog refinement and preparation
D. Provide clarifications necessary to assist the team with their story estimating and sequencing
E. Review and reprioritize the Team backlog as a part of the preparatory work for the second
team breakout
Answer: A B
Question: 273
A. To evaluate Metrics
B. To identify Acceptance criteria
C. To iterate on Stories
D. To adjust and identify ways to improve
Answer: D
Question: 274
The Program Board highlights feature Delivery Dates, milestones and what else for Agile Release
Train Teams?
A. Requirements
B. Timeboxes
C. Dependencies
D. Objectives
Answer: C
Question: 275
Answer: A D
Question: 276
Good Coaches don’t give people the answer, but instead they do what?
pg. 68
Leading SAFe 5.1 Agilest – Certification Dump
Answer: B
Question: 277
What is the time when Scrum Master participates but doesn’t necessarily facilitate?
Answer: D
Question: 278
Answer: C
Question: 279
Business Owner is a Role on which dimension of Lean Portfolio Management? (Choose two)
Answer: A C
Question: 280
a. Value stream
b. Agile Delivery Pipeline
c. Shared Resources
d. Agile Release Train
Answer: D
Question: 281
A. Continuous Deployment
B. Release on Demand
C. Automated Testing
pg. 69
Leading SAFe 5.1 Agilest – Certification Dump
D. Scheduled Release
Answer: B
Question: 282
The Team in the Agile Release Train do not need to be synchronised on common cadence.
A. True
B. False
Answer: B
Question: 283
Who creates and refines the user stories and the acceptance criteria?
Answer: A
Question: 284
A. Augmented Solution
B. Custom-built Solution
C. General Solution
D. Universal Solution
Answer: C
Question: 285
A. True
B. False
Answer: A
Question: 286
The relationship between ______________ and _____________ are in the core of WSJF. (Choose
Two)
A. Processing Rate
B. Cost of Delay
C. Average wait Time
pg. 70
Leading SAFe 5.1 Agilest – Certification Dump
D. Job duration
E. Queue length
Answer: B D
Question: 287
A. Three
B. Five
C. Seven
D. Nine
Answer: C
Question: 288
In context of the whole product thinking, which product is often considered the “minimal offering”
of a Product?
A. Augmented product
B. Potential product
C. Expected product
D. Generic product
Answer: D
Question: 289
According to the Agile Manifesto, the highest priority is to satisfy the customer through early and
continuous delivery of _________________ software?
A. Valuable
B. Working
C. Optimal
D. Cheap
Answer: A
Question: 290
A. Continuous Exploration
B. Continuous Integration
C. Continuous deployment
D. Continuous Testing
Answer: D
Question: 291
Which of the following are Roles on Agile Release Team? (choose Two)
pg. 71
Leading SAFe 5.1 Agilest – Certification Dump
C. System Team
D. Business Owners
Answer: A C D
Question: 292
Small batch sizes enable _____________ feedback with lower transaction Cost.
A. Faster
B. Slower
C. Less detailed
D. More detailed
Answer: A
Question: 293
Answer: D
Question: 294
Which of the below are key to leading successful change? (Choose Three)
Answer: A B D
Question: 295
Which of the following are part of Agile Release Train ART Sync? (Choose Two)
A. Architectural Sync
B. Scrum of Scrums
C. PO sync
D. Product Management Sync
Answer: B C
Question: 296
A. Large Batches
B. Culture
C. Measurement
D. Automation
pg. 72
Leading SAFe 5.1 Agilest – Certification Dump
Answer: A
Question: 297
Which Design Thinking Tool helps Teams imagine what a specific persona is thinking, feeling, hearing
and seeing as they use the product.
A. Story map
B. Customer journey map
C. Empathy map
D. Story board
Answer: C
Question: 298
The Team and Technical Agility competency describe the critical skills and ______________
principles and practices that high-performing Agile Teams and Teams of Agile teams used to create
high quality solutions for their customers
A. Lean Agile
B. DevOps
C. SMART
D. Extreme programming
Answer: A
Question: 299
A. Four
B. Five
C. Three
D. Ten
Answer: B
Question: 300
A Customer journey map illustrates the experience as a user engages with a Company ‘s
____________ Value stream, products and Services
A. Operational
B. Highest priority
C. Development
D. Customer
Answer: A
Question: 301
A. Shared Ownership
B. Visibility
pg. 73
Leading SAFe 5.1 Agilest – Certification Dump
C. High Quality
D. Alignment
Answer: D
Question: 302
A. Welcome changing requirements, even late in Development. Agile processes harness change
for the Customer’s competitive advantage.
B. Take an Economic View
C. Agile processes promote sustainable development. The sponsors, developers, users should
be able to maintain a constant pace indefinitely.
D. The best Architecture, requirements and design emerge from self-organizing teams
Answer: B
Question: 303
Which of the below are rules for building architectural runway? (Choose Three)
Answer: B C D
Question: 304
In the context of whole product thinking, which product represents the customer’s minimal
purchase conditions as informed by alternative or competing products?
A. Expected product
B. Augmented product
C. Generic product
D. Potential product
Answer: A
Question: 305
Answer: C
Question: 306
pg. 74
Leading SAFe 5.1 Agilest – Certification Dump
Which 3 of the below need to be taken in to account when assigning Business Value to PI objectives?
(Choose Three)
A. Risk Value
B. Efficiency Value
C. Market Value
D. Future Value
E. Consumer Value
Answer: B C D
Question: 307
A. True
B. False
Answer: A
Question: 308
Business Agility requires that __________________ use Lean and Agile practices to continually
deliver innovative, high-quality products and services faster than the competition.
A. The developers
B. The Business Owners
C. Business and technology Leaders
D. Everyone involved in delivering Solutions
Answer: D
Question: 309
A market event is one time future event, which has a high probability of manually effecting one or
more solutions.
A. True
B. False
Answer: A
Question: 310
Answer: B
Question: 311
What is a SAFe recommended approach to implement a crosscutting Epic that spans multiple PIs?
pg. 75
Leading SAFe 5.1 Agilest – Certification Dump
Answer: C
Question: 312
Answer: A
Question: 313
Which of the below are not one of the Core competencies of business agility?
A. Continuous Integration
B. Continuous Learning culture
C. Lean portfolio management
D. Agile product delivery
Answer: A
Question: 314
Which design thinking tool illustrate the experience as a user engages with a Company’s operational
value stream, products and services?
A. Empathy Map
B. Story Map
C. Customer Journey Map
D. Acceptance Criteria
Answer: C
Question: 315
A. The Developer
B. The Economic Belt
C. The Customer
D. The Business
Answer: C
Question: 316
pg. 76
Leading SAFe 5.1 Agilest – Certification Dump
A. True
B. False
Answer: B
Question: 317
What ensures that every element and every increment of the solution reflects quality standards
throughout the development lifecycle?
A. Built-in Quality
B. Product Owner acceptance
C. Sign off by Executives
D. Definition of Ready
Answer: A
Question: 318
How is a functional model of the feature or product that are to be built called?
A. Persona
B. Prototype
C. Archetype
D. Proof of concept
Answer: B
Question: 319
Which event id usually 2 days long and happens at the beginning of every PI?
A. Iteration Planning
B. Inspect & Adapt
C. PI Planning
D. Iteration review
Answer: C
Question: 320
A. Low cooperation
B. Innovation implemented
C. Collaboration encouraged
D. Responsibilities shared
Answer: A
Question: 321
A. True
pg. 77
Leading SAFe 5.1 Agilest – Certification Dump
B. False
Answer: B
Question: 322
Customer Centricity and Design Thinking is a dimension of which Business Agility core competency?
Answer: B
Question: 323
The teams in an Agile Release Train and aligned around common vision and execute and deliver on a
cadence?
A. True
B. False
Answer: A
Question: 324
Which of the below are not part of the CALMR approach to DevOps?
A. Lean flow
B. Automation
C. Release on demand
D. Culture
Answer: C
Question: 325
Which are a set of directives which describe the Goal that needs to be achieved by an Agile Release
Train?
A. Business Objectives
B. Iteration goal
C. OKRs
D. PI Objectives
Answer: D
Question: 326
A. System requirements
B. Infrastructure requirement
C. End user requirement
D. Architecture requirement
pg. 78
Leading SAFe 5.1 Agilest – Certification Dump
Answer: A B D
Question: 327
Which of the following are the purpose of the IP Iteration? (Choose Four)
Answer: A B C D
Question: 328
Answer: C
Question: 329
A. Continuous Integration
B. Agile Product Delivery
C. Lean portfolio Management
D. Continuous Learning Culture
Answer: B
Question: 330
A. Agile Delivery
B. Continuous Integration
C. Continuous Learning Culture
D. Continuous Learning Culture
Answer: A
Question: 331
Empathetic design guides the development of solutions that move beyond functional needs, also
addressing:
Answer: D
pg. 79
Leading SAFe 5.1 Agilest – Certification Dump
Question: 332
A. True
B. False
Answer: A
Question: 333
Which design thinking tool conveys the problems customers face in the context and triggers of why
they use the product?
Answer: D
Question: 334
Epics in the analysing state that have the highest WSJF are pulled into the _____________ , as soon
as space is available?
A. Database
B. Team backlog
C. Portfolio backlog
D. Program backlog
Answer: C
Question: 335
Persona is a fictional character created to represent a single user who might use a site, brand or
product is a specific, unique, different than the majority way.
A. True
B. False
Answer: B
Question: 336
______________ help companies recognise and capitalize or opportunities that are predictable and
require longer term planning.
A. Empathic design
B. Market rhythms
C. Market events
D. User research
Answer: B
Question: 337
pg. 80
Leading SAFe 5.1 Agilest – Certification Dump
Which components of the Continuous Delivery Pipeline is the ability to make value available to
Customers all at once, or in a staggered fashion based market and business need?
A. Release on demand
B. Continuous Integration
C. Continuous exploration
D. Continuous Deployment
Answer: A