PR05 - Grid 2-B
PR05 - Grid 2-B
PR05 - Grid 2-B
PROJECT INFORMATION
Client Name:
Project Name:
Project Number:
RESULTS SUMMARY
Beam Shear - X Direction PASS 0.0121 0.5513 N/sq mm 22 - 1.5 DL + 1.5 PO - 1.5 TL + 1.5 TA + 1.5 WL-X
Beam Shear - Z Direction PASS 0.0071 0.5595 N/sq mm 1 - 1.5 DL + 1.5 IL + 1.5 PE
Bottom Rebar Area - X Direction PASS 7468.0145 2086.2 sq mm/m 17 - 1.5 DL + 1.5 PO + 1.5 TL + 1.5 TA + 1.5 WL+X
Bottom Rebar Area - Z Direction PASS 7744.6077 2086.2 sq mm/m 40 - 0.9 DL + 0.9 PO - 0.9 TL + 0.9 TA + 1.5 WL-Z
Top Rebar Area - X Direction PASS 7468.0145 2311.2 sq mm/m 33 - 0.9 DL + 0.9 PO + 0.9 TL + 0.9 TA + 1.5 WL+X
Top Rebar Area - Z Direction PASS 7744.6077 2311.2 sq mm/m 19 - 1.5 DL + 1.5 PO + 1.5 TL + 1.5 TA + 1.5 WL+Z
MATERIAL QUANTITIES
Load Combination Load Element Soil Footing App Axial Total Axial Buoyant
Weight Weight Weight Load Load Load
kN kN kN kN kN kN
Load Combination Load Element Soil Footing App Axial Total Axial Buoyant
Weight Weight Weight Load Load Load
kN kN kN kN kN kN
Load Combination Max Allowable Pile Max Allowable Pile Max Allowable Pile
Comp Comp No. Uplift Uplift No. Shear Shear No.
kN kN kN kN kN kN
Load Combination Max Allowable Pile Max Allowable Pile Max Allowable Pile
Comp Comp No. Uplift Uplift No. Shear Shear No.
kN kN kN kN kN kN
Pile - 1
Pile - 2
Pile - 1
Pile - 2
Pile - 1
Pile - 2
Pile - 2
Punching Perimeter - Pp = 4 m
Punching Perimeter - Pp = 4 m
Load Combination Max Pos Pos Mom Max Neg Neg Mom
Moment Location Moment Location
kN-m m kN-m m
Load Combination Max Pos Pos Mom Max Neg Neg Mom
Moment Location Moment Location
kN-m m kN-m m
33 - 0.9 DL + 0.9 PO + 0.9 TL + 0.9 TA + 1.5 WL+X 13 32 100 7468.015 2311.2 -86.968 X
19 - 1.5 DL + 1.5 PO + 1.5 TL + 1.5 TA + 1.5 WL+Z 26 32 100 7744.608 2311.2 -245.744 Z
Note: Bar spacing in top level X direction does not meet spacing requirements
Note: Bar spacing in top level Z direction does not meet spacing requirements
Bottom Steel
17 - 1.5 DL + 1.5 PO + 1.5 TL + 1.5 TA + 1.5 WL+X 13 32 100 7468.015 2086.2 187.701 X
40 - 0.9 DL + 0.9 PO - 0.9 TL + 0.9 TA + 1.5 WL-Z 26 32 100 7744.608 2086.2 170.27 Z
Note: Bar spacing in bottom level X direction does not meet spacing requirements
Note: Bar spacing in bottom level Z direction does not meet spacing requirements
Rebar size Rs = 32 mm
Rebar diameter db = 32 mm
Rebar area Ab = 804.248 sq mm
Footing Moment M= 187.701 kN-m/m
Cast concrete depth below rebar Cd = 50 mm
Casting Postion Factor Fcp = Not Applicable 1
Epoxy Coating Factor Fep = Not Applicable 1
Rebar Size Factor Frb= Not Applicable 0
Transverse Reinforcement Index Ktr = Not Applicable 0
Rebar cover to rebar diameter ratio r = f(Cb/db) = 1
Reinforcement Grade Factor Frg= 1
Ultimate Bond Stress Tbd = Beta * sqrt(fc'); Beta = 0.5 for deformed bars 2.72 N/sq mm
Required development length in tension ld,o = (0.87)*(fy*db)/(4*Tbd) 1279.412 mm
Minimum required development length In tension ld,min = 300 mm
Consider reduction based On rebar stress ratio Cred = True
Provided rebar area Aprov = 10455.22 sq mm
Required rebar area based on moment Areqd = 548.928 sq mm
Provided to required rebar ratio Rp,r = Aprov/Areqd 19.047
Reduced development length based on rebar ratio ld,rpr = ld,o/Rp,r 67.173 mm
Final Development Length ld = max{ld,rpr,ld,min} 300 mm
Rebar size Rs = 32 mm
Rebar diameter db = 32 mm
Rebar area Ab = 804.248 sq mm
Footing Moment M= 170.16 kN-m/m
Cast concrete depth below rebar Cd = 50 mm
Casting Postion Factor Fcp = Not Applicable 1
Epoxy Coating Factor Fep = Not Applicable 1
Rebar Size Factor Frb= Not Applicable 0
Transverse Reinforcement Index Ktr = Not Applicable 0
Rebar cover to rebar diameter ratio r = f(Cb/db) = 1
Reinforcement Grade Factor Frg= 1
Ultimate Bond Stress Tbd = Beta * sqrt(fc'); Beta = 0.5 for deformed bars 2.72 N/sq mm
Required development length in tension ld,o = (0.87)*(fy*db)/(4*Tbd) 1279.412 mm
Minimum required development length In tension ld,min = 300 mm
Rebar size Rs = 32 mm
Rebar diameter db = 32 mm
Rebar area Ab = 804.248 sq mm
Footing Moment M= -84.237 kN-m/m
Cast concrete depth below rebar Cd = 1300 mm
Casting Postion Factor Fcp = Not Applicable 1
Epoxy Coating Factor Fep = Not Applicable 1
Rebar Size Factor Frb= Not Applicable 0
Transverse Reinforcement Index Ktr = Not Applicable 0
Rebar cover to rebar diameter ratio r = f(Cb/db) = 1
Reinforcement Grade Factor Frg= 1
Ultimate Bond Stress Tbd = Beta * sqrt(fc'); Beta = 0.5 for deformed bars 2.72 N/sq mm
Required development length in tension ld,o = (0.87)*(fy*db)/(4*Tbd) 1279.412 mm
Minimum required development length In tension ld,min = 300 mm
Consider reduction based On rebar stress ratio Cred = True
Provided rebar area Aprov = 10455.22 sq mm
Required rebar area based on moment Areqd = 222.366 sq mm
Provided to required rebar ratio Rp,r = Aprov/Areqd 47.018
Reduced development length based on rebar ratio ld,rpr = ld,o/Rp,r 27.211 mm
Final Development Length ld = max{ld,rpr,ld,min} 300 mm
Rebar size Rs = 32 mm
Rebar diameter db = 32 mm
Rebar area Ab = 804.248 sq mm
Footing Moment M= -245.744 kN-m/m
Cast concrete depth below rebar Cd = 1300 mm
Casting Postion Factor Fcp = Not Applicable 1
Epoxy Coating Factor Fep = Not Applicable 1
Rebar Size Factor Frb= Not Applicable 0
Transverse Reinforcement Index Ktr = Not Applicable 0
Rebar cover to rebar diameter ratio r = f(Cb/db) = 1