St-Nerf-25 - Reinforcememt Details
St-Nerf-25 - Reinforcememt Details
St-Nerf-25 - Reinforcememt Details
200
SUMP PIT
T20-200 T&B EXTRA A-142 MESH
300
A-142 MESH COL REINF'T
SSL BOTHWAYS
T12-200 A-142 MESH T12-200 AS PER DETAIL
T16 @ 150 C/C T12-200 T10-150(H) 200 400 COLUMN T12-100 (H)
200 2T20
T12 @ 200 C/C T12 @ 150 C/C
3T12 ANCHOR BAR X E
T10-200
200
300
BOTH FACE B C
400
COLUMN A
300
T16 @ 200 T12-200 T12-200
200
EXTRA BOTH FACE
VERTICAL
T12-200
300
T16-200(V)EF VERTICAL D
BEAM AS PER 2T20
BEAM AS PER BEAM AS PER D
300
INFILL BLOCK SCHEDULE 2T16 C
350
WALL SCHEDULE SCHEDULE U-BARS
T12-200(H)EF
150
( BLAST WALL ) 2T20 2-T20 B
A
2T20 E 200 200 350
4T20
400 200 ANCHOR BAR
FGL
TYPICAL R.C.DETAIL OF SUMP PIT TYP. SUPPORT DETAILS X
TYPICAL R.C.DETAIL OF TYP. SUPPORT DETAILS
AT BEARING SIDE OF
T16-200(V)
PARAPET BEAM
SCALE:- 1:20 HOLLOW CORE SLAB
AT NON BEARING SIDE OF
CORBEL AT END SECTION AT `X-X`
E.F HOLLOW CORE SLAB SCALE:- 1:20
ONLY APPLICABLE IN COLUMNS
T12-200(H)EF
SCALE:- 1:25
BLOCK WALL LOCATIONS R.C CORBEL SCALE:- 1:20
SCALE:- 1:25
75
LIFTING SLOT (BOTTOM STEEL COVER 50mm) P.C SLAB
145
150
100X20mm 150
5 T8-250 c/c
400
UB 356x171x67
300
P SECTION - Q (S275)
KICKER
T8 @ 250 C/C
300
3T10
75
T12-200(H)EF
(U BARS)
(S.F) PLAN
CABLE TRENCH COVER T12-200(V)
COL. REINF'T GIRDER 5M.T CAPACITY
TYPICAL R.C.DETAIL OF RAFT SLAB WITH SCALE:- 1:25 E.F
T16-150(B)
1000 400 500
BUND WALL (TRANSFORMER AREA) SEE BASE SLAB
SCALE:- 1:25 REINF'T TYPICAL CORBEL IN
LANDING LVL COLUMNS TO SUPPORT REINF'T
TYPICAL R.C.DETAIL OF RAFT SLAB HOLLOW CORE SLAB T12-200 AS PER SCHEDULE
SCALE:- 1:25
PRECAST CONCRETE
TYPICAL CABLE TRENCH
D
ROAD LVL.
COVER 175mm THK. T12-150(TOP)
BEAM REINF'T DETAIL T12-200(H)EF
LAP LENGTH
SEE SCHEDULE
150
T16-200(V)EF
70
SCALE:- 1:25
25
PRECAST CONCRETE
COVER 150mm THK. T10-200(DISTRIBUTION)
KICKER
(100x25)x20Wx 3THK. 2000
125
75
10
200
0
NOT MORE THAN
GRND. LVL. T12-150(BOTTOM) RSA 50x50x6
AT 300mm. C/C (MAX.)
2200MM
B
LA
WALL REINF'T
TS
T12-150
T12-150
IS
BOTHWAYS -<1m
WA
BOTHWAYS FLOOR LVL
T12-150
DETAIL - R CANTILEVER BEAM - R.CWALL
K.
BOTHWAYS
0TH
SCALE :- 1:20
CONNECTION DETAIL
20
200
400
4T16 6T16
400
200
(2SETS)
300
FB1 2T20+2T16 2T20 2T16 2T20+2T16 2T20+2T16 T10 - 150 - T10-200 LINKS T8-200 T8-200
200 400 (2 LEGGED) (2SETS) (2 LEGS) T8-200 0 ISSUED FOR CONSTRUCTION HM
27.06.2021
FB2 4T20+2T20 4T20 4T16 4T20+2T16 4T20+2T16 T10 - 225 - 400 300
400 450 (4 LEGGED) 400
400
FB2A 4T20+2T20 4T20 4T16 4T20+2T16 4T20+2T16 T10 - 225 540Hx200 THK UPSTAND
400 450 (4 LEGGED) T12-200 EW
T10 - 200 COLUMN-C1 TYPICAL COLUMN & BASEMENT
FB3 400 990 4T20+3T20 4T20 4T16 4T20 4T20
(4 LEGGED)
3T16 E.F COLUMN-C2 COLUMN-C3 COLUMN-C4 COLUMN-C5 KINGDOM OF BAHRAIN
3T16 E.F
SCALE:- 1:20
SCALE:- 1:20 SCALE:- 1:20 SCALE:- 1:20 SCALE:- 1:20
CONNECTION DETAIL
T10 - 200
FB4 200 990 2T20+2T16 2T20 2T16 2T20 2T20
(2 LEGGED) ELECTRICITY AND WATER AUTHORITY
FB5 300 450 3T20+3T16 3T16 3T16 3T20+3T20 3T20
T10 - 200
(2 LEGGED)
- PLANNING & STUDIES
FB6 4T20 4T16 4T20 4T20 4T16 T10 - 200 -
400 450 1600mm LONG T20Ø
(2 LEGGED)
T8 - 200 (TOP & BOTTOM BOTH LAYERS
B1 400 400 4T16 4T16 4T16 4T16 4T16 -
(2 LEGGED)
T10 - 150 L+1600mm LONG T20Ø INTERNATIONAL
RB1 400 450 4T20+3T20 4T16 4T16 4T20+2T20 4T20+3T20 - (TOP & BOTTOM BOTH LAYERS
(4 LEGGED) 75mm(TYP)
Consulting Engineers to the Energy Sector
50mm
(TYP)
RB2 400 450 4T20 4T16 4T16 4T16 4T20 T8 - 200
-
P.O. Box 5922, Manama, Kingdom of Bahrain
(2 LEGGED) Tel: (+973) 1770 8118 Fax: (+973) 1770 0115
L
SCHEDULE OF SLAB OPENING
ISMAIL KHONJI ASSOCIATES
B
TOP REINF'T
T12-150
B
SLA
FGL
BS1 550 T20-150 T20-150 T16-150 T16-150 TWO WAY T10-200 c/c B+1600mm LONG T20Ø
220/66 KV TRANSMISSION DEVELOPMENT
IST
500
BOTTOM
250 TWO WAY REINF'T
K.
T12-150
T12-150(H) EF
SUBSTATION CIVIL WORK
20
Rev
HM TMS 1154 ST-NERF-25
c