SAUDI ARABIAN OIL COMPANY
eleal2
Gpgouull gSolji
Saudi Aramco
EWwo-16N018
COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM AND UPS.
ESTABLISHMENT FOR ECC & PORT CONTROL AT RT
a LOW VOLTAGE CABLE SIZING CALCULATION
i
i
:
2
§
i
;
:
g
&
i
i
5
i
:
:
‘| | JACOBS ZATE
BE i
5 |e
3 [estes ateoumon rarest core pecs ow |r | cat | OT
TORTS TOONSIntrodueti
‘The selection of Low Voltage cables is based on:
1+ Cable Ampacity as per NEC tables.
2. Voltage Drop calculation.
4: Cable Ampacity:
Ampacity is defined as “the current in amperes a conductor can carry continuously under the conditions of
Use (conditions of the surrounding medium in which the cables are installed) without exceeding ils
temperature rating’. The ampacity values stated (specified) in NEC tables are based an some specific
conditions relative to the cable's immediate surrounding environment. So, a derating factor should be.
applied against a base ampacity to calculate the derated ampacity as stated in the following formula:
r
F
Where:
("')is Derated Ampacity, cable ampacity at actual installation conditions.
(I) is Base Ampacity, cable ampacity specified in NEC tables.
(F) is Overall Derating Factor.
The overall derating factor is a correction factor that takes into account the differences in the cable's
actual installation and operating conditions from the base conditions. This factor establishes the maximum
load capability that results in an actual cable life equal to or greater than that expected when operated at the|
base ampacity under the specified conditions". The Overall Derating Factor (F) is composed of several
‘components as indicated in the following Equation:
F=Ffx Ftx Fthx Fg
Where
Ff = Derating factor for firo coating,
Ft = Derating factor to account for the differences in ambient and conductor temperatures from
the base case
Fh = Derating factor for underground soil thermal resistance (only for Directly Buried cables).
Fg = Derating factor for cable grouping,
20F4Fire Coating Derating Factor (Fj:
As per Sec. 12.6.4 of SAES-P-104, F, = 0,85 when cables are freproofed by coating or wrapping with a
compound or other material. Ifnot, then F; shall equal to 1.0
Ambient and conductor temperature derating factor (Ft):
This adjustment factor is used to determine the cable ampacity when the operating ambient,
temperature and/or the maximum allowable conductor temperature differ trom the original
temperatures at which the cable base ampacity is specified in the NEC Tables. The expression for
calculating the effect of changes in the conductor and ambient temperatures on the base ampacily is given
by this Equation for copper conductors:
112
Te-Tal As per SAES-P-104 Section 12.6
Te-Ta (Source of formula: IEEE 835)
Where:
Tc : Conductor temperature (used in the table)
Ta: Table ambient temperature
Tat : Actual ambient temperature
Soil Thermal Resistance Derating Factor for Direct Buried Cables (F,
As per Sec. 12.6.1(B) of SAES-P-104, Earth Thermal Resistivity (RHO) for Land = 120°C-cmW.
To obtain ampacities at 120°C-cmiwatt, when not listed in the NEC lables, ampacitios at 90°C-cmvW should
be multiplied by the following factors:
0.892 (for Direct buried single core cables)
0.90 (for Direct buried multicore core cables)
Grouping Derating Factor (Fa):
Grouping derating factor (Fg) of cables directly buried 3/C and 1/C are selected as per tables 13-10 and
13-11 of IEEE standard 399-1997; respectively.
Grouping derating factor (Fg) of cables in conduit is selected depending on the number of current carrying
conductors in a raceway as per table Table 310.15(8)(3)(a) of NEC2011
30F42. Voltage Drop Limitations:
‘The selected conductor, if not of sufficient size, will cause excessive voltage drop in the circuit, and the drop
will be in direct proportion to the circuit length. The NEC recommends that the steady-state voltage drop in
power, heating, or lighting feeders be no more than 3% of the system nominal voltage. The percentage
voltage drop can be determined from the formulas below:
(Simplified equations from IEEE Standard 141-1993)
For Three-Phase Load:
BX lw XL
(R Cos 0-+X Sin 6) x 100%
1000 x
WV.D.=
For Two-Phase/Single-Phase Load:
2X Imac ¥ L(R Cos +X Sin @) x 100%
1000 x Es
WV.D.=
Where
%6V.D. = Percent Voltage Drop.
E; = System Nominal Voltage (Volts).
Iyex = Maximum Operating Current (Amperes),
Circuit Length (meters)
R ircuit Resistance (Ohms/km),
x Circuit Reactance (Ohms/km).
Cos @ = Power Factor of Load
Sin® = Reactive Factor of Load
Under the steady-state conditions, the voltage at the utilization equipment must comply with the
requirements of Saudi Aramco Engineering Standard SAES-P-100, Sec. 6.2.
Notes:
~ This calculation sheet is for Low voltage systems only.
Cable Type is Copper, XLPE Insulated
- NEC ampacity tables are selected as per the guidelines of Section 12.6.1 of SAES-P-104.
- Fault duration time has been considered as per SAES-P-104, Para 12.6.6 and ETAP study.
Attachments:
- Attachment-1: Low Voltage Cable Size Calculation
- Attachment-2: SAUD! Cable Company Catalogue
40F4afelalelalala
See =o x ors r +}|ATTACHMENT-2
THREE AND FOUR CORE CABLES WITH COpPER CON
XLPE INSULATED AND PVC SHEA
asta 8 a = 2»
‘ oi 8 2 “3 ® »
° 208 = “ @ “ » x
© = ® ® = er 2 @
® vs te o @ 2 «
= on7 Ce ~~
aoe wr wma
1 ost avr ee ee ee
‘= coe a0 a ee ee ee
5 a1 oa ws amma
2 corse oat ee ee
m0 0 cera ee
19 ooera cess ee ee
0 osseo ose ows2s asm oxes0 oxo
‘ sea ana ower
10 1310 soe oat
veer 000 1088 oy
= asses cars x08 0353
0 sera ooo om as?
os esr aoe os ars
1% 1008 ore ons ors
1 ona cece omer 205
15 cee cess 00038 700
20 wore cers en) nr
0 cscs ees 035 orm
“eo case acess ome ont
so cos cece om aveABLES LAID DIRECT IN GROUND
Ite site condtins a ot the sane as he tere cnc fr which the apace ae CANE, th urn ating inthe proves
tables are te mums wit te gpropreta aig ators shan ma flowing es
Rating factors fr varaion aground temperate
XC ates 80°)
ating factors fo variation n depth of burl to contre of cable in the efi! group of cables),
oa
125
109
oss
ow
006
Coe)
ows
osRATING FACTORS FOR LOW VOLTAGE CABLES
Rating factors for variation in thermelresisityof sol average values)
Sng cor eatie
oro 160 16 12 107 ost oe ors
ro 4c.) a7 noe or os: 80 on
wos ue 108 108 asa ose or
fem 25-59 16 190 108) owe oe ars
ter 185.900 18 1 16 oe ost on
Rating actors for variation in ar temperate
wpe be 10 108 ‘ ons ow pee
ve yea 85°) 18 ant 105 1 098 ony ose
‘Group rating factors fr muticore cabs in formation
2 oe asr ost 093
6 ose 070 ore oa
5 ass os or a3RATING FACTORS OW VOLTAGE CABLES
for circuits of thee single core cables, intro old touching i iat harlzontal formation
eet oy
ot terres
oat ae or om re
‘ an EUs 6) on ‘ge
ating actors for vari
on in thermal resistivity ot sl fverage vas)
ee ‘ol tara sity in Can
Single ore able
fem tes 00 ut 108 100) ass pes ore
ro 00-800 12 08 108 oss oe ore
wpe 10 100 ce oor pee oss
25-190 108 sot 103 oss so ss
185-00 sor os 103 ons oe ossRating actors for dept faving
(to conte of auctor tet group of vets)
138
2
‘rou rating factors fr single cor
Croup rating tactrs fr muticore sabe In sng way a
098
98
es in treto sinale way ducts, horizontal formation
oar
as
‘Spscing
oa
Low vouraceSAUD! ARABIAN OIL COMPANY
sanz] soup 6v | ao
TSSUED FOR CONSTRUCTION
sae ean
SMU
sg, OE
ae RE
dpgouul gSoly
Saudi Aramco
EWO- 16N018A
COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM &
UPS ESTABLISHMENT FOR ECC & PORT CONTROL
ADEQUACY REPORT OF EXISTING STANDBY DIESEL
GENERATOR
PREPARED BY
JACOBS ZATE
‘STANDBY DIESEL GENERATOR SIZING snare] mawrao] wor] onamnewo | ewrno | wvno [2
‘COMPLETE UPGRAGE OF ENERGENY POWER SYSTEWs | DOC | 7
UPS ESTABLISHMENT FOR ECC & PORT CONTROL ose | P | CALC1315 of | 00
RAS TANURA SAUDIARABIA | W/eNo EWO-16NOTBA | _4
TSO TEIN tarSay Aramco 2646-ENG (03/99)
Z| g SAUDI ARABIAN OIL COMPANY
els
g TABLE OF CONTENTS le
BR Ie
aly 4. INTRODUCTION 3a |g
52 ie
2. OBJECTIVE seu 3
3 3. REFERENCES ..... 3 3
2 4, PRINCIPLE DESIGN CONSIDERATIONS. svn nnatnnnieseeee . 3a
85 Hl
ale 5. LOAD SUMMARY FOR STANDBY DIESEL GENERATOR vo sesoss a ff
gle IP
Slo 6. STANDBY DG SET SIZING CALCULATION a
2 7. CONCLUSIONS... 4 ie
lz
Ie
Bae FE
a FE
sau a
re | 4
"Rav I3
Amo
| aan le
ay E
Le 3 | | iS
| IE
peld LE
Saad E
Zi E
Bs aie E
Brads le
gfe IS
Bogik iE
Bitte.
* £5 | ££] stanoay oieset GENERATOR SENG ewarrre| mac wo] wor] oamwewo [wno [rev [2
gi | 1: F[SOMPLETE UPGRADE OF EMERGENY POWERSYSTEN | DOC a
3 | 1 5 5 slurs esraauisiaenr FoR Ecc a PORT CONTROL oss | P| CALCISIS | oF | 00
© 25 be &[ RAS TANURA SAUDIARABIA | 10/EWO. EWO-16N018A, .
TSO RES UIT Te‘Saud romeo 2646-£NG (03/99)
2]3] SAUDI ARABIAN OIL COMPANY
sly 1. INTRODUCTION
42 The project scope is to provide Emergency power backup to new critical equipment’s
ats inside new ECC room on the fist floor and port control room on the second flor. Also, 10
51 | provide UPS backup for Computers, lighting and emergency lighting for conference room
during emergencies. The new emergency loads shall be connected to existing standby
Diesel Generator.
The existing Diesel Generator is feeding the existing Emergency Main Distribution Board.
The new emergency loads shall be connected at Emergency Main Distribution board via
distribution transformer
F
F
2. OBJECTIVE
The purpose of this report is to verify the existing diesel Generator capacity by considering
new emergency loads considered in this project.
ISSUED FOR CONSTRUCTION
Sle 3. REFERENCES
Ao
gl?
= The calculation is performed using latest revisions of the NFPA and Saudi Aramco
ele standard referred therein:
lel e 3.1, SAES-P-100 Basic Power System Design Criteria F
earns 3.2. SAES-P-113 Motors & Generators. IE
ine le
3.3. 17-SAMSS-518 Diesel Generator sets. >
Fee 3.4. NEC National Electrical Code. EB
"ow E
a E
“gu | 4. CONSIDERATIONS Ss
to 4.1. The existing emergency loads connected at existing diesel Generator are taken from [2
ngeNer RA-248806,001 iz
—— 4.2, The new Dry type distribution Transformer is proposed and shall be connected at le
ny existing Emergency Main Distribution Board to feed all the new emergency loads. Ie
4.3. The existing loads and new loads details are covered in project load list (CAL1312)
and same is considered in this report.
5
‘venFienTion
a 4.4. The connected loading on new distribution Transformer is considered 85% of its 2
ua rating, E
fest
il ;
gil le
Bie td
Be 3 | € | stanoBy o1eset GENERATOR sizinc ona oanrne] nec] ennwmene [vino [mvve: fe
||| S[[COMPLETE UPGRADE OF ENERGENY POWER SYSTEME | DOC —T3
5 | | | [ups estaBusiiMeNT FOR ECC & PORT CONTROL os6 | P| CALCISIS | | oo
Bis RAS TANURA __savorarasia | oie Ewo-16no18A a
TDSOTOTS OSTA‘Sous Aramco 2616 NG (03/99)
SAUDI ARABIAN OIL COMPANY
tang} smul xo | a
DescarTow
ISSUED FOR CONSTRUCTION.
» [rears [ero]
NINE
‘shu
‘su
Rev
5. LOAD SUMMARY FOR STANDBY DIESEL GENERATOR
Refer Load list (Document No-CAL1312) for details of connected load at existing Standby
Diesel Generator,
EXISTING STANDBY DIESEL GENERATOR
items No. | LOAD DESIGNATION ‘CONNECTED LOAD (KVA)_| REMARK
1 | AicHanaling Unit ($1 —S6) 27.9 (Note-1) eae
2 Electric Duct Heater 15 Baiering.
aad Load _|
3 _| Load on New Distribution Transformer 95.62 (Note-2) fe
| Total Load = 13852
TOTAL LOAD INCLUDING FUTURELOAD | ___ 13852 EE
TLAKW, 0.8PF =
Minimum Required DG RATING 138.52kVA
Note:
1, 30 HP Motor rating for AHU (30 x 0.746/0.8 = 27.9 KVA)
2. 85% of Transformer rating (112.5 x 0.85 = 95.62 kVA)
6. ADEQUACY CHECK OF EXISTING DG SET
Total load on Existing Standby Diesel Generator in kVA = 138.52 kVA
Total load on Existing Standby Diesel Generator in kW = 111 kW (0.8 Power Factor)
The Existing Standby Diesel Generator Rating = 136kW, 0.8 PF, 3 phase, 60Hz
% Loading of Existing Standby Diese! Generator = 111/136 = 81.6 %
7. CONCLUSIONS
Based on the above calculation, it is verified that the existing standby diesel Generator
136 KW, 0.8PF, 3 Phase, 480V, 60Hz is sufficient to cater new emergency loads
considered in this project. The loading of generator is not more than 90% of its rating
fi
E
IE
Hl
E
le
ie
h
H
ki
‘STANDBY DIESEL GENERATOR SIZING ‘owarvee [nr no] moc] RARE HO,
COMPLETE UPGRADE OF EMERGENY POWER SYSTEMS | DOC
[UPS ESTABLISHMENT FOR ECC & PORT CONTROL
ose | P| CALCt315
a
of | 00
RAS TANURA
SAUDIARABIA |-0/E" EWO.16NOTEA
4
TOS OTBIO ATID‘sus franco SOS-6- 16518 (95/2005) =
SAUDI ARAMCO
33 Data Schedule
g2 For 16-Samss-si8: Low Voltage Panelboards
ae mats sed
BE | 1 puyer's quotation Request/ Purchase Order No.
8; 2 Buyers 81/3.0.Ne, _16H038_, Lne Item No
i 3 Ponelboard Tag No, —
Bs Service information
B& 20 © Indoor © Outdoor
B], | 22 electrical area cassteation
eis © Unclassified
gal © Classified
a IE ~ | 20. Severe corrsive Environment: __No
eae 33 System frequency: 60 Hz evntinetany|
ISOUED FOR CONSTRUCTION
ake IFAC, Number of Phases/Wires __3/4 ae
5 le 35. UPS service: _No
aa 40 Rated Current: __400__ A (100A minimum)
EGE g | 42 snor cncut merging Rang: 10. (10 KA minimum)
BEE 25 | 43 rated vottase: 208
© FE) 50. Minimum ambient SF fmperatare (Flower than 0°C) *c
[2 8] 53 site altitude (it greater than 1000 meters) meters,
Le 70 ‘Neutral bus required: __Yes
_f n IFYES, rated current of neutral bus as a % of phase busi _100%
BEE
58 [he 4] 74 Main circuit disconnector required Yes
ike IFYES, trip rating _400_ A
Be 76 Main circuit supply conductor conneetors(if applicable): Supplied by Supplier Yes
eS
Bel a7 IFYES: No./phase and size of main circuit supply conductors
as | 33 2 pn. 95 mm?
79 Branch circuit breaker requirements
d
z Quantity Poles Trip Rating
fi 80 1 3100
Ss BL a 3P 70.
| 28g 82 1 3P 50.
z| Bee | || 9 i SPACE
3| 938 ee
3) 355
Z| 238
@] 283
228 | ||wotes to Buyer: (1) Refer to SAES-P-100 for definition of Severe Corrasive Environment.
£55 IP ccancercurcae ormmnaencrronensvsens [WG TYPE[puanT Ho INDEX | — DRAWING NO."—[SHT NO] REV NO
gee Us ESTAR. GHENT FOR EOC & PORT COWTROL 05
eee TERMINAL WEST FER ea P| RE- 364626 | on |
238 at Saar2u0 aco $05 16515 05/205
SAUDI ARAMCO
Data Schedule
For 16-SAMSS-518" Low Voltage Panelboards
ornaten eb supe Sues
USED FON CONSTRUCTION
vic osm avo oat
5
es
|
De
TOE ORDERETOW
ori
ONE
o
TERTESONE our acran PERATRSONT]
ToeseNaceNcr)
TSGTRTE
FEVSON VALIDATION
i
:
[Notes to Buyer: (1) Refer to SAES-P-100 for definition of Severe Corrosive Environment,
Buyer's Quotation Request/ Purchase Order No.
Buyer’s B.1/2.0. No. _16NO18._, Line Item No
Panelboard Tag No. 056-064-PP-011
Service information:
@ Indoor © Outdoor
Electrical Area Classification
© Unclassified
© Classified
Severe Corrosive Environment" No.
System frequency: _60 Hz
IFAC, Number of Phases/Wires __3/4
UPS service: __Yes
Rated Current: 100 A (100A minimum)
Short Circuit interrupting Rating: 10__kA (10 kA minimum)
Rated Voltage: 208
Minimum ambient air temperature (Flower than 0°C) °C
Site altitude (if greater than 1000 meters) meters
Neutral bus required: __Yes
IFYES, rated current of neutral bus as a % of phase bus: __100%
Main circuit disconnector required Yes
IFYES, trip rating _70__ A
‘Main circuit supply conductor connectors(if applicable): Supplied by Supplier: Yes.
IF YES: No,/phase and size of main circuit supply conductors:
1__joh._25 mm?
Branch circuit breaker requirements
\
Quantity Poles _Thip Rating en enn eaRSTRUCTION
4 3 50 B0 FOR coHSTRUCTION
z SPACE lade
COUFLETE URGE OF eNERCENOY POWER YETENA OWS. TYPE[PLANT NO.| INDEX | —ORAWNG NO
= TERMINAL WEST PIER. 088 e RE- 364627Sus sean SbS-E-16515 (05/2005)
REVSON VALOATON
38 SAUDI ARAMCO
8 Data Schedule
ae For 16-SaM5s-518: Low Voltage Panciboards
28 {iromaon ob eapledo upat)
EA | i Guyer Quctation Raquiet) purcheke Orde Ne.
a5 2 Buyer's 8.1/2.0. No. _16NO38_, Line Iter No
Be 3 Panelboard Tag No. 056-064-PP-008
a8 Service information:
a& 20 @ Indoor © Outdoor
a 22 Electrical Area Classification:
Dek © Unclassified
gag © Classified
@ [ee | 30 Severe Corrosive Environment! No.
Belk | 33 system frequency: 50 Hz
ek. IFAC, Number of Phases/Wires __3/4
5 JB & | 35 upsservice: __ ves
. E - 40 Rated Current: 100__A (100A minimum)
EE|E =| 41 stot cra neruntingRathor 10 KA (10 KA minimum)
Bil
By
gilt 43 Rated Voltage: 202
r ie 50, Minimum ambient air temperature (if lower than 0°C)
Ba|| 9) | 2 steateuse orarenter mon 1000 meters meters
if 70 Neutral bus required: __Yes
-E IFYES, rated current of neutral bus as a % of phase bus: __ 100%
sale Main circuit disconnector recuired: __Yes
5S IFYES, tp voting 30 A
ack 76 Main cireut supply conductor connector applicable): Suppled by Supple
"ig 2
eS} 7 IFYES: No./phese and size of main cireuit supply conductors:
gs] 78 1__/ph. 16 mm?
79 Branch circuit Breaker requirements
gf] Quantity Poles Thp Rating |.
2 80 8 1p 20 “ 5st
: at 2 SPACE (save ssi nan Ne
2 82
g 83
3 sa
i
@
Notes to Buyer: (1) Refer to SAES-P-100 for definition of Severe Corrasive Environment.
3 COORLETE UAE OF BREF PONER Tea JONG. TPE] PLANT NO] WDEX | DRAWN NO
a en ae eee
£56 BAST "SAUDI ARABIA|Sout ym 0 61658 n7095
a8 SAUDI ARAMCO
a Data Schedule
£2 For 16-SAMSS-518¢ Low Voltage Panelboords
Ha {eterna ets et
He 1 Buyer's Quotation Request/ Purchase Order No.
55 2 Buyer's 81/9.0.No. _16NO18 , Line tem No
Be 3 Panelboard Tag No. 056-064-PP-010
g8 Service information
a8 20 @ Indoor © Outdoor
aI, 22 Electrical Area Classification
i ®© Unclassified
E © Classited
Fees sgt ceee Coma ene entail
FS | 33 system frequency: _ 60 He
se IFAC, Number of Phases/Wires _3/4
oe =
ef 3
B28] 35 ursservice: __ves
i 2 =e
ZTE] 42 Rated Current: _100__ (1008 minimum)
BE [Eg | 41 snorcrcutnterupting Rating: 10K 10 KA minimum
Bile 43 Rated Voltage: 208,
re 50 Minimum ambient Bir EmMperature (Flower than 0°C)
2 [E28 | 53 site attitude ct greater than 1000 meters) meters
Ola 8s
tS 79 Neutral bus required: __Yes
Bol? IFYES, rated current of neutral bus as a % of phase bus: _ 100%
eal 74 Main cireuit disconnector required Yes
a8 75 XFYES, trip rating __ 30 A
eek,
a 76 Main eircult supply conductor connectors applicable): Supple by Suople: ves
foe
le 8 | 27 If YES: No./phase and size of main circuit supply conductors:
as | 3 tion mm?
79 Branch circuit Breaker requirements
g Quantity Poles Trip Rating
£2 80 7 e 20
53 ai 5 SPACE
3| 255) || 2
g| See | || &
3] 838 Be
AG
282 | |Ihotes to suyer:_(1) Refer to SAES-P-100 for definition of Severe Corrosive Environment.
388 coum urcnioe oFenscEucyonrnsvsreua OW. 1E] PLANT NO] WOEX | DRAWN WO. —[SHT-NO
Bbo [UPS ESTABLISHMENT FORECC & PORT CONTROL 02
ahs Tein ero oe | © | RE. 364629} oSAUDI ARAMCO
Data Schedule
16-5aMSS-521: Indoor Transfer Switch - Low Voltage
USED FOR CONSTRUCTION
uvriceestife> ao pare
REVSIONBESCRETION
33
35
40
HBR
REE
oO
TRIPE [on aan TST
56
57
58
(SIGN CERTIRCATION
{DESI AGENCY
TSGTRTE
TENSONALDATION
Buyer's Quotation Request/ Purchase Order No.
Buyer's B.1,/1.0.No. _16N018_, Line Item No
3 Tag No. 056-064-ATS-001
Service information:
20 As indicated on the attached reference documents OQ ____@arinetotoung
system frequency: _60 Hz
Number of Phases/Wires 3/4 _
Rated Current : _225 A
System Grounding Method: __ Solid
Short Circult Interrupting Rating: 10 _ kA (10 kA minimum)
Rated voltage: __480__(600V maximum)
Site altitude (if greater than 1000 meters) meters
Operation Type(1): _Open-Transition
Maintenance Bypass Switch Required": _Yes
Overlapping neutral contacts Required’: __Yes.
Main circuit supply conductor connectors (if applicable):
Supplied by Supplier: _No
If YES: No./phase and size of main circuit supply conductors:
1 /ph.,_120, _mm2
Space Heater voltage: VAC (240 V maximum)
Notes to Buyer:
(1) Refer to SAES-P-116 for criteria
(2) Use of Closed-Transition requires approval per SAES-P-116,
oNPAETE UDGHADE OF PRERGENGY POWER SYsTEws [OWS TVPE[PLANTING] INDEX | DRAWNGNO.[SHT.NO.[REV.NO,)
TERUNA, VEST PER, oo | © | RE- 364630 | om
i
i
i
e
5
:
i
é
TS Twia, SAUDI ARASI|£ SAUDI ARAMCO, PURCHASE ORDER.
Gla | [de eects te
OTE WroRATON TooecourereD BY _fF}rurcwasen I~ wwwweacrunex
INFORMATION SUPPLIED BY THE GUYER
8] | | clewens ne rownennen Tt
ale s»feeounounruns eran accu [No ~
é g x Se reeaeene errr
ale ef sou vos Gare SGOT om
a wf eweuencr sor 2589
ean eaeer ner Tel eas) .
: x] auewor camara
ale “| a
2 zifuxrenerree [RODD LAA
GL
ele rhrrenvonciue 30_awuresar_ 17.4 __wrtow: ov as PER ATTACHED CUTYEYELE AGRA
ae beri! joo ram roanumcnae
H foe caressag SAUDI ARAMCO Rew bate rene
AH ce cna STN
as 7 TFORMATION SUPPLIED BY THE VENGOR
pasate in
2] norma voursce 0%)
5 4 ruin
ale ‘xfs ourur
Ay | pareoranen won arr. <0a.ncone
ad f
BB) | [oq woman = own
8 vw] eReausey coroner)
Blarias a TSEC | vuerscnses
. z Species meen HOURS TO BOR AN CAPACITY
FTE al neat ornare ano vanonne
ele]e] [2] re esomronmenscuny
52 |8) |=] cserommonsaw ns asrons
3/° asf SAUDI ARAMCO
ge Data Schedule
a pceeeereene
BE [1 wners citer none case re No
2 Buyers 84/10.Ne, _LONDIB_, Une Rem No
3 3 Panto a9 No 56.064
8 ‘Service information:
i eter Sem
H), | 22 eecent aren cameos
ad © Unclassified
af 6 clssitee
=H _ | 50 severe corosveenvronment”: wo
M3 | 33 system frequency: 60 Hz
Ei UAC Nurber of hases/res _ 3
ibs
& |e 8 35 UPS service: __Yes
FT] corsets _ 0082004 mney
EE |B =| 42 shorccrcutinerrupting Rating: _10_ KA (10 kA minimum)
ae
GEIL EE | o> estervetage 208
FEES SS BNRIe tien arrencein Oiower than O°) ‘c
5 _ TE 2] 53. site attitude (if areater than 1000 meters) meters
“Oli és
EA] 70 Neal but aged: Yen
_ n IFYES, rated current of neutral bus as a % of phase bus: __100%
agle &
5a |e .2 | 74 — main circuit disconnector required: Yes
Bees] ctaryee ensteuag raat
BPI | 26 sam cnetuny onder emt rite: uptedy Supe ves
Pe.
E El zz inves: no/phove and aze or main creat sup enduro
g5 | 78 1 /ph._16 mm?
2B mchoeutiaruienes | — :
J JACOBS ZATE|
i cuetty Fees Tap Rtg
gF 80 3 2» 30 oman
fe | |g 3 ts ISSUED FOR CONS "AUCTION
8) 28s 82 4 SPACE
a] Ege | |] 8
| ¢93| || 6
BE ||uotes to suyer: (1) Reter to SAES-P-100 for definition of Severe Corrosive Environment
FA COURT Pct oF eteEnGyoneTTTEMa [OG TYPE[PLANT NG] ROEK [DRANG NO [BAN [RENN
8: TERMINAL WEST FER “| oe | | Re- seacsz] o | |
aa samaSous race 2616 ENG (1/2002)
Page : 1/2
ED RCTS
g ‘SAUDI ARABIAN OIL COMPANY
7 Data Schedule 1 ie
> 14-SAMSS-533 e
a ‘Three-Phase Dry-Type Power Transformers ;
i Description Buyer's Required Values Vendor's Proposed Values ff
2|e Transformer Voltage E
Al High Side (Delta) kV (0.480) fae 4
ae Low Side (WYE) kV (0.208.120) cg) Pe
1 Transformer Rating E
(Nominal) kVA ars) fea
ale Type of Transformer E
eh Indoor (x) fen, E
pls Outdoor cea ce)
STL LF tndoorrastomer Coling Mead :
eae Ventilated SelfCooled Class AA (x) Cs A
sort | Yortons spcuetroce ai 0 cy ;
ze npn: Read E
Minimum 4% (xX) C ¥ A
Other (specify in %) aay eee) ie
Enclosure for Indoor Transformer E
P caaimcror] Standard Tye 2 ox) Cee FS
rage a Other (specify) Saar | ie d fe
Pstinoe| Enclosure Paint Color: Fl
Standard (Lieht gray) (x) Cay E
Other (specify) tc ( ) =
Coil Assembly Construction 4
Resin Encapsulated x) eee F
3 5
i : ag Solid Cast t 73 FE
Ein TRUCTION) :
A or Fee |e | wes Toor] uw
Cees [RAS TANURA, “SAU01 ARABIA] JO /EWO TenoSous ams 2616.46 (30/2002)
SAUDI ARABIAN OIL COMPANY
7 Data Schedule
Ho ‘Three-Phase Dr Tpe Power Transformers
. Description Buyer's Required Values Vendor's Proposed Values
2|8 Tap changer Range (De-enersized
: 8 Standard (2-1/2% FCAN, 2-1/2% FCBN) ( X ) (
ale Othe (specify) t3 t
a Aunilliary Power Supply:
120 VAC (single phase) C ) ¢
Other (specify)
eli High Vottaze Winding Terminations th (
i Interal en) r
7 Flanged Throat:
es] 8 Terminal Enclosure fee fe
‘eronees | Incoming Cable Size (mm*/AWG) (5) (
ms
ser] Low Voltae Winding Terminators
a o) :
‘CERTIFIED. Flanged Throat < t {
sw} Terminal Enclosure
['sosimcie] Outgoing Cable Size (mm*/AWG) (2x95) (
Js | Newt abe size mms ao) (1x50) (
|__| Remarks:
aF
ele BUYER VENDOR
ee |
5
5
&
i
COUPLETE UsGRADE OF NERGENEY POWER YSTENE] wwe Wwe | Rano | pase | vomes [ane] we
besususicrrenceze rortcome, olla ire lice
eas TAWA pies tees Ta
WHOISrace 2646-ENG (10/2002)
SAUDI ARABIAN OIL COMPANY,
Fecal cer] pur oma]
&ngouwl gSoll
‘Saudi Aramco
El EWO-16N018
“lg COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM &
7 UPS ESTABLISHMENT FOR ECC & PORT CONTROL
RAS TANURA REFINERY
gfe
chen UPS SIZING CALCULATION
isu ED FOR const uC ON}
ae PREPARED BY:
be E
SB g §
-
2
E
&
3
2), RSeee cease 00 Pose |e | enti |
3 CALIHONE Page: 112 Toso TOONSUPS SIZING CALCULATION
1.0 Objective
‘This calculation is for sizing the new UPS system to be installed in administration bullding at TER (Room-112).
2, Reference Drawings:
Drawing # Dascription
IRACBAaAIOG [ONE LINE DIAGRAM
IRA3ad622 & 248818 [PANEL BOARD SCHEDULE
[GALI312 JELECTRIGAL LOAD CALCULATION
3.0 Assumptions:
1. The UPS system configuration is Unitary UPS System,
2. As per Tablo-1 of SAES-P-103, the required Battery Backup time is 30 minutes for In-Plant AC (UPS} load where the
Primary Power Source is EMDB and stand-by generator.
3. The calculation is based on the selection of flooded lead acid batteries which are mast suitable for standby float service
applications (UPS) in an indoor temperature contralled environment,
4.0 UPS Load List:
sn ono oESoRPTiON ono va) [avanty] TOL | newanns
[anise Paraben, COC ay aye |
[Eran Darton Pars COR Nee)| age —| 4 —t9—| —anay
37 Brora Dslr Parebape EO. Wow t)| ase —[ 4 24g iy
TOTALUPSLOAD= 14.40 kVA
Note: 1) Refer drawing number RA-364622,001 & RA-248818.002 for load detail on Panel board,
5.0 Inverter Sizing (UPS kVA rating at 0.8 Power Factor)
5.1) Steady-state power requirement:
mFuegown= = w= 2A A per AES, Tate. for UPS
The UPS size is 20 kVAUnit @ 0.8 Power Factor
AC input: 208V, 60Hz, 9-Phase, 3-Wire + Ground
‘AC Output: -208/120v, 60Hz, 3-Phase, 4-Wire + Ground
Page 20f 2Su Ware 217 ENG (1200)
DRAWING START cour) CMT pomecensremce ueci Ahmed
CONTROL JACOBS ZATE 22-Dec-16 lemme comerniem comer bana 56 s7erts-400023 jenn
prawine — [seer] nev aia PERCENT COMPLETE couiere wou ewsion TeaNGATIED
MEER = | DRAWING TITLES: " = ar aie —_
cae ee a cesroc Ist
Rees ‘9 [bev TYPE TaANGFORUER DATASHEET OSE XFRTO08
Trae cor | a0 feecrmeal ove Une OGRA ae 7 |
lLeceno: Notes: REVISION VALIDATION
1 usTonawmcs or NOEKHNNNEREA ORE THIS REVEIOUN. W016 COVERED FOR KL APPRGNAL RD CERTIFICATION
ACHES ZATEL
SUED FARCONSTRUCTON ——
REQUREMENTS, PER AEP 234, UNDER DRAWING COMPLETION CERTIFICATE NO
SAUDI ARABIAN OIL COMPANY
lorammes conrRot SHEET
psc
Ce woe)
Complete Upgrade Of Emergency Power System & UPS Establishment
oar | ae | eee | eee a Seman veo ee
mien wasn oc cow RASTANURA ‘SAUDI ARABIA
TGB ORGERIETONO 56 A RD-714676 ot oF 02 | 00Sau Wane 27.NG (200)
pascal} arart_[_coue] “PTT ocaocr me renee er . mene | meee
CONTROL JACOBS ZATE 22.Dee-46 bern srinsstetta besoroe . see ae
drawn [ager] ey Gane se PERCENT coWPLETE re rn rn ae
Peseta Eero a i T c I I |
lLeceno: notes. REVISION VALIDATION.
fy usr onsrms er noes KavenEn ORDER ee a
00m 2703 WEEKS 10 THE AED ED CAPTION DATE ABOVE [PRAWINGS CONTROL SHEET sc
“er 7
Complete Upgrade Of Emergency Power System & UPS Establishment
Raa OE | Sa SE | ae aa Poms err
noms | mom nowt nowt [RASTANURA SAUDI ARABIA
TOS ORDERED WO. 56 A RD-714676 02 OF 02 | ooREFERENCE DRAWINGS 4
YEE
JACOBS ZAT F
ISSUED FOR CONSTRUCTIO
PANELBOARD SCHEDULE
TERMINAL WEST PIER
(P| RA-248)SSD
ISSUED FOR COKSTA
JACOBS ZATE
TION
Lya58 HP ‘EER STEEL S/STE PVE ‘POWER Im) - CONTRCL pee
oom fax] ne [mw |'[ noasze | ee
ae mo iamen 6 oe tat afoia + recast :
PC-s87 zsKva | 200 036-064-UFS.002 ey ‘056-064-011 Hy oe P| 1416 25 mma 18 |p
0.3838 POWER Hee ikva | 208 056-064PP-011 “— ae P| 4c temmz 6 — ls
reaese rowan vie | 2ae scoserr-o11 z aoa Po se P| 4c tem 3% hs
ee i sewn | ae Ser ceeeeeee 2a aa eee n : i
roses ania | wef cceoeaPrane PROJECT UNT IN CONFERENCE 3 | 128 some {| ra hs
reson Powe avemin | | ‘86 064.008 ‘ouecRenice ROOM ticimic ot” [8 P| 12 10m | xiPe foorioad a0 >
asa ows cons feat said a tte oo ee i
si ATELECT. ROOM-RTI9 ST eee ss te oe 6 uC 4 [20
3 aE ese oaer caeeececon ounce Sefer eee re ss :
Rese | Povie aewa | a0 ‘cen 06.008 ea Is
resi vow caina) vo eae ESE aianae |e er acame [ane ponent 0 I:
po-saar | Power - FanaKva | 120 056-069-FF-010 [ECE ROOM LIGHTING CKT 8 p| 12K: ame sainay by
ATELECT ROOM -R212 7 ft 7 6 ANC 4mm as
omer aT o) een || "Cons ZATE
=a aS Sa seniaveront | =] seats [sake bon ~~ | SUED FOR CORSERUCTON
earl en reer | apa a ee =i aie nema ese eel of
PC-3853 - ‘ 208 2 056-064-PP.077 056-064-FP-010 — fsafaey “Lo | +416 tema | xv foot 50 = 39.
(ea = AEnnoNWALATON j
SAUDI ARABIAN OIL COMPANY
gear iu eve churn hie) a Scr PA OTR ORTON
|oC - Electrical Contra (Per SAES-P-104) [SHALL BE VERIFIED BY CONSTRUCTION CONTRACTOR DURING CONSTRUCTION. | REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO: Hee
ro Pome cote Per sAEs-P-104) CABLE & CONDUIT SCHEDULE ccs
ie heen pene
(DESIGN AGENCY) I) reowneo @nuOLArUNUCO} NUMBER Laduiad THROUGH —
ata copra feel etal eee Fema wer
ERLE SET —| wae | wan | wom | vee | see
ELECTRIGAL ONE LINE DIAGRAM RA 240606 ,007 Ev. No. [OATE, "REVISION DESCRIPTION beaseenes beanie!
SEGRE Ge TRSNMNTS | —Tassersor —| oe | weave [estenronconmucton Ce
Tee ero TEST nt — [OREN TEENS avo ORE RETRACTION
s6NO18. "CERTIFIED AND DATED 056 ¥ RD-364620 007 00
a Toa RS TOTES TATSEEz
GS AUCTION
TO ons TOROUETORS
g58 HP B i >) PRR ESTEELISISTEPVG [)—— sowerey- cowmeen or TOTAL
ie senvice focus) uae |g fa yp estegeer fy] tn saetty | are ewanKs
582 Te) se De |! | woes _
rae : FORE wn | Cod APR or Fae tome Pe fon 50
ATELECT ROOW-Ri3 Aver ROOM 1042 S| vevtene | pve
esse fo Sasi’ | 08 6.04.90 1N609R A UN 8 P| vaca | sare pooion 30
srevect Roow 212 ATECCROO S| etme | pve
reas Powe eauiein | on 6.087009 ins0oR wc Uw 3 P| iacame | sare posion 30
|__areect Roowmoie ——|_areco Room | se4mme | pve Ese se eee seseece
pe e87 sane : :
ees ine See
Leceno
Jo -cendun per saES.P.108)
Jat owes caates LENGTH IS APPROXIATELY. THE ACTUAL LENGTH SHALL
be veRimeD By consTRUCTION CONTRACTOR DURING CONSTRUCTION
[REVISION VALIDATION |
SAUDI ARABIAN OIL COMPANY
ieripdcailecuetnns moraine Hixeersak ncn canes eee a
mee aes oeanien CABLE & CONDUIT SCHEDULE
footie is
Srpesevacicn \ty moun euoamen |_| NUMBER ast THROUGH ue
RT TE oan - caee [a Tan. West PER
"ELECTRICAL ONE LINE DIAGRAM RA-248806 001 REV.NO, | GATE [REVISION DESCRETION sspabascsssel pareassenemscel
TEETRE Ne eae [teaser —| w | wan lenumvrencoemuceon RTT — TR — RT
ae TREE RON ENON | aro TERE
18307 001 aN P70 AED FOR 056 P RD-364620 002 00
‘Ser aco ETERS TOTO SEJACOBS ZATE
ISSUED FOR CONSTRUCTION
ici T
‘SOREDILEGpgnuJl gSoll
Saudi Aramco
DOC. NO. 2 CAL1312
JOB NO. : EWO-16N018
JACOBS ZATE
ELECTRICAL LOAD CALCULATION
COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM &
UPS ESTABLISHMENT FOR ECC & PORT CONTROL
PROJECT
PROJECT NO. EWO-16N018
LOCATION RAS TANURA
00 Decté
ISSUED FOR CONSTRUCTION
AAA
GSI ‘SMU
REV. DATE
DESCRIPTION
PREPARED
CHECKED ‘APPROVED.
@pgoui gSolt
‘Saudi Aramco.
JACOBS ZATE
Page: 113ELECTRICAL LOAD CALCULATION FOR MDB
PROJECT TITLE COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM DATE: 12122116
UPS ESTABLISHMENT FOR ECC & PORT CONTROL
JEWO-16NO18A Rev 00
ax.
trem LOAD TAG # LOAD Description S| ae Boman’ lactual KVA| Operating Duty
poof WA |
LOADS DETAIL
1 AHU-t [AIR HANDLING UNIT=1 Tea] WA] 480] 1.00] 100.0% 7600 | 16.00 c
2 fawu2 ~ [a HANDLING UNIT-2 120] wa | 400 | 1.00 | 100.0% 1200 | 12.00 c
3 [pp POWER PANEL -1 66.0] kvA | 480 1.00 | 100.0% 66.00 66.00 | c
4 |pp2 Power PI eit ‘sa eva} 480 | 4.00 | 100% ce
| 5 [oP JOP IN ELECTRICAL ROOM -113 zo} va | 480 | 1.00 | 100.0% 7ooo | 7ooo | c_
6 [SPARE SPARE kva | 480 | 1.00 100.0% 0.00, 0.00
7_|SPARE Eeiaa| SPARE Teva | 480 0.00 0.00
8 [anus JAIR HANDLING UNIT-2 as| wa | 480 3.50 380 c
9 |ewos EMERGENCY DISTRIBUTION BOARD. ~152.5| kvA | 480 162.49 | 152.49 c
= Total Load in MDB 37199 | 371.99
a71a9_| 37199
INoTE:
}. The existing loads information are taken from Drawing RA-248606.001. Total Connected Max.Demand kVA 371.99 KVA
Maximum Operating Demand kVA 371.99 kVA
REFERENCE:
4. Electrical One Line Diagram - RA-248806.001 371.99 KVA
2, Panelboard schedule - RA-248818.002
Existing Transformer rating 500 KVA
Derated Transformer rating as per SAES-P-121, TABLE+ 425 KVA
Calculated Operating load 372.0 KVA
Corresponding Amperes 447.4 Amps
CONCLUSION
Existing Transformer (S00KVA) derated rating 425 KVA> 371.99 KVA Opearating load
LEGEND : Considered as per SAER-6268
JC-CONTINUOUS LOAD 100%
I- INTERMITTENT LOAD/MOV. 30%
|S-STANDBY LOAD 10%
PAGE 20F 3ELECTRICAL LOAD CALCULATION FOR EMDB
DATE: 12/22/16
PROJECT TITLE : COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM.
&UPS ESTABLISHMENT FOR ECC & PORT CONTROL
EWO-16NO18A
Efficiency
(%)
Equipment
KVA Rating
Voltage
(Volts)
Item
no.
LOAD TAG # LOAD Description PF Demand Factor]
NEW LOADS
1 [o56-XFR(T)-Ox1 Transformer 125] kA] 480 | 1.00 | 100.0% 112.50] 0.85] 95.63 95.63 c
uaa iz Total new Load a
EXISTING LOADS
1_[Transtromer T-3 [AIR HANDLING UNIT 28] kVA | 480 28.00 28.00 ] c
| 2 |eDH-307 ELECTRICAL DUCT HEATER 15| va | 480 | 1.00 | 100.0% 75.09] 15.00 c
3. |sPare [ aoe
4
5
| Existing Load
138.63 138.63
Total Connected Max. Demand kVA 138.63 kVA,
Maximum Operating Demand kVA 138.63 kVA
10% Future Load 13.86 KVA
NOTE: 152.49 kVA
1. The existing and new loads information are taken from Drawing RA-248806,001.
REFERENCE:
1. Electrical One Line Diagram - RA-248806.001
2. Panelboard schedule - RA-248818.001
3. Panelboard schedule - RA-248818.002
4, Panelboard schedule - RA-364622.002
PAGE 3 OF 3COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM & UPS ESTABLISHMENT
FOR ECC & PORT CONTROL
DETAIL DESIGN
EWO # 16N018
TRANSFORMER SIZING CALCULATION
OC. NO.
ae
avout
CLIENT
24-240008.001 __flecvical ne Line Diagram Admin Bi
(00 | ISSUED FOR CONSTRUCTION
Lararon
MA
sd
JACOBS ZATE
REFERENCES: REV. DESORIPTION Date | PRERD.| cHkO. | APPvD.| APPVD. ENGINEERING DESIGN CONSULTANT.
[CONTRACT NO: EWOHTENOT®-001
COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM & UPS ESTABLISHMENT
FOR ECC & PORT CONTROL
TRANSFORMER SIZING CALCULATION
056 P DOCNO: — CALI3I4 IsHTNO: 001 OF 003 | 00
cour Page 113ELECTRICAL LOAD SUMMARY
Type of Duty
Continous
3: Sany
at ee (MAXIMUM OPERATING EMERGENCY
sswormmce LORD DESCRIPTION tocamon — voctace aay] CURRENT su ee | an cunRent oan ere
o
e ry os | _s wa Wa ae wr
es Powe Pare ee 9) wo fo [0 | am | © [© | 7000 700
Essent Ostiton Panelbar (95900 om [> [|e [as | «| 0 | ws 1000
meroocytain |EssrtlDtbtonPanetin(EDP-A) woo [0 | wa [0 | 0 | 2506 1899
Sab Bord ‘amination dra | 99g 400 1616 v6
eons toonaton ae akon om Drawing RA E4200 & RA2EB8002 LEGEND
20F3TRANSFORMER SIZING CALCULATION
For NEW Transformers
T Taso
a A tion) | femstone | awmet
Pj Fut Lond A ra Song
Dee | Fae, Coin | Ten Operaing fa Tenpusie | cyfiy | tarstomer | Socooed | rocsacoace | Sat ae
a ee ee Ip ay tems [SIT Omra! cvetacor | Lem | “bag | ERY | "Ee | Sarina | "raping |OOR=TO!
(ea) = ror wen [ww | ta | She
SEPT — [RAS TaNORAL —O a na a ca} 3s} a re aaa aero szoaSoga
Sample Calation or New Transtorme:86FR(T}XX1
Min Tans Sze VA) = (uot X Fo x A
Mn. Tanker Siz KYA) wn
SolcodTarsomerSo(KVA)= 13289,
Ni
4. Total Operating Load (Lo) isthe Continues Load + 30% of Inlermittent Load + 10% of Stand by Loac (refer to Load Caleulation Summary Sheet)
2. Projected Future Load is assumed to be 20% of the Total Operating Load.
3. Growth Factor is assumod tobe 1.1% for eol-cooled transformers as por SAES-P-121, Section 6.1.4 tis assumed to bo 1.0% for OAVFA transformers
4, Load Factor is assumed to bo 1.0%
5. Tomporature Derating Factor is per table 1 of SAES-F
6. Diversity Factor is assumed tobe 1.0%
7. Transformer Rating is per ANSI stander preferred KVA ratings,
121. Its 15% for Ol mmersed / Outdoor Solar Exposed
30FSELECTRICAL ROOW-RII
2No FLo0R
ELECTRIC!
ROOM «82121 EQUPOMENT PLAN
NOTES:
REFERENCE DRAWINGS
COMMAICATION ROON-RIQS
FIRST FLOOR COMMUNICATION ROOM &186) £0U
UACOBS ZATE
ISSUED FOR CONSTRUCTION
TLL THE OMEWSIOW WERE WARKED UP
SED OO SITE MIST ON 01/25/2016
° to 29 28
Lou 1. i
we TERS
TTRICAL EQUIPWENT_ PLAN
ADMINISTRATION BLILOING
Reemmicran) =) soeie
A
ls
e
Gacoas ZATE
ELECTRICAL ROOW-AIS Issn rth pousraucttl
' | el
TEEN
Gr came commu
REFERENCE DRAWINGS
eect,
FROW-R 2
i
3.
Le ala.
communteariow
ROOM IOS
Pete enihaae anal
1)
des
"SAUDI ARANTAN” OM COMPANY
CABLE/CONDUIT LavouT "BL
ADMINISTRATION BUILOING
IER
AUDT ARAB
2N0 FLOOR ELECTRICAL ROOM 18212) CABLE/CONOMIT PLANNOTES CONTINUE
eo HT oe
T
{Ell coomlbh«»
JACOBS ZA
ged F62 CONSTRUCTIONWOTES CONTINUE
SINGLE LINE DIAGRAM
AGMNISTRATION BUILOING
JACOBS ZATE
ISSUED FOR CONSTRUCTION
00 coo H «ok Oe
LegEND
REFERENCE ORAWNGSTeaEN
da a |
T
SAUD] ARABIAN OW. COMPAN
iE LINE Din
2OKVA UPS =
P_RB-364621
[RasrRiCTED |OY PRowance
CONNECTION
TaBLE-Is
INSIDE BUILDING FLOOR MOUNTED ELECTRICAL EQUIPMENT GROUNDING
BROS a
NOTES:
REFERENCE _ORAWINGS
wosame (7 at
sat
INSIOE BUILDING WALL MOUNTED ELECTRICAL EQUIPMENT GROUNDING
ona
a en,
2otSmm 9/067 918
JACOBS ZATE
0 £98 CONSTRUCTION
*
Pe 5S ancnon eo.7 wre
Ene BOT SE FLO
SAUDI ARABIAN Oi COMPANY
ELECTRICAL INSTALLATION DE TAIL | EDT
UiL DING©
JACOBS ZATE
ISSUED FOR CONSTRUCTION
onde nseap
SALW TAS THe EORUCTON CONTANED TEER GRE THE BOLE PREAH GF AGfISWIICE NG REPRODUCTION
GROUNDING GRID PLAN
a GROUNDING LOOP-COMMUNICATION ROON-186 DETAIL 3)
z T T®
oe
DENELIION NOTES WNOER £90"
GROUNDING GRID PLAN
coon 81s 208
GROUNDING LOOP-ELECTRICAL ROOM-RII3 DETAIL
GROUNDING LOOP-ELECTRICAL ROOM-212 DETAIL &
56 P RA-248815
no
boy[EDR-TaT]coMMUNICATION TOWER
a
Te 1Roow-R106)
[SACOBS ZATE|
: ay
fete Toei
f EAUDIARAWAN,
| es
| aon gawees
-{eoW-30i| communicarion TONER can
ig
ls
WO. PONER RISER OWAGRAM | EPI
ea q
—— i
Te moow-n200 I —_etecT. RooW Aa i
i 0-8 : tee ss E
ec ip
a i
f lz
- “ ie aie a een ce oats desetetalt thoce tee-renena OM e«
crt [fie coor oa
EF ERENEE DEE i
Te ROOM-RIVE> H
\ eo Beene sige (accede E
;
ae
|
JACOBS ZATE] |;
; i : coupe sae eaueraueringl le
i 5] i re 25 £08 CONSTRUCTION! E
ti E
oe =] | :
i Pearce \ le
1 5 wr id v ! CENERATOA
| es ae (sak 5 08 ‘ lais| i fae Ee 9 :
oo oo ye i :
en ais ly
B
ie
056 RA-248807
; - Sa aMATERIAL TAKE-OFF LIST
ARAMCO 6228(03/06)
SAS. 7 cans] OWS] 308
REV. CODE DESCRIPTION sooner] se | av | vu | stans [OWS] SCOR
co [PTE TRansronten: 112.5608, ov fame ta 7
fs:zo, sna, soz cM, 224.0%
co esa ka Ome an sooo0ori76 | 1.0 ea
lvrennurrisic Power suerey
les: ackva
co nur tev apse en, ame sooosssz6] 10 ”
Joureur. 200, smsnse cares
firs nou BATTERIES.
rancuscano, ELECTRICAL: 8 BREAKER,
Jit, PL, ie, SOLD NeTRAL
fae, sou Han, ne 1, COPPER Bus,
Ise snrace ma, Hor-P GaLv ot
0 fetecrao cat zc RATED evaOsuRe,
ox ASIC coz, Ut, ASSEMOLED, MT
leace ror nin ster eeAKen,
re toon Wate Renee, ANS
eRenAER 208
toooso7e73| 0 fm
Joweasonno,euecrrcay: 1 aReaKeR,
22 vac, 3, DISTRAUTION 3 Pi 4
fn, rc se, Soto nee,
sans, 100. man, nan, coPrER BUS,
[sree sunrace nf, HOTS GALY OR
00 Jetecrap oa amc ouareD enctasne,
ox AStc Dra, UL, ASSEMALE, WH
b"seace For rican ranch
fneness. wit se on xeaneR,
fxanch acne zon
soonsessr2 | 9 eB
Jswernoaso,evecrRIcN: 12 oREAKER,
qa ¥AG, 34, DISTREGTION 3H, 4
vane, puscn, «tke, SOLO NEURAL
ins 00 wa en 1, COPPER IS
sree, surrace mig, HOT OIP GAL oR
00 Jetectno caw zinc euaTeD encosuRe, sanososses | 1.0 ms
oka Sic, cor, ASSEMBLED, WIT
Isnces FoR icin amv eens,
fri Sox warn eaeaKeR, ano
Inores:
{ISSUED FOR CONSTRUCTION REFERENCE ORAWING
comPILeD BY Rev.
‘CHECKED | DATE | _PROJECTENGR
FaReLaoRRD SCHED Fae
Tenors. we sr Taare | ao ager, equim avo sete
EW.O. PHASE TENG. ITEM [AREA | START-UP DATE row ustncxhchaw ——[v-oaen?
rina_[_ if [reviston| a0
finoex Fitarias for ELECTRICAL EQUIPMENTS SHEET 1 OF 9
p COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM & UPS ESTABLISHMENT
pcan FOR ECC & PORT CONTROL /0-248807
056 __JeasTaNuRa saupI Rasta)MATERIAL TAKE-OFF LIST
“ARAMCO 6226(03/05)
REV. CODE DESCRIPTION
ans
STOCK NUMBER
DWE] 308
cove | _numsens
sare [ow | wu ‘STATUS
Jenner owen execretcas: 12
Jnence, 1209 VAC, 2,
fisteasinon 3, site Luc
fn me, Scuto mre AN,
00 Wa, ne, COOPER BUS,
foe. suRince sr, Horo Gay
Jenccosun, roca Si 2, UL,
Jassencuco, win «saces fon
JpucimeRatcneneaxens, ir
ous en ene, sean aRevce}
o rovesos027| Lo mA
raves, eurcracaL 2
aneaces 008 vac, 9
bisreaunion 3p, Nie, PL
In WR, SUID NEUTRAL was,
ino ma, ue caeen as
Ise, suazace NT, HOT ox cALW
Jor electro cay zwcruareo
Jescuasune, 106 sic oH
fasta, wins snces Fon
uci saan: oRcacens Wirt
Jor warn aaence, eaancr wera
ronosa6o2?| Lo ”
NOTES:
ISSUED FOR CONSTRUCTION REFERENCE DRAWING
‘compro By ev.
‘checked | DATE | PROJECT ENGR
a RS SERED — ET
TaRoTs ca or Tapais_| sm | apa. eqUNENT VOUT Ree
Bi EW.0. BHASE ENG. ITEM | AREA | — START-UP DATE —[romtn wser oiasaan —[ucrnaor
Fiwal__| rec _[ Revision] 00
INDEX | Materials for ELECTRICAL EQUIPMENTS [SHEET 20F 9
> (COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM & UPS ESTABLISHMENT
pcan FOR ECC & PORT CONTROL 1/0-248807
156 __|eas TANURA SAUDI ARABIA]MATERIAL TAKE-OFF LIST
ARAMCO 6228(03/06)
" ss J Sa 08
REV, CODE DESCRIPTIOF ae] oe [ov | ow sans [ere | ae
Lv power cance eno son,
co fouetrervcriencune, ccorsrt cue] 200 | wre
lovrowen cae oo ee,
— |euoaperrecenaeeoureD, 4: rooonrser | aso | wre
somes
ky rower casi, san too,
co —_Jourcremucanaanouten, c- rowers | asa | we
lov eowes cate eo 000,
o> |eupurerecunanouten, 4: roooss2 | os50 | wre
re
00 |cupaetyeucrunaamouReD, °yC- 000447085 (S48)] 15.0 mie
9 fowxtre/evcrunaamourcn, 2/c rooonzes7 | ao.0 or
sam
ky rower cau oa-000,
o> |eupapereveiunasenouren, 2: roonrees | scoo | oom
rote
lov rower case, e-an0,
co aayoezrvermioeune,2- some | mmo | wre
on founarerrecunannoureD, 2: ronmeirssscmy]s600 | we
[own
krone case, on 020%,
o> feuoareirvenasoouren, 2c: vowairss | sooo | ure
|wores:
ISSUED FOR CONSTRUCTION [REFERENCE DRAWING
COMPILED BY Rev.
‘CHECKED ate PROIECT ENGR
CLE [COROT — eT
Tonos, o eH ToS | ea | ae ae conor soos
BE EW.0. PHASE ENG. ITEM ‘AREA | _ START-UP DATE —|roveR isin oIAGRIN —|pase0o7
inal [FE Revision] 00.
jiex | Watarals or COW VOLTAGE POWER CABLES [SHEET 30F9
° ‘COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM & UPS ESTABLISHMENT
Poa FOR ECC & PORT CONTROL, T/0-248807
o36__}eas tanura
SAUDI ARAsiA|MATERIAL TAKE-OFF LIST
ARAMCO 6228(03/06)
rence] omen EET owe [aw [iw eae ST
acs coon Sieg
» faxes es
0 |. GREEN FOR GROUNDING cane | a a
alas nen ieee
ov fase zee 26am age | me | om
ANE
@ |, GREEN FOR GROUNDING amen) om ™
- JGREEN FOR GROUNDING mest | ae —
aa Ga
> [GREEN FOR GROUNDING (su8) = =
mama pee
—— oe —
go] amr raat or cee Re ers eran
bis eae re-set?MATERIAL TAKE-OFF LIST
ARAMCO 6226(03/06)
Sar a Dae] sea
wev.cooe| vescumrion aaa] swe | en | vo | sans [eS] Som
ence wren commen
eonression re, ua om snomren
0 Jos-txy, cunaperpvcrunaAMouRED, (su8) * -
fist
xe nme comms
omresson Tres rau rom sone
00 Jos-uxy, cunaperevcrunaRmoureD, (8) = ae
ficsssne
rs wc men commen,
nsw res sae ro
bl KV, CU/XLPE/PYCAUNARMOURED, ee a a
[rec men conven,
-cnrsion rr, sac roR
@ [0.6-1KV, CU/KLPE/PVCAINARMOURED, an oe 7
[re ween conve,
go eons nee src ron woos | sco |g
sew curarerscunamautcy, om
Jie warts comer,
ao fomescnnme state ron eee
le camarerenauoi
Jesus wen come,
ao foment Sorat eon ross | gy | eg
lt, cuparemvennnouney ‘im
Frese
lauren core,
kcrresion testa ron see ee
00 Jo.stkv, cupnrerevcrunaamoureD, — *
fico
fee us men comes,
Sno STALE FOR
© Jose, cumservcnaRwouren, Sept | 40: e
fics i
sae wc men conven,
cSeression tre, sma ron oe :
(00 Jost, cure resPYCIUNARMOURED, oe ™
pice
ISSUED FOR consTRUCTION nerenence onawina
compute ev nev,
cnecxeo [eave] paovecrencr
(coca TT
oH 3 I Tepes | sara corms
S| ew.o. [pias —[ eva. [ann | ~ staR-up pate ores oes buena ferns
finat_|_iFC [REVISION] 00.
oa Waar Tor WER CABLES ACCESSORIES IsHEET 'S OF 8
2 _| “"comPLETE upciabe oF EMERGENCY POWER SYSTEM 8 UPS ESTABLISHMENT
fran FOR ECC poRT COnTROL 10249807
055__Jeas ranuna savor anaotalMATERIAL TAKE-OFF LIST
ARAMCO 6228(03/06)
REV, DESCRIF SAMS Pe ae y ‘STAT a berero
a vacate Srocknumeee] 5 * "= Tus | cove NUMBERS |
[eaaecron: ream
sian nx stu eae
(00 Josxcunoin conoucroR, Hove —e
ease asco To
Jomecron rena;
(00 Jeno, surtaBue FoR so sqM oes] 42 a
ohresson ne ou rena veo
0 fra, surTaace ror 25 som (suB), ” m
cms oe ous Wa wooo! so |
Joao, surraeue FoR is SH (su5)
enone conbicox
Jcamecron: eran;
Eerste ce enn
00 fra, surtasce For 20 sqm ee ae a
2 |pto suman roves swore | oo |
Jeomecron: rer;
00 Jeno, SurTABLE FoR 3 sqM 8) a “
[xeon coneucron
co _ieusnn commen i. rossero] 19 | x
co fvmsuaron wn ro rvs mova] 20 | a
co face se sonsene] 20 |
{ISSUED FOR CONSTRUCTION erenence oRaWiNG
courneo sy rev
qiecee | pave | prowecrence
are aE
TonOTE ta Hr Tapas | “|e foe mi eon sor — fase
Siew. | ~puask | ene. ren —[ ‘ane | ~ start-up oateponttnce snomer—frsess
Fina [tec | revision] 00
foe | waters or ‘GROUNDING CABLES ACCESSORIES SHEET 6 OF9
»_| "COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM & UPS ESTABLISHMENT
cane FORECC PORT CONTROL 1v0-248807
oss_frastanuna savor anaeiaMATERIAL TAKE-OFF LIST
ARAMCO 6228(03/06)
EV. CODE -RIPTIC Pt y — 3 com
a ee "STOCK NUMBER = = ve oe | NUMBERS |
co fewer A rs vanes | 20 fe
o gerececeericms cea
o fecssryemeome vars | 20 |e
o> fesrneceor ass ze Lo romero | aco ex
oo ex sco aonceronas rowaraot | seo |x
oo fparwsisc ems ox mers woes | ao | es
oo feast smune Te as worm | ao | a
co fexmoccnrano roasts | reve] en
oo feomgtmcw near eeae Heeee a
co feet ran omc ee voi | io | ex
© feawome vommse | sored] wre
co _feezmmeatow sues voowrasse | seve’'s| me
are
1SUED FoR consrRUCTION erenence namin
conrnso ey ew
Ca a
senora—| oa =I Tae —| soe foae se coeur ofa
Bi_| “ewo,—|—“past —| ene ren | — aren — | ~stanviue bate fume toot fo
FINAL [IFC [ REVISION] 00
ioe — arate ‘GROUNDING CABLES ACCESSORIES ‘SHEET 7 OF
> _| ""conptére urbe or enencricy powensroren & UPS ESTABLISHMENT
a once pont como. Tyo-24a807
ss _ [eas rama savor analMATERIAL TAKE-OFF LIST
ARAMCO 6228(03/06)
CODE (PTION iAPS. “SAP st TY yu rarus | OWS a
— sn STOCK NUMBER ¥ ul wan CODE NUMBERS.
See eT
sian sono, ansican Zine coareD rov01289 | go
fi eats on a
. oe wwocsz] 40 |e
uarae
(00 fret rateans, STANDARD LG, wer ane) be *
eae cur ac
pee eae ieee |e ee
encase me etc on | #
Lr ase aaa
fe fame ban ecto woo! oy | sq
[conDurr, NOT THREADED Tw (35) .
ee ea sawansal 20 | en
00 oonourr, ner rinexDeD Tree ween) ee e
eee on
eee fstenence pawns
sx | —ewos —| — mane —| aren | nee] Sta fe
FINAL | 1FC_| REVISION] 00
ecg ONDUTTS AND ACCESSORIES weer S0r9
ig ien sassMATERIAL TAKE-OFF LIST
“ARAMCO 6228(03/06)
EY, CODE Bescon a ed ee
oo fomor ourne 3:0 ns wor! 5p |g
[our Al re oi)
co fenou cone om. cs cov oor] 40 |e
oo Geer ree roe ee vwooean| oo | ex
on pista comron aeons ce ae ce
co fowsrarrave ror cs cone won| so | ex
co fomsmuraae ronson. cs vor | i
lower aes og
co aL ene nam unm cone. swoon] 200 |
% soa nataseeso0 SO ‘omnes | “0 |e
hu scsesowsrresmimcrox > woroir| ay |g
(00 fr oa. 5: concur ‘GuB) "
co fp corouri20e 3 sto won| 54 | eg
fein co’ on
oo fupmase sense sumac ron zon swooows| 20 | en
co fer cmc eoc 2 0. rows vovasi| 26 | ea
a) eases vwoenaa | zo | ta
oo fa roo ne A swovasiz7} 200 | ta
SSUED FoR CONSTRUCTION erenence orawin
conmmteo ov wey.
‘enecee | eave | pnonkcranae
ona a ae | eae no ooo
ef ew. Base —| ewe. ven —[-anea—|~ staRr-DPonte ropes as gat ors
Final [18] Reviston]| 0
noe — |r Tar “CONDUITS AND ACCESSORIES isHEET 9 OFS
° COMPLETE UPGRADE OF EMERGENCY POWER SEI B UPS ESTABLISHMENT
far FoR ece& pont conto 110-248907
[as ranua savor anesz 3 SAUDI ARABIAN OIL COMPANY
HE Gogowl gSoljl
Saudi Aramco
EWO16N018
COMPLETE UPGRADE OF EMERGENCY POWER
ISSUED FOR CONSTRUCTION
SYSTEM & UPS ESTABLISHMENT FOR ECC &
PORT CONTROL
‘NA
_ARA
CONSTRUCTION SCOPE OF WORK
‘SMU
aaa
See PREPARED BY
nn JACOBS ZATE
= DECEMBER 2016
2
5
g SCOPE OF WORK onare| parva] noes] own [owe [eon]?
3 LNT TREATS | “DOG : F
3 TERMINAL WEST PIER ase | a | REET | OF | 49
Ep RAS TANURA SAUDIARABIA | S7=O _yen078 9
TDSORTS TSNSvc Aramco 2616-ENG (03/99)
23 SAUDI ARABIAN OIL COMPANY
£8 TABLE OF CONTENTS
[2| q 1 ABBREVIATIONS / LETTER SYMBOLS. 3
2. PROJECT SUMMARY. 8
3 REFERENCE DOCUMENTS.
3.1, Saudi Aramco Engineering Standards (SAES)
3.2 Saudi Aramco Material System Specification (SAMS)
DESCRIPTION
ISSUED FOR CONSTRUCTION
3.3 Saudi Aramco Engineering Procedures,
3.4 Saudi Aramco General Instruction Manual
3.5 Industry Codes and Standards
3.6 Project Documents. ~
4 ELECTRICAL SCOPE...
4.1 General —
—| 42 Demolition Scope of work
alg 4.3. New Scope of work
gl
als
ream
‘SMU
OPERATIONS le
fon 2 Lb
be 3 | IS
Be g| | Ie
a5! a
ed e
Ear ie
8 q 2
: SCOPE OF WORK ovarire[anrno] nace] _onawmana [owno [revno [2
g SEE On ORT ORT SGT] DOC 7
3 TERMINAL WEST PIER SSI a beeen or | 00
= RAS TANURA, SAUDIARABIA | “9/50 16NO18 s
TSO TETSU TaeAeameo 2616-£NG (93/99)
— The entire emergency load of the Admin building shall be fed from the EMDB. In normal
zg SAUDI ARABIAN OIL COMPANY
els 1 ABBREVIATIONS / LETTER SYMBOLS ES
gle RIR Ras Tanura Refinery a
sa] SAEP —_Saual Arameo Engineering Procedure E
a/= SAES Saudi Aramco Engineering Standard iE
SAMSS. ‘Saudi Aramco Material System Specification Ee
7 Ecc Emergency Control Center I=
8 MCC Motor Control Center q
alE SWGR Switchgear lE
2/5 [2
go le
als 2 PROJECT SUMMARY E
a The Marine Admin Building consists of three (3) floors; a
- * Ground Floor - Engineering departments, le
| * First Floor - ECC and Emergency control and HE
ae + Second Fioor - Port Control. iq
S| | | Recently on first floor a new ECC room was constructed. [;
ze Al main electrical systems are located in ELECTRICAL ROOM-108 on the ground floor. |
5 The normal power system is fed by a SOOKVA, 13.8kV/480V, 3-phase, 4-wire transformer |=
eal e to a MDB with an Automatic Transfer Switch (ATS) to transfer power to the Emergency EE
sera MDB (EMDB). E
— tina” E
bie 22a For emergencies an additional standby generator (136KW, 480V, 60Hz, make [2
ee CUMMINGS) is available for power supply. E
ARA FE
IE
IP
Ee
fe
le
“SM operating conditions the MDB feeds the EMDB through the ATS. During power failures the
6 standby generator wil start up automatically to feed EMDB through the ATS.
ToS See high level schematic below:
Fee
‘OPERATIONS
AMO Transformer. Standby Generator
foare 12 IS
zg] woe |[__ats__[|-{_ewoe A
Ee 3 Ee
63.4 Loads Loads F
mis a __boads | | |?
Zar ;
Bile L
Begis
E Ae
239 Fl sconeor work were [ranrvo] oer] aemmevo [ano
852 Si pmreomeancsormerrenrEETET ‘DOS = +
3 4 2 2 [TERMINAL WEST PIER oss | A 714677 le
2252 5 {[ RAS TANURA SAUDI ARABIA | 2/20 16NO18 2
TDSOTGTS UaSaudi tramco 2516-£NG (01/99)
SAUDI ARABIAN OIL COMPANY
3 REFERENCE DOCUMENTS
5/3
Ela 3.1. Saudi Aramco Engineering Standards (SAES)
32 SAES-A-202 Saudi Aramco Engineering Drawing Preparation
SAES-P-100 Basic Power System Design Criteria
= SAES-P-103, UPS and DG Systems
2 SAES-P-104 Wiring Methods and Materials
ele SAES-P-111 Grounding
f2 SAES-P-116 ‘Switchgear and Control Equipment
gle SAES-P-121 Transformers and Reactors
8/5
g 3.2 Saudi Aramco Material System Specification (SAMSS)
14-SAMSS-533 __Three-Phase Dry-Type Power Transformers
16-SAMSS-518 Low Voltage Panelboards
16-SAMSS-521 Indoor Automatic Transfer Switch - Low Voltage
16-SAMSS-516 Uninterruptible Power Supply System
ing Procedures
MINA, SAEP-122 Project Records
Ser SAEP-304 Instructions for Establishing and Maintaining Mandatory
_ARA Saudi Aramco Engineering Requirements
CERTFED SAEP-302 Instructions for Obtaining a Waiver of a Mandatory Saudi
Sear Aramco Engineering Requirements
P casa SAEP-303 Engineering Review of Projects
= SAEP-334 Retrieval, Certification and Submittal of Saudi Aramco
OPERATIONS Engineering and Vendor Drawings
= SAEP-281 Project Quailty Issues Escalation Process
Ps SAEP-1023 ‘Saudi Aramco Engineering Procedure / Inspection Coverage
Ls in Projects I
re SAEP-1150 Inspection Coverage on Projects Ee
--— SAEP-1151 Inspection Requirements for Contractor - Procured Materials |
Belair and Equipment E
Par SAEP-1154 Guidelines for Contractor's Quality Pian H
Baie. E
3528! S) scope or work ararnre|macrwo] mocx] _orawnena [ano [anna |
8525 2 oem rommcmrroTTETEGATTET] ‘DOC =
2) 0 | | s[TERMINAL WEST PIER os [eee] cei | toe |e
&255: '[ Ras TaNuRA SAUDIARABIA | 2/80 16NO18 2
TDSOTST OIE taeSouai srameo 26
16-£NG (03/99)
z|8 SAUDI ARABIAN OIL COMPANY.
siz 3.4 Saudi Aramco General Instruction Manual
=e G1-0006.012 Isolation, Lockout and use of Hold Tags
S18 GL2.710 Mechanical Completion and Performance Acceptance of
Lel2 Facilities
z 3.5. Industry Codes and Standards
8 NFPA 70 National Electrical Codes (NEC)
ale RA-248818 PANELBOARD SCHEDULE
8 RA-248818 PANELBOARD SCHEDULE
2 RD-364620 CABLE AND CONDUIT SCHEDULE
Z RD-364620 ‘CABLE AND CONDUIT SCHEDULE
~ RA-364622 PANELBOARD SCHEDULE
g 2 RB-364625 ELECTRICAL EQUIPMENT PLAN
ele RB-364624 CABLE/CONDUIT LAYOUT
als RA-248806 ELECTRICAL ONE LINE DIAGRAM
lee 8 RA-248806 DEMO. ELECT. ONE LINE DIAGRAM
RB-364621 ELECTRICAL ONE LINE DIAGRAM
RA-248807 POWER RISER DIAGRAM
= RA248807 DEMO. POWER RISER DIAGRAM
mars RE-364626 POWER PANEL DATA SHEET 056-064-PP-007
SMU RE-364627 POWER PANEL DATA SHEET 056-064-PP-011
oar, 122278 RE-364628 EMERGENCY PNL DATA SHEET 056-064-PP-008
RE-364629 EMERGENCY PNL DATA SHEET 056-064-PP-010
ae RE-364630 AUTOMATIC TRANSFER SWITCH DATA SHEET ATS
oro RE-364631 UPS DATA SHEET
e122 RE-364632 POWER PANEL DATA SHEET 056-064-PP-009
Pi] RE-364633 DRY TYPE TRANSFORMER DATA SHEET 056-064-XFR
| | (7-003
fay RA-248815 GROUNDING PLAN
aree RB-364623 ELECTRICAL INSTALLATION DETAIL
Fae RB-364625 ELECTRICAL EQUIPMENT PLAN
Ee 10-240807 MATERIAL TAKE OFF
3 7 [Score oF work oeanre ear] sec] oma [erm [son
3: BES TTT DOS >
3 i [TERMINAL WEST PIER faucet of | 00
8 RAS TANURA SAUDI ARABIA | 60 y6NOIe 8
OTITIS IeSout Aramco 2516-€NG (03/99)
z\3 SAUDI ARABIAN OIL COMPANY
ely CE-ALI311 LV CABLE SIZING CALCULATION
aS CE-ALI312 ELECTRICAL LOAD CALCULATION
816 CE-AL1313 UPS SIZING CALCULATION
HE CE-AL1314 TRANSFORMER SIZING CALCULATION
CEALISIS, ADEQUACY REPORT OF EXISTING STANDBY DIESEL
GENERATOR
4 ELECTRICAL SCOPE
4.1 General
This Section of the Construction Scope of Work provides the electrical requirements of
upgrading the emergency power system & UPS establishment for ECC and Port Control at
Ras Tanura Administration Building.
DESCRIPTION
ISSUED FOR CONSTRUCTION
+ The CONTRACTOR shall be responsible for all aspect of the project in terms of
configuration, fabrication, procurement, documentation, drawings, inspection, integration,
installation, testing & commissioning and system familiarizationitraining,
Sls
sé * Contractor shall have total system responsibility for the performance and functionality of all
ety] items furnished as per contract.
ea
=e ‘+ All components necessary for the proper functionality of the equipment's, but not explicitly
sl e specified and/or described herein shall be identified and provided by CONTRACTOR as
Te part of the system.
MINA
22 + The CONTRACTOR shall plan and execute the work as per Saudi Aramco Procedures
TEE and Standards, Where required a detailed project execution plan shall be submitted for
"aRA Saudi Aramco approval prior to the start of work. The CONTRACTOR shall carry out site
eae surveys to verify actual field conditions.
CERTFED
uu + Obtain the proper work permit in accordance with Saudi Aramco Construction Safely
aa Manual.
ner + The CONTRACTOR shall carry-out site inspection prior to start construction,
OPERATORS
+ Ensure that specific work package are prepared, whereby specific work task are defined,
i work permit are identified necessary tools and equipment are prepared and the area are
poe provided with necessary safety markings/barrer. I:
gi] Ie
ke 3 * All electrical materials and work associated that are required for this project, whether [=
Be g | shown or not on the drawings shall be supplied and installed by the CONTRACTOR. |E
ge. unless specified otherwise. ie
Basie + The CONTRACTOR shall perform all works in accordance with the requirement of this fy
Beds project. Any deviation must frst be approved by Sau Aramco Representative prior to ts |
3 impiementation E
Si) | 2 sl scope or work ‘oware|rowTno] noe] onawcna [ewrna [rcwne [2
50 25 2 2 penrtmenctornmmncrmnmanraEMRTTRT| DOC 5
2292 2 2[TERMINAL WEST PIER SEI a aceon of | 00
2: 15 &[ RAS TANURA ‘SAUDI ARABIA | 29/5" 46NO18 2
DSO OTSuet rarnco 2616-ENG (03/99
HB SAUDI ARABIAN OIL COMPANY
* Provide all required test equipment and perform all required testing for all electrical
equipment's, cables in accordance with all applicable International and Saudi Aramco
Standards. Provide all necessary test report.
AMO
Fexca[oear] our
wana] sw) RO
+ Coordination with Saudi Aramco shall be the responsibilty of the CONTRACTOR with
regard to the de-energization / energization of the related electrical equipment in the
project. Any installation hardware which is not listed in Material Take Off and is required to
Complete the job in total to the satisfaction of SAUD! ARAMCO is to be supplied by the
CONTRACTOR
© Complete cabling and installation shall be performed by the CONTRACTOR as per
relevant Saudi Aramco engineering standard SAES-P-104 and standard drawings. Saudi
‘Aramco inspector shall inspect cable laying, testing and complete inspection in compliance
with the latest Saudi Aramco Pre-commissioning forms and guide lines.
DESGRPTION
ISSUED FOR CONSTRUCTION
* All electrical installation work shall be carried out in compliance with the latest National
Electrical Code (NEC) and applicable Saudi Aramco Engineering Standards SAES-P-103,
SAES-P-104 and SAES-P-111. Any installation hardware which is not listed in Material
‘Take Off and is required to complete the job in total to the satisfaction of SAUDI ARAMCO.
is to be supplied by the CONTRACTOR,
reW9|
The CONTRACTOR shall follow Saudi Aramco General Instruction Manual
(GI-0006.012) for Isolation, Lockout and use of Hold Tags.
6 frenove
S * The CONTRACTOR shall follow Saudi Aramco Construction Safety Manual, 5" edition.
Teac] 4.2 Demolition Scope of work
Tmsie| © All Electrical works shall comply with the latest Saudi Aramco Engineering Standards,
== Specification and industrial standards.
ARA
Demolition works shall include the following works:
+ Disconnect and demolish the existing ATS in electrical room no. 113 and keep all related
cables and conduits for the new ATS. Refer to RA-248807.001, RA-248815.001 and RA-
248806.001
* Demolish and remove the dry type transformer T-2 in electrical room no. 113 as per
drawing RA-248807.001 and RA-248806.001
‘+ The existing power/conduit (PC-3518 and PC-3519) which is connected to dry type
transformer T-2 shall be demolished and removed as per RA-248806.001
|
| 4.3 New Scope of work
+ The existing diesel generator has been verified against new emergency loads, the loading
Of generator is not more than 90% of its name plate rating, refer to adequacy report
CAL1315. So, the existing generator shall not be replaced,
+ The new 112.5 KVA dry type transformer 056-064-XFR (T)-003 has been sized based on
TORR ETSEWETATEET | DOC +"
or | 00
RAS TANURA, SAUDI ARABIA | “6/60 16NO18 2
TDSOIETE OSE dae
oss | a | RE-714677Sout Aramco 2616-£N6 (03/99)
‘SAUDI ARABIAN OIL COMPANY
‘nal smu] Rov
DESCRPTION
ISSUED FOR CONSTRUCTION
few]
__ hana
ARA
“Suu.
i
=
modified loads; refer to transformer sizing calculation CAL 1314.
CONTRACTOR shall provide and install new 480V Automatic Transfer Switch (056-064-
ATS-001) in electrical room no. 113 in same location of the demolished ATS as per
drawing RA-248806,001 and RB-364625.001
The existing power and control cables (PC-3503, PC-3504, and PC-3515 & CC-3621)
shall be reconnected to new ATS 056-064-ATS-001 as per drawing RA-248807.001
CONTRACTOR shall provide and install new 250AF/175AT breaker in the existing (space
location no. 5) of Emergency Distribution Board (EMDB) at as per drawing RA-28806.001.
‘The existing EDP-A load of EMDB in breaker no. 3 shall be shifted to new panel 056-064-
PP-007 and make breaker no.3 as spare.
CONTRACTOR shall provide and install new 112.5KVA dry type transformer 056-064-
XFR (T)-003 in electrical room no. 113 at the location of demolished transformer T-2 as
er equipment layout drawing RB-364625.001.
Provide new power cables for the 112.5KVA dry transformer 056-064-XFR (T)-003 as per
RA-248806.001 and RD-364620.001
CONTRACTOR shall provide and install new 20KVA UPS (056-064-UPS-002) in
Telecommunication Electrical Room no. 106 as per RA-248807.001, RB-364625.001 and
RB-364621.001
Connect the new 056-064-UPS-002 to new distribution panelboard 056-064-PP-007 as
per RB-364621.001 and RB-364625,001
CONTRACTOR shall provide and install new UPS panel 056-064-PP-011 in
Telecommunication Electrical Room no.106 as per drawing RA-248807.001, RB-
364625.001
The main incomer cable of existing panel "EDP-C" shall be disconnected from existing
panel "EDP-A" in ckt. 14, 16 & 18 and make it spare breaker as per drawing RA-
248818.002,
Provide new main incomer cable (PC-3852) from existing panel "EDP-A" to 056-064-PP-
007 as per drawing RA-248807.001
The CONTRACTOR shall connect the main incomer of the existing “EDP-C", which is
located in communication tower, to new UPS panel 056-064-PP-011 as per drawing RB-
364621.001, RB-364625,001 and RA-364622.001
CONTRACTOR shall provide and install new UPS distribution panel 056-064-PP-008 in
electrical room no. 113 as per drawing RA-248807.001 Rev.0A2, RB-364625.001 and RA-
zene 364622.001
5 be: ‘The new emergency distribution panel 056-064-PP-008 shall be connected to new UPS
Bgib panel 056-064-PP.011 as per RA-248807.001
gissse
522 § [scope or work ware [pwrwo]encx] omamwena [aaa [san
325 | Eiger gaornnacronnmmrarimaTToTE| “DOC
$2) | sfrennnac west PER lh
224 ts e[ Ras TANURA SAUDI ARABIA | +6)" 16NO18 a
TOSI TOT OTTSaudi Aramco 2616-ENG (93/99)
Zs SAUDI ARABIAN OIL COMPANY
Ela
e|8 * The lighting loads for conference room shall be transferred from existing LP-A and PP-A to
AB (056-064-PP-008 as per drawing RA-364622.001.
s/s + The existing loads at ckt. 2 & 8 of LP-A shall be shifted to new UPS panel 056-064-PP-
ras 008.
* The existing loads at ckt. 5, 7, 12 & 13 of PP-A shall be shifted to new UPS panel 056-
064-PP-008.
+ The CONTRACTOR shall provide and install new UPS distribution panel 056-064-PP-010
in electrical room no. 212 as per drawing RB-364621.001, RB-364625.001 and RA-
364622.001
* The new UPS distribution panel 056-064-PP-010 shall be connected to new UPS panel
056-064-PP-011 as per RA-248807.001
+ The existing loads at (ckt. 10, 11 & 12) of LP-B shall be shifted to new UPS panel 056-
064-PP-010 as per drawing RA-248818.001
DESGRETION
ISSUED FOR CONSTRUCTION
‘+ The existing loads for ECC room at (ckt. 16 & 17) of PP-B shall be shifted to new UPS
ele panel 056-064-PP-010 as per drawing RA-248818.001
HE
- + The CONTRACTOR shall provide and install new distribution panel 056-064-PP.009 in
gla electrical room no. 212 as per drawing RA-364622.001, RA-248807.001 and RB-
“le 364625.001
re
* The new split AC for ECC Room shall be fed from new emergency panel 056-064-PP.009
as per drawing RA-364622.001.
+The new power cables shall be routed through RGS conduit as indicated in drawing. The
roe Conduit shall be supported from room ceiling structure as per drawing RB-364624.001 and
ean RD-364620.
TaD]
‘smu + The CONTRACTOR should provide grounding for all new equipment and panels;
lars 1220010 automatic transfer switch, dry type transformer, power panels and uninterruptable power
cRaETN supply. Refer to drawing RA-248815.001
Lo Taam ‘+ Grounding connection should be provided to all new electrical equipment and panels. The
SEAT grounding shall be connected to existing grounding bus bar or grounding grid
lone 22076 + All new equipment, conduits, structures and other appurtenances installed under this
Fee project shall be grounded as required by SAES-P-111 and article 250 of NFPA-70. After
2 | the installation of the new equipment, reconnect the disconnected grounding cables.
Le i
z »} © Electrical drawings indicate the general layout of the installation, Layouts of accessories of
bs the conduit system are shown diagrammatically unless specifically shown and/or
zo dimensioned, they do not necessarily indicate all required fittings, bends, conduits,
Be Fy ae ‘supports and other similar items required for a complete installation.
ae END OF SCOPE OF WORK
Bilis
9232 7 [score oF work osinre[euoT Wo] mom] onawmano [ovina [Rovno
$52 0) i earmnmncorsncncrmenmarermsmmareer "BOC >
22% 2 2[ TERMINAL WEST PIER z 056 | A | RE-714677 or | oo
@25 55 [pas Tanura SAUDIARABIA | “0/50 16No18. 2
TDSO BETS UI Tae