SMM 12 Hot Work Permit
SMM 12 Hot Work Permit
SMM 12 Hot Work Permit
Office review and agreement of RA and Workplan reference no: ______________ Date / time: ________
1. GENERAL PRECAUTIONS
20 Have all personnel involved in the preparation and hot work operation been
briefed?
2. EQUIPMENT PREPARATION (delete as necessary)
Items YES NO
A. Electric arc
Are cables, connections and electrode holder in good condition?
Are quick disconnect coupling free and operational?
Is negative return connected direct to work piece?
B. Oxygen / acetylene
Are regulators, gauges, hoses and connections in good condition?
Are back fire preventers connected?
Is torch in good condition and fitted with correct tip?
5. AREA AUTHORITY
I have checked the above conditions and consider it safe to carry out the work stated during the period
stated above, provided that the conditions laid down are followed
Signature: _____________________________ (Suptd, Ch. Off, Safety Off, Ch. Engr., 2nd Engr.)
6. ACCEPTANCE
I understand the precautions to be taken and will return this permit for cancellation in accordance with
Section 9
Rev: 04 Page 2 of 4
BSM Hot work permit Form: SMM 12
7. WORK AUTHORITY
Permission to carry out the work stated is granted subject to the conditions above
Office agreement for hot work (if applicable): Yes / No (Mark as applicable)
9. PERMIT CLOSURE
The work has been completed /suspended and all persons under my supervision, materials and
equipment have been withdrawn.
Authorized person in charge: Name: _______________ Rank: _________
(Suptd, Ch. Off, Safety Off, Time: _______________ Date: ___________
Ch. Engr., 2nd Engr.)
Permit Closed: Master: ________________ Time: __________ Date:___________
GENERAL INSTRUCTIONS
Starting and finishing time must not exceed the time allocated by the authorized signatories.
Provide specific location of work.
Description of work to include type of equipment to be used.
Hot work should not be carried out within 30m of any non-gas free cargo tanks, ballast tanks, slop
tanks, pump rooms and forward cofferdams, noting the following:
Rev: 04 Page 3 of 4
BSM Hot work permit Form: SMM 12
- Cargo and slop tanks to be purged and inerted to <8% O2 and not more than 2% HC.
- Ballast tanks completely filled with ballast water and ballast water confirmed without oil traces.
- Pump rooms, cofferdams, void spaces to be confirmed not more than 2% HC.
Hot work to be carried out >500 mm from a F.O. tank deck or bulkheads.
Hot work is prohibited during bunkering operations.
For all Hot Work - A full a risk assessment, work plan, hot work permit and minutes of the safety
meeting must be prepared. Details of work proposal and procedure must be discussed.
Hot work on pipelines containing oil: The necessary section to be removed from its place by cold
work and repaired in designated workshop.
Tests for combustible gas should be carried out immediately before commencement of hot work
and at frequent intervals as long as the work is in progress.
This permit must be displayed at the work site and must be returned to the authorized person upon
completion of the hot work.
Any change in the conditions, which were agreed to, when issuing this hot work permit will
invalidate it.
Hot work must stop immediately and must not be restarted until all safety precautions have been
rechecked and a new permit issued.
Note 1 For hot work in the designated engine room workshop this hot work permit is not to be used.
Note 3:
Informing the office about start and completion/suspension of hot work is mandatory
Rev: 04 Page 4 of 4