Rate Analysis For Solar Panel
Rate Analysis For Solar Panel
Rate Analysis For Solar Panel
CONNECTIONS
Rate Analysis
labor Material Equipment Consume able
Over Head & Profit Tax
SR. NO Description UNIT QTY 25% 7% RATE Amount Remarks
Labor Qty Total Man Rate Per Cost Qty
Trade Amount Cost (PKR) Item Unit Qty Rate Amount Items UNIT Cost/ Hrs Hrs Amount Cost (PKR) Items Unit Usage Job Rate Amount Cost (PKR)
MAN HRS Hrs Day (PKR)
Elec/Mech 0.33 0.10 0.0 2,000 8 Grinder 9" NO 7.69 0.10 - Grinding Disc Nos 0.10 - 320 - -
Supervisor
Fitter - 0.10 - 1,200 - Grinder 5" NO 5.77 0.10 - Cutting Disc Nos 0.10 - 280 - -
Shifting, & Lifting of solar Structure and Rigger/Folder 1 0.10 0.1 1,200 15 Scaffolding Pipe Nos 100 2.00 0.10 20 PPE Nos 0.10 0.1 200 2.00 -
1 panel with Complete Electrical Nos 1,900.00
Connections
Electrician - 0.10 - 1,500 - Scaffolding Joint Nos 300 1.00 0.10 30 -
Electrical tool
Helper 7 0.10 0.7 800 70 Set SET 19.23 0.10 - -
Elec/Mech
Supervisor 0.33 0.10 0.0 2,000 8 Grinder 9" NO 2 7.69 0.10 2 Grinding Disc Nos 0.10 0.1 320 3.20 -
Fitter 2 0.10 0.2 1,200 30 Grinder 5" NO 2 5.77 0.10 1 Cutting Disc Nos 0.10 0.1 280 2.80 -
Rigger/Folder - 0.10 - 1,200 - Scaffolding Pipe Nos 1.00 0.10 - PPE Nos 0.10 0.1 200 2.00 -
1 Installation of solar Structure Nos 1,900.00
Elec/Mech 0.33 0.10 0.0 2,000 8 Grinder 9" NO 7.69 0.10 - Grinding Disc Nos 0.10 320 - -
Supervisor
Fitter 2 0.10 0.2 1,200 30 Grinder 5" NO 5.77 0.10 - Cutting Disc Nos 0.10 280 - -
Rigger/Folder - 0.10 - 1,200 - Scaffolding Pipe Nos 1.00 0.10 - PPE Nos 0.10 0.1 200 2.00 -
1 Installation of solar panel with Complete Nos 1,900.00
Electrical Connections
Electrician 2 0.10 0.2 1,500 38 Scaffolding Joint Nos 1.00 0.10 - -