This document outlines instrumentation specifications for packaged equipment on an LNG project.

This document specifies requirements for instrumentation on packaged equipment including general design, electrical specifications, control valves, pressure relief devices, drawings and documentation requirements.

The document specifies general design requirements, electrical specifications, control valves, pressure relief devices, required calculations, drawings and documentation, inspection testing and quality assurance, shipping and handling, and accessories/special tools.

CONFIDENTIAL

Project No Unit Document Material Serial N° Rev. Page


Type Code

080494C 000 JSS 1500 0001 3 1/19

OWNER DOCUMENT NUMBER: ECA-00-PCS-SPE-0011

ECA LNG

ENERGIA COSTA AZUL PHASE I LNG PROJECT

INSTRUMENTATION FOR PACKAGED EQUIPMENT


SPECIFICATION

This document is subject to the terms and conditions of that certain Engineering, Procurement and Construction Contract No. PO45751054 relating to
the Energia Costa Azul Phase 1 LNG Project dated February 27, 2020.

See project 078392C for previous revisions.

Jan-Willem
Digitally signed James Yeakle
Handels
by: Chan Miller 2020.10.13 11:
Date: 2020.10.13
2020.10.13
09:33 -06'00'
11:14:45 -06'00' 13:52:44 -05'00'

3 13-OCT-2020 ISSUED FOR DESIGN C. MILLER J. YEAKLE J.W. HANDELS

2 15-APR-2020 ISSUED FOR DESIGN R. MILLER C. MILLER J. YEAKLE

WRITTEN BY CHECKED BY APPROVED BY


REV. DATE STATUS
(NAME & SIGN) (NAME & SIGN) (NAME & SIGN)
DOCUMENT REVISIONS

Confidential - Do Not Disclose Without Authorization Technip USA, Inc. TBPE Firm Reg. No. F-3030
CONFIDENTIAL

Project No Unit Document Material Serial N° Rev. Page


Type Code

080494C 000 JSS 1500 0001 3 2/19

ENERGIA COSTA AZUL PHASE I LNG PROJECT


INSTRUMENTATION FOR PACKAGED EQUIPMENT SPECIFICATION
OWNER DOCUMENT N°: ECA-00-PCS-SPE-0011

Revision Description:
Section /
Revision Description
Page
Page 1 and
2 all Headers, Updated Project Number and EDSA
Footers
3 4.3 Revised Section Title to Controls and Interface with BPCS
4.3.6 to
3 Added Sub-Sections on Controls and Interface with BPCS per TD-INS-0014 response
4.3.13
3 11.2 Deleted 3-axis impact monitors per TQ-INS-0050

Holds:
Hold # Description Page

Confidential - Do Not Disclose Without Authorization Technip USA, Inc. TBPE Firm Reg. No. F-3030
CONFIDENTIAL

Project No Unit Document Material Serial N° Rev. Page


Type Code

080494C 000 JSS 1500 0001 3 3/19

ENERGIA COSTA AZUL PHASE I LNG PROJECT


INSTRUMENTATION FOR PACKAGED EQUIPMENT SPECIFICATION
OWNER DOCUMENT N°: ECA-00-PCS-SPE-0011

Table of Contents
1. Purpose ........................................................................................................................ 4
2. General ........................................................................................................................ 4
3. Definitions..................................................................................................................... 8
4. General Design Requirements.................................................................................... 11
5. Electrical Specifications for Instruments and Control Panels....................................... 15
6. Control Valves ............................................................................................................ 16
7. Pressure Relieving Devices ........................................................................................ 16
8. Required Calculations................................................................................................. 16
9. Drawings and Documentation ..................................................................................... 16
10. Inspection, Testing, and Quality Assurance ................................................................ 18
11. Shipping and Handling................................................................................................ 18
12. Accessories and Special Tools ................................................................................... 19

Confidential - Do Not Disclose Without Authorization Technip USA, Inc. TBPE Firm Reg. No. F-3030
CONFIDENTIAL

Project No Unit Document Material Serial N° Rev. Page


Type Code

080494C 000 JSS 1500 0001 3 4/19

ENERGIA COSTA AZUL PHASE I LNG PROJECT


INSTRUMENTATION FOR PACKAGED EQUIPMENT SPECIFICATION
OWNER DOCUMENT N°: ECA-00-PCS-SPE-0011

1. Purpose

The intent of this document is to describe the requirements for instrumentation furnished
by a Major Equipment Package Supplier for the Energía Costa Azul (ECA) Phase I LNG
Project. This document establishes general guidelines for the design and supply of
hardware and documentation expected by the buyer and owner to achieve project
objectives.

2. General

Scope

The Project Specification covers the minimum requirements for design,


materials, manufacture, testing, inspection, and shipping of instruments for
packaged equipment for a natural gas liquefaction plant.

The specific requirements for each item shall be as stated in the Material
Requisition and associated Data Sheets.

In case of conflict between this specification and Material Requisition or


Purchase Order, order of precedence in ECA-00-PMT-DEB-0001 (Basis of
Design) shall apply.

Compliance with this specification does not relieve the Vendor of the
responsibility for furnishing instruments and equipment of proper design and
construction and fully suitable for all specified operating conditions.

All comments, exceptions, and clarifications to this specification shall be


specifically addressed in the Vendor’s proposal by reference to the
applicable paragraph.

Concept

Instrumentation shall be provided as specified per the P&IDs, data sheets,


and this project specification. Process values shall be measured directly
where possible, (or by indirect or computed methods where not possible), or
by inference where direct measurement is not feasible for the purpose of
control.

Process values not required for control, but considered necessary for the
purpose of plant operation, plant-wide energy or material balance, or
hazards analysis shall be indicated or recorded in the main control room.

Confidential - Do Not Disclose Without Authorization Technip USA, Inc. TBPE Firm Reg. No. F-3030
CONFIDENTIAL

Project No Unit Document Material Serial N° Rev. Page


Type Code

080494C 000 JSS 1500 0001 3 5/19

ENERGIA COSTA AZUL PHASE I LNG PROJECT


INSTRUMENTATION FOR PACKAGED EQUIPMENT SPECIFICATION
OWNER DOCUMENT N°: ECA-00-PCS-SPE-0011

Local indication, except for use in specific manual balancing or adjusting


functions, shall be considered only for the purpose of confirmation the
process unit or instrument is operating. Direct operated indicators shall be
considered to be a means of emergency or "last resort" operation, and shall
be provided only where required.

Reference Documents

Any other codes, standards, or practices in addition to, or instead of, those
listed in this specification which are required for a project will be listed in the
requisition or purchase order.

The applicable issue date is the latest issue date prior to the approval date
of this Specification.

Applicable norms and regulations indicated in Project’s list of norms and


regulations document ECA-00-PMT-LST-0002.

Project Philosophies, Specifications, and Drawings

The latest revisions of the following project documents form an integral part
of this specification:
Project Specification No. Description
ECA-00-DET-SPE-0003 Welding Requirements for Cryogenic Service
ECA-00-MEC-SPE-0005 External Coatings
ECA-00-ELE-SPE-0002 Electrical Installation Specification
ECA-00-ELE-SPE-0017 Electrical Equipment Furnished with Packaged
Equipment
ECA-00-ELE-SPE-0024 Instrument Cable
ECA-00-MEC-PHI-0001 Inspection and Expediting Philosophy
ECA-00-MEC-PHI-0006 Equipment Preservation Philosophy
ECA-00-PIP-SPE-0017 Cryogenic Valves
ECA-00-DET-SPE-0003 Welding Requirements for Cryogenic Service
Welding and Heat Treatment Requirements for
ECA-00-DET-SPE-0005
Equipment and Piping
ECA-00-PCS-PHI-0001 Process Monitoring and Control Philosophy

Confidential - Do Not Disclose Without Authorization Technip USA, Inc. TBPE Firm Reg. No. F-3030
CONFIDENTIAL

Project No Unit Document Material Serial N° Rev. Page


Type Code

080494C 000 JSS 1500 0001 3 6/19

ENERGIA COSTA AZUL PHASE I LNG PROJECT


INSTRUMENTATION FOR PACKAGED EQUIPMENT SPECIFICATION
OWNER DOCUMENT N°: ECA-00-PCS-SPE-0011

PLC Package Systems Rotating Machinery


ECA-00-PCS-PHI-0002
Philosophy
ECA-00-PCS-SPE-0001 Integrated Control System ICSS
ECA-00-PCS-SPE-0003 Field Instrument Specification
Pressure Relief Valve and Rupture Disc
ECA-00-PCS-SPE-0018
Specification
ECA-00-PMT-DEB-0001 Project Basis of Design
ECA3-00-PRC-PHI-0004 Overpressure Protection Philosophy
ECA3-00-PRC-PHI-0005 Isolation Philosophy
Requirements for Positive Materials Identification
ECA-00-QTY-SPE-0001
and Ferrite Testing
ECA-00-PCS-SPE-0031 Telecommunications

Industry Standards

Revisions indicated in ECA-00-PMT-LST-0002 (codes, guidelines and standards)


shall apply:

Standard No. Description


ISA 5.1 Instrumentation Symbols and Identification
Graphic Symbols for Distributed Control/Shared Display
ISA 5.3
Instrumentation, Logic, and Computer Systems
ISA 12.04.04 Pressurized Enclosures
Functional Safety: Safety Instrumented Systems for the
ISA 84.00.01
Process Industry Sector, Part 1
Functional Safety: Safety Instrumented Systems for the
ISA 84.00.01
Process Industry Sector, Part 2
Functional Safety: Safety Instrumented Systems for the
ISA 84.00.01
Process Industry Sector, Part 3
Sizing, Selection, and Installation of Pressure-relieving
API STD 520, Part I
Devices in Refineries, Part I—Sizing and Selection
Sizing, Selection, and Installation of Pressure-Relieving
API STD 520, Part II
Devices in Refineries Part II—Installation
API STD 521 Pressure-relieving and Depressuring Systems
API RP 551 Process Measurement
API RP 552 Transmission Systems

Confidential - Do Not Disclose Without Authorization Technip USA, Inc. TBPE Firm Reg. No. F-3030
CONFIDENTIAL

Project No Unit Document Material Serial N° Rev. Page


Type Code

080494C 000 JSS 1500 0001 3 7/19

ENERGIA COSTA AZUL PHASE I LNG PROJECT


INSTRUMENTATION FOR PACKAGED EQUIPMENT SPECIFICATION
OWNER DOCUMENT N°: ECA-00-PCS-SPE-0011

API RP 553 Refinery valves and Accessories for Control and Safety
Instrumented Systems
API RP 554 Process Control Systems Part 1 to 3
ASME BPVC Boiler and Pressure Vessel Code, Section I and VIII
IEC 61508 Functional Safety of Electrical/Electronic/programmable
Electronic Safety - Related Systems
IEC 61511 Functional safety - Safety instrumented systems for the
process industry sector
NFPA 59A Standard for the Production, Storage, and Handling of
Liquefied Natural Gas (LNG)
NFPA 70 National Electrical Code
NFPA 72 National Fire Alarm and Signaling Code
NFPA 496 Standard for Purged and Pressurized Enclosures for
Electrical Equipment
G/20709/LICUE/2017
CRE Permit
Punto 5.4 and Anexo 4
ASEA’s DAC Relevant ASEA’s DAC for liquefaction facilities
Standard for the production, storage, and handling of
NFPA 59A
Liquefied Natural Gas (LNG)
Installation and equipment for Liquefied Natural Gas -
EN1473
Design of onshore installations
Liquefied natural gas (LNG) - Production, storage, and
CSA Z276
handling
Recommended Practice for Classification of Locations for
API RP 500 Electrical Installations at Petroleum Facilities Classified
as Class I, Division 1 and Division 2
NOM-001-SECRE-2010 On Natural gas quality requirements
NOM-001-SEDE-2012 Electrical Installation (Utility)
NOM-002-SECRE-2010 Natural Gas utilization installations (Exploitation)
Natural Gas Distribution facilities (supersedes NOM-003-
NOM-003-ASEA-2016
SECRE-2011)
Transport of natural gas, ethanol and gas associated with
NOM-007-ASEA-2016
carbon mineral by means of pipelines
Design, construction, safety, operation and maintenance
NOM-015-SECRE-2013 of LPG storage facilities or supply facility associated to
transport facilities or distribution by pipelines of LPG
which are part of the onshore terminals or import marine

Confidential - Do Not Disclose Without Authorization Technip USA, Inc. TBPE Firm Reg. No. F-3030
CONFIDENTIAL

Project No Unit Document Material Serial N° Rev. Page


Type Code

080494C 000 JSS 1500 0001 3 8/19

ENERGIA COSTA AZUL PHASE I LNG PROJECT


INSTRUMENTATION FOR PACKAGED EQUIPMENT SPECIFICATION
OWNER DOCUMENT N°: ECA-00-PCS-SPE-0011

facilities
Related to safety and health conditions in working
NOM-011-STPS-1993
centers with noise generation
Establishes the maximum permissible limits for noise
NOM-081-SEMARNAT-
emission from fixed sources and method of
1994
measurement.
Guidelines regarding the Industrial Safety, Operating
DACG - NG Liquefaction Safety and Environment Protection for Design,
Administrative General Construction, Pre-Start-Up, Operation, Maintenance,
Provisions Close, Dismantling and Abandonment of Gas Natural
Liquefaction
Guidelines for conformation, implementation and
DACG – SASISOPA
authorization of Management Systems on the Industrial
Administrative General
Safety, Operating Safety and Environment Protection
Provisions
(SASISOPA) for Hydrocarbon business

3. Definitions

OWNER Party which initiates the project and ultimately pays for its
design and construction. The OWNER will generally specify
the technical requirements, and may also include an agent or
consultant, authorized to act on behalf of the OWNER.

Engineering, Party which carries out all or part of the design, engineering,
Procurement, and procurement, installation, and commissioning or management
Construction (EPC) of a project or operation of a facility. The OWNER may
Contractor sometimes undertake all or part of the duties of the contractor.

Project Energía Costa Azul (ECA) Phase I LNG Project

Vendor Party which supplies an item, equipment, or service to perform


the duties specified by the OWNER

Package Equipment Machinery or Process Package Equipment Vendor


Vendor

Within the context of this Engineering Specification, the following words shall be as
defined below:

Confidential - Do Not Disclose Without Authorization Technip USA, Inc. TBPE Firm Reg. No. F-3030
CONFIDENTIAL

Project No Unit Document Material Serial N° Rev. Page


Type Code

080494C 000 JSS 1500 0001 3 9/19

ENERGIA COSTA AZUL PHASE I LNG PROJECT


INSTRUMENTATION FOR PACKAGED EQUIPMENT SPECIFICATION
OWNER DOCUMENT N°: ECA-00-PCS-SPE-0011

Accuracy The maximum positive and negative deviation of a value from


the correct or ideal value (e.g. the deviation of an indicated
value displayed by an instrument from the actual process
value).

Basic Process Control A system which responds to input signals from the process
System (BPCS) and its associated equipment, other programmable systems,
and/or from an operator, and generates output signals
causing the process and its associated equipment to operate
in the desired manner and within normal production limits.

Distributed Control A system which divides process control functions into specific
System (DCS) areas interconnected by communications (normally data
highways), to form a single entity. The system is
characterized by digital controllers and typically by central
operation interfaces. Distributed control systems consist of
functionally integrated subsystems which may be physically
separated and remotely located from one another. Distributed
control systems generally have at least one shared function
within the system. The shared function may be the controller,
the communication link, or the display device.

Human-Machine Operator window into the control system. Typically consists of


Interface (HMI) a computer-type monitor with graphical and text-based
screens and function keys (for outdoor use), and/or keyboard
and pointing device.

Instrumentation Process measurement, monitoring, controlling, and


interlocking devices and equipment

Instrument System A collection of instrumentation specifically designed and


configured to perform a unique function, i.e., distributed
control, safety instrumented systems, process stream
analysis, etc.

Interlock A system which, in response to a predetermined condition,


initiates a predefined action. Typically comprised of binary
(on/off) signals and logic used for process control,
sequencing, or protective interruption of normal process
control functions. Protective interlocks are typically further
defined as being either safety related or commercial (asset or
production protection) related.

Confidential - Do Not Disclose Without Authorization Technip USA, Inc. TBPE Firm Reg. No. F-3030
CONFIDENTIAL

Project No Unit Document Material Serial N° Rev. Page


Type Code

080494C 000 JSS 1500 0001 3 10/19

ENERGIA COSTA AZUL PHASE I LNG PROJECT


INSTRUMENTATION FOR PACKAGED EQUIPMENT SPECIFICATION
OWNER DOCUMENT N°: ECA-00-PCS-SPE-0011

International Society An international standards and certification organization,


of Automation (ISA) specifically focused on instrumentation and control systems

Local Residing in close physical proximity to the main machinery


train in the field, such as equipment, devices, instruments,
etc.

Local Control Panel Control Panel or operator station consisting of PLC,


(LCP) pushbuttons, switches, and indicating lights, which resides in
physical proximity to the main machinery in the field.

Local Control Room Control room which resides in close physical proximity to the
main machinery train in the field, which could house control
cabinets for BPCS, SIS,FGS, other devices and instruments,
etc.

Main Control Room Control room which resides inside the Main Control Building
(MCR) and houses the BPCS operator consoles and other equipment.

Programmable Logic Industrial digital computer which has been ruggedized and
Controller (PLC) adapted for the control of processes or machines, with high
reliability and ease of programming and fault diagnostics.

SIF Safety Instrumented Function per ISA-84.00.01-2004 (IEC


61511-1 Mod)

Piping & A detailed graphical representation of a process including the


Instrumentation hardware and software (e.g. piping, equipment,
Diagram (P&ID) instrumentation, etc.) necessary to design, construct, and
operate the facility

Repeatability The closeness or agreement of repeated measurements of


output or reading for the same value of input or process
variable, under the same operating conditions, when
approached from the same direction for full range traverses,
expressed as a percent (of measured span) deviation.

Reproducibility The closeness or agreement of repeated measurements of


output or reading for the same value of input or process
variable, expressed as percent (of measured span) deviation.
Reproducibility includes hysteresis, dead band, drift, and
repeatability errors.

Confidential - Do Not Disclose Without Authorization Technip USA, Inc. TBPE Firm Reg. No. F-3030
CONFIDENTIAL

Project No Unit Document Material Serial N° Rev. Page


Type Code

080494C 000 JSS 1500 0001 3 11/19

ENERGIA COSTA AZUL PHASE I LNG PROJECT


INSTRUMENTATION FOR PACKAGED EQUIPMENT SPECIFICATION
OWNER DOCUMENT N°: ECA-00-PCS-SPE-0011

Safety Integrity Level One of three possible discrete integrity levels (SIL 1, SIL 2,
(SIL) and SIL 3) of Safety Instrumented Systems. SIL is defined in
terms of Probability of Failure on Demand (PFD). (Reference
IEC 61508 and 61511)

Safety Instrumented A system composed of sensors, logic solvers, and final


System (SIS) control elements for the purpose of taking the process to a
safe state when predetermined conditions are violated.

“shall” A mandatory requirement for which exceptions will not


normally be granted

SmartPlant Instrumentation database software which allows users to


Instrumentation (SPI) automate tasks including creating Instrument Data Sheets,
Instrument Index, Loop Drawings, and Hookup Drawings

System Controls cabinet together with all the equipment and auxiliary
devices/components, control software program, and hardware
as described.

4. General Design Requirements

Instrumentation for packaged equipment shall meet the requirements of the project
Instrument Specification ECA-00-PCS-SPE-0003. Packaged Equipment that handle
natural gas/ liquefied shall be in compliance with NFPA 59A Chapters 6, 9 and 10
as applicable.

Instrument Index and Data Sheets

The Package Equipment Vendor shall provide an instrument list, listing each
component by tag number, type, range or size, service, process line or
equipment number, I/O type (as applicable), and manufacturer’s name and
model number. The format and exact content of the instrument list shall be
developed by the EPC contractor.

The EPC contractor shall provide a project Instrument Index of all tagged
instruments per the Instrument Specification ECA-00-PCS-SPE-0003. The
Instrument Index shall be developed in Smart Plant Instrumentation (SPI).

The Package Equipment Vendor shall provide instrument data sheets in


Smart Plant Instrumentation format, by using SPI ISF files and an external
editing tool. The EPC contractor shall provide the SPI data sheet formats

Confidential - Do Not Disclose Without Authorization Technip USA, Inc. TBPE Firm Reg. No. F-3030
CONFIDENTIAL

Project No Unit Document Material Serial N° Rev. Page


Type Code

080494C 000 JSS 1500 0001 3 12/19

ENERGIA COSTA AZUL PHASE I LNG PROJECT


INSTRUMENTATION FOR PACKAGED EQUIPMENT SPECIFICATION
OWNER DOCUMENT N°: ECA-00-PCS-SPE-0011

and original SPI ISF files to the Package Equipment Vendor to be completed
and returned to the EPC contractor.

The EPC contractor shall import the vendor completed instrument data sheet
ISF files provided by the Package Equipment Vendor into the overall project
SPI instrument database for inclusion in the Instrument Index and other
project deliverables.

Controls and Interface with BPCS

The Vendor shall provide isolated contacts for repeating specified alarms via
hardwired signals (e.g., common alarms, main equipment status, common
shutdown, low pressure or loss of positive pressure in enclosure, if
applicable) to the Basic Process Control System (BPCS). The actual number
of signals will differ from one package to another. The EPC contractor will
mark up Vendor’s schematic diagrams to indicate which alarms are shall be
repeated in the BPCS.

Programmable Logic Controllers (PLCs) supplied with control panels for


execution of equipment protection and/or control logic shall be in accordance
with project specification ECA-00-PCS-PHI-0002, PLC Package System
Rotating Machinery Philosophy. The PLC shall be furnished with redundant
Ethernet IP links over single mode fiber optic cables to communicate of alarm
and equipment status information to the BPCS. Fiber optic cables,
connectors, FO receivers/ transmitter interphase should be compatible with
the requirements specified in ECA-00-PCS-SPE-0031.

All hardware required to operate the Vendor's package (e.g., pressure


regulators, gauges, flow meters, instrumentation, control valves, etc.) shall
be supplied by the Vendor.

Skid-mounted or package equipment instrumentation shall be installed in


locations which are accessible from grade or permanent platform for
maintenance and visibility of local displays, without the use of temporary
ladders or scaffolds.

Instruments for lube oil consoles, gas seal modules, and equipment shall be
gauge-board mounted. Design and locations shall be provided based on
package requirements and accessibility.

Packaged equipment controls shall be capable of accepting inputs from the


plant’s BPCS and SIS.

Confidential - Do Not Disclose Without Authorization Technip USA, Inc. TBPE Firm Reg. No. F-3030
CONFIDENTIAL

Project No Unit Document Material Serial N° Rev. Page


Type Code

080494C 000 JSS 1500 0001 3 13/19

ENERGIA COSTA AZUL PHASE I LNG PROJECT


INSTRUMENTATION FOR PACKAGED EQUIPMENT SPECIFICATION
OWNER DOCUMENT N°: ECA-00-PCS-SPE-0011

Packaged controls shall meet the project design requirements in terms of


separation of control and shutdown functions, pre-alarms, shutdown bypass
testing, and removal for maintenance in a manner that will maintain: safe
operation of the process, annunciation, and communications interfaces.

The package controls shall be interfaced with the BPCS. The package
equipment control system shall use HART protocol as the preferred platform
to interface its field devices with the plant’s Asset Management System
(AMS).

If a packaged equipment control system is independent and supplied by the


equipment vendor, the equipment process control system shall provide
inputs/outputs compatible with the BPCS as required. It will be necessary to
provide process control commands such as remote set points.

Acceptable means of control from the BPCS are:

 Hard-wired signals on an individual function basis

 Other industrial accepted communication protocols (Ethernet or


Modbus) TCP/IP that is compatible with the BPCS

Alarms and monitoring indications to the BPCS shall be transmitted through


soft connections via the system network. Stop / start commands, valve
commands, and all other controls from the BPCS shall be transferred to
packaged equipment via hardwired signals.

The package controls shall follow project SIS requirements for their
shutdown functions.

Refer to the following project specifications for additional details:

 PLC Package Systems Rotating Machinery Philosophy, ECA-00-PCS-


PHI-0002

 Telecommunication Specification, ECA-00-PCS-SPE-0031

Fail-Safe Requirements

Instruments shall be designed to fail safe on air and/or power failure.

The Package Equipment Vendor shall recommend and the EPC


contractor shall approve the fail-safe actions of all instruments,

Confidential - Do Not Disclose Without Authorization Technip USA, Inc. TBPE Firm Reg. No. F-3030
CONFIDENTIAL

Project No Unit Document Material Serial N° Rev. Page


Type Code

080494C 000 JSS 1500 0001 3 14/19

ENERGIA COSTA AZUL PHASE I LNG PROJECT


INSTRUMENTATION FOR PACKAGED EQUIPMENT SPECIFICATION
OWNER DOCUMENT N°: ECA-00-PCS-SPE-0011

actuated valves, and related components.

Fail safe designs shall be reviewed and verified during HAZOP.

HAZOP fail safe findings shall be implemented.

All instruments, actuated valves, and related components supplied


by the Package Equipment Vendor shall meet the required SIL
rating as determined from the project’s Safety Requirement
Specification.

Materials of Construction

The materials of wetted parts of instruments and connecting pipe, valves, tubing,
and fittings shall be in accordance with the project piping or equipment materials
specification. The materials shall be selected for long-term corrosion resistance to
fluids being handled. As a minimum, the wetted part material shall be 316SS.
The piping and components for instruments installation/ connection shall follow the
provision stated in NFPA 59A Chapter 9 as applicable

Tagging

Instrument nameplate labeling and instrument tagging shall be in


accordance with project Field Instrument Specification ECA-00-PCS-SPE-
0003 paragraphs 3.7 and 18.

Instrument Tubing and Fittings

Instrument tubing and fittings shall be per paragraph 3.19.1 of the project
Field Instrument Specification ECA-00-PCS-SPE-0003.

Electrical Area Classification, Design, and Enclosures

Electrical or electronic instrument devices and their enclosures shall conform


to the requirements of the electrical area classification. Electrical protection
for all package instruments shall be explosion proof as per FM/UL

Instrument housings installed in indoor and/or outdoor areas shall be NEMA


4X, 316 stainless steel.

Control panel enclosures installed in indoor areas shall be NEMA 12, painted
carbon steel.

Confidential - Do Not Disclose Without Authorization Technip USA, Inc. TBPE Firm Reg. No. F-3030
CONFIDENTIAL

Project No Unit Document Material Serial N° Rev. Page


Type Code

080494C 000 JSS 1500 0001 3 15/19

ENERGIA COSTA AZUL PHASE I LNG PROJECT


INSTRUMENTATION FOR PACKAGED EQUIPMENT SPECIFICATION
OWNER DOCUMENT N°: ECA-00-PCS-SPE-0011

Control panel enclosures installed in outdoor areas shall be NEMA 4X, 316
stainless steel.

Battery limits for package units shall be defined as follows:

Package vendor shall provide all required cables, cable trays and junction
boxes within the package. Wiring between package instruments to package
JB shall be in vendor scope. All wiring shall be provided according to the
project specification.

Interconnecting wiring from package JB/Local Control Panel to ICSS


(located in control room) will be in EPC Contractor’s scope.

The end panels shall be furnished with a minimum ¼-inch x 1-inch copper
ground bus complete with solderless connector for one No. 4 AWG bare
stranded copper cable. Bus bar sizes shall be confirmed by EPC contractor
in detail design.

Panel grounding shall be by means of a stranded copper conductor, in


accordance with Electrical Installation Specification ECA-00-ELE-SPE-
0002.

Terminal boxes for incoming and outgoing signal leads shall be located at
the bottom of the panel.

Each instrument, electronic transducer, controller, or analyzer requiring 120


VAC power shall be provided with an individual disconnect switch suitable
for the equipment’s required area classification.

Disconnect switches shall be provided with metal tags indicating the


associated instrument tag numbers.

4.9.7 120VAC UPS redundant feeder (as required) will be provided to the
package UCP/LCP. Further distribution to field instruments including
24VDC redundant power supplies shall be by the package vendor.

5. Electrical Specifications for Instruments and Control Panels

Electrical specifications for package equipment instruments and control panels shall
be provided in accordance with Instrument Specification ECA-00-PCS-SPE-0003
paragraph 3.22.

Confidential - Do Not Disclose Without Authorization Technip USA, Inc. TBPE Firm Reg. No. F-3030
CONFIDENTIAL

Project No Unit Document Material Serial N° Rev. Page


Type Code

080494C 000 JSS 1500 0001 3 16/19

ENERGIA COSTA AZUL PHASE I LNG PROJECT


INSTRUMENTATION FOR PACKAGED EQUIPMENT SPECIFICATION
OWNER DOCUMENT N°: ECA-00-PCS-SPE-0011

6. Control Valves

Control valves and actuators shall be sized, selected, and provided per Instrument
Specification ECA-00-PCS-SPE-0003.

Smart valve positioners shall be provided for all control valves

Flanged valves shall conform to the requirements of the applicable piping material
specification, with the following exceptions:

Valves 4” and smaller shall be provided with minimum ANSI 150 flanges,
according to the applicable piping specification.

Globe style, sliding stem valves of any size shall be provided with minimum
ANSI 150 flanges, according to the applicable piping specification.

Live loaded, fugitive emission controlling packing systems shall be provided for all
sliding stem control valves in flammable or toxic material services.

7. Pressure Relieving Devices

Relieving devices shall be provided in accordance with project Pressure Relief Valve
and Rupture Disc Specification ECA-00-PCS-SPE-0018.

8. Required Calculations

The Vendor shall provide the following calculations in accordance with project Instrument
Specification ECA-00-PCS-SPE-0003:

1. Thermowell wake frequency

2. Flowmeter sizing

3. Control valve Cv and noise and Actuator sizing

4. Relief valve orifice sizing

5. Level device calibration

9. Drawings and Documentation

The Vendor shall provide installation detail drawings for all instruments.

The drawings shall include the following:

Confidential - Do Not Disclose Without Authorization Technip USA, Inc. TBPE Firm Reg. No. F-3030
CONFIDENTIAL

Project No Unit Document Material Serial N° Rev. Page


Type Code

080494C 000 JSS 1500 0001 3 17/19

ENERGIA COSTA AZUL PHASE I LNG PROJECT


INSTRUMENTATION FOR PACKAGED EQUIPMENT SPECIFICATION
OWNER DOCUMENT N°: ECA-00-PCS-SPE-0011

Instrument process piping and/or tubing

Instrument air piping and/or tubing

Instrument electrical wiring

Wiring, logic, and schematic diagrams shall be provided as required for process
monitoring and control, shutdown, interlock, and safety systems.

Control narratives (written, functional descriptions of the intended operations) shall


be provided for process monitoring and control systems. Cause and Effect matrices
shall be provided for shutdown, interlock, and safety systems.

Loop drawings shall be provided for each complete instrument loop.

Drawings shall show all terminations, numbered terminals, and cable


identifications.

Each loop drawing shall show and identify all items interconnected in an
instrument signal circuit, including power supply terminals.

Instrument datasheets shall be provided for all instrument and control devices.

The datasheets shall be in Smart Plant Instrumentation (SPI) format using


SPI ISF files.

The initial instrument datasheet ISF files shall be provided to the Vendor by
the EPC Contractor for completion using an external SPI datasheet editor
and subsequent return to the EPC Contractor.

The EPC contractor shall import the vendor completed instrument


datasheets into the project SPI database.

The Vendor shall provide schematic diagrams and/or assembly drawings on which
instrument components are identified by a symbol and a tag number.

The EPC Contractor shall make provisions to assign a block of instrument


tag numbers for Vendor use.

The Vendor shall follow the numbering and tagging convention as described on
P&ID Legend Sheet to identify and tag components.

The Vendor shall provide draft installation and operating manual(s) (IOMs) for

Confidential - Do Not Disclose Without Authorization Technip USA, Inc. TBPE Firm Reg. No. F-3030
CONFIDENTIAL

Project No Unit Document Material Serial N° Rev. Page


Type Code

080494C 000 JSS 1500 0001 3 18/19

ENERGIA COSTA AZUL PHASE I LNG PROJECT


INSTRUMENTATION FOR PACKAGED EQUIPMENT SPECIFICATION
OWNER DOCUMENT N°: ECA-00-PCS-SPE-0011

instrumentation and controls within his scope of supply, at least eight (8) weeks
before scheduled shipment.

Engineering data shall be provided in accordance with project Instrument


Specification ECA-00-PCS-SPE-0003 paragraph 19, and supplier data
requirements from the project requisition.

10. Inspection, Testing, and Quality Assurance

Inspection of control systems (BPCS, control panels, multiplexers, SIS, and PLCs)
shall be performed in accordance with project Inspection Philosophy ECA-00-MEC-
PHI-0001, Integrated Control System ICSS Specification ECA-00-PCS-SPE-0001,
and the ITP included with the project requisition.

Test notification shall be provided to EPC Contractor ten (10) business days in
advance of the testing for witnessing the test.

Instrumentation welding requirements shall be per project specifications Welding


Requirements for Cryogenic Service ECA-00-DET-SPE-0003 and Welding and
Heat Treatment Requirements for Equipment and Piping ECA-00-DET-SPE-0005.

Positive material identification (PMI) requirements shall be per project specification


Requirements for Positive Materials Identification and Ferrite Testing ECA-00-QTY-
SPE-0001.

BPCS/SIS acceptance testing shall be performed in accordance with the Integrated


Control System ICSS Specification ECA-00-PCS-SPE-0001, and the ITP included
with the project requisition.

Package equipment PLC control panel acceptance testing shall be conducted as


defined in PLC Package Systems Rotating Machinery Philosophy ECA-00-PCS-
PHI-0002, and the ITP included with the project requisition.

11. Shipping and Handling

Shipping, handling, and preservation shall be in accordance with Field Instrument


Specification ECA-00-PCS-SPE-0003 paragraph 20.

Shipping crates and boxes shall include three-axis impact monitors.

Shipping items shall be export boxed, and sufficient for twelve-month storage.

Confidential - Do Not Disclose Without Authorization Technip USA, Inc. TBPE Firm Reg. No. F-3030
CONFIDENTIAL

Project No Unit Document Material Serial N° Rev. Page


Type Code

080494C 000 JSS 1500 0001 3 19/19

ENERGIA COSTA AZUL PHASE I LNG PROJECT


INSTRUMENTATION FOR PACKAGED EQUIPMENT SPECIFICATION
OWNER DOCUMENT N°: ECA-00-PCS-SPE-0011

12. Accessories and Special Tools

A complete set of accessories, including any special tools, shall be provided for operating,
maintaining and testing the equipment, in accordance with project Field Instrument
Specification ECA-00-PCS-SPE-0003 paragraph 21.