Auxiliary Transformer
Auxiliary Transformer
Auxiliary Transformer
TABLE OF CONTENT
1. Task
a.Work Status----------------------------------------------------------------------------------------------------------2
b.Documentation------------------------------------------------------------------------------------------------------2
c.Personnel-------------------------------------------------------------------------------------------------------------2
d.Measuring Instrumentation---------------------------------------------------------------------------------------2
2. Preconditions---------------------------------------------------------------------------------------------------
--------2
3. Precautions------------------------------------------------------------------------------------------------------
--------2
4. Scope--------------------------------------------------------------------------------------------------------------
--------3
5. Execution---------------------------------------------------------------------------------------------------------
--------3
a.Visual Checks------------------------------------------------------------------------------------------------------3
b.Testing of Transformer
1. insulation resistance / Polarization index test----------------------------------------------------------3
2. Voltage Ratio Measurement--------------------------------------------------------------------------------4
3. Vector Group/Phase Displacement-----------------------------------------------------------------------4
4. Winding Resistance Test------------------------------------------------------------------------------------5
5. Excitation current Measurement---------------------------------------------------------------------------6
6. Temperature indicator and sensor Calibration--------------------------------------------------------7
7. Bushing Current Transformer------------------------------------------------------------------------------7
8. Testing and commissioning of cooler control cabinet------------------------------------------------7
9. Transformer protection devices functional check-----------------------------------------------------7
10. Protective Earthing Checks---------------------------------------------------------------------------------7
6. Documents-------------------------------------------------------------------------------------------------------
--------8
7. Reference--------------------------------------------------------------------------------------------------------
---------8
8. Attachment------------------------------------------------------------------------------------------------------
---------8
Task
This instruction comprises a complete description of the testing of oil and dry type
distribution or auxiliary transformers.
Preconditions
1.1. Work status
• Erection has been completed.
• Labelling of the equipment and designation of live enclosed plant sections has
been carried out.
1.2. Documentation
• The circuit diagram of Electrical equipment ,cabinets, etc are available
• Test Sheet TS-AT01 is available
• Product manual of the transformer is Available
• Factory Test Results of the transformer is available
1.3. personnel
• Commissioning engineer: - (1) engineer with experience in
commissioning of transformer and switch gear.
• Technician or helper:- (2) skilled worker with adequate on -the-
job training
• Witness from the client‘s concern department
2. Precautions
The work will only proceed when a Permit to Work (PTW) in work permit area has been
obtained. The PTW will be kept on site for consultation during the testing works.
The above contents may not be reproduced, transmitted,
or distributed to any form or by any means with out prior
permission of the originator
Page 3 of 9
Equipment : Auxiliary Transformer(<10MVA)
Date:13 Feb,09 Revision: 0
• Observe the rules for handling electronic components
sensitive to electrostatic discharge (ESD measures).
• Special safety arrangements shall be made for all areas
which are not explicitly designated as” electrical operating areas” when performing
tests at voltages in excess of 50V.
• Closing of the work permit after completion of the work (if
the test area is to be considered in work permit area) is necessary.
• Before test voltages are applied a check shall be carried out to ensure that no
unauthorized persons are working at the corresponding load-where ever necessary
barriers should be provided.
3. Scope
• Testing of Transformer
• Checking Auxiliaries and cooling system
• Checking that the mounting position is correct,
• Testing of bushing CT
• Checking of correct Earthing,
Execution
3.1. Visual Inspection.
Prior to carrying out electrical tests, a visual check of the transformer should be
carried out paying particular attention to the following points
Correct labeling of devices and cables
Equipment and cables are undamaged
Correct execution of the cable gland/sealing end
Name plate data, match with drawing and ambient condition
Firm cable termination/terminal connection and ferruling
Apply the test voltage on following Connection and note down the readings
Two Winding Transformers
HV – LV + Earth
LV – HV + Earth
The insulation resistance Measurement is done from 15 seconds to 1 minute
with 15 seconds interval and then for every minute up to ten minutes. Value
obtained at 10 minute divided by value at 1 minute gives polarization index
The test shall be done for each and every phase at all tap position as follows.
1W-2V> 1W-2W=1V-2W=1V-2V
The measured values should be compared with factory value, for that, a
conversion for the temperature correction should be done by following
formula.
R75 = Ra x 234.5+75
234.5+Ra
De-electric test for the oil should be performed as per IEC 156 using de-
electric test machine
Winding insulation resistance and winding resistance for the fan motors
should be carried out.
Insulation resistance test for the control circuit should be carried out.
After obtaining all the results and found satisfactory auxiliary power can be
switched on and voltage/phase sequence measurement should be carried
out.
Manual/auto operation of the fans should be checked
Heater and lighting circuit should be checked and made functional.
Documents
Test sheet TS-AT01 shall be completed.
References