0% found this document useful (0 votes)
27 views3 pages

Gantt Chart

The document outlines tasks and timelines in a Gantt chart for completing a research project from September 2021 through May 2022, including researching a title, objectives, writing the first chapter introducing the problem and background, reviewing related literature, and conducting interviews.

Uploaded by

tinker bell
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views3 pages

Gantt Chart

The document outlines tasks and timelines in a Gantt chart for completing a research project from September 2021 through May 2022, including researching a title, objectives, writing the first chapter introducing the problem and background, reviewing related literature, and conducting interviews.

Uploaded by

tinker bell
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

GANTT CHART

TASK NAME SEPTEMBER OCTOBER


1. Research Title
2. Objectives
3. Chapter 1 THE PROBLEM AND ITS BACKGROUND
Introduction
Statement of the Problem
Theoretical Framework
Conceptual Framework
Assumptions
Hypotheses
Importance of the Study
Scope and Limitations of the Study
Definition of Key Terms
4. Chapter 2 Review of Related Literature
Related Readings
Related Literature
Related Studies
Synthesis
GANTT CHART

2021 -2022
NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY

You might also like