Forecasting - Solutions - 24 - 02 - 2022
Forecasting - Solutions - 24 - 02 - 2022
Forecasting - Solutions - 24 - 02 - 2022
w1 0.2 28.8
w2 0.3
w3 0.5
w1 0.1
w2 0.2
w3 0.3 Ft = Ft-1 + α(At-1 - Ft-1)
w4 0.4
4 period weighted Error Error
moving average alpha 0.85967 Error(ALPHA) (TWO PERIOD) (fOUR PERIOD)
25 36
30.15802 1.3410109753 1
29.1625 14.726368399 9
30.6 32.46148 2.3670299501 9 20.25
32.4 33.7841 10.342011574 12.25 27.5625
34.5 36.54871 2.3985117443 0.25 3.0625
35.2 35.21733 10.351217558 16 7.5625
34.1 32.45149 30.785986731 20.25 12.25
35.5 37.22138 7.7207426869 25 20.25
37.3 39.61008 6.8124969522 4 0.5625
37.6 37.36627 28.796873548 42.25 22.5625
35.7 32.75305
MSE 13.785659102 13.9 14.2578125
RMSE 3.7129044025 3.728270376461 3.775951866748
14.2844444444444 8.700951826
3.7794767421489 2.9497375859