Bestek Rumah Tinggal Pak Agus
Bestek Rumah Tinggal Pak Agus
Bestek Rumah Tinggal Pak Agus
TAI
LPE
RENC
ANAANRUMAH2L
ANT
AI
2021
RANDUGUNT
ING,KOT
ATE
GAL
ASYRAF ARCHITECT
A
120 WARDROBE
250
K. TIDUR
±0.00
RUANG KELUARGA
±0.00
MUSHOLA
+0.10 1301020
WUDHU
-0.05
80
XSIZE
YSIZE
XSIZE
YSIZE
DAPUR
350 HALAMAN ±0.00
250
-0.25
-0.15
-0.05
NAIK
600 240
200 TERAS
-0.05
KOLAM RENANG 150
DENAH LANTAI 1
SKALA 1 : 100
ASYRAF ARCHITECT
A
KM/WC
+2.55
250 K. TIDUR
+2.60
250
K. TIDUR
+2.60
470 BALKON
+2.50
B B
280
RUANG KELUARGA
+2.60
1020
BALKON
+2.55
240
200
VOID
TURUN
120 FT 4 FT 3 FT 6 FT 7
±0.00
250
±0.00
50
FT 5 FT 6
±0.00
150
120
FT 2 FT 5 FT 1
±0.00 +0.10 1301020
FT 8
-0.05
FT 9
80
350 ±0.00
250
-0.25
-0.05 120
±0.00
-0.15
FT 5 FT 1
-0.05
FT 5 FT 9
FT 8 FT 8 600
NAIK 240
200 -0.05
KOLAM RENANG 150
FT 9 FT 6
RENC. FOOTPLAT
SKALA 1 : 100
20 20 40
ASYRAF ARCHITECT
40 20 20
20 15 15
600
B2
200 350 380
200 400
120 B2
±0.00
250
±0.00
A3 A3
470 230 -0.25
-0.05
50
±0.00
150
120
A1 A1 -0.05
80
350 A2 A2 ±0.00
250
-0.25
-0.05 120
±0.00
240
200 B1
B1
200 120 280 300 150 180 150 150
1530
RENC. PONDASI
SKALA 1 : 100
30 30
15 15
Spesi Spesi
Rabat Beton Rabat Beton ASYRAF ARCHITECT
Tanah Urug Muka Tanah Urug
±0.00 ±0.00 ±0.00 Lantai ±0.00
-0.10
-0.25 Urugan Sirtu Padat -0.25 Urugan Sirtu Padat
30 30
15 15 30
15
Spesi
Rabat Beton
Tanah Urug Muka
±0.00 ±0.00 Lantai ±0.00
-0.05
-0.10 -0.10 -0.15
-0.25 Urugan Sirtu Padat -0.25 -0.25
BALOK 15 15 40 40 20 20
BALOK BALOK
SL K1 K2
20
20
20
20
20
20
TUL. ATAS 2 Ø12 2 Ø12 TUL. ATAS 3 Ø19 3 Ø19 TUL. ATAS 2 Ø19 2 Ø19
TUL. BAWAH 2 Ø12 2 Ø12 TUL. BAWAH 3 Ø19 3 Ø19 TUL. BAWAH 2 Ø19 2 Ø19
SENGKANG Ø8-10 Ø8-15 SENGKANG Ø8-10 Ø8-15 SENGKANG Ø8-10 Ø8-15
15 15 15 15 25 25
BALOK BALOK
BALOK
K3 KP
15
15
15
15
B1
50
50
TUL. ATAS 2 Ø19 2 Ø19 TUL. ATAS 2 Ø12 2 Ø12
TUL. BAWAH 2 Ø19 2 Ø19 TUL. BAWAH 2 Ø12 2 Ø12 TUL. ATAS 3 Ø19 3 Ø19
SENGKANG Ø8-10 Ø8-10 SENGKANG Ø8-10 Ø8-10 TUL. BAWAH 3 Ø19 3 Ø19
SENGKANG Ø8-10 Ø8-15
TUL. PINGGANG 6 Ø12 6 Ø12
B2 B3 B4/RB
20
20
40
40
30
30
TUL. ATAS 4 Ø16 4 Ø19 TUL. POKOK 4 Ø16 4 Ø16 TUL. ATAS 2 Ø12 2 Ø12
TUL. BAWAH 2 Ø12 2 Ø12 TUL. PINGGANG 2 Ø12 2 Ø12 TUL. BAWAH 2 Ø12 2 Ø12
SENGKANG Ø8-10 Ø8-15 SENGKANG Ø8-10 Ø8-10 SENGKANG Ø8-10 Ø8-15
SL
SL
±0.00
SL 250
±0.00
SL
470 230 -0.25
SL -0.05
SL SL 50
SL SL
±0.00 SL
SL 150
120 SL SL
SL SL
±0.00
SL +0.10
SL 1301020
SL SL
-0.05 SL 80
350 SL
±0.00
250
SL -0.25 SL SL
SL SL SL
-0.05 120
±0.00 SL SL
SL -0.15 SL
SL -0.05
SL
SL
600 240
200 SL
NAIK SL
-0.05
KOLAM RENANG 150 SL
SL SL SL SL SL SL
RENC. SLOOF
SKALA 1 : 100
ASYRAF ARCHITECT
15 15
ELEVASI ±0.00 ELEVASI ±0.00
Muka Lantai Muka Lantai
TUL POKOK 4 - Ø12 TUL POKOK 4 - Ø12
ELEVASI -0.10
Lx = 450
15 20
ELEVASI ±0.00 ELEVASI ±0.00
Muka Lantai Muka Lantai
TUL POKOK 4 - Ø12
ELEVASI -0.05
Lx = 350
20 20
ELEVASI ±0.00
Muka Lantai TUL POKOK 4 - Ø16
ELEVASI -0.10
TUL PINGGANG 2 - Ø12
ELEVASI -0.15
DIMENSI 20 x 15
TAMAN
POSISI TUMPUAN LAPANGAN
SL
20
20
SLOOF 20x15 SLOOF 20x15
Lx = 300
470 230 K2 K2
KP KP 50
KP KP
150
120
K1 K2 K1
KP KP
K3 1301020
KP K3 80
350 250
KP KP
120
K2 K1
KP K3 K3 K2 K3
NAIK
600 240
200 KOLAM RENANG 150
KP K3 K2 KP KP KP
K1 K1 KP K2 K2
250 250
470 KP KP K2 K2
280
KP K2 K1
K3 KP KP 1020
350 250
290
VOID
K1 K2 K3
KP K3 KP
KP
240
200
VOID
TURUN
K3 K2 KP
20
20
ELEVASI +5.10 ELEVASI +5.10
+5.10 +5.10
+4.90 +4.90
ASYRAF ARCHITECT
RING BALK 20 x 15 RING BALK 20 x 15
+2.30
+2.20
BALOK 30 x 15
BALOK PEIL 40 x 20
DIMENSI 40 x 20
POSISI TUMPUAN LAPANGAN
40 40
BALOK
K1
20
20
TUL. ATAS 3 Ø19 3 Ø19
TUL. BAWAH 3 Ø19 3 Ø19
SENGKANG Ø8-10 Ø8-15
±0.00 ±0.00 ±0.00 ±0.00
BALOK 20 20
4 - Ø19 4 - Ø19
2 - Ø19
K2
20
20
-1.05 Ø8 - 15 (Begel) -1.05 Ø8 - 15 (Begel)
-1.15 -1.15
TUL. ATAS 2 Ø19 2 Ø19
Ø12 - 15 Ø12 - 15
Lantai Beton 5cm Lantai Beton 5cm
TUL. BAWAH 2 Ø19 2 Ø19
-1.55 Pasir Urug 5cm -1.55 Pasir Urug 5cm
Tanah Asli Tanah Asli SENGKANG Ø8-10 Ø8-15
80 60
Detail Penulangan K1 dan K2
SKALA 1 : 40
15
15
15
ELEVASI +5.55
15
+5.55 ELEVASI +5.10
+5.10
+5.35
+4.90
ASYRAF ARCHITECT
RING BALK 20 x 15
RING BALK 20 x 15
ELEVASI +2.60
+2.60
ELEVASI +2.60 +2.40
+2.60
+2.30
DIMENSI 15 x 15
BALOK 20 x 15
POSISI TUMPUAN LAPANGAN
K3
15
15
TUL. ATAS 2 Ø19 2 Ø19
TUL. BAWAH 2 Ø19 2 Ø19
SENGKANG Ø8-10 Ø8-10
Spesi
Rabat Beton
Muka +0.10
Tanah Urug DIMENSI 15 x 15
±0.00 Lantai POSISI TUMPUAN LAPANGAN
-0.10
-0.25 Urugan Sirtu Padat 15 15
±0.00 ±0.00 BALOK
KP
15
15
-0.25 Tanah Urug Pondasi Batu Kali
Urugan Tanah Kembali
-0.85 TUL. ATAS 2 Ø12 2 Ø12
4 - Ø19 -1.05 TUL. BAWAH 2 Ø12 2 Ø12
Tanah Asli
70
90
SENGKANG Ø8-10 Ø8-10
-1.05 Ø8 - 15 (Begel)
-1.15 Pasir Padat
Aanstampeng
Ø12 - 15
-1.55 Lantai Beton 5cm
Pasir Urug 5cm
Tanah Asli Detail Penulangan K3 dan KP
60 SKALA 1 : 40
1 2 3 4 5 6 7 8 ASYRAF ARCHITECT
C' 90 130
C
80
350 250
260
120
D' D
240
200
E' E
200 120 280 300 150 180 150 150
1530
250 250
470
280
1020
350 250
290
VOID
240
200
VOID
TURUN
KETERANGAN
BALOK 50 x 25
RENC. RING BALK +5.10 BALOK 40 x 20
SKALA 1 : 100
BALOK 30 x 15
BALOK 20 x 15
ASYRAF ARCHITECT
250 250
470
280
1020
350 250
290
VOID
240
200
VOID
TURUN
KETERANGAN
BALOK 50 x 25
RENC. RING BALK +5.55 BALOK 40 x 20
SKALA 1 : 100
BALOK 30 x 15
BALOK 20 x 15
ASYRAF ARCHITECT
20
BEGEL Ø8
40.Ø
40.Ø
4 - Ø12
BEGEL Ø8 - 10 BEGEL Ø8 - 15
15
Lx = 400
20
BEGEL Ø8
40.Ø
40.Ø
4 - Ø12
BEGEL Ø8 - 10 BEGEL Ø8 - 15
15
Lx = 350
DIMENSI 20 x 15
POSISI TUMPUAN LAPANGAN
BALOK 15 15
B4/RB
20
20
TUL. ATAS 2 Ø12 2 Ø12
Detail Penulangan Ring Balk (20x15) TUL. BAWAH 2 Ø12 2 Ø12
SKALA 1 : 30 SENGKANG Ø8-10 Ø8-15
1 2 3 4 5 6 7 8 ASYRAF ARCHITECT
C' 90 130
C
80
350 250
260
120
D' D
240
200
E' E
200 120 280 300 150 180 150 150
1530
250 250
470
A +2.30
280
0.12
1020
350 250
290
VOID
240
200
VOID
TURUN
P2
120
250
470 230
BV
P3
50
P2
P2 150
P2
120
1301020
J1
80
350 250
P3
PJ1 PJ1 120
J1
P1 NAIK
600 240
200 150
250 250
470
P2 P3 P2
PJ2
280
PG P2
1020
350 250
290
VOID
PJ1
240
J1
200
VOID
TURUN
100 80 70
5 30 60 5 5 70 5 5 60 5
5
B B
35
200
200
200
195
195
152
8
Pot. A-A A Pot. A-A A Pot. A-A A
120 115
5 55 55 5 5 50 5 50 5
5
B B B B
180
175
200
195
Pot. A-A A
Pot. A-A A
250
5 60 5 55 55 5 60 5
A C
12 12
5
5
B B
200
200
195
195
Pot. A-A A C Pot. C-C
180
5 80 5 85 5
Pot. B-B
A C
12 12
5
5
B B 50
5 40 5
60
Pot. B-B
A
5
12
30 5
B B
200
200
195
60
40
5
5
Pot. A-A A
60
5
120
250
470 230
50
150
120
1301020
80
350 250
120
NAIK
600 240
200 150
250 250
470
280
1020
350 250
290
VOID
240
200
VOID
TURUN
10
8
35 10 10
10
lubang udara
35 10
40
pvc Ø4'',
kemiringan 2%
15
15
15
15 25
208
110 Air Kotor
78
Endapan tanah urug
pasangan
bata, trasram
1pc : 2ps
30
10
Potongan A-A
1030 150 30 10
SKALA 1 : 30
pipa udara
5 gip Ø 1,5'', tinggi
10 2m menempel
dinding terdekat
pvc Ø4", ke
25 15
15
peresapan
105
5
40
10 50
5 5
40
15
105
5
A A
120
150
40
40
70
50
510
5
25 15
10
40
510
5
Detail Septictank pvc Ø4"
15
15
dari closet
SKALA 1 : 30
10
5 10 5
15 40 15 150 15 40 15
290
plate beton tebal
10cm. tulangan
silang rangkap
Ø12mm-10mm
ASYRAF ARCHITECT
12mm-10mm
besi tul. Ø
besi tul. Ø
pvc Ø4",
12mm-10mm dari septic tank tanah urug
60
pasangan bata
trasram 1pc : 2ps
besi tul. Ø
12mm-10mm
12mm-10mm
besi tul. Ø
100
50
Penulangan Tutup
SKALA 1 : 25
50
395
pv
cØ
4",
8 22
pvc Ø4",
dari septic tank
80
Buis Beton
50
Ø80 cm
tahu-tahu
ijuk melingkar
22 8
SKALA 1 : 25
ASYRAF ARCHITECT
120
PLAFOND
KACA KACA KACA
PLAFOND 100x100
250
100x100
PLAFOND
470 230 100x100
50
PLAFOND
100x100 PLAFOND 150
120 100x100
1301020
PLAFOND
100x100 80
350 PLAFOND
250
100x100
120
NAIK
600 240
200 KOLAM RENANG 150
470
PLAFOND 280
100x100
1020
PLAFOND
100x100 KACA PLAFOND
350 PLAFOND
100x100 RANGKA 100x100 250
HOLLOW 290
PLAFOND
100x100 240
200
VOID
120
250
470 230
50
150
120
1301020
80
350 250
120
NAIK
600 240
200 150
250 250
470
280
1020
350 250
290
VOID
240
200
VOID
TURUN
120
GRANIT GRANIT 250
60x60 60x60
GRANIT 150
120 60x60
1301020
GRANIT
60x60
GRANIT 80
350 60x60 250
KRAMIK 120
20x20
NAIK
600 240
200 150
GRANIT
470 60x60
GRANIT
60x60
280
1020
GRANIT
350 60x60 GRANIT GRANIT 250
60x60 60x60 290
VOID
240
200
VOID
TURUN
RENG
GENTENG
30°
LISTPLANK
TALANG PVC