CONTENTS
CHAPTER 1 PREPARATION AT BASE............................. 1
CHAPTER 2 MOBILIZATION.............................................. 12
Mechani
r)
Tool
○ ● ○ ○ ○
Disassembly
Tool
○ ● ○ ○ ○
Assembly
China National Logging Corporation CNLC/WL/BPSSOP-A0
BRIDGE PLUG SETTING SOP Page 3 of 53
Preparation at Base
1.1 Introduction
The Model "E-4" Wireline Pressure Setting Assembly is a device
in which the products of combustion are utilized for the gradual
development of force through pressure . This motive force
operates the various working parts of the Pressure Setting
Assembly in a sequence to ensure the successful setting of
Bridge Plugs, Retainer, Production Packers or Cement
Retainers.
In this manual, the CNLC made size-20 Pressure Setting
Assembly is taken as the reference tool for operation steps
description.
For selection of correct size plug setting tool and junk catcher
/gauge ring
Plug Type
equipment if required
Warning:
After the Firing Head and W.L.P.S.A. have been run and fired,
gas under very high pressure will be trapped inside the tools.
THIS PRESSURE MUST BE BLED OFF BEFORE
DISASSEMBLY IS BEGUN. FAILURE TO COMPLY WITH THE
FOLLOWING BLEEDING INSTRUCTIONS MAY RESULT IN
SERIOUS INJURY. Safety glasses, gloves and long sleeves
must be worn while bleeding pressure off of the W.L.P.S.A.
The W.L.P.S.A. should always be bled in a well ventilated
area.
bleeds off.
Chapter 2 Mobilization
Descriptions
SCOPE
After completing the equipment preparation, the crew loads the
equipment to the logging unit and travels to the well site. This
section describes the transportation requirement under CNLC
QHSE policy.
Shooting Panel
CCL
Shooting Bridle
Step 3: The field engineer shall ensure that the explosives are
properly packed and separated. Check that blasting cap
carrying cases are properly mounted and grounded, and
that the remnant box is grounded.
Step 5: The field engineer shall report the crew departure time
to the client and rig representative, and ensure
communication equipment is carried.
Step 6: All the vehicles must not exceed local driving speed limit
on the way to wellsite. Company driving speed limits as
listed below can be used as reference in most cases:
China National Logging Corporation CNLC/WL/BPSSOP-A0
BRIDGE PLUG SETTING SOP Page 16 of 53
Mobilization
1 Asphalt road 60 80 60
5 Inside town 30
6 Inside yard 5
China National Logging Corporation CNLC/WL/BPSSOP-A0
BRIDGE PLUG SETTING SOP Page 17 of 53
Preparation at Wellsite
SCOPE
This section describes the operating procedures after crew
arrival at wellsite and before running tool into the well.
STEP Senior
Engineer Operator
Operator
○ ● ○
Pre-Rigging Up
Preparations
○ ● ○
Plug setting tool
Preparations
China National Logging Corporation CNLC/WL/BPSSOP-A0
BRIDGE PLUG SETTING SOP Page 18 of 53
Preparation at Wellsite
Step 2: Hold spot safety meeting with client and tool pusher:
Step 2: Clean up rig area, cat walk for wiring or other objects
that might effect wireline operation.
Warning
Before working with explosives, set out signs reading,
“Danger Explosives” in the area, following all the safety
procedures described in the WCP SOP.
China National Logging Corporation CNLC/WL/BPSSOP-A0
BRIDGE PLUG SETTING SOP Page 21 of 53
Preparation at Wellsite
NOTE
The following steps describe the work procedures to
connect plug to the setting tool, however due to various type
of plugs possibly being run, the procedures for different
plugs may differ slightly from the description below.
China National Logging Corporation CNLC/WL/BPSSOP-A0
BRIDGE PLUG SETTING SOP Page 24 of 53
Preparation at Wellsite
WARNING
Before attaching cable head to the pressure setting
assembly, all the CNLC HSE regulations regarding explosive
operations must be followed
Chapter 4 Operations
Descriptions
SCOPE
This section describes the operating procedures of setting plug
downhole. For the step by step procedures of rigging up and
HSE precautions for operations with explosives, please refer to
SOP of openhole logging and WCP.
Operation Instructions ● ○ ○
China National Logging Corporation CNLC/WL/BPSSOP-A0
BRIDGE PLUG SETTING SOP Page 27 of 53
Operations
NOTE
It is strongly recommended that the first run into hole is the
junk catcher with the gauge ring to determine if the casing ID
is large enough to permit subsequent passage of the setting
tool. To achieve this, a gauge ring is run on the junk catcher.
In addition, the junk catcher serves to clean the well of junk
that might otherwise foul the tool and cause a premature set.
The gauge ring OD is, in all cases, slightly larger than the
setting assembly that is to be run, ensuring that the setting
assembly will pass through any tight spots in the casing that
can be passed by the gauge ring.
NOTE
In deviated wells (greater than 30o it may not be possible to
get a setting tool run on wireline past a downhole liner top.
Warn the client of this prior to running.
NOTE
If there is no short joint near the setting depth, you might
need to make a long interval correlation pass to contain the
short joint in log, this can be done by logging down while run
in hole.
China National Logging Corporation CNLC/WL/BPSSOP-A0
BRIDGE PLUG SETTING SOP Page 29 of 53
Operations
Step8: Go down again at least one joint below the setting depth,
log up slowly and stop the winch.
NOTE
The Baker slow set charge is designed to provide a slower
setting speed. A longer setting time generally increases the
reliability of the packing element, seal and slips. Setting
times for the slow set charge range from 10 to 200 sec. Do
not pull out early.
Step12: After confirming the plug has been set, log up at speed
of 1800ft/hr, finish the log after at least 5 joints.
China National Logging Corporation CNLC/WL/BPSSOP-A0
BRIDGE PLUG SETTING SOP Page 30 of 53
Operations
Warning
After the firing head and adapter have been run and fired,
gas under very high pressure will be trapped inside the tools.
THIS PRESSURE MUST BE BLED OFF BEFORE
DISASSEMBLY IS BEGUN. FAILURE TO COMPLY WITH THE
FOLLOWING BLEEDING INSTRUCTIONS MAY RESULT IN
SERIOUS INJURY. Safety glasses, gloves and long sleeves
must be worn while bleeding pressure off of the downhole.
The tools should always be bled in a well ventilated area.
Step15: Bring the tool to a open area, put down the tool so that
the bleeder valve facing up. Locate the bleeder valve
vent hole next to the bleeder valve; make sure this vent
hole is pointing away from all personnel. Use the
manual bleeder valve wrench or the correct size Allen
wrench to back out the stem until the pressure bleeds
off.
Step16: Rig down after the pressure has been bled off
completely,
China National Logging Corporation CNLC/WL/BPSSOP-A0
BRIDGE PLUG SETTING SOP Page 31 of 53
Post Job Wellsite Procedure
SCOPE
This section describes the operation procedures after rigging
down. The Field Engineer needs to deliver the field prints, and
crew need to prepare for leaving the wellsite.
STEP Senior
Engineer Operator
Operator
Post-Job Follow Up ○ ● ○
China National Logging Corporation CNLC/WL/BPSSOP-A0
BRIDGE PLUG SETTING SOP Page 32 of 53
Post Job Wellsite Procedure
Step1: Field engineer makes the field prints for the plug setting
job and delivers to the witness.
Step3: Back up all the logging data and shut down the power.
Chapter 6 Demobilization
Descriptions
SCOPE
After completing the job, the logging crew are ready to return
base. This section describes all the requirements for
demobilization.
Demobilization ○ ● ○
China National Logging Corporation CNLC/WL/BPSSOP-A0
BRIDGE PLUG SETTING SOP Page 34 of 53
Demobilization
6.1 Demobilization
Step1: Senior operator makes sure all items (tools and
service tools) are safely & tidily loaded and secured.
Number of
Modify
Modification Amender Date Approver Date
Modify Record
No.
Notify Form