WCM Score Sheet - Format
WCM Score Sheet - Format
Evaluation date:
WCM-SELF ASSESSMENT SCORE
Level Score
3.38
3.38
3.36
1.92
2.50
3.00
3.70
3.33
3.01
Sl Pillar name Description/Level Weightage
Total 34 295
1 2
30% 25%
0.2 0.4
0.1 0.2
0 to 6 7 to 55
0 to 6 7 to 55
>2 2
5% 4%
0 2% to 3%
15% 10%
Procedure present with defined frequency
Procedure present with defined frequency
and record and analysis and improvement
and record but no analysis
level is 30%+
System followed properly and with necessary System followed properly and with
necessary action. Minimum 2
action. Minimum 1 actions/month
actions/month
System followed properly 5S QCFI Certified
>60% >80%
0.6 0.8
0.3 0.4
56 to 80 81 to 93
56 to 80 81 to 93
<1 0
3% 1%
3% to 5% 5% to 7%
50% to 70% lessons taught and reviewed 70% to 90% Lessons taught and reviewed.
20% to 30% 30% to 40%
5S QCFI-JUSE Certified 3 30
>90%
1 2 20
0.5 1 5
94 to 100 1 10
94 to 100 2 10
0% 2 10
0% 3 15
50%+ Improvement 2 30
50%+ Improvement 3 30
50%+ Improvement 3 15
7 % and above 3 15
Cp=1.67+ 3 30
> 90% 4 20
> 95% 4 20
> 90% 4 40
>40% 3 30
Sr.No Description/Level Weightage 1
LEVELS 40 STRUGGLER
Machines
/equipment
s are laid
out as per
Wastes attributed to
availability
unplanned layout are
of
identified.People are trained
space.There
2 Plant Layout and teams are formed for
is no
consideratio improvements.Efforts are to
ensure layout conducive to
n of process
linear material flow
flow as part
of plant
layout
decisions
Predominan Management focus area to
tly reduce cost,eliminate
manual.Not movement related quality
seen as issues.teams organized to
3 Material Handling System
activity that identify handlinf issues at
can improve each stage i.e.material
productivity receipt,inspection,acceptanc
and Quality e,storage etc.
2 3 4
3 4 5
Significant deployment
Modern methods Complete delpoyment of
of automation for
restricted to some areas automation for handling'
handling
WORLD CLASS
Actual scroe 135
Maximum score 200
% 67.5
Sr.No Description/Level Weightage 1
Awareness to all,
Formation of zone,
zone council, Micro
1 Work Place management 15 checklist of each
employee for own
area given area. Initial
photographs taken
LEVELS 40 STRUGGLER
200
Unclean work
area with
Training /Awareness
clutter all
created at all
Swachh workplace 10 around and
levels.Initiatives for 1S
floor space
is being implemented
unclean with
oil,grimeetc
Maximum score
3 4 5
Standardisation of 5S
procedures have been 5min 5S activity is
Visual Management is undertaken using routine for
in place Initiatives for various tools e.g.job everyone.Continual
2S &3S are cycle charts,visual improvement in
implemented across cuessuch as productivity and
the company. signs,placards,display motivation is
score boards,check measured for PDCA
lists
8
6
6
8
4
5
5
5
3
5
5
4
5
8
9
7
7
Assesment Assessment
Level Score
4 60
3 30
3 15
3 30
3 4 5
Good Very Good Excellent
>60% >80% >90%
>60% >80% >90%
Assessment
Score
639
639
950
67.3
Sr.No Description/Level Weightage
LEVELS 60
No concept
ofprocess
capability
/process
10 Process Capability Assessment and Enhancement
performance
assessmente.
g.no control
charts
Process
Quality Plan
11 Process Control (Control
Plan) does
not exist
5 Quality Circles
A Number of Problem solved by QC / LQC (QC - 3, & LQC - 15 ) Ha
B System of working of QC / LQC with a regular changeover of M
Case Study Presentation during the Audit
(Completed Projects)-Review the Practical
C
implementation status during Audit i.e. Plant
Visit )
6 Quality Improvement Team
Two projects on Half yearly basis (Top &
Middle Management) on Automation ,Process
Control for Defect Free Product ,Plant
Efficiency ,Cost Control ,Wastage Control ,Energy
A
Saving or Fuel Saving & any Value added work
done for Plant Beautification and For World Class
Manufacturing ) by involving Multi Skill
Teammembers
11 Quality Assurance
Overall Product Quality Awareness among the
A Teammates (QA ,Mixing / Die /Oven /Stacker
/Packing Operator )
Knowledge of Lab Employees about Testing
B
Procedure & Specifications / Standards
Knowledge of Keypoint Operators, Technical
C Supervisory Staff & Teammates on Process and
Trouble Shooting
Involvement of Directors / Unit Head in Process &
D
Quality Checks
Use of Leak test apparatus in the plant with
E
records - Check leak % for Each Machine
0 to 6 7 to 55 56 to 80 81 to 93
0 to 6 7 to 55 56 to 80 81 to 93
>2 2 <1 0
5% 4% 3% 1%
2 3 4 5
7 to 55 56 to 80 81 to 93 94 to 100
Being planned one certificate Three Certificate Five Certificate
Average Good Very Good Excellent
<1.5% <1% < 0.5% 0%
30 to 60%of
machines/process
60 to 90% machines 90% or more
equipments are
/process equipments machines /process
Machines upgraded to meet the PLC,CNC
are equipments are
specifications.However machine controlled.Monitoring
PLC/CNCcontrolled,wit PLC/CNCcontrolled,wi
setting and monitoring is is enabled through
h self monitoring th self monitoring
manual. triggers on display
triggers/alarms/correc triggers/alarms/correc
panels and
cutoffs(Andon tions tions
System)
20 12.00
10 7
10 5
30 23.00
10 7
5 4
15 12
20 16.00
20 16
370 305
20 16
20 18
20 18
15 12
10 9
25 10
15 14
15 14
15 14
100 80
15 14
10 9
10 9
10 9
10 9
5 4
5 4
5 4
5 4
5 5
5 5
10 8
10 8
10 8
20 12.00
10 6
10 6
110 95.00
5 4
10 9
5 5
5 4
5 4
5 5
5 4
5 5
5 5
5 4
10 9
10 8
10 8
10 9
10 8
5 4
5
Assesment Assessment
Level Score
1 2 20
0.5 1 5
94 to 100 1 10
94 to 100 2 10
0% 2 10
0% 3 15
WORLD CLASS
Actual scroe 115
Maximum score 300
% 38.3
Sr.No Description/Level Weightage 1
Storage System 20
A RM / PM / WIP and FG 5
B Spare Parts 5
C Scrap Material 5
D Scrap Handling Procedure / Wastage Disposal Procedure 5
2 3 4 5
Assesment
Level
3 4 5
FIFO followed for few FIFO for substantial FIFO for WIP & A,B
items categary of items class inventory
0
Assessment
Score
30
30
15
75
150
50.0
Sr No. Description/Level Weightage 1
3 Kaizen 35
Kaizens Personal : Kaizen / 2 Month /
A 5
Person at all Level -At a glance
2% to 3% 3% to 5% 5% to 7% 7 % and above 3
3 4 5
Automation resulting
Mostly operations are
Mostly operations are automated and in reduction of
automated for variations,losses and
system data is used
controls improvement of
for reducing variation
operations.
Productivity is
measured and have
Concept of low cost improved to the
automation is Productivity is extent of 80% or
brought into small measured and have more of internal
group activity and the improved to the targets.Continuous
group uses varius extent of 50% or exercises undertaken
tools such as Kaizen more of internal for identification and
sheets,one point targets implementation of
lessons etc opportunities for
Productivity
improvement.
18.00
3.00
5.00
5.00
Assessment
Score
20
40
15
75
125
60.0
Sr.No Description/Level Weightage 1
No system of planned
maintenance.
7 Planned Maintenance 10 Equipments are
repaired as and when
breakdown occurs.
LEVELS 50 STRUGGLER
1 Autonomous Maintenance 25
Daily cleaning with LLF for 5 minutes
A during in presence of Supervisor & 5
Maintenance person
Planned maintenance
Planned maintenance system is in place.
Planned maintenance system is in place.
Adherence to schedule
system is in place.
Adherence to Adherence to schedule is is more than
schedule is 50%to 80% to 95%.Measures 95%.Machine
Planned Maintenance 80%.Step 1,2,& 3 of undertaken to eliminate breakdowns have
system is in place autonomous
repeat failures. Step 4&5 reduced by 5% in last 4
of autonomous one year. Step 6&7 of
maintenance are maintenance are autonomous
implemented and are implemented and are
maintenance are
taking place regularly taking place regularly in implemented and are
in the organization
the organization taking place regularly in
the organization
3 4 5
Visible throughout the
Visible in one area Visible in few areas
plant
18.00
4
3
4
9.00
1.00
3
5
9.00
9.00
Assessment
Score
20
30
15
20
20
40
40
185
250
74.0
Sr No. Description/Level WTG
LEVELS 30
6 Waste Management
1 2 3 4 5
< 50% lessons taught 50% to 70% lessons 70% to 90% Lessons 90%+ lessons taught
not in practice
and reviewed taught and reviewed taught and reviewed. and reviewed
Maximum sco
1 2 3 4 5
>60% >70% >80% >95% >98%
>20% >40% >60% >80% 100%
>20% >40% >60% >80% 100%
Value analysis of
manufacturing
activities for waste
Awareness on waste elimination is done
Waste reduction
and its effect on
through group activity project is meeting
No awareness on profitability.Prelimina
waste and its impact ry wages of waste and detailed action atleast 70 to 90% of Waste reduction is
on profitability and reduction plans are in place its target and is meeting target of 90%
Customer. implemented with no along with targets showing continuous and more.
and reviews.Project is improvement from its
tracking mechanism
meeting 50 to inception.
in place
70%and improvement
measures are
initiated.
Assesment Assessment
Level Score
4 40
3 30
3 30
Manpower Management
Skills Chart 2 2 4
Team photos 1 2 2
Accident log 2 4 8
Attendance Chart 1 2 2
Holiday Chart 1 2 2
Health & Safety
Regulations 1 5 5
Signs 3 4 12
First Aid 3 4 12
Fire equipment 3 4 12
Emergency exits 2 4 8
Machine Management
Machine Check Sheet 2 4 8
Oiling and lubrication check sheet 2 4 8
Tooling Identification/Shadow boards 2 4 8
Identification of Services 2 4 8
Electrical isolation 2 4 8
Transparent covers 2 3 6
Fluid Min/Max levels 2 4 8
Dials and indicators 3 4 12
Status lights 2 4 8
Material Management
Pick up and Drop off points 2 4 8
Min / Max levels 3 3 9
Part / material identification labels 4 3 12
Visible Planning system 3 2 6
Method
Standard Operating Procedure 3 4 12
Standardised Work Combination Table 2 2 4
Standardised Work Chart 3 2 6
Quality Instructions / samples 3 4 12
Quality Output
Customer Not Right First Time 2 3 6
Statistical Process Control 5 4 20
Run Chart of weight process wise. 4 2 8
Daily machine wise UCLc display 3 2 6
Weekly bar graph of UCLnp vs average UCLc 4 2 8
CV% 3 3 9
Internal Not Right First Time issues 3 3 9
Cost Output
Overall Equipment Effectiveness along with A%, P% and
5
Q% ( Use belt graph)
4 20
Downtime record 4 3 12
Overtime record 1 4 4
GTT study outcome stage wise 3 0 -
Rejected production 3 4 12
Rejected output can not be recycled 4 4 16
Wrapper Wastage 3 4 12
Not Right First Time costs 2 3 6
Delivery Output
Output plan V actual, including reasons 3 4 12
Delivery Schedule Adherence results 3 4 12
Reasons for Late / wrong delivery 3 4 12
Supplier delivery performance 3 4 12
Management Boards
Quality, Cost, Delivery (output measures) 3 4 12
Organisational Chart 1 4 4
Visual Management board 1 4 4
# All the faculties and observers, please give your weightage for all displays in the sca
Dear Manoj and Shailesh, as per your opinion, which one CM units will not like to display because of their inter
Marks in 0
Weightage# Total marks REMARKS
to 5 scale
2 3 6
1 2 2
4 4 16
1 4 4
1 3 3
1 4 4
1 4 4
1 4 4
4 4 16
3 4 12
2 4 8
2 4 8
1 3 3
1 3 3
3 3 9
2 2 4
3 3 9
3 4 12
3 4 12
4 3 12
3 3 9
4 4 16
5 3 15
4 4 16
3 2 6
2 3 6
1 4 4
1 2 2
5 2 10
4 2 8
3 2 6
4
2 8
3 2 6
2 2 4
3
4 12
5 2 10
3 4 12
3 2 6
3 4 12
2 2 4
3 4 12
2 2 4
2 4 8
3 4 12
2 4 8
4 4 16
5 4 20
3 2 6
5 4 20
5 5 25
5 4 20
5 4 20
5
4 20
5 4 20
5 3 15
5 4 20
4
4 16
4
4 16
5
4 20
3 4 12
4 4 16
2 4 8
4 4 16
5 4 20
2 3 6
3 4 12
5
4 20
5 3 15
5 4 20
3 4 12
5 4 20
5 4 20
5 4 20
5 4 20
4 4 16
1
2
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Annual Sales (Rs) = Total sales in rupees in a financial year
Total no of employees
Permanent employees + casual employees (on an average day) = Total No of Employees
Total no of hourly employees
Average number of casual workers on any given day
Ratio of direct labor to indirect labor
Direct labor is defined here as those workers whose direct involvement in the manufacturing
process leads to a value addition that can be attributed to the cost of manufacturing. All other labor
will be classified as Indirect labor e.g.; maintenance staff, material handling (shop floor, stores,
etc), housekeeping, supervisors, etc.
Total Inventory Holding
Turnover for current year
---------------------------------------------------- = Stock turns per year and
Value of total inventory holding at year end
Operating days per annum
------------------------------------ = Total inventory days
Stock turns per annum
Raw Material Holding
Turnover for current year
---------------------------------------------------- = Stock turns per year and
Value of Raw materials
Operating days per annum
------------------------------------ = RM inventory days
Stock turns per annum
WIP Holding
Turnover for current year
---------------------------------------------------- = Stock turns per year and
Value of WIP
Operating days per annum
------------------------------------ = WIP days
Stock turns per annum
Finished Goods Holding
Turnover for current year
---------------------------------------------------- = Stock turns per year and
Value of Finished Goods
Operating days per annum
------------------------------------ = Finished Goods days
Stock turns per annum
The sum of RM, WIP & FG inventory types will equal the value of total inventory holding.
First pass yield (%)
Average number of accepted products manufactured without rework
------------------------------------------------------------------------------------ x 100 = First Pass Yield %)
Average total production
Customer return rate:
Number of units returned by customers in year
-------------------------------------------------------- x 1,000,000 = Customer Return Rate PPM
Total number of units sold in year
OR If product variety is high, then the following may be used
Value of units returned by customers in year
------------------------------------------------------- x 1,000,000 = Customer Return Rate PPM
Value of units sold in year
Internal reject rate:
Number of manufactured units rejected through inspections in year
-------------------------------------------------------------------------------- x 100 = Internal Reject Rate
(%)
Total units manufactured in year
OR If product variety is high, then the following may be used
Value of manufactured units rejected through inspections in year
-------------------------------------------------------------------------------- x 100 = Internal Reject Rate (%)
Total value of units manufactured in year
Internal scrap rate:
Value of material scrapped during production in year
------------------------------------------------------------------- x 100 = Internal Scrap Rate (%)
Total value of material purchases in year
Note: This measure is based on the material purchase value and not the hypothetical selling or value
added price of the scrapped product/material.
Internal rework rate (%):
Number of manufactured units reworked as a result of defects in year
----------------------------------------------------------------------------------- x 100 = Internal Rework Rate
Total number of units manufactured in year
Note: Internal reworks are any internal off-line activity carried out to correct production tasks that
are not completed to specification during the course of the manufacturing process.
Example: One in ten bumpers painted at a paint shop are found to have poor finish due to dust
entering the paint booth. As a result, these bumpers do not progress directly from painting to
polishing, but rather to a rework area where the identified bumpers are corrected. This activity is a
rework process. In this case the firm would register a 10% rework rate for the painting of its
bumpers.
Supplier return rate:
Number of units returned to suppliers in year
---------------------------------------------------------- x 1,000,000 = Supplier Return Rate PPM
Total number of units purchased in year
OR If product variety is high, then the following may be used
Total value of units returned to suppliers in year
------------------------------------------------------------- x 1,000,000 = Supplier Return Rate PPM
Total value of units purchased in year
Average manufacturing throughput time:
This is defined as the average times taken to manufacture for the five major products of the
company. The time is calculated from the start of value adding process till the final packing (when
it is ready for dispatch).
Production time lost to machine/tool changeovers:
Total production time lost due to machine and
Tool changeovers in year
------------------------------------------------------- x 100 = Machine & tool changeovers as a % of
Total production time in year production time
Supplier lead time performance:
This is defines as the average time taken by the supplier from the receipt of the order to the delivery
of the goods. The average times for the 5 most important goods can be enclosed.
Customer delivery reliability:
Number of on time and in full deliveries to customers in year
-------------------------------------------------------------------------- x 100 = On time and in full
Total number of deliveries to customers in year deliveries (%)
Production time lost to machine/tool breakdowns:
Total production time lost due to machine and
tool breakdowns in year
------------------------------------------------------------------ x 100 = Machine & tool breakdowns as %
Total production time in year of production time
Note: This includes all production time lost due to machine and/or tool breakdowns and not only
the time taken to repair the machine/tool.
Predictive/preventative maintenance as a % of total maintenance time:
Total time spent for Predictive and/or
Preventive maintenance in year
------------------------------------------------------- x 100 = Predictive/Preventive Maintenance as % of
Total time spent on maintenance total maintenance
in year
Area of facility (Sq Mtr)
Total area of the facility = covered area + uncovered area
Covered Area of facility (Sq Mtr) = Total covered area of the facility which is directly or indirectly
used for production.
Number of different processes: Average no of processes to produce a product
Employee suggestions received:
Total number of employee suggestions received in year
------------------------------------------------------------------- = Number of suggestions received per
Average number of employees in year
Employee suggestions received:
Total number of employee suggestions implemented in year
------------------------------------------------------------------------ = Number of suggestions implemented per employee
Average number of employees in year
Expenditure on own R&D activities:
This includes all costs associated with new product development including R&D staffing and
facility costs. This figure excludes royalty payments to parent companies and/or licensors.
Contribution of new products to past year sales:
Total value of sales in year from products
released over past 12 months
---------------------------------------------------- x 100 = Contribution of new products to sales (%)
Total value of sales in year
Note: ‘New product sales’ can be defined as the sales derived from any product that is materially
different in application or form from products previously manufactured and sold by the firm, and
that carry a separate identity (i.e. product number).
Expenditure on IT (% of turnover):
Total spend on IT
-------------------------------------- x 100 = Expenditure on IT (% of turnover)
Total turnover in a year
Expenditure on Automation (% of turnover):
Total spend on Automation
-------------------------------------- x 100 = Expenditure on Automation (% of turnover)
Total turnover in a year