Atomic Energy ZC STP Tender Proposal 07.05.11
Atomic Energy ZC STP Tender Proposal 07.05.11
Atomic Energy ZC STP Tender Proposal 07.05.11
Sewage Generation per day is taken as 225 m3/day. Design of the plant is sized for 225m3/day with
20 hrs of operation and operating flow rate of 11.25 m3/hr. Peak flow considered is 33.75m3/hr.
Eventually the collection sump shall have the holding time calculated on the basis of the peak flow
with the downstream unit operations would be basing on the average flow rate only.
Odor - Objectionable
PH Values at 25 C - 6.0-8.5
Total Suspended Solids, mg/L - 150-200
Oil & Grease, mg/L - 20
Chemical Oxygen Demand, mg/L - 600-700
Bio Chemical Oxygen Demand, mg/L - 350-450
Odor - Odorless
PH Values at 25 C - 7.0-8.5
Total Dissolved Solids, mg/L - Subjective not under the
treatment scope
Total Suspended Solids, mg/L - <10
Chemical Oxygen Demand, mg/L - <130
Bio Chemical Oxygen Demand, mg/L - <20
pH : 6-7
BOD : 250-300
COD : 600-700 SEWAGE
TSS : 400-450
O&G : 50
Physical Treatment
PRIMARY
TREATMENT
Screening, Oil & Grease Removal
1
DEPT.OF ATOMIC ENERGY: ZIRCONIUM COMPLEX
SEWAGE TREATMENT PLANT
NIT REF: ZC/NFC/585/2011
PROPOSAL REF : EST/P8190/7235/11:07.05.11
The effluent generated at different sources of sewage generation shall be routed to a common collection
cum equivalisation sump with front end screen chambers for removal of grit / solids. The solid
substances trapped in the screen and grit chamber shall be periodically removed.
The Effluent from the collection shall be pumped to an UASB reactor for anaerobic digestion of sewage
especially the solids attributing higher organic pollutant loads.
The UASB shall be of followed by an aeration tank acting on attached growth technology. Due to higher
organic loading rate in the proposed aeration scheme the volume of the aeration tank is considerably
reduced than that of the conventional process and also the system can take care of the shock loads.
Aeration tank over flow will be lead to the secondary settling tank. The settling tank shall be installed
with clarifier mechanism with central driven type so as to ensure phase separation of solids and water.
The separated sludge shall be drained to sludge drying beds.
A Clarified water tank / treated water sump shall be provided for collection of treated water from the
settling tank , wherein Hypo chlorite dosing is effected for dis-infection and routed through tertiary
filters for further polishing.
The tertiary treatment shall have a feed pump, Pressure Sand Filter (PSF) and Activated Carbon Filter
(ACF). Water collected in the clarified water tank shall be pumped through the Pressure Sand Filter
(PSF) and Activated Carbon Filter (ACF) for final polishing of the treated water. Filtered water from the
ACF shall be directly utilized for gardening.
ENSYS CUSTOMER
ENGINEERING
EQUIPMENT / SYSTEM
2
DEPT.OF ATOMIC ENERGY: ZIRCONIUM COMPLEX
SEWAGE TREATMENT PLANT
NIT REF: ZC/NFC/585/2011
PROPOSAL REF : EST/P8190/7235/11:07.05.11
ENSYS CUSTOMER
3
DEPT.OF ATOMIC ENERGY: ZIRCONIUM COMPLEX
SEWAGE TREATMENT PLANT
NIT REF: ZC/NFC/585/2011
PROPOSAL REF : EST/P8190/7235/11:07.05.11
15. ELECTRICAL
MCC / OPERATING PANEL X
CABLING WITHIN THE SYSTEM BDY. X
CONNECTION AND TERMINATION X
20. COMMISSIONING X
& STABILISATION
01. ENGINEERING -
ENSYS
Complete Design of the plant is by the Ensys . The proposal follows the same in total compliance
and only areas which warrants input from ENSYS end the same is furnished with due back ups.
4
DEPT.OF ATOMIC ENERGY: ZIRCONIUM COMPLEX
SEWAGE TREATMENT PLANT
NIT REF: ZC/NFC/585/2011
PROPOSAL REF : EST/P8190/7235/11:07.05.11
EQUIPMENT
Besides for the kitchen waste residue an online grit chamber with oil trap is provided to remove the
floating oil matters, the emulsified oil matters get drained out in the system through settling scheme
provided.
Considering the site inward level and the nature of soil strata around the area, it is proposed to go in
for a collection of well of adequate volume to receive the sewage.
Tank is sized for 8 hours holding time with an operating flow rate of 11.25 m3 / hr & 3 hours
considering the peak flow rate of 33.75 m3/hr and also considering the inward level of 2.95
mts. It may be noted the consideration of the soil strata and the topography of the site induces
to minimize underground structures.
However considering the holding volume requirements, an additional collection cum equivalisation
tank is considered, whereas the same shall be positioned just above the ground level with regular
pumping of the sewage from the collection well.
With the above consideration an overall retention / holding time of 16 hours for the average flow
rate is maintained.
The tank shall be provided with an air mixing through coarse bubble diffusers with a tapping taken
from the main air blower for effective mixing of the solids with the sewage.
There shall be two sets of pumps to pump the sewage from the collection well to collection tank and
from collection tank to UASB as well.
5
DEPT.OF ATOMIC ENERGY: ZIRCONIUM COMPLEX
SEWAGE TREATMENT PLANT
NIT REF: ZC/NFC/585/2011
PROPOSAL REF : EST/P8190/7235/11:07.05.11
No.off Two [ 1 w + 1 s ]
Capacity 25 m3/hr
Type Submersible, Gutter Pump
Impeller Open with Carbide Tipped cutter
Head 10 mwc
Motor HP 2.0HP
Solid Handling Capacity 35 mm
RPM 2900
From Collection Tank to UASB reactor
No.off Two [ 1 w + 1 s ]
Capacity 11.25 m3/hr
Type Mono Block CI Pump,
Head 10 mwc
Motor HP 2.0HP
Solid Handling Capacity 15 mm
RPM 2900
The tank shall be provided with platforms and ladders with hand rails for inspection and visual
assessment.
The UASB reactor shall have a flare installed on the top for flaring of the bio gas generated out of
the digester. Considering the fact that the gas is not going to be utilized elsewhere in the facility, the
requirement of an additional gas holder is not warranted. The inherent volume available in the
digester top itself would suffice the buffer holding prior to being flared off.
6
DEPT.OF ATOMIC ENERGY: ZIRCONIUM COMPLEX
SEWAGE TREATMENT PLANT
NIT REF: ZC/NFC/585/2011
PROPOSAL REF : EST/P8190/7235/11:07.05.11
between the biomass, the air and water flowing through it. The fill media serves as a carrying
medium for the biomass and favors a uniform growth of biological slime due to its regular structure.
The tank shall have platforms and ladders with hand rails for inspection and visual assessment
which is under the scope of the customer.
Twin lobe blower along with motor and accessories having the following specifications shall be
provided for aeration of the effluent in the aeration tank.
BLOWER SYSTEM
No. of air blowers THREE [ 2 w + 1 s ]
Blower Capacity 120 m3/hr
Head 0.4 kg/cm2
Motor HP 5
7
DEPT.OF ATOMIC ENERGY: ZIRCONIUM COMPLEX
SEWAGE TREATMENT PLANT
NIT REF: ZC/NFC/585/2011
PROPOSAL REF : EST/P8190/7235/11:07.05.11
Essentially being a biological scheme and the requirement of the uninterrupted operation of the
blowers becomes imminent. Further with the advent of the requirement of partial aeration to be
given for the collection tank the consideration of three blowers with two in operation and one as
stand bye is considered.
One Number tank with partitions shall be constructed for collection of the clarified water
[Secondary Treated] from the clarifier and tertiary treated water from the filters.
The clarified water tank shall be provided with a Hypo chlorite dosing system for dis-infection and
allow the feed to pass through the tertiary treatment system. The dosing system shall be resting with
ENSYS.
8
DEPT.OF ATOMIC ENERGY: ZIRCONIUM COMPLEX
SEWAGE TREATMENT PLANT
NIT REF: ZC/NFC/585/2011
PROPOSAL REF : EST/P8190/7235/11:07.05.11
The tertiary treatment is a final polishing treatment given to the treated water duly disinfected across
the clarified water tank. As per the prevailing conditions since the reusability of treated water to the
maximum extent is to be ensured, the tertiary treatment provides the option of using the filtered
water across the tertiary filters to be used for gardening and usage in toilets for flushing. This also
bring down to a larger extent the intake of water from outside. On a long run would do justification
on the investment as well.
The tertiary treatment system comprise of a set of filters [ PSF–Pressure Sand Filter & ACF –
Activated Carbon Filter] with feed pumps and due interconnecting pipings, valves and fittings along
with electrical controls and backwashing provisions.
The treated water across the filter outlet could be directly taken for reuse sections with piping /
pumping arrangement as may be required by the CUSTOMER.
Two numbers centrifugal pump with motor and accessories shall be provided for pumping of treated
water through the PSF and ACF.
Pressure sand Filter and Activated carbon filter with sand and carbon media along with required
piping, valves and fittings are considered in scope of service.
PRESSURE SAND FILTER – Vertical
Number of filters One
Diameter 1200 mm
Height 2000 mm
Material of Construction MS EPOXY
Thickness Dish – 8 mm Shell 6 mm
Filter Medium Graded Sand
ACTIVATED CARBON FILTER - Vertical
Number of filters One
9
DEPT.OF ATOMIC ENERGY: ZIRCONIUM COMPLEX
SEWAGE TREATMENT PLANT
NIT REF: ZC/NFC/585/2011
PROPOSAL REF : EST/P8190/7235/11:07.05.11
Diameter 1200 mm
Height 2200 mm
Material of Construction MS EPOXY
Thickness Dish – 8 mm Shell 6 mm
Filter Medium Activated Carbon
One number operating cum MCC panel is considered in our scope of supply. The panel consists of
MCB’s, push buttons with indications, etc., for all the electrical equipments.
A double door vermin proof control panel with audio visual alarms and annunciator’s for display of
system failures. The power and control cabling within the system boundary is considered under the
scope of ENSYS.
The Electrical control Room shall be constructed for an estimated foot area of 30 Sq. mtr
[ approx.325 Sq ft ]. The room shall of conventional design with RCC roofing. Incidentally the
Operator and the Lab section would be a division made out of the same.
17 ERECTION - ENSYS
Erection of all the equipment / system considered forming a part of the scope of supplies shall be
resting with ENSYS.
It may be noted that complete interconnecting piping, pipe supports, valves, fittings for the whole
system from the point of collection sump to the filter outlet is resting with ENSYS.
The plant shall be operated for a defined span as indicated in the tender through our well trained
operational staff.
20. SPARES -
ENSYS
10
DEPT.OF ATOMIC ENERGY: ZIRCONIUM COMPLEX
SEWAGE TREATMENT PLANT
NIT REF: ZC/NFC/585/2011
PROPOSAL REF : EST/P8190/7235/11:07.05.11
Operational spares as may be required for the efficient operation of the STP is considered under the
purview of this tender.
11
DEPT.OF ATOMIC ENERGY: ZIRCONIUM COMPLEX
SEWAGE TREATMENT PLANT
NIT REF: ZC/NFC/585/2011
PROPOSAL REF : EST/P8190/7235/11:07.05.11
ELECTRICAL FEATURES
I) DISTRIBUTION BOARD
Distribution board shall be as per the following brief specification:
1. Make – Auto Switch / Power Controls
2. Non – Compartmentalized, floor mounting
3. Non-draw out (fixed type)
4. Single front
5. Sheet thickness – 14/16 gauge CRCA
6. Location – In door
7. Cable entry – Bottom
8. Busbars – Aluminium
Earth busbar – Aluminium
10. Incomer – 1 no.
Incomer shall consist of following components:
a. TPN-FSU – 1 no.
b. Ammeter with selector switch – 1 set
c. Voltmeter with selector switch – 1 set
d. Supply ON indication lamps – 3 nos.
11. DOL starter (upto 7.5 kW)
DOL starter shall consist of following components:
a. TPMPCB – 1no.
b. Power contactor – 1 no.
Push button with 1 element – Stop & Start
Ind.lamps – on & off
Note: Switchgear ratings for above starters shall be as per manufacturers standard selection chart.
13. Control Supply
SPMCBs – as required for instrument supply.
14. Capacitors– Not considered
15. Power wiring – minimum 2.5 sq.mm PVC insulated copper wire.
Control wiring – 1.5 sq. mm PVC insulated copper wire
Control supply – 1ph, 230 VAC obtained from phase and neutral.
16. Makes of components
12
DEPT.OF ATOMIC ENERGY: ZIRCONIUM COMPLEX
SEWAGE TREATMENT PLANT
NIT REF: ZC/NFC/585/2011
PROPOSAL REF : EST/P8190/7235/11:07.05.11
a. Switchgear – SIEMENS
b. Control gear – Teknic
c. Indicating meters – AE/IMP/RISHABH(L&T)
1 LOCAL PUSH-BUTTON STATION
Local push button stations are not considered, as drives are very near to Dist. Board. All
drives will be operated from the Distribution board.
III) CABLES
1. Make – Incab / Polycab
2. Power cables – PVC insulated, PVC sheathed, GI armoured, Copper conductor cables as
per IS 1554. Minimum power-cable size shall be 3c x 4-sq. mm
3. Control cables – PVC insulated, PVC sheathed, GI armoured, solid copper conductor
cables as per IS 1554. Control cable size shall be 1.5 sq.mm.
IV) OUTDOOR CABLE-ROUTING
Cables shall be run buried underground in un-constructed excavated and back-filled
trenches upto individual equipment.Civil work for trenches to be done by client.
1 EARTHING
Main below ground earth-grid, earth stations (pits, electrodes etc.) and two earth
connections near the distribution board shall be provided by the client.
Equipment earthing from distribution board to motors shall be provided by us using GI
wire / strip depending on motor rating.
VI) MOTORS
1. Make – Crompton / Siemens
2. Motors will be as per IS 325, totally enclosed, fan cooled squirrel cage induction motors.
Degree of protection will be IP55. Motors are suitable for supply voltage of 415 volts ±
10% and frequency of 50 Hz. ± 5%, and combined variation ± 10%.
13
DEPT.OF ATOMIC ENERGY: ZIRCONIUM COMPLEX
SEWAGE TREATMENT PLANT
NIT REF: ZC/NFC/585/2011
PROPOSAL REF : EST/P8190/7235/11:07.05.11
COLLECTION CUM
B2 EQUIVALISATION 5 X 5 X 3.5 LD
TANK
E. AERATION TANK 1
4.5 X 4.5 X 4.2 LD
SECONDARY
F. 1 4 DIA X 3.5 LD
SETTLING TANK
G. CLARIFIED WATER / 1
5 X 5 X 4 LD
TREATED WATER
TANK
H. SLUDGE DRYING 8
2 X 2 X 1.5
BEDS
1. Photographs shown in the proposal is for information purpose only. Actuals might vary depending on the site
conditions.
2. All dimensions specified is in meters unless otherwise specified
3. LD refers to Effective Liquid Depth
4. SWD refers to Sid Water Depth – Influent Point of Entry
5. DIA refers to diameters of the equipment / vessel considered
6. HOS refers to height on straight
14