A Prior To Erection (Rotating Equipments) : 2 Calibration of Testing / Checking Equipments
A Prior To Erection (Rotating Equipments) : 2 Calibration of Testing / Checking Equipments
A Prior To Erection (Rotating Equipments) : 2 Calibration of Testing / Checking Equipments
Sl.
Activity Description PLL LINDE/SECL EIL Documents
No.
d)Damage P I HP IMIR
a) Working Radius P I RW
b)Swing obstruction P I RW
SIGN.
NAME
DATE
Prepared & Checked by (PLL) Approved By (LINDE/SCEL) Reviewed & Approved by ( EIL)
Page 1 of 2
DOC No:- PLL/ROTATING/ITP/ 07 REV 0
Sl.
Activity Description PLL LINDE/SECL EIL Documents
No.
A ALIGNMENT
2 Grouting works
3 Flange alignment
b) Clearance P I S PLL/ROTATING/F-06
c) Concentricity P I S PLL/ROTATING/F-06
g)Boxing - Up P HP HP PLL/ROTATING/F-07
LEGEND-
W : Witness point
RW : Random Witness
HP : HOLD POINT
S : Surviellance
I : 100% Examination by Contractor
SIGN.
NAME
DATE
Prepared & Checked by (PLL) Approved By (LINDE/SCEL) Reviewed & Approved by ( EIL)