Quantity Surveying Activity Manual: 1 FO-ACAD-SDE-00X/20MAR2020/REV.0
Quantity Surveying Activity Manual: 1 FO-ACAD-SDE-00X/20MAR2020/REV.0
Quantity Surveying Activity Manual: 1 FO-ACAD-SDE-00X/20MAR2020/REV.0
ACTIVITY NO. 5: Detailed Quantity Survey of Non-Structural Parts of the Project (Electrical
System and Sanitary / Plumbing System)
1.5. Procedures/Instruction
The activity comprises of the following steps:
A. Electrical Quantity Takeoff
FO-ACAD-SDE-00X/20MAR2020/REV.0
Each company should provide detailed quantity survey of non-structural parts of the project under
electrical works and activities.
1.Review the specification to determine the requirements reflected in Electrical Plans. Things to
consider:
• Roughing-ins – Conduit Size (Sizes and Lengths), Wire (Types, Sizes and Lengths),
Outlets (Floor, wall, overhead), Switches (2-, 3-, and 4-way), Panel Boards, Breakers
(Size, number of each), Weatherproof control panels, power requirements
• Finish – Fixtures (Floor, wall, ceiling etc.), Mounting Requirements, Alarm System,
Time Clock, TV Outlet, Heaters
• Miscellaneous – Hook-up for various items from other trades (Motor, boilers, etc)
1.6.3. Observation
1.6.4. Conclusion
2
FO-ACAD-SDE-00X/20MAR2020/REV.0
1.6.5. Documentation
FO-ACAD-SDE-00X/20MAR2020/REV.0