0.
5 AS 1 DISTRIBUTION BAR
AT TOP (8mm @ 8''mm c/c) AS2
>0.1L 1 0.3L 1 0.3L 2
0.5 AS 2 >0.15L 1 >0.15L 2
LY
DISCONTINUOUS EDGE
EDGE BEAM P/2 P AS 1 INTERMEDIATE BEAM P
0.5AS 1 P/2
0.2LX
0.25L 1 0.25L 2
0.15L 1 BARS IN SHORTER DIRECTION SHALL BE PLACED
TORSION REINFORCEMENT AT CORNER
BELOW BARS PLACED IN THE LONGER DIRECTION
L1 L2 8Ø@200MM C/C BOTHWAY IN FOUR LAYERS
DISCONTINUOUS EDGE
DETAIL OF BAR IN
SIMPLIFIED RULES FOR BAR BENDING IN TWO WAY SLAB
SHORTER DIRECTION
0.2LY
LX
DETAIL OF BAR IN
LONGER DIRECTION
0.5 AS 1 DISTRIBUTION BAR
AT TOP (8mm @ 8''mm c/c) AS 2
0.1LX
>0.1L 1 0.25L1 0.25L2
0.5 A S 2 0.1LY
EDGE BEAM P/2 P AS 1 INTERMEDIATE BEAM P
0.5AS 1 P/2
0.2L 1 0.2L 2
0.15L 1
L1 L2
TYPICAL DETAIL OF A SLAB SPANNING
IN TWO DIRECTION
SIMPLIFIED RULES FOR BAR BENDING IN ONE WAY SLAB
0.23 2-10# Conti
GENERAL NOTES :-
0.23
1. All dimensions are in feet, unless other wise specified.
STP.8#@ 2.
3.
Do not scale drawings,only written dimensions shall be followed.
Discrepancies noted shall be brought to the notice of the consultant prior to
0.200M c/c execution.
4. This drawing is based on Ar. drawings.
5. The drawing shall be read in conjunction with other structural and
2-10# Conti architectural drawings
6. Clear cover to main reinforcement shall be:-
LINTEL -(9''X9'') 50mm in Footings,
40mm in Columns.
25mm in Beams.
CROSS SECTION 7.
20mm in Slabs
The mix of concrete shall be M-25 grade in R.C.C. Work.
8. Reinforcement shall be Fe -500 grade conforming to is 1786.
9. Min lap length shall be 49d, d is least diameter of bar in mm.
10. The period of curing should not be less than 10 days for all the concrete
components such as column,slabs, footings exposed to hot and dry weather
conditions.
11. For plastering and brick stone wall footings the period of curing should not
R.C.C. TWO WAY SLAB DETAILS:- R.C.C. ONE WAY SLAB DETAILS:- be less than 7 days.
12. Minimum period before striking all RCC work are as follow Vertical form
work to columns, walls, beams is 16-24 hours.Soffit form work to slabs(props to
SLAB NO. SHORT SPAN LONG SPAN DIST. R/F THICK GRADE SLAB NO. MAIN R/F DISTRIBUTION R/F THICK GRADE be re-fixed immediately after removal of form work) is 3 days. Soffit form work to
beams (props to be re-fixed immediately after removal of form-work) is 7 days.
13. Props to slabs:
S1 #8@6''C/C #8@6''C/C #8@8''C/C 6'' M-25 S3 #8@6''C/C #8@8''C/C 6'' M-25 Spanning up to 15' is 7 days
Spanning over 15' is 14 days
Props to beams and arches
Spanning up to 20' is 14 days
S2 #10@6''C/C #10@6''C/C #8@8''C/C 6'' M-25 Spanning over 20' is 21 days
PROJECT TITLE DRAWING TITLE CONTRACTOR
DESIGN BY: DRAWN BY: DATE
Mr. Parivesh Ji House SLAB REINFORCEMENT Doot House, Ajmer Road, Jaipur
B.G
DETAIL V.K.S 04_03_2022
Mob. 9309479913
SCALE DRG. NO.
N.T.S. STR/07/R0