Aggregate Base
Preparation of Subgrade
Temperature Limitations
Spreading
Compacting
Checking and Correcting Base
Priming
Method of Measurement
Basis of Payment
Subbase
Preparation of Subgrade
Temperature Limitations
Spreading
Compacting
Checking and Correcting Subbase
Method of Measurement
Basis of Payment
AGGREGATE BASE
An aggregate base is a dense-graded compacted aggregate that is normally
placed on a prepared subgrade in accordance with Section 105.03.
Materials used for aggregate bases are required to be size No. 53, Class D
or Higher in accordance with Section 904.
PREPARATION OF SUBGRADE
TEMPERATURE LIMITATIONS
Aggregate is not placed when the air temperature is less than 35° F or on a
frozen subgrade. Frozen aggregates may not be used.
SPREADING
10-1
COMPACTING
PRIMING
METHOD OF MEASUREMENT
BASIS OF PAYMENT
The accepted quantities of compacted aggregate base are paid for at the
contract unit price per ton, complete in place. The cost of placing,
compacting, water, and necessary incidentals is included in the costs of the
pay item. Payment is not made for material placed outside of a one to one
slope from the planned typical section. Replacement of pavement
damaged by the Contractor's operations is done at no additional payment.
SUBBASE
10-2
Coarse aggregate No. 8 used as an aggregate drainage layer is required to
consist of 100 % crushed stone or air cooled blast furnace slag and meet
the requirements of Section 904.
PREPARATION OF SUBGRADE
TEMPERATURE LIMITATIONS
Aggregate may not be placed when the air temperature is less than 35° F
or on a frozen subgrade. Frozen aggregates may not be used.
SPREADING
COMPACTING
10-3
CHECKING AND CORRECTING SUBBASE
METHOD OF MEASUREMENT
Subbase for PCCP or dense graded subbase is measured by the cubic yard
based on the theoretical volume to the neat lines as indicated on the plans.
The quantity indicated in the Schedule of Pay Items is adjusted if the
quantity is different by more than 2 % of the measured quantity.
BASIS OF PAYMENT
The accepted quantities of subbase for PCCP or dense graded subbase are
paid for at the contract price per cubic yard, complete in place. The cost
of compacting, water, aggregates placed outside neat lines as indicated on
the plans, and necessary incidentals is included in the cost of the subbase.
PREPARATION OF SUBGRADE
TEMPERATURE LIMITATIONS
Aggregate is not placed when the air temperature is less than 35° F or on a
frozen subgrade. Frozen aggregates may not be used.
SPREADING
DUST PALATIVE
METHOD OF MEASUREMENT
BASIS OF PAYMENT