100% found this document useful (1 vote)
209 views4 pages

Project Safety Checklist

This document provides a project safety checklist with 14 categories of mandatory safety compliances for construction projects. It includes requirements for signage, entry/exit controls, electrical safety, access ways, safety meetings, labor camp hygiene, fire safety, legal documents, lifting equipment inspections, site plans, emergency response, general rules, equipment documents, and scaffolding safety. Adherence to the criteria listed in the checklist is mandatory or must be followed to ensure workplace safety.

Uploaded by

Aejaz Mujawar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
209 views4 pages

Project Safety Checklist

This document provides a project safety checklist with 14 categories of mandatory safety compliances for construction projects. It includes requirements for signage, entry/exit controls, electrical safety, access ways, safety meetings, labor camp hygiene, fire safety, legal documents, lifting equipment inspections, site plans, emergency response, general rules, equipment documents, and scaffolding safety. Adherence to the criteria listed in the checklist is mandatory or must be followed to ensure workplace safety.

Uploaded by

Aejaz Mujawar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

PROJECT SAFETY CHECKLIST

SAFETY MANDATORY COMPLIANCES


SR.NO CATEGORY MANDATORY CRITERIA EXCEPTANCE CRITERIA

1 Display of Safety Signages Diplayed All around site, labour camp, entry exit point, store area, assembly area, as suggested by QHSE Dept. Mandatory

2 Control on Entry / Exit Points CCTV Camera/Register Entries & Dedicated Security Personel/ Complete & close fencing for labour camp & Site. Mandatory

• Industrial boards, sockets, plug tops provided in site & Buildings.


• RCCB 30mA fixed in labour camp, all 3 phase machines, and all main electrical boards of buildings.
• Double Insulated Electrical Cables used at site & Fixed at height safely
3 Electrical Safety • Earthing provided for DG, labour camp, all 3 phase machines, all main electrical boards of buildings.
Must

• Appropriate lights arrangement provide in site surrounding, building Staircases & work areas.
• Competent electrician provided for temporary electrical connection, maintenance & repairing work at site.

Access to work place for labors


4
& engineers Safe & marked Pedestrian Pathways provided to enter in site & each buildings. Must

• Mass TBT conducted every Saturday for all workers & site staff by Planedge Project Team on Safety.
5
No. Of Tool Box Meetings • Frequently TBT by QHSE officer & engineer during site visit. Mandatory
Conducted on site

• Dedicated person/Agency deployed for daily housekeeping of labour camp, cleaning toilets, removal & disposal of
waste. •Labour
Camp should not be allowed nearby or below under construction building.
• Tested & certified drinking water arrangement provided & water tank cleaned once every week.
• Insulated electrical connections provided & fixed at height safely.
6 LAbour Camp Hygine • Separate enclosed & Marked Toilet & bathroom facility provided for male & female. Mandatory
• Lights provided in labor camp surrounding, toilets, pathways, bathrooms& washing Areas.
• 1 toilet for every 10 workers at site & labour camp.
• Creach provided for children’s.
• Proper drainage system provided to prevent waste water stagnant & rain water.
• Pest control, fogging & Sanitization to be done on regular basis recored kept for evidence.

• Available @ Site, sales Office, Near DG, Store & Labor Camp, welding, cutting areas periodically filled & inspected for
operation.
7
Fire Safety & Fire extingushers • ABC type dry powder 6 Kg fire extinguisher to be provided. Must
on site & Labor Camp • Appropriate numbers of Filled sand buckets to be provided at site & labour camp

• Labour license for contractor (Above 50 workers).


• Workmen Insurance policy hard copy of contractors (RCC, BBM, Painting, Fabrication, POP, Waterproofing, Scaffolding
8
Legal Safety Documents erectors, Electrical, Plumbing etc.) available at site. Mandatory
complainces • BOCW registration hard copy of contractors (RCC, BBM,) available at site.
• BOCW registration of all workers to be done.
• Form No 11 of all lifting equipment’s (Mini lift, concrete lift/winch machine, man/material lift, lifting belts, D-shackles,
3rd Party Inspections for Lifting slings, scissorlift, boom lift,suspended scaffold etc.) available at site.
9 Equipments & Temporary • Frequency of testing of lifting equipment should be done every 6 month, Mechanical failure, change of Mandatory
Scaffolding works on site. location,installation of new machine.
•Lifting equipments are in good conditions.

• Printed, displayed on A01 Size at planedge site office.


10 Site Logistic Plan • Content of logistic plan should be as per checklist from QHSE Dept.
Mandatory

• Emergency siren available at planedge office.


• Stretcher available at contractor site offices.
11 Emergency Reponse plan • First Aid box as suggested by QHSE Dept should be available at planedge & all contractor site offices. Mandatory
• Nearby hospital type to be done and tie-up letter to be obtained from hospital for emergency services 24hours.
• Emergency evacuation plan & team to be displayed at planedge & contractor site offices.

•Workers below 18 years & above 60 years age prohibated to work at site.
•ID prrof (Aadhar card copy) of all workes avalible at site office.
•Covid 19 safety arranegment done ( Santization facilities,nose mask for
all, social distancing,signages , Qurantine Room ,body tempreture check gun etc).
•Toilet facilty provided for staff
12 General Site Safety Rules at site .Drinking water & toilet arranrgment done for workers at site.
Mandatory
•Appropriate Lightining Arrangments done in site premises, building staircases, pathways & dark areas
•.Debris chute provided in buildings.
•Form No 13
availible for Air Compressors.
Equipmets operated at site
( Trasit Mixer, Operator License, PUC Copy, RC card/Copy, Equipment insurance, form 11 for crane/hydra, equipment fitness
13 Hydra,Excavator,JCB) have certificate). Mandatory
valid documents maintained at •Medical Fitness certificate from certified doctor required for crane & lifitng equipment operators in form XXVIII.
site.
• Inspected & Certified by competent 3rd party consultant.
• Scaffolding structure supported with MS/GI round pipe & swivel clamps to
permanent bldg structure. • Fall Arrestor provided for
scaffolders while erecting & dismantling scaffold. •
Scaffolding structure covered with safety net from inside every 6mtr and outside with green net for BBM, Plaster works.
14
Scaffolding Safety ( H -Frame , •Metal Must
Cuplock) scaffold is away from electrical connection minimum 10 mtr.
•Suspended scaffold (Gandola) form no 11 avalible & fall arrestor provided for all workers.
•Bamboo Scaffold prohibated for use.

• Licensed Operator, Swing radios protection, Insurance of operator & Equipment.


• Inspected & certified by 3rd Party Consultant every 6 month, after repair, reinstallation, and any incident, Installation.
15 Cranes, Hoist & Elevators • Dedicated Signalman with Walkie talkie for tower cranes. Must
• Fall Arrestor for Tower crane operator with full body harness should be provided
•Medical certificate from certified doctor required for crane & lifitng equipment operators in form XXVIII.

• Underground utilities/services identifies prior to start work & necessary safety measures taken.
• Hard barricading done work for excavated area
Min 1.0 mtr or more from edge for excavated area as per soil
condition.
16 Trenching & Excavation •Access privuded with safe steps & handrails to enter in excavted area. Must
• Dewatering done in work area.
• Adjacent Structures protected from collision into excavated area.
• Safety net fixed or shoring, benching done to protect loose soil collision in excavated area.
• Underground utilities/services identifies prior to start work & necessary safety measures taken.
• Hard barricading done work for excavated area
Min 1.0 mtr or more from edge for excavated area as per soil
condition.
16 Trenching & Excavation •Access privuded with safe steps & handrails to enter in excavted area. Must
• Dewatering done in work area.
• Adjacent Structures protected from collision into excavated area.
• Safety net fixed or shoring, benching done to protect loose soil collision in excavated area.

Utilities disconnected & purged, Blast mat, warning signs, Blasting Govenment Permission, Traffic Control & Blasting
17 Demolishing & Blasting materila storage capcity, Competent certified Blaster
Must

•Dedicated Signal man provided for excavtor, JCB & Dumper with red flag & wistle.
•Reverse horn, seat belt, back mirror avalible for equipments.
•Valid Licensed operator avalible .
18 Backfilling Must

•No another
activity rather than backfilling in area alllowed

• 1st layer permanent safety net (6x10 mtr each net) fixed at 1st/2nd slab of buildings outer side with no gaps, damages.
• 2nd layer safety net (5x10 mtr each net) fixed at RCC work maximum below 2 floor of building outer side with no gaps,
damages.
19 Safety Net • Safety net should be PP with monofilament or single braded with monofilament (Make Garware/Tuff).
Must

• Test certificate required of safety nets, slab /beam brackets, and nylon/ PP rope.
•Fall test conducted with 90 kg bag .

Well anchored Nylon Rope of 16-20mm dia (Tuff Make) fixed @1.2 Mt height above slab & without sagging & multiple
20 Lifelines joints.
Must

• 1.5 sqmtr size Cutouts or less , on all building floors covered with fabricated heavy steel screen mesh and anchored as
All Lifts openings, Ducts, well.
21
Cutouts & MAnholes • 1.5 mtr size & above & lift ducts from inside covered with single braded safety net, U clamps & anchor fastener at Must
every 6mtr (2 floor alternate) starting from 1st floor of buildings.
• Lift Duct openings at each building floors covered with fabricated heavy steel screen mesh & anchored as well.

• Safety Helmet, Reflective jacket, Safety shoes to be provided for workers & staff.
• Clear Face shield provided for steel cutting fitter & grinder operator.
22
Avaliblity of PPE,s for • Face shield, leather apron & hand gloves, respiratory protection provided for welders. Must
workers,staff & visitors • Full body safety harness with double scaffolding harness provided workers working at height.
• Safety helmet provided for visitors at site entry gate.

23
Machine /Equipment Safety Bar cutting, bending machine, mini lift, concrete lift, etc all have safety guards for there rotating and hazardious parts Must
Guarding with good condition.

• Oxygen level should be 19.5-23.5 in confined space to be checked with oxygen test meter (i.e Drager)
• Safe Access & egress to be provided to enter in confined space.
Confined Space Safety (UGWT, • Dedicated Hole watcher (Hepler) with log sheet available at confined space area entry/exit point.
24 OHWT ,Underground sewage • Strict supervision & continues to be done in area. Must
line) • Emergency arrangements should be done prior to work.
• Appropriate illumination to be provided in confined space.

• Material (ACC ,waterproofig blocks) staked at miximum 1.5 Meter height safely .
•Building Staircases & pathways cleaned & clear from
obstructions. •Vehicular road, site premises
clear from obstruction & cleaned
25 Houskeeping •Plyoods, props,cement bags etc stacked safely & properly at site & buildings.
Must
•Store room material stacked safely in propers racks with
identification tag & in cleaned condition.
•Site offices are cleaned & arrangment in good condition done.
• Material (ACC ,waterproofig blocks) staked at miximum 1.5 Meter height safely .
•Building Staircases & pathways cleaned & clear from
obstructions. •Vehicular road, site premises
clear from obstruction & cleaned
25 Houskeeping •Plyoods, props,cement bags etc stacked safely & properly at site & buildings.
Must
•Store room material stacked safely in propers racks with
identification tag & in cleaned condition.
•Site offices are cleaned & arrangment in good condition done.

• Well ventilated storage room provided for chemical storage.


• MSDS displayed at storage area outside with fire Extinguisher.
• Appropriate PPE, s provided for workers as per MSDS for handling, usage of types of chemicals.
26 Chemical Safety •Metal Trays provided for chemicals drums, cans to avaoide spillage.
Must
• Empty drum, can & hazardous material waste disposed on outside site on regular intervels.

• Well ventilated gas cylinder storage room provided at site.


• Gas cylinder should be stored in vertical position in fabricated racks or trolleys.
• Gas cylinders should have safety guards at valve.
• Flash back arrestor should be provided for cylinder and hose pipe separate with ignition torch.
Gas welding & cutting Safety • Calibrated & tested gauge for cylinder & working pressure to be provided. •Fire
27 Hot Work Safety (Arc Welding , Extingusher avalible in work area. Must
Cutting) • Flammable & combustible material removed from workarea minimum 10 mtr away.
• Welding machines is in good condition & operated by certified welder.
• Fire Extinguisher & fire blanket available in work area.
• Leather Apron, Hand gloves, facesheild provided for welder & fitters.

• Worker (Height work, Tower crane ) should be stopped immediately in rain & high winds.
28
Safety in extreme weather •Electrical connection to be prorected from water & rain Must
conditions • Loose MS sheets
tied safely to fly off in high winds.

• Wooden ladders prohibited for use.


• MS & Aluminum ladder to be used of good condition
• Ladders should free for damages, oily steps, cracks, rust etc.
29 Ladder Safety • Ladder with handrail to be provided at under construction RCC slab, should be tied fixed at top & bottom with landing