100% found this document useful (1 vote)
234 views33 pages

QA.55b OJT Initial Licence Practical Training - Iss 01

Uploaded by

soufiane jouadi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
234 views33 pages

QA.55b OJT Initial Licence Practical Training - Iss 01

Uploaded by

soufiane jouadi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 33

BCT Aviation Maintenance

Ltd Building 100


East Midlands
Airport DE74 2SA
UK
Tel: +44 1332 813589
Fax: +44 1332 814956

UK.145.01119

Aircraft On-The-Job (OJT)


Practical Training Programme
&
Training Record
For EASA Part-66 Licensed
st
A/B1/B2 Engineers For 1 Aircraft Type Addition to
Licence

© Copyright BCT Aviation Maintenance Ltd 1


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Trainee/Applicants Details
Full Name: Mr SOUFIANE JOUADI

Date of birth: 26/SEPTEMBER/1969

Place of birth: CASABLANCA / MOROCCO

Licence Number: …………………………………………….

Aircraft type including engine: ……………………………....

Licence rating being applied for: BOEING 777-200/300

Date from: …………………. To: ………...…………………

Location (s): LAGOS, NIGERIA.

© Copyright BCT Aviation Maintenance Ltd 2


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

1. INTRODUCTION

This OJT programme is designed for EASA Part 66 A, B1 & B2 aircraft engineering licence
holders to provide practical training elements to allow the initial granting of an EASA Part-66
aircraft type rating. This training meets the requirements of EASA Part-66, Annex 3.

This document is a derivative of the QA.55 series of documents designed for OJT training.

Training tasks must be carried out on an aircraft. Use of a simulator or other appropriate
equipment such as Computer Based Training (CBT) facilities, system mock-ups and rigs must be
on simulators or systems approved by the Authority for that purpose.

The training programme will generally take between 8 and 16 weeks as determined by the
Training Manager in consultation with the Quality Manager. The duration of training will be
dependent on the experience of the applicant, the status and availability of aircraft, aircraft
systems and other maintenance or training systems.

The training programme includes:


 Routine checks
 Familiarisation with the operation of applicable systems
 Familiarisation with applicable special tools
 Specific maintenance procedures
 Fault diagnosis
 Use of appropriate documentation
 Health and safety requirements and aircraft working safety procedures, practises
and requirements will be adhered to throughout

BCT’s Training Manager will select the tasks for the practical training from the ATA Chapters
listing.

Tasks regarded as not applicable should be annotated as such with ‘N/A’.

Training tasks listed must be signed and stamped by the approved supervisors/assessors upon
satisfactory completion.

2. LEVEL OF EXPERIENCE

An engineer without any previous type rating/s will be required to successfully complete:

a) A Part-147 theoretical type course and examination – plus:


b) A Part-147 approved practical training and assessment - plus:
c) A Mandatory On Job Training (OJT) and assessment. This shall be carried out
with an appropriately approved Part-145 or Part-147 organisation.

© Copyright BCT Aviation Maintenance Ltd 3


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Practical Training:
Is defined as Aircraft visits within the scope of the approved EASA Part-147 approved TNA.

On Job Training (OJT):


Objective - The objective of OJT is to gain the required competence and experience in performing
safe maintenance.
OJT shall cover a cross section of tasks acceptable to the competent authority. The OJT tasks to be
completed shall be representative of the aircraft and systems both in complexity and in the
technical input required to complete that task under one-to-one supervision. While relatively
simple tasks may be included, other more complex maintenance tasks shall also be incorporated
and undertaken as appropriate to the aircraft type.
Each task shall be signed off by the student and countersigned by a designated trainer/supervisor.
The tasks listed shall refer to an actual job card/work sheet, etc.

Certificate:
BCT’s Quality Manager will issue a certificate to the individual on successful completion of the
Part 145 OJT training.

Notes:
Trainer and Supervisor are considered the same for the purpose of this document.

The OJT should cover at least 50 % of the tasks listed from page 6 onwards. Tasks reflect Appendix II to AMC to
Part-66. Tasks should be selected among those applicable to the type of aircraft and licence (sub) category applied
for. Other tasks than those in the Appendix II may be considered as a replacement when they are relevant. These must
be recorded on the last page of this document. Typically, in addition to the variety and the complexity, the OJT tasks
should be selected because of their frequency, safety, novelty, etc.

Up to 50 % of the required OJT may be undertaken before the aircraft theoretical type training starts.

The trainer column must be signed and stamped by an engineer holding the actual aircraft type with the appropriate
engine on their licence and be in possession of a current authorisation on that aircraft/engine combination.

The assessor block at the base of each page must be completed by approved assessor named in MOE section 1.

It is recommended that copies are always kept of completed OJT books when submitted.

© Copyright BCT Aviation Maintenance Ltd 4


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Trainee/Applicant Details:

Trainee/Applicant Full Initials Signature & Date Licence Number


Name
Mr SOUFIANE JOUADI

Trainer/Supervisor/Assessor/Quality Manager - Stamp identification Table

All persons verifying work in this practical training record must complete an entry in the table
below

Full Name Signature & Date Initials Stamp Licence Number

© Copyright BCT Aviation Maintenance Ltd 5


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS: CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy
00 B1 or Card number or Task Reg Initials Initials Maintenance
B2 Description Manager Initials
13/08/2018 Familiarisation with ETOPS, maintenance B1 B2 Usage of Technical Documentation 5N-BVE
ETOPS
documentation and standard practices
14/08/2018 General external familiarisation B1 B2 A/C Walk Around 5N-BVE

13/08/2018 Familiarisation with cockpit layout & safety B1 B2 Familiarization with Cockpit Layout 5N-BVE
checks
13/08/2018 Aircraft safety procedures and practices. B1 B2 Aircraft Health and Safety Procedures 5N-BVE
Overview
Health & safety procedures
13/08/2018 Work environment (hangar and line) health & B1 B2 Work Environment Health and Safety 5N-BVE
Procedures Overview
safety procedures
CHAPTER 05 – Time Limited &
Maintenance Checks
‘B’ or ‘C’ Check (Transport Category Aircraft) B1 B2

Assist carrying out a scheduled maintenance B1 B2


check i.a.w. AMM
15/08/2018 Review Aircraft maintenance Log for correct B1 B2 Aircraft Maintenance Log Review for 5N-BVE
Correct Completion
completion
15/08/2018 Review records for compliance with B1 B2 AD Review Records for Compliance 5N-BVE
airworthiness directives
15/08/2018 Review records for compliance with B1 B2 Component Life Limits Review for 5N-BVE
Record Compliance
component life limits
16/08/2018 Carry out Daily check: B1 B2 Daily Check Performed 5N-BVE

I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 6


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
10/08/2018 Carry out 48 Hr/Weekly check B1 B2 Weekly Check C/O 5N-BVE

10/08/2018 A-check: Carry out A-check tasks B1 B2 Aircraft Fuselage Exterior GVI 5N-BVE

11/08/2018 Procedure for inspection following heavy B1 B2 Heavy Landing Inspection Check 5N-BVE
landing
11/08/2018 Procedure for inspection following lightning B1 B2 Lightning Strike Inspection Check 5N-BVE
strike

CHAPTER 06 – Dimensions & Areas


20/08/2018 Locate component(s) by zone/station number B1 B2 Familiarization with Access Panel 5N-BVE
Locations
21/08/2018 Perform symmetry check B1 B2 Aircraft Symmetry Check 5N-BVE

21/08/2018 Lifting and Shoring B1 B2 Aircraft Lifting 5N-BVE

20/08/2018 Assist in: Jack aircraft nose wheel B1 Jacking Aircraft at Point D 5N-BVE

20/08/2018 Jack complete aircraft B1 Lift Airplane with Axle Jacks 5N-BVE

Sling or trestle major component B1

I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 7


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
CHAPTER 08 - Levelling/Weighing
01/10/2018 Level aircraft B1 Aircraft Levelling Maintenance 5N-BUU
Practices
Weigh aircraft B1
02/10/2018 Prepare weight and balance amendment B1 Weight and Balance Amendment 5N-BUU
Preparation
02/10/2018 Check aircraft against equipment list B1 Aircraft Equipment List Check 5N-BUU

CHAPTER 09 - Towing and Taxiing


01/10/2018 Prepare aircraft for towing B1 Towing Points /Limitations of 5N-BUU
Steering Angle
01/10/2018 Be part of aircraft towing team B1 Towing Team - Procedures 5N-BUU

03/10/2018 Tow aircraft B1 Aircraft Towing 5N-BUU

CHAPTER 10 – Parking and Mooring


01/10/2018 Tie down aircraft B1 Undercarriage Mooring Locations 5N-BUU

03/10/2018 Park, secure and cover aircraft B1 Normal parking procedures 5N-BUU

03/10/2018 Position aircraft in maintenance dock B1 Position dock for APU access 5N-BUU

CHAPTER 11 – Placards and Markings


05/10/2018 Check aircraft for correct placards B1 Aircraft Exterior Placards check 5N-BUU
I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 8


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
05/10/2018 Check aircraft for correct markings B1 Exterior Aircraft Correct Markings 5N-BUU
Check
CHAPTER 12 - Servicing
01/02/2019 Refuel aircraft B1 Aircraft Pressure Refuel 5N-BVE

01/02/2019 Defuel aircraft B1 Aircraft Defuel C/O 5N-BVE

02/09/2019 Carry out tank to tank fuel transfer B1 Tank to Tank Fuel Transfer 5N-BVE

15/12/2018 Check/adjust tyre pressures B1 LG Tire Pressure Check/Servicing 5N-BVE

01/02/2019 Check/replenish oil level B1 APU Oil Servicing 5N-BVE

01/02/2019 Check/replenish hydraulic fluid level B1 Fill Hydraulic Reservoir with a 5N-BVE
Hand Pump
20/02/2019 Check/replenish accumulator pressure B1 Brake Accumulator Pressure 5N-BVE
check/servicing
20/02/2019 Charge pneumatic system B1 Pressurize Portable Water System 5N-BVE

21/02/2019 Grease aircraft B1 Aileron & Flaperon Lubrication 5N-BVE

02/01/2019 Connect ground power B1 B2 Primary/Secondary GPU Connection 5N-BVE


01/02/2019 Service toilet/water system B1 Potable Water Servicing 5N-BVE

01/02/2019 Perform pre-flight/daily check B1 Pre-flight/Daily Check C/O 5N-BVE

CHAPTER 18 – Vibration & Noise


Analysis
Analyse noise spectrum B1 B2 N\A
I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 9


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
Analyse engine vibration B1 B2

CHAPTER 21 – Air Conditioning


13/02/2019 Replace flow control valve B1 Upper Flow Control SOV 5N-BUU
Removal/Installation
13/02/2019 Replace outflow valve B1 CPOV Replacement 5N-BUU

13/02/2019 Replace safety valve B1 Positive Pressure Relief Valve 5N-BUU


Removal/Installation
14/02/2019 Replace vapour cycle unit B1 Condenser/Heater Replacement 5N-BUU

14/02/2019 Replace air cycle unit B1 ACM Removal/Installation 5N-BUU

14/02/2019 Replace cabin blower B1 Upper Recirculation Fan Replacement 5N-BUU

15/02/2019 Replace heat exchanger B1 Dual Heat Exchanger Replacement 5N-BUU

15/02/2019 Replace pressurisation controller B1 Cabin Pressure Controller Replacement 5N-BUU

15/02/2019 Clean outflow valves B1 Clean/Inspect FWD Outflow VLV 5N-BUU

16/02/2019 Check operation of air conditioning/heating B1 Operational Test of Cabin Temp 5N-BVE
system Controller (CTC)
16/02/2019 Check operation of pressurisation system B1 B2 Pressurisation System Check 5N-BVE

16/02/2019 Troubleshoot faulty system B1 B2 Failure of the Overboard Exhaust 5N-BVE


Valve

CHAPTER 22 – Auto Flight


Install servos B2 N/A
I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 10


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
Rig bridge cables B2 N/A
Replace controller B2 N/A
Replace amplifier B2 N/A
Replacement of the auto flight system LRUs B2 N/A
for fly-by-wire aircraft
Check operation of auto pilot B2 N/A
Check operation of auto-throttle/auto-thrust B2 N/A
Check operation of yaw damper B2 N/A
Check and adjust servo clutch B2 N/A
Perform autopilot gain adjustments B2 N/A
Perform mach trim functional check B2 N/A
Troubleshoot faulty system B2 N/A
Check flight management systems B2 N/A

CHAPTER 23 - Communications
Replace VHF com unit B2 N/A
Replace HF com unit B2 N/A
Replace existing antenna B2 N/A
Replace static discharge wicks B2 N/A
Check operation of radios B2 N/A
I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 11


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
Perform antenna VSWR check B2 N/A
Perform Selcal operational check of B2 N/A
passenger address system
Functionally check audio integrating system B2 N/A
Repair co-axial cable B2 N/A
Troubleshoot faulty system B2 N/A

CHAPTER 24 – Electrical Power


Charge lead/acid battery B1 B2 N/A
17/10/2018 Charge ni-cad battery B1 B2 NI-CAD Battery Charging 5N-BUU
17/10/2018 Check battery capacity B1 B2 Battery Capacity Check 5N-BUU

Deep-cycle ni-cad battery B1 B2


17/10/2018 Replace integrated drive/generator /alternator B1 B2 Remove/Install of a Back-up 5N-BUU
Generator
18/10/2018 Replace switches B1 B2 Switch Replacement 5N-BUU

18/10/2018 Replace circuit breakers B1 B2 Circuit Breaker Replacement 5N-BUU

18/10/2018 Adjust voltage regulator B1 B2 Power Regulation Adjustment 5N-BUU

19/10/2018 Change voltage regulator B1 B2 APU Electrical Load Control Unit 5N-BUU

Amend electrical load analysis report B1 B2


19/10/2018 Repair/replace electrical feeder cable B1 B2 Electrical Feeder Cable Replacement 5N-BUU
I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 12


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
20/10/2018 Troubleshoot faulty system B1 B2 Failure of the Generator Control 5N-BUU
Unit 1
20/10/2018 Perform functional check of integrated B1 B2 Operational Test of a Back-up 5N-BUU
drive/generator/alternator Generator System
Perform functional check of voltage regulator B1 B2
CHAPTER 25 – Equipment Furnishings
10/01/2019 Replace carpets B1 Aisle Carpet Replacement 5N-BVE

10/01/2019 Replace crew seats B1 Captain Seat Replacement 5N-BVE

10/01/2019 Replace passenger seats B1 PAX Seat Replacement 5N-BVE

11/01/2019 Check inertia reels B1 Captain Harness Inertia Reel Check 5N-BVE

11/01/2019 Check seats/belts for security B1 PAX Seats Check for Security 5N-BVE

11/01/2019 Check emergency equipment B1 B2 Emergency Equipment Check 5N-BVE


12/01/2019 Check ELT for compliance with regulations B1 B2 ELT Inspection Check 5N-BVE

Repair toilet waste container B1


12/01/2019 Repair upholstery B1 Replace Upholstery 5N-BVE

12/01/2019 Change cabin configuration B1 Cabin Configuration Change 5N-BVE

13/01/2019 Replace cargo loading system actuator B1 FWD Cargo Door PDU Replacement 5N-BVE
13/01/2019 Test cargo loading system B1 FWD Cargo Loading System Test 5N-BVE
13/01/2019 Replace escape slides/ropes B1 FWD PAX Door Escape Slide 5N-BVE
Replacement

I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 13


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
CHAPTER 26 – Fire Protection
15/01/2019 Check fire bottle contents B1 Eng No1 Fire Bottle Check 5N-BUU

15/01/2019 Check/test operation of fire/smoke detection B1 B2 Fire/Smoke Detection Sys Test Operation 5N-BUU
& Test
and warning system
15/01/2019 Check cabin fire extinguisher contents B1 Cabin Fire Extinguisher Content Check 5N-BUU

16/01/2019 Check lavatory smoke detector system B1 Lavatory Smoke Detector Sys Check 5N-BUU

27/01/2019 Install new fire bottle B1 Eng No1 Fire Bottle Replacement 5N-BUU

27/01/2019 Check cargo panel sealing B1 FWD Cargo Panel Sealing Check 5N-BUU

27/01/2019 Replace fire bottle squib B1 Eng No1 Fire Bottle Squib Replacement 5N-BUU

29/01/2019 Troubleshoot faulty system B1 FWD Lavatory Smoke Detector Inop 5N-BUU

29/01/2019 Inspect engine fire wire detection systems B1 B2 Eng No1 Fire Wire Detection Sys 5N-BUU
Inspection

CHAPTER 27 – Flight Controls


07/02/2019 Inspect primary flight controls and related B1 Primary Flight Controls & Components 5N-BVE
Inspection
components i.a.w. AMM
07/02/2019 Extending/retracting flaps & slats B1 TE & LE Flaps & Slats Operational Test 5N-BVE

07/02/2019 Replace horizontal stabiliser B1 Horizontal Stabiliser Replacement 5N-BVE

09/02/2019 Replace spoiler/lift dumper B1 Ground Spoiler Replacement 5N-BVE

09/02/2019 Replace elevator B1 LH Elevator Replacement 5N-BVE

I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 14


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
Deactivation/reactivation of aileron servo B1 N/A
control
15/02/2019 Replace aileron B1 Aileron Replacement 5N-BVE

15/02/2019 Replace rudder B1 Rudder Replacement 5N-BVE

16/02/2019 Replace trim tabs B1 Rudder Tab Replacement 5N-BVE

16/02/2019 Install control cable and fittings B1 Horizontal Stab Cable & Fitting 5N-BVE
Replacement
16/02/2019 Replace slats B1 LH Slat No1 Replacement 5N-BVE

17/02/2019 Replace flaps B1 TE Flaps Replacement 5N-BVE

20/01/2019 Replace powered flying control unit B1 Flap Ball Screw Replacement 5N-BVE

21/02/2019 Replace flap actuator B1 Flap Actuator Replacement 5N-BVE

07/01/2019 Rig primary flight controls B1 Horizontal Stabiliser Adjustment 5N-BVE

11/12/2018 Adjust control cable tension B1 Horizontal Stab Control Cable Tension 5N-BVE
Adjustment
10/12/2018 Check control range and direction of B1 Primary Flight Control Range & 5N-BVE
Direction Control
movement
07/12/2018 Check for correct assembly and locking B1 TE Flaps Inspection 5N-BVE

05/12/2018 Troubleshoot faulty system B1 B2 Slat Skew Sensor 13B Failed 5N-BVE

01/12/2018 Functional test of primary flight controls B1 Primary Flight Controls Functional Test 5N-BVE

02/12/2018 Functional test of flap system B1 Flap System Operational Test 5N-BVE
I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 15


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
Operational test of the side stick assembly B1 N/A
10/10/2018 Operational test of the THS B1 THS Operational Test 5N-BUU

10/10/2018 THS system wear check B1 THS System Wear Check 5N-BUU

CHAPTER 28 – Fuel
27/01/2019 Water drain system (operation) B1 Fuel System Components 5N-BVE
Location/Operation
28/01/2019 Replace booster pump B1 Removal/Installation of a Fuel Pump 5N-BVE

Replace fuel tank cells B1


01/09/2018 Replace/test fuel control valves B1 Fuel Control Valves 5N-BVE
Replacement/Test
01/09/2018 Replace magnetic fuel level indicators B1 Fuel dipstick Replacement 5N-BVE

01/09/2018 Replace water drain valve B1 Water Drain Sump Drain Valve 5N-BVE
Replacement
03/09/2018 Check/calculate fuel contents manually B1 Fuel Content Manual Calculation 5N-BVE
03/09/2018 Check filters B1
Flow check system B1 Fuel Boost Pump High Flow Mode 5N-BVE
05/09/2018 Check calibration of fuel quantity gauges B1 B2 FQIS Operational System Test 5N-BVE

06/09/2018 Check operation feed/selectors B1 B2


10/08/2018 Check operation of fuel dump/jettison system B1 Review of Fuel Jettison System 5N-BVE

10/08/2018 Fuel transfer between tanks B1 Fuel Transfer Between L/H & R/H 5N-BVE
Wings
I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 16


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
05/08/2018 Pressure re-fuel (manual control) B1 Pressure Re-fuel with Manual 5N-BVE
Control.
31/08/2018 Deactivation/reactivation of the fuel valves B1 Cross-feed Operation (MEL). 5N-BVE
(transfer de-fuel, X-feed, re-fuel)
25/08/2018 Troubleshoot faulty system B1 B2 Fuel Pumps. Left Wing Fuel Pump 5N-BVE
Fwd System Malfunction.

CHAPTER 29 - Hydraulics
01/02/2019 Replace engine driven pump B1 ENG No1 EDP Removal/Installation 5N-BVE

01/02/2019 Check/replace case drain filter B1 ENG No1 Case Drain Filter Replacement 5N-BVE

01/02/2019 Replace standby pump B1 Left System ADP Replacement 5N-BVE

02/02/2019 Replace hydraulic motor pump/generator B1 RAT Hydraulic Pump/Generator 5N-BVE


Replacement
02/02/2019 Replace accumulator B1 Hydraulic Accumulator Replacement 5N-BVE

02/02/2019 Check operation of shut off valve B1 EDP SOV Operation Check 5N-BVE

03/02/2019 Check filters/clog indicators B1 Differential Pressure Indicator Check 5N-BVE

03/02/2019 Check indicating systems B1 Hydraulic Temperature Indication 5N-BVE


System Test
03/02/2019 Perform functional checks B1 RAT System Test 5N-BVE
05/02/2019 Troubleshoot faulty system B1 Fault of an Air Driven Pump 5N-BVE
05/02/2019 Pressurisation/depressurization of the B1 Pressurization/Depressurisation of 5N-BVE
Hydraulic System
hydraulic system
PTU operation B1 N/A

I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 17


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
CHAPTER 30 – Ice and Rain Protection
Replace pump B1

Replace timer B1 N/A


Inspect repair propeller deice boot B1 N/A
Test repair propeller de-icing system B1 N/A
Inspect/test wing leading edge de-icer boot B1 N/A
07/01/2019 Replace anti-ice/deice valve B1 Wing Anti-Ice Valve Replacement 5N-BVE

07/01/2019 Install wiper motor B1 Wiper Motor Installation 5N-BVE

07/01/2019 Check operation of systems B1 Operational Test of The Wing Ice 5N-BVE
Protection System
08/01/2019 Operational test of the pitot-probe ice B1 Pitot Probe Ice Protection 5N-BVE
protection Operational Test
08/01/2019 Operational test of the TAT ice protection B1 TAT Ice Protection Operational Test 5N-BVE

08/01/2019 Operational test of the wing ice protection B1 Wing Ice Protection Operational 5N-BVE
system System Test
09/01/2019 Assistance to the operational test of the B1 Engine No1 Anti-Ice Test Engine 5N-BVE
engine air-intake ice protection (with engines Running
in operation)
09/01/2019 Troubleshoot faulty system B1 B2 Failure of a Window Heat Control 5N-BVE
Unit

I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 18


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
CHAPTER 31 – Indicating/Recording
Systems
01/10/2018 Replace flight data recorder B1 B2 Flight Data Recorder Replacement 5N-BUU

01/10/2018 Replace cockpit voice recorder B1 B2 CVR Replacement 5N-BUU

02/10/2018 Replace clock B1 B2 Captain Clock Replacement 5N-BUU

02/10/2018 Replace master caution unit B; B2


03/10/2018 Replace FDR B1 B2 FDR Replacement 5N-BUU
03/10/2018 Perform FDR data retrieval B1 B2 FDR Data Retrieval 5N-BUU
04/10/2018 Troubleshoot faulty system B1 B2
04/10/2018 Implement ESDS procedures B1 B2 ESDS Procedures Compliance 5N-BUU

15/10/2018 Inspect for HIRF requirements B1 B2 HIRF Requirements Inspection 5N-BUU

15/10/2018 Start/stop EIS procedure B1 B2 EIS Start/Stop Procedure 5N-BUU

16/10/2018 Bite test of the CFDIU B1 B2 Primary Display System Test 5N-BUU
16/10/2018 Ground scanning of the central warning B1 B2 Warning Electronic System Test 5N-BUU
system

CHAPTER 32 – Landing Gear


Build up wheel B1
13/08/2018 Replace main wheel B1 Main Wheel Replacement
13/08/2018 Replace nose wheel B1 Nose Wheel Replacement

I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 19


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
15/08/2018 Replace shimmy damper B1 Load Dynamic Damper Replacement 5N-BVE

15/08/2018 Replace steering actuator B1 Steering Actuator Replacement 5N-BVE

16/08/2018 Replace truck tilt actuator B1 Truck Tilt Actuator Replacement 5N-BVE

16/08/2018 Replace gear retraction actuator B1 MLG Retraction Actuator Replacement 5N-BVE

20/08/2018 Replace uplock/dowlock assembly B1 Uplock/Downlock Assy Replacement 5N-BVE

20/08/2018 Replace shimmy damper B1 Load Dynamic Damper Replacement 5N-BVE

21/08/2018 Rig nose wheel steering B1 Nose Wheel Steering Rigging 5N-BVE

21/08/2018 Functional test of the nose wheel steering B1 Nose Wheel Steering System Functional 5N-BVE
Test
system
22/08/2018 Replace shock strut seals B1 Shock Strut Seals Replacement 5N-BVE

22/08/2018 Servicing of shock strut B1 Shock Strut Servicing 5N-BVE

25//08/2018 Replace break unit B1 Remove & Install Main Wheel 5N-BVE
Brake Unit
27/08/2018 Replace brake control valve B1 Brake Metering Valve Replacement 5N-BVE

27/08/2018 Bleed brakes B1 Brakes Bleeding 5N-BVE

29/08/2018 Replace brake fan B1 Brake Cooling Fan Assy Replacement 5N-BVE

29/08/2018 Test anti skid unit B1 Anti-Skid Unit Test 5N-BVE


30/08/2018 Test gear retraction B1 Gear Retraction Test 5N-BVE
30/08/2018 Change bungees B1 Bungees Replacement 5N-BVE
I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 20


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
11/02/2019 Adjust micro switches/sensors B1 Micro Switches/Sensors Adjustment 5N-BVE

11/02/2019 Charge struts with oil and air B1 Shock Strut Servicing With Nitrogen & 5N-BVE
Fluid
11/02/2019 Troubleshoot faulty system B1 Normal Anti-Skid Valve 5 is 5N-BVE
Unserviceable
12/02/2019 Test auto brake system B1 Auto-Brake System Test 5N-BVE

Check/test emergency blowdown B1


12/02/2019 Operational test of the landing gear doors B1 Landing Gear Doors Operational Test 5N-BVE

CHAPTER 33 - Lights
31/08/2018 Repair/replace rotating beacon B1 B2 Rotating Beacon Replacement 5N-BUU

31/08/2018 Repair/replace landing lights B1 B2 Landing Lights Replacement 5N-BUU

02/092018 Repair/replace navigation lights B1 B2 Navigation Lights Replacement 5N-BUU

02/09/2018 Repair/replace interior lights B1 B2 Interior Lights Replacement 5N-BUU

07/09/2018 Replace ice inspection lights B1 B2 Inspection Lights Replacement 5N-BUU

07/09/2018 Repair/replace logo lights B1 B2 Logo Light Replacement 5N-BUU

08/09/2018 Repair/replace emergency lighting system B1 B2 Emergency Lighting Replacement 5N-BUU

08/09/2018 Perform emergency lighting system checks B1 B2 Emergency Lighting System Check 5N-BUU

I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 21


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
Troubleshoot faulty system B1 B2 Logo Light Inoperative

CHAPTER 34 - Navigation
Calibrate magnetic direction indicator B2 N/A
Replace airspeed indicator B2 N/A
Replace altimeter B2 N/A
Replace air data computer B2 N/A
Replace VOR unit B2 N/A
Replace ADI B2 N/A
Replace HIS B2 N/A
11/08/2018 Check pitot static system for leaks B1 B2 Pitot/Static System Leak Check 5N-BVE

Check operation of directional gyro B2 N/A


Functional check weather radar B2 N/A
Functional check Doppler B2 N/A
Functional check TCAS B2 N/A
Functional check DME B2 N/A
Functional check ATC Transponder B2 N/A
Functional check flight director system B2 N/A
I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 22


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
Functional check inertial nav system B2 N/A
Complete quadrantal error correction of ADF B2 N/A
system
Update flight management system database B2 N/A
Check calibration of pilot static instruments B2 N/A
Check calibration of pressure altitude B2 N/A
reporting system
Troubleshoot faulty system B2 N/A
Check marker systems B2 N/A
Compass replacement direct/indirect B2 N/A
Check Satcom B2 N/A
Check GPS B2 N/A
Test AVM B2 N/A

CHAPTER 35 - Oxygen
27/01/2019 Inspect on board oxygen equipment B1 Oxygen Equipment Inspection 5N-BUU

27/01/2019 Purge and recharge oxygen system B1 Servicing Oxygen System 5N-BUU

28/01/2019 Replace regulator B1 Oxygen Regulator Replacement 5N-BUU

I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 23


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
11/02/2019 Replace oxygen generator B1 Oxygen Generator Replacement 5N-BVE

11/02/2019 Test crew oxygen system B1 Captain Oxygen Mask Test 5N-BVE

11/02/2019 Perform auto oxygen system deployment B1 Auto Oxygen Deployment Check 5N-BVE
check
12/02/2019 Troubleshoot faulty system B1 Oxygen mask stowage compartment 5N-BVE
problem -captain's

CHAPTER 36 – Pneumatic Systems


09/09/2018 Replace filter B1 Water Tank Pressurization Compressor 5N-BUU
Inlet Filter Replacement
10/09/2018 Replace air shut off valve B1 PRSOV Replacement 5N-BUU

10/09/2018 Replace pressure regulating valve B1 APU Pressure Regulating Valve 5N-BUU
Replacement
09/09/2018 Replace compressor B1 Water Tank Pressurization Compressor 5N-BUU
Replacement
Recharge dessicator B1
Adjust regulator B1
11/11/2018 Check for leaks B1 Eng No1 Pneumatic Leak Check 5N-BUU

11/11/2018 Troubleshoot faulty system B1 Isolation Valve Centre Failed Closed 5N-BUU

CHAPTER 37 – Vacuum Systems


15/12/2018 Inspect the vacuum system i.a.w. AMM B1 Toilet Waste Vacuum Sys Inspection 5N-BVE

15/12/2018 Replace vacuum pump B1 Toilet Waste Vacuum Blower 5N-BVE


Replacement
I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 24


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
02/12/2018 Check/replace filters B1 Toilet Vacuum Blower Filter 5N-BVE
Check/Replacement
Adjust regulator B1
02/12/2018 Troubleshoot faulty system B1 Relay (VACUUM BLOWER SYS 2&3) 5N-BVE
in P210 is not in commanded position.

CHAPTER 38 – Water/Waste
27/08/2018 Replace water pump B1 Potable Water Pump Replacement 5N-BUU

27/08/2018 Replace tap B1 Water basin Faucet Replacement 5N-BUU

31/08/2018 Replace toilet pump B1 Toilet Vacuum Blower Replacement 5N-BUU

01/09/2018 Troubleshoot faulty system B1 Potable water: indicator at service panel 5N-BUU
Shows level of zero.
01/09/2018 Inspect waste bin flap closure B1 Waste Bin Flapper Inspection 5N-BUU
CHAPTER 45 – Central Maintenance
System
03/09/2018 Retrieve data from CMU B1 B2 Data From CMU Retrieval 5N-BUU
03/09/2018 Replace CMU B1 B2 CMU Replacement 5N-BUU
03/09/2018 Perform Bite check B1 B2 CMU Bite Check 5N-BUU
03/09/2018 Troubleshoot faulty system B1 B2 Cursor Control Device (Left) signal has 5N-BUU
no output or is failed

CHAPTER 49 – APU
23/11/2018 Remove/Install APU B1 APU Removal/Installation 5N-BUU
23/11/2018 Remove/Install inlet guide vane actuator B1 Inlet Guide Vane Actuator Removal 5N-BUU

I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 25


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
23/11/2018 Inspect hot section B1 Hot Section Boroscope 5N-BVE
23/11/2018 Operational test of APU B1 APU Operational Test 5N-BVE
24/11/2018 Operational test of APU emergency shut B1 APU Emergency Shutdown Operational 5N-BVE
Test
down
24/11/2018 Troubleshoot faulty system B1 B2 APU has high oil temperature. 5N-BVE

CHAPTER 51 - Structures
Sheet metal repair B1
Fibre glass repair B1
Wooden repair B1 N/A
Fabric repair B1 N/A
Recover fabric control surface B1 N/A
03/01/2019 Treat corrosion B1 Corrosion Treatment 5N-BUU
03/01/2019 Apply protective treatment B1 Protective Treatment Application 5N-BUU

CHAPTER 52 - Doors
27/01/2019 Inspect passenger door i.a.w. AMM B1 PAX Door Inspection 5N-BVE
27/01/2019 Rig/adjust locking mechanism B1 Locking Mechanism Rigging 5N-BVE
Adjust air stair system B1 N/A
28/01/2019 Check operation of emergency exits B1 Emergency Exits Operation Check 5N-BVE
28/01/2019 Test door warning system B1 Door Warning System Test 5N-BVE
28/01/2019 Troubleshoot faulty system B1 Passenger Entry Door 1L Actuator has a 5N-BVE
fault.
I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 26


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
11/12/2018 Remove and install passenger door i.a.w. B1 PAX Door Removal/Installation 5N-BUU
AMM
12/12/2018 Remove and install emergency i.a.w. AMM B1 Door Escape Slide Removal 5N-BUU

11/12/2018 Inspect cargo door i.a.w. AMM B1 FWD Cargo Door Inspection 5N-BUU

CHAPTER 56 - Windows
23/11/2018 Replace windshield B1 Replace Capt Windshield 5N-BUU

Replace direct vision window B1


22/11/2018 Replace cabin window B1 Replace Cabin Window 5N-BUU

22/11/2018 Repair transparency B1 PAX Window Transparency Repair 5N-BUU

CHAPTER 57 - Wings
Skin repair B1 N/A
Recover fabric wing B1 N/A
Replace tip B1 N/A
Replace rib B1 N/A
05/01/2019 Replace integral fuel tank panel B1 Replace Right Fuel Tank Panel 5N-BUU

Check incidence/rig B1

I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 27


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
CHAPTER 60 - Propeller
Assemble prop after transportation B1 N/A

Replace propeller B1 N/A


Replace governor B1 N/A
Adjust governor B1 N/A
Perform static functional checks B1 N/A
Check operation during ground run B1 N/A
Check track B1 N/A
Check setting of micro switches B1 N/A
Assessment of blade damage i.a.w. AMM B1 N/A
Dynamically balance prop B1 N/A
Troubleshoot faulty system B1 N/A

CHAPTER 71 - Power plant


Build up ECU B1
01/10/2018 Replace engine B1 Removal/Installation Engine No1 5N-BUU

Repair cooling baffles B1 N/A


03/10/2018 Repair cowling B1 Engine Cowling Repair 5N-BUU
Adjust cowl flaps B1 N/A
I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 28


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
24/10/2018 Repair faulty wiring B1 Repair Engine No1 Low Oil Pressure 5N-BUU
Transmitter Wire
12/11/2018 Assist in dry motoring check B1 Dry Motoring Check Using the MAT 5N-BVE

12/11/2018 Assist in wet motoring check B1 Wet Motoring Check 5N-BVE

11/12/2018 Assist in engine start (manual mode) B1 Engine Manual Start 5N-BVE
24/10/2018 Troubleshoot B1 Troubleshoot Engine No1 Hot Start 5N-BUU

CHAPTER 72 – Turbine Engine


15/10/2018 Replace module B1 Engine Module Replacement 5N-BUU

16/10/2018 Replace fan blade B1 Engine No1 Fan Blades Set Replacement 5N-BUU
17/10/2018 Hot section inspection/boroscope check B1 Hot Section Boroscope 5N-BUU
16/10/2018 Carry out engine/compressor wash B1 Engine/compressor Wash 5N-BUU
12/11/2018 Carry out engine dry cycle B1 Both Engines Dry Crank 5N-BUU
12/11/2018 Engine ground run B1 Perform Engine Ground Run 5N-BUU
Establish reference power B1
11/12/2018 Trend monitoring/gas path analysis B1 Engine Gas Path Analysis 5N-BUU
11/12/2018 Troubleshoot B1 Troubleshoot Engine No1 Stall 5N-BUU

CHAPTER 73 – Fuel and Control


Turbine
30/08/2018 Replace FCU B1 Fuel Metering Unit Replacement 5N-BVE
28/08/2018 Replace Engine Electronic Control Unit B1 B2 Removal/Installation of Engine 5N-BVE
Electronic Controller
(FADEC)
I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 29


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
12/11/2018 Replace Fuel Metering Unit (FADEC) B1 Fuel Metering Unit Removal/Installation 5N-BUU

13/11/2018 Replace engine driven pump B1 Fuel Pump Removal/Installation 5N-BUU

22/08/2018 Clean/test fuel nozzles B1 Fuel Nozzle Check 5N-BUU

22/08/2018 Clean/replace filters B1 Removal/Installation of the Fuel Filter 5N-BUU

Adjust FCU B1
Troubleshoot faulty system B1 B2
30/08/2018 Functional test of FADEC B1 B2 Operational Test of the EEC on the 5N-BUU
Ground (with engine non motoring)

CHAPTER 76 – Engine Controls


29/08/2018 Rig thrust lever B1 Thrust Lever Resolver Adjustment 5N-BUU

Rig RPM control B1


Rig mixture/HP cock lever B1
30/08/2018 Rig power lever B1 Thrust Lever Resolver Adjustment 5N-BUU
Check control sync (multi-eng) B1
19/11/2018 Check controls for correct assembly and B1 Control Correct Assy and Locking Check 5N-BUU
locking
20/11/2018 Check controls for range and direction of B1 Engine Control System Adjustment/Test 5N-BUU
movement
23/11/2018 Adjust pedestal micro-switches B1 Switch Pack Adjustment/Test 5N-BUU
15/11/2018 Troubleshoot faulty system B1 Failure of the Control of the Fuel Shut- 5N-BUU
off Valve Engine#1
I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 30


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
CHAPTER 77 – Engine Indication
27/09/2018 Replace engine instruments B1 B2 Upper Display Replacement 5N-BUU

27/09/2018 Replace oil temperature bulb B1 B2 Engine No1 Oil Temperature sensor 5N-BUU
Replacement
28/09/2018 Replace thermocouples B1 B2 Engine No1 Thermocouple Replacement 5N-BUU
28/09/2018 Check calibration B1 B2 EGT Calibration Check 5N-BUU
24/09/2018 Troubleshoot faulty system B1 B2 High EGT Fault (thermocouples) 5N-BVE

CHAPTER 78 – Exhaust Turbine


03/09/2018 Replace jet pipe B1 Turbine Exhaust Plug Replacement 5N-BVE

03/09/2018 Replace shroud assembly B1 Thrust Reverser Replacement 5N-BVE

03/09/2019 Install trimmers B1 T/R Trimmers Installation 5N-BVE

05/09/2018 Inspect/replace thrust reverser B1 Thrust reverser Eng No1 T/R 5N-BVE
Replacement and Inspection
07/09/2018 Replace thrust reverser component B1 Engine No1 T/R Left Lower Actuator 5N-BVE
Replacement
07/09/2019 Deactivate/reactivate thrust reverser B1 Deactivation of the Thrust Reverser for 5N-BVE
Flight (MEL)
21/08/2019 Operational test of the thrust reverser system B1 Operational Test of the Thrust Reverser 5N-BVE
System Engine No2

CHAPTER 79 – Oil Systems


20/08/2018 Change oil B1 Engine No1 Oil Tank Replacement 5N-BVE

20/08/2018 Check filter(s) B1 Engine No1 Pressure Filter 5N-BVE

Adjust pressure relief valve B1


I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 31


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date ATA CHAPTERS & LIST of TASKS CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy B1 or Card number or Task Maintenance
CONTINUED: Reg Initials Initials
B2 Description Manager Initials
16/08/2018 Replace oil tank B1 Engine No1 Oil Tank Replacement 5N-BVE

16/08/2018 Replace oil pump B1 Engine No1 Oil Pump 5N-BVE


Removal/Installation
17/08/2018 Replace oil cooler B1 Fuel/Oil Heat Exchanger Replacement 5N-BVE

Replace firewall shut off valve B1


17/08/2018 Perform oil dilution test B1 Oil System Filter Contamination Test 5N-BVE
17/08/2018 Troubleshoot faulty system B1 Troubleshoot Low Oil Pressure Engine 5N-BVE
Number 1

CHAPTER 80 – Engine Starting


14/08/2018 Replace starter B1 Engine No1 Starter 5N-BVE
Removal/Installation
14/08/2019 Replace start relay B1 Engine No1 Start Relay 5N-BVE
Replacement
13/08/2018 Replace start control valve B1 Removal/Installation of Starter 5N-BVE
Control Valve
13/08/2018 Troubleshoot faulty system B1 Failure of the Starter Control Valve 5N-BVE
Engine#1

CHAPTER 83 – Accessory Gearbox


15/08/2018 Replace gearbox B1 Intermediate Gearbox Replacement 5N-BVE

15/08/2018 Replace drive shaft B1 Engine No1 EDP Drive shaft 5N-BVE
replacement
15/08/2018 Inspect / Replace magnetic chip detector B1 Engine No1 Magnetic Chip 5N-BVE
Detectors Inspection

I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 32


Form QA.55b
Issue No. 01
Date: 17-12-14
Standard Aircraft Practical Training Programme

Date Additional or Supplementary Tasks CAT Task Code or Work A/C Trainee Trainer Quality or
dd/mm/yy Selected for Completion by Trainer – B1 or Card number or Task Maintenance
Reg Initials Initials
List ATA Chapter and task: B2 Description Manager Initials

I confirm that the above listed and identified tasks have been carried out satisfactorily. Assessor: Initials / Stamp / Date

© Copyright BCT Aviation Maintenance Ltd 33


Form QA.55b
Issue No. 01
Date: 17-12-14