ABSTRACT OF COST
Bill No. Description Amount INR %
g
1 SITE CLEARANCE e
5,474,676
2 EARTH WORK
1,073,720,930
2a EARTH WORK(Approaches)
455,584,086
3 SUB-BASE, BASE-COURSES
495,685,808
4 BITUMINOUS PAVEMENT COURSES 962,852,140
Subtotal for Highway 2,993,317,640 41
5 CROSS DRAINAGE WORKS
172,415,542 2
6A MAJOR,MINOR BRIDGES ,ROB,FLYOVERS ,OVERPASS & UNDERPASSES
FLYOVERS 2
253,562,870
VUP 5
209,977,263
LVUP 9
300,314,868
INTECHANGE STRUCTURES 1
29,184,801
MINOR BRIDGES 4
207,425,576
MAJOR BRIDGES 3;
1340m 1,636,897,353
6B R.E.Wall , Crashbarrier with Friction slab 5.736
km 582,064,393
Subtotal for Structures
3,219,427,124 44
7 TRAFFIC SIGNAGES, ROAD MARKING & APPURTENANCES
258,596,292
8 DRAINAGE AND PROTECTION WORKS
314,116,030
9 TRAFFIC MANAGEMENT SYSTEM
55,858,450
10 GENERAL ITEMS
5,527,900
11 WAYSIDE AMENITIES
i) CIVIL COST
7,319,184,770 100
ii Escalation @ 5% up to bid due date
5,805,723,522 20.678003
zc 5,922,830,478 5,922,830,478
qty 5% 5626688953.906
1.32 7427229419.156 7818136230.691
%ge 0.51 -4.72
0.25/0.2
0.7
4.90% 5.50% SQM SQM
WMM DBM BC PC TC FLYASH
153945 92455 27515 588416 1176832 2656446
RATES
murum 300
metal 918.727915 avg rate
crs sand 1590.10601
ns 2120.14134
TTL
153945 92455 27515 588416 1176832 2656446 rubble 494.699647
cement 375
steel 50000
130000
GSB
2600
4500
6000
2600
3000
CUM/STEEL MT
10652036 BRASS
1.07 Dismantling of kilometre stone including cutting of earth, foundation and disposal of
dismantled material with all lifts and lead upto 1000 m and back filling of pit as
per Technical specifications and as directed by the
Engineer-in-charge.
1.09 Scarifying the existing bituminous road surface to a depth of 50 mm and Sqm 3
disposal of scarified material with in all lifts and leads.
Total for Bill No. 1 - SITE CLEARANCE
Amount
amt %ge wr wa
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
-
0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
-
0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
-
0 0.00 0
- 0 0.00 0
- 0 0.00 0
-
0 0.00 0
0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
-
0 0.00 0
5,474,676
5474589.13 100.00 5376468
98.2077
PROJECT : From Km 48+520 to Km 71+060
ROAD DESCRIPTION : Ahmedabad Dholera Expressway Length of Road : 22.540 Kms
Turfing with sods of embankment slopes, verge, earthen shoulders and other
2.13 locations all complete as per Technical Specification Clause 307. sqm 581807 28
- 0 0.00 0
175
15
2176072 1059040978
10590.41
PROJECT : From Km 48+520 to Km 71+060
ROAD DESCRIPTION : Ahmedabad Dholera Expressway Length of Road : 22.540 Kms
-
214,736,909 214736272 43.32 1130 145562080
Providing and applying Tack Coat with bitumen emulsion using emulsion pressure
distributor at the rate of 0.25 kg /sqm on the prepared granular surface treated with
primer cleaned with mechanical broom all complete as per Technical specifications and as
4.02 (a)
directed by the Engineer-in-charge.
sqm 588416 11
4.02 (b) Providing and applying Tack Coat with bitumen emulsion using emulsion pressure sqm 588416
distributor at the rate of 0.20 kg/sqm on the prepared nominal bituminous surface
cleaned with mechanical broom all complete as per 9
Technical specifications and as directed by the Engineer-in-charge.
Providing and laying Dense Graded Bituminous Macadam with 100-120 TPH batch type
HMP producing an average output of 75 tonnes per hour using crushed aggregates of
Grading-l as per Table 500-10, premixed with bituminous binder @ 4.9 per cent by weight of
total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher
with sensor control to the required grade, level and alignment, rolling with smooth
4.03 wheeled, vibratory and tandem rollers to achieve the desired compaction all complete as
per Technical specifications and as directed by the Engineer-in-charge.
Providing and laying Bituminous Concrete with 100-120 TPH batch type hot mix plant
producing an average output of 75 tonnes per hour using crushed aggregates of
grading-II, premixed with bituminous binder @ 5.5 per cent of mix and filler, transporting
the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to
the required grade, level and alignment, rolling with smooth wheeled, vibratory and
4.05 tandem rollers to achieve the desired compaction all complete as per Technical specifications cum
Clause 507 and as directed by the Engineer-in-charge.
Total for BILL NO. 4 - BITUMINOUS PAVEMENT COURSES / CEMENT CONCRETE PAVEMENT
Amount
amt %ge wr wa
5,295,740
0 0.00 0
- 0 0.00 0
0 0.00 0
- 0 0.00 0
950 225
70 25
bit
2400 4580
4580
4675
PROJECT : From Km 48+520 to Km 71+060
ROAD DESCRIPTION : Ahmedabad Dholera Expressway Length of Road : 22.540 Kms
Item Quantity
No. Description Unit Rate
Providing and fixing the Tar paper bearing complete as per drawing and Technical
5.11 specifications and as directed by the Engineer-in-charge. sqm 424
Construction of precast RCC railing of M35 Grade, true to line and grade, tolerance of
vertical RCC post not to exceed 1 in 500, leaving adequate space between vertical
post for expansion, complete as per drawing and Technical specifications and as
5.13 directed by the Engineer-in-charge. m 1925
5.14 Providing and fixing filler type expansion joint in slab bridges and culverts m 1669
complete as per technical specification section 2600
Providing and fixing RCC Grade M10 Marker posts of dimensions as shown in Drawings
5.15 and as per Technical Specifications and as directed by the nr 1187
Engineer-in-charge
5.16 Providing and laying Filter material underneath pitching in slopes cum 1522
complete as per drawing and Technical specification
Providing and laying Pitching on slopes laid over prepared filter media including
5.17 boulder apron laid dry in front of toe of embankment complete cum 1636
as per drawing and Technical specifications
Providing and laying flooring laid over cement concrete bedding grade M- 15 complete
5.18 as per drawing and technical specifications Clause 1303 0
Printing of culvert No. and span arrangement of any shade with synthetic enamel paint
black or any other approved colour to give an even shade as complete as per Technical
5.20 specifications and as directed by the Engineer- nr 44 63
in-charge.
0 0.00 0
0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
56,335,808 56333508 32.68 4657 48474713
- 0 0.00 0
-
0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
79,236,639 79226010 45.95 47810 51156700
- 0 0.00 0
-
0 0.00 0
- 0 0.00 0
- 0 0.00 0
-
0 0.00 0
- 0 0.00 0
-
0 0.00 0
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
277,591 278369 0.16 0
2,772
2772 0.00 0
172,415,542
172403898.6 100.00 133119978
77.21402
PROJECT : From Km 48+520 to Km 71+060
ROAD DESCRIPTION : Ahmedabad Dholera Expressway Length of Road : 22.540 Kms
d) Providing and laying in position RCC crash barrier with friction slab,
including reinforcement and centering & shuttering, complete. m 10086 12571
Sub-Total for BILL NO.6 - New Bridges / Under Passes / Grade seperators/ ROBs.
STRUCTURES SUMMARY
I) FLYOVERS SUMMARY LS
II) VUP SUMMARY LS
III) LVUP SUMMARY LS
IV) INTERCHANGES
V) MINOR BRIDGES SUMMARY LS
VI) MAJOR BRIDGES SUMMARY LS
V) ROB SUMMARY LS
TOTAL COST
Amount
amt %ge wr wa
Construction of cement concrete kerb I-Shape Kerb Top width 150 mm and 350
7.02 mm high laid with kerb laying machine, foundation concrete laid m 157
manually, all complete as per clause 409.
7.03 Painting two coats on kerbs in black and white or yellow after filling the surface with sqm 63
synthetic enamel paint complete as per drawing and Technical specifications
and as directed by the Engineer-in-charge.
a Direction and Place Identification Signs upto 0.9 sqm Size Board. sqm 0 7765
b Direction and Place Identification Signs with size more than 0.9 sqm size sqm 45 8096
Board.
Providing and erecting overhead signs with a corrosion resistant 2mm thick
aluminium alloy sheet reflectorised with high intensity retro- reflective
sheeting of encapsulated lense type with vertical and lateral clearance given in
clause 802.2 and 802.3 and installed as per clause 802.6 over a designed support
system of aluminium alloy or galvanised steel trestles and trusses of sections
7.06 and type as per structural design requirements and approved drawings and all
complete as per Technical specifications and as directed by the Engineer-in-charge.
a Lane, Centreline, Edge and other marking along strips sqm 10057 376
b Directional arrows and letters sqm 111 376
c chevron marking and pedestrain crossing sqm 376
7.08 Reinforced cement concrete M15 grade kilometre stone of standard design as per
IRC:8-1980, fixing in position including painting and printing etc all complete as per
Technical specifications and as directed by the
Engineer-in-charge.
a 5th kilometre stone (precast) nr 14 3364
b Ordinary kilometer stone (precast) nr 62 2063
7.09 Reinforced cement concrete M15 grade boundary pillars of standard design as nr 480
per IRC:25-1967, fixed in position including finishing and lettering but
excluding painting all complete as per Technical
specifications and as directed by the Engineer-in-charge.
7.12 Providing and fixing RCC M-30 grade in new jersey type crash barrier at Medians m 12672 3860
including reinforcement , centering, shuttering all complete as per Drawings and
Technical Specifications Clause 811, 1000 & 1600
Providing and fixing of road stud 100x 100 mm, die-cast in aluminium, resistant
to corrosive effect of salt and grit, fitted with lense reflectors, installed in
concrete or asphaltic surface by drilling hole 30 mm upto a depth of 60 mm
and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873
7.13 part 4:1973 all complete as per Technical specifications and as directed by the nr 948 595
Engineer-in-charge.
7.14 Providing, fitting and fixing mild steel railing complete as per drawing and m 2764
Technical Specification
Supply, install, test and commission 30m high mast pole with 4 x 400 watts
Metal Halide lanterns which can withstand forces exerted with wind speeds of
180 kmph with 3 seconds gust, dead weight stress and having high powered
electrically driven power tools for raising and lowering of lantern carriage,
7.15 aviation obstruction luminaries, earthing arrangements, all accessories, lamps, etc. nr 12 1798925
complete for safe working load of 850kg complete as per Technical specifications.
7.16 Supply, install, test and commission 9m high street light pole with 1 x 150 watts Metal nr 142 33925
Halide lanterns, earthing arrangements and all accessories, lamps, anchor bolts
etc. complete as per Technical specifications.
7.17 Supply, install, test and commission 9m high street light pole with 2 x 150 watts Metal nr 28 41809
Halide lanterns, earthing arrangements and all accessories, lamps, anchor bolts
etc. complete as per Technical specifications.
- 0 0
-
0 0
- 0 0
- 0 0
- 0 0
364,320.00
364320 7000 315000
- 0 0
- 0 0
0 0
47,096.00 47096 2500 35000
127,906.00 127906 1800 111600
-
0 0
- 0 0
- 0 0
131,936.00 131936 750 99750
164,672.00 164672 750 124500
48,913,920.00
-
0 0
4,817,353.64
1,170,645.08
Plain cement concrete leveling course below Drain bottom and Walkway including
8.03 centering and shuttering all complete as per drawing and 0
Technical Specification Sections 1500 & 1700.
a PCC Grade M-10 cum 4156
b PCC Grade M-15 cum 182 4570
c PCC Grade M-20 cum 4977
a) Plain / Reinforced cement concrete M-25 grade for Covered drain including
centering and shuttering but excluding reinforcement and strands all complete
8.04 as per drawing and Technical Specification Clauses cum 960 5372
1500, 1700, 2100, 2200 & 2300.
8.08 Construction of energy dissipation basin and sumps in M-15 as per nr 621 1942
drawing and Technical Specification Section 1500 & 1700.
Construction of catchpits for median drains with cement concrete M-20 grade walls
and M-15 grade bedding and PVC pipe 150 mm dia for inlets all complete as per
8.09 drawing and Technical Specification Section 1500 & nr 6460
1700.
8.10 Stone pitching on slopes for erosion protection complete as per drawing
and technical specification section 2500.
(i) Stone Pitching cum 57391.94 1862
8.11 Filler material underneath stone pitching complete as per drawing and cum 31805.23 1773
technical specification section 2500.
Laying Reinforced Cement Concrete Pipe NP4 (IS 458) on first class bedding in
8.12 single row. Complete as per drawing and technical
specification section 2900.
a) 450 mm m 950
b) 900 mm m 4202
8.13 Providing weep holes in abutments, wing walls, retaining walls, return nr 430 185
walls etc. complete as per drawing and Technical Specification Clause
Providing, drilling and inserting 100 mm dia perforated PVC pipe wrapped with
geotextile as drainage pipes in hill slopes to be reinforced as per approved
8.14 drawings & Technical Specifications or as directed by the Lm 404
Engineer-in-charge.
Providing. laying and fixing of Non-woven PP geotextile over hill slopes to be stabilised,
including the cost of all materials. labour. equipments etc. required for the
8.15 completion of job as per Technical Specifications or as sqm 176269 72
directed by the Engineer-in-charge
G.I Barbed wire fencing 1.8m high (Providing and fixing1.8m high GI Barbed wire
fencing with 2.4 m angle iron posts 50 mm x 50 mm x 6 mm placed every 3 m center
to center founded in M15 grade cement concrete, 0.6 m below ground level,
every 15th post, last but one end post and corner post shall be strutted on both side and
8.16 end post on one side only and provided with 12 horizontal lines and 2 diagonals m 30010 492
interwoven
with horizontal wires, fixing with GI stapels, turn buckles etc complete as
8.17 Stone masonry work in cement mortar 1:6 in foundation complete as cum 2737 3743
drawing and Technical Specification.
Construction of boundary wall including earthwork, PCC, brick masonry in cement
mortar 1:3 with wire fencing over wall, providing opening and grating if necessary
and all necessary arrengment all complete as per drawing and technical specification
8.18 section 300, 1300 and 1700. Rm 500 2460
- 0 0.00 0
- 0 0.00 0
832,197 831740 0.26 3,765.00 685230
- 0 0.00 0
- 0 0.00 0
1,205,982
1205982 0.38 1700 1055700
- 0 0.00 0
-
0 0.00 0
106,863,791 106863792.28 34.02 1250 71739925
56,390,665
56390672.79 17.95 1350 42937060.5
- 0 0.00 0
- 0 0.00 0
- 0 0.00 0
79,550
79550 0.03 200 86000
- 0 0.00 0
10,243,748
10244591 3.26 3100 8484700
FOUNDATION
Earth work in excavation for foundations, Pile Caps and floors of the bridges, retaining walls
etc.,including setting out, dressing of sides,ramming of bottom, getting out the excavated material,
disposal of surplus soil as directed, all types of shoring and strutting, bailing out of water from
6.01 excavated pit with all labour and material complete as per
drawing and technical specification as directed by Engineer.
Laying Plain Cement Concrete M-15 with graded stone aggregate of 40 mm nominal size, in
foundation and floors, retaining walls of bridges including mechanical mixing, vibrating, pumping
6.03 and bailing out water, curing where ever required with all materials complete including the cost of Cum 4,764.00 48.97 48.97
shuttering as per drawings and technical specifications as
directed by Engineer.
Laying in position Design mix concrete from batching plant, using 20 mm graded crushed stone
aggregate and coarse sand of approved quality using Admixtures in recommended proportions ( as per IS
9103), as per approved Mix design in RCC in raft foudations, Box structure and pile cap, at all levels
6.04 including vibrating. finishing, curing, materials, labour, P&M and shuttering but excluding cost of -
reinforcement etc complete as per
specifications and direction of the Engineer
b) M-35 grade Cum 5,754.00 645.98 645.98
SUBSTRUCTURE -
Laying in position Design mix concrete from batching plant, using 20 mm graded crushed stone aggregate
and coarse sand of approved quality using Admixtures in recommended proportions ( as per IS 9103), as
per approved Mix design in RCC substructure at all levels including vibrating, finishing curing, labour,
6.05 P&M and Shuttering but excluding cost -
of reinforcement complete as per specifications and direction of the Engineer
Supplying and laying Pitching with stone boulders weighing not less than 35 kg each with the voids
filled with spalls on slopes laid over prepared filter media including boulder apron laid dry in front of toe
6.09 of embankment complete as per drawing and Technical Cum 1,818.00 94.93 94.93
specifications (Filter media to be paid separately under the relevant item).
6.10 Supplying and fixing of Drainage Spouts of 100 mm UPVC complete as per drawing and Nos 1649 52.00 52.00
Technical specification
6.11 Supplying and laying Wearing course with 40mm Bituminous Concrete over 25mm Thk Sqm 945.00 872.10 872.10
Bitumen Mastic Layer with proper slope as per drawing and specification.
Laying in position Ready mix concrete from batching plant, M30 grade (Design Mix Cement
Concrete) using 20 mm graded crushed stone aggregate and coarse sand of approved quality
using Admixtures in recommended proportions ( as per IS 9103), as per approved Mix design in
6.12 approach slab at all levels including vibrating. finishing curing, including cost of all materials, labour, Cum 8,772.00 26.78 26.78
P&M but including cost of reinforcement and
shuttering complete as per specifications and direction of the Engineer
6.13 Providing and fixing filler type expansion joint in slab bridges and culverts complete as MT 1855 38.25 38.25
per technical specification section 2600
Fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston
supported by a disc or un reinforced elastomer confined within a metal cylinder, sealing rings, dust
seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be of cast
steel / fabricated structural steel, metal and elastomer elements complete as per IS 2062, IS: 1030,
AISI:304, AISI:316, IS:6911, BS:3784, IS:3400, IS:226, BS 5400.,Bridge code and as per drawing
6.14 and approved Technical Specifications including grouting. The design of the bearings shall be -
submitted by the manufacturers/ contractor and got approved from Authority before fixing. Test
report of the bearings should be got approved before the materials are lifted from the manufacturer
premises.
- 0
- 0
- 0
0
- 0 0 0
12,784,312 12784569.55 33.60944 47,810.00 7444495.1
4,939,297 4939490.8 12.98546 47810 2870512.4
3,887,419 3887274 10.21928 47810 2228424.1
70,954
70953.75 0.186531 1298.5 49667.625
- 0 0
Laying Plain Cement Concrete M-15 with graded stone aggregate of 40 mm nominal size, in foundation
and floors, retaining walls of bridges including mechanical mixing, vibrating, pumping and bailing out
6.03 water, curing where ever required with all materials complete including the cost of shuttering as per Cum 4,764.00 36.42
drawings and technical specifications as directed
by Engineer.
Laying in position Design mix concrete from batching plant, using 20 mm graded crushed stone aggregate
and coarse sand of approved quality using Admixtures in recommended proportions ( as per IS 9103), as
per approved Mix design in RCC in raft foudations, Box structure and pile cap, at all levels including
6.04 vibrating. finishing, curing, materials, labour, P&M and shuttering but excluding cost of reinforcement
etc complete as per
specifications and direction of the Engineer
b) M-35 grade Cum 5,754.00 535.46
SUBSTRUCTURE
Laying in position Design mix concrete from batching plant, using 20 mm graded crushed stone aggregate
and coarse sand of approved quality using Admixtures in recommended proportions ( as per IS 9103),
as per approved Mix design in RCC substructure at all levels including vibrating, finishing curing,
6.05 labour, P&M and Shuttering but excluding cost
of reinforcement complete as per specifications and direction of the Engineer
Supplying and laying Pitching with stone boulders weighing not less than 35 kg each with the voids
filled with spalls on slopes laid over prepared filter media including boulder apron laid dry in front of toe
6.09 of embankment complete as per drawing and Technical Cum 1,818.00 94.93
specifications (Filter media to be paid separately under the relevant item).
6.10 Supplying and fixing of Drainage Spouts of 100 mm UPVC complete as per drawing and Nos
Technical specification 1649 36.00
6.11 Supplying and laying Wearing course with 40mm Bituminous Concrete over 25mm Thk Sqm
Bitumen Mastic Layer with proper slope as per drawing and specification. 945.00 585.23
Laying in position Ready mix concrete from batching plant, M30 grade (Design Mix Cement
Concrete) using 20 mm graded crushed stone aggregate and coarse sand of approved quality using
Admixtures in recommended proportions ( as per IS 9103), as per approved Mix design in approach slab
6.12 at all levels including vibrating. finishing curing, including cost of all materials, labour, P&M but Cum 8,772.00 26.78
including cost of reinforcement and
shuttering complete as per specifications and direction of the Engineer
6.13 Providing and fixing filler type expansion joint in slab bridges and culverts complete as per MT
technical specification section 2600 1855 25.50
Fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston
supported by a disc or un reinforced elastomer confined within a metal cylinder, sealing rings, dust
seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be of cast
steel / fabricated structural steel, metal and elastomer elements complete as per IS 2062, IS: 1030,
AISI:304, AISI:316, IS:6911, BS:3784, IS:3400, IS:226, BS 5400.,Bridge code and as per drawing
6.14 and approved Technical Specifications including grouting. The design of the bearings shall be
submitted by the manufacturers/ contractor and got approved from Authority before fixing. Test report of
the bearings should be got approved before the materials are lifted from the manufacturer
premises.
Supplying and laying of filter media consisting of granular materials of GW, GP, SW groups as per IS 1498-
1970 in required profile including filling of Boulders behind abutments, wing walls / return walls etc above
6.16 bed level with all labour and material Cum 1513 425.48
complete job as per drawing and technical specification.
Supplying and fixing of weep holes in Plain/ Reinforced concrete abutment, wing wall/ return wall with 100
6.17 mm dia AC pipe, extending through the full width of the structure Nos. 205 137.00
complete as specified.
SUBTOTAL
Amount
%ge wr wa
26,409 50 32205.5
- 0
- 0
- 0
- 0
- 0
a) 85 tonnes nr 0 7913
b) 140 tonnes nr 0 4804
c) 205 tonnes nr 0 11587
d) 250 tonnes nr 0 14130
e) 400 tonnes nr 0 22608
Supplying, fitting and fixing in position true to line and level
elastomeric bearing conforming to IRC: 83 (Part-II) section IX and
6.11 clause 2005 of MoRTH specifications complete including all cucm 0 1
accessories as per drawing and Technical
Specifications.
Providing and laying Pitching on slopes laid over prepared filter media
including boulder apron laid dry in front of toe of embankment complete
6.23 as per drawing and Technical cum 0 1818
specifications
Providing and laying flooring laid over cement concrete bedding
6.24 grade M-15 complete as per drawing and technical 0
specifications Clause 1303
Rubble stone laid in PCC Grade M-15 cum 0 4195
Flexible Apron :Construction of flexible apron 750 mm thick comprising
6.25 of loose stone boulders weighing not less than 40 cum 0 1922
kg beyond curtain wall.
Providing and laying of boulder apron laid in wire crates made with
4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm
6.26 mesh (weaved diagonally) including 10% extra for laps and joints laid with cum 0 2322
stone boulders weighing not
less than 40 kg each.
Clearing grass and removal of the rubbish up to a distance of 50 m outside
6.27 the periphery of the area cleared. sqm 0 3
Structure Cost LS
Sub-Total for BILL NO.6 - New Bridges / Under Passes / Grade seperators/ ROBs.
Amount
%ge wr wa
- 0
- 0
- 0
43,822,464.00 14.5921726 6,055.23 36893307.71223
- 0
- 0
32,894,185.00 10.9532323 6055.23039 25930918.61654
- 0
- 0
- 0
21,243,710.00 7.07381228 6055.23039 15646715.32438
- 0
- 0
- 0
- 0
68,803,990.00 22.9106173 47,810.00 32051824
48,127,950.00 16.0258299 47810 22375080
29,607,000.00 9.85865275 47810 13578040
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0 0
- 10818.5 0
- 1298.5 0
- 841.4 0
- 10703 0
- 1059.1 0
- 1272.6 0
- 0 0
- 2936.5 0
- 1345.4 0
- 1625.4 0
- 2.1 0
- 7904.4 0
- 49 0
0 0 0
300,314,868
100 183735485.2531
61.18095
VUP
Sl No. Item Unit Rate Total Qty.
Earth work in excavation for foundation of structures in ordinary soil by
mechanical means as per drawing and technical specification,
including setting out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing of sides and bottom
6.01 and backfilling with approved material all complete as per Technical
specifications and as directed by the Engineer-in-charge.
6.10 Providing and laying Reinforced cement concrete of M30 grade for cum
approach slab including reinforcement and formwork all complete as
per drawings and Technical specifications and as 9746 187.69
directed by the Engineer-in-charge.
Construction of precast RCC railing of M35 Grade, true to line and
grade, tolerance of vertical RCC post not to exceed 1 in 500, leaving
adequate space between vertical post for expansion, complete as per
6.11 drawing and Technical specifications and as directed by the Engineer-in- m 2139 -
charge.
(a) Providing and erecting precast concrete fascia panels of M35 grade sqm
including reinforcement, soil reinforcing element, foundation pad,
all accessories, components and draiange 4961 387.75
system including ground improvement complete.
Filling, grading and compaction with selected material meeting approved
(b) design parameters in layers in reinforced zone cum 664 326.70
complete.
Providing and laying in position RCC crash barrier with friction slab,
(c) including reinforcement and centering & shuttering, m 15455 -
complete.
Providing and fitting Drainage Spouts complete as per drawing and
6.14 Technical specifications and as directed by the Engineer-in- nr 1649 62.00
charge.
Providing and fixing filler type expansion joint in slab bridges and culverts
6.15 complete as per technical specification section 2600 m 1855 220.00
6.19 Backfilling behind abutment, wing wall, retaining wall, breast wall and cum
return wall complete as per drawings & technical specifications
Clause 710.1.4.of IRC:78 & Technical specification 1562 1,680.61
clause 305.4.4.
Providing and laying filter media with granular crushed
aggregates as per specification to a thickness of not less than 600
mm with smaller size towards the soil and bigger size towards the
6.20 wall and providing over the entire surface behind abutment, wing wall, cum 1513 1,942.86
return wall to the full height, compacted to firm condition complete as
per drawing and technical
specification Clause 2504.
6.22 Providing and laying Pitching on slopes laid over prepared filter media cum
including boulder apron laid dry in front of toe of embankment
complete as per drawing and Technical 1818 321.03
specifications
Providing and laying flooring laid over cement concrete bedding grade M-15
6.23 complete as per drawing and technical specifications 0-
Clause 1303
Rubble stone laid in PCC Grade M-15 cum 4195 -
Flexible Apron :Construction of flexible apron 750 mm thick comprising
6.24 of loose stone boulders weighing not less than 40 kg cum 1922 -
beyond curtain wall.
Providing and laying of boulder apron laid in wire crates made with
4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh
6.25 (weaved diagonally) including 10% extra for laps and joints laid with stone cum 2322 -
boulders weighing not less than 40 kg
each.
Clearing grass and removal of the rubbish up to a distance of 50 m outside
6.26 the periphery of the area sqm 3-
cleared.
6.27 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete metre
as per drawing and technical specifications and removal of
excavated earth with all lifts and lead upto 1000 m. 11292 4,800.00
(Pile diameter-1200 mm)
6.28 Printing of Bridge No. and span arrangement of any shade with synthetic nr
enamel paint black or any other approved colour to give an even shade as
complete as per Technical specifications and 70 -
as directed by the Engineer-in-charge.
Providing and laying 65 mm wearing course on top of deck slab consisting
of 25 mm thick mastic asphalt wearing course and 40 mm thick Bituminous
concrete laid to required level and slope after cleaning the surface,
including providing antiskid surface with bitumen precoated finegrained
hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per
10 sqm and at an approximate spacing of 10 cm center to center in both
directions, pressed into surface when the temperature of surfaces is not less
6.29 than 1000C, protruding 1 mm to 4 mm over mastic surface, all 945 1,818.14
complete as per clause 507 and 516.
Sqm
Total Amount 209,977,2
Total amount wa %ge wr wa
- 0.00
- 0.00
- 0.00
20,027,655.91 18826000.494 8.97 5875 19221889.63
- 0.00
- 0.00
11,979,541.20 11260781.324 5.36 5875 10766003.3
- 0.00
- 0.00
- 0.00
6,797,510.11 6389675.2014 3.04 5875 5707669.425
53,456.55 53456.55 0.03 6375 46856.25
2,509,227.22 2358652.4556 1.12 6875 2067806.125
- 0.00
- 0.00
71,411,247.34 67126946.112 31.97 47,810.00 39088232.06
15,639,215.44 14701155.38 7.00 47810 8543360.14
10,606,367.93 9969619.32 4.75 47810 5715197.838
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
272,000.00 200000 0.10 1 200000
- 0.00
- 0.00 0
- 0.00 10818.5
- 0.00 841.4
- 0.00 10703
- 0.00 1183.7
- 0.00 0
- 0.00 2936.5
- 0.00 1345.4
- 0.00 1625.4
- 0.00 2.1
- 0.00 49
a Ordinary Soil - Depth Upto 3m cum 12,969.64 3,122.08 7,693.18 23,784.89 43 1,022,750
b Ordinary Rock - (not requiring blasting) cum - 52 -
Providing and laying Plain cement concrete in Levelling Course,
mechanically mixed and compacted, including centering and
shuttering all complete as per drawings and Technical specifications
7.02 and as directed by the Engineer- in-charge. - - -
a PCC Grade M15 cum 561.23 147.57 342.54 1,051.34 4,963 5,217,805
a PCC Grade M20 cum - 5,540 -
7.03 Bored cast-in-situ M35 grade R.C.C. pile excluding metre 12,900.00 2,700.00 7,500.00 23,100.00 11,763 271,725,300
reinforcement complete as per drawing and technical
specifications and removal of excavated earth with all lifts
and lead upto 1000 m. (Pile diameter-1200 mm)
Providing and laying Reinforced Cement Concrete in
Foundation mechanically mixed including centering and
7.04 shuttering but excluding cost of reinforcement, all - - -
complete as per drawing and Technical specifications
and as directed by the Engineer-in-charge.
a RCC Grade M30 cum - 5,894 -
b RCC Grade M35 cum 9,043.65 1,722.60 4,521.83 15,288.08 5,994 91,636,722
Providing and laying Reinforced Cement Concrete in
Substructure, mechanically mixed and compacted, including
centering and shuttering but excluding cost of reinforcement,
7.05 all complete as per drawings and Technical specifications - - -
and as directed by the Engineer-
in-charge.
a RCC Grade M30 cum - 6,264 -
b RCC Grade M35 cum 4,900.40 1,200.04 2,094.53 8,194.97 6,401 52,456,014
Providing and laying Reinforced cement concrete in super structure
including centering and shuttering but excluding cost of
7.06 reinforcement, all complete as per drawing and Technical - - -
specifications and as directed by the Engineer-
in-charge.
a RCC Grade M25 cum - 6,747 -
b RCC Grade M30 cum - 6,842 -
c RCC Grade M35 cum 5,235.59 796.40 2,915.28 8,947.26 6,967 62,335,578
d RCC/PSC Grade M40 - Solid Slab cum 55.57 8.23 30.87 94.67 7,576 717,205
e RCC/PSC Grade M45 - T Beam & Slab cum 8,428.18 1,086.01 4,635.50 14,149.69 7,824 110,707,203
f RCC/PSC Grade M45 - Box girder cum - 8,794 -
Supply and fabrication of Mild Steel as per IS 2062 including
drilling, welding, riveting, grinding supply of bolts, nuts,
washers, fixtures etc. at site. Assembling, erection of fabricated
steel structure to proper line, level and camber as per approved
drawings and technical specifications section 1900
complete including transportation and handling, painting all
exposed surfaces of steel work after erection with one coat of
7.07 red lead primer paint to IS 102 and two coats of paint including all MT - 93,992 -
labour consumable other material machinery tools and tackles
complete as per specification and directed by engineers
including furnishing of detailed erection scheme and getting the
same approved from competent authority
7.08 Supplying, fitting and placing HYSD bar reinforcement all complete - - -
as per drawing and Technical specifications and as directed by
the Engineer-in-charge.
1,636,897,353
amt %ge wr wa
0.00
0.00
0.00
91636751.52 5.60 6070.23039 92802167.801
0.00
0.00
52456002.97 3.20 6070.23039 49745355.928
0.00
0.00
0.00
62335560.42 3.81 6070.23039 54311929.548
717219.92 0.04 6570.23039 622003.7109
110707174.56 6.76 7070.23039 100041568.23
0.00
0.00
0.00
505295305.34 30.87 47,810.00 282465782.9
81222759.63 4.96 47810 45313839.9
264494412.5 16.16 47810 145559457.4
0.00
0.00 5770.1
0.00 16485
0.00 3502.8
0.00 8449
9479036 0.58 10303.3 6635325.2
0.00 0.7
0.00
0.00 3472.7
0.00 464.8
0.00 10818.5
0.00 1525.3
0.00 877.1
0.00 11148.9
0.00 143.5
0.00 1138.9
0.00 1183.7
0.00 36988.7
0.00 51.1
a Ordinary Soil - Depth Upto 3m cum 41 1,191.90 2,232.74 1,431.51 1,431.51 6,287.66 257,794.05
b Ordinary Rock - (not requiring blasting) cum 50 0 - -
c Hard rock (blasting prohibited) cum 360 0 - -
Providing and laying Plain cement concrete in Levelling Course,
mechanically mixed and compacted, including centering and
shuttering all complete as per drawings and Technical
6.02 specifications and as directed by the Engineer-in-charge. 0 0 - -
a PCC Grade M15 cum 4764 59.25 112.20 256.89 256.89 685.22 3,264,387.98
b PCC Grade M20 cum 5002 - 172.29 172.29 344.58 1,723,638.07
Providing and laying Reinforced Cement Concrete in Foundation
mechanically mixed including centering and shuttering but
excluding cost of reinforcement, all complete as per drawing
6.03 and Technical specifications and as directed by the Engineer-in- 0 0 - -
charge.
122.40
Construction of Reinforced Earth structures (RES) complete
6.13 as per additional technical specification 0 0 - -
Appendix-I
Providing and erecting precast concrete fascia panels of M35
grade including reinforcement, soil reinforcing element,
(a) foundation pad, all accessories, components and draiange sqm 4961 0 - -
system including ground improvement
complete.
Filling, grading and compaction with selected material
(b) meeting approved design parameters in layers in reinforced cum 664 0 - -
zone complete.
Providing and laying in position RCC crash barrier with friction slab,
(c) including reinforcement and centering & m 15455 0 - -
shuttering, complete.
Providing and fitting Drainage Spouts complete as per drawing 64.00
6.14 and Technical specifications and as directed nr 1649 40.00 105,536.00
by the Engineer-in-charge.
24.00
Providing and fixing filler type expansion joint in slab bridges 133.50
6.15 and culverts complete as per technical m 1855 82.50 247,642.50
specification section 2600
51.00
Providing and laying of Asphaltic Plug joint to provide for horizontal
movement of 25 mm and vertical movement of 2 mm, depth of
joint varying from 75 mm to 100 mm, width varying from 500
mm to 750 mm (in traffic direction), covered with a closure
plate of 200mm x 6mm of wieldable structural steel conforming
to IS: 2062, asphaltic plug to consist of polymer modified
6.16 bitumen binder, carefully selected single size aggregate of 12.5 m 1202 0 - -
mm nominal size and a heat resistant foam caulking/backer rod,
all as per approved drawings and specifications.
266.00
Backfilling behind abutment, wing wall, retaining wall, breast wall
and return wall complete as per drawings & technical specifications
6.19 Clause 710.1.4.of IRC:78 & Technical specification clause cum 1562 0 440.00 440.00 880.00 1,374,560.00
305.4.4.
-
Providing and laying Filter material underneath pitching in slopes
6.21 complete as per drawing and Technical cum 1691 561.259344 561.26 949,089.55
specification
6.22 Providing and laying Pitching on slopes laid over prepared cum 1818 585.16 680.09 1,236,408.73
filter media including boulder apron laid dry in front of toe of
embankment complete as per drawing
and Technical specifications
94.93
Providing and laying flooring laid over cement concrete bedding
6.23 grade M-15 complete as per drawing and 0 0 - -
technical specifications Clause 1303
Rubble stone laid in PCC Grade M-15 cum 4195 0 - -
Flexible Apron :Construction of flexible apron 750 mm thick
6.24 comprising of loose stone boulders weighing not cum 1922 0 909.37 909.37 1,818.74 3,495,610.39
less than 40 kg beyond curtain wall.
Providing and laying of boulder apron laid in wire crates made with
4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x
100mm mesh (weaved diagonally) including 10% extra for laps
6.25 and joints laid with stone boulders weighing not less than 40 kg cum 2322 0 - -
each.
400.00
Printing of Bridge No. and span arrangement of any shade
with synthetic enamel paint black or any other approved colour
6.28 to give an even shade as complete as per Technical specifications nr 70 0 - -
and as directed by the
Engineer-in-charge.
Providing and laying 65 mm wearing course on top of deck slab
consisting of 25 mm thick mastic asphalt wearing course and
40 mm thick Bituminous concrete laid to required level and
slope after cleaning the surface, including providing
antiskid surface with bitumen precoated finegrained hard
stone chipping of
13.2 mm nominal size at the rate of 0.005cum per 10 sqm and
at an approximate spacing of 10 cm center to center in both
6.29 directions, pressed into surface when the temperature of surfaces 945 780.30 1,237.50 935.00 935.00 3,887.80 3,673,971.00
is not less than 1000C, protruding 1 mm to 4 mm over
mastic surface, all complete as per clause 507 and 516.
Sqm
Total Amount 207,425,576
amt %ge wr wa
0
14138084.352 6.815943102555 6,070.23 14915090.2452919
0
0
10393997.12 5.010925894498 6070.2303887 10267527.6123364
0
0
0 6070.2303887
8191048.416 3.948888587995 6070.2303887 7559913.48792085
47056.31 0.022685755976 6070.2303887 39274.390614841
4310716.032 2.078187855855 6570.2303887 3611629.36374276
0
0
0
211376 0.101903960492 3362.8 147963.2
0
0
0
0
0 0
0 3472.7
0 464.8
0 10818.5
0 841.4
0 10703
0 2936.5
3495618.28 1.685230807196 1345.4 2446932.796
0 1625.4
0 2.1
0 49
(a) Providing and erecting precast concrete fascia panels of M35 grade sqm 4,961 - -
including reinforcement, soil reinforcing element, foundation pad, all
accessories, components and draiange
system including ground improvement complete.
Filling, grading and compaction with selected material meeting approved
(b) design parameters in layers in reinforced zone cum 664 - -
complete.
Providing and laying in position RCC crash barrier with friction
(c) slab, including reinforcement and centering & shuttering, complete. m 15,455 - -
7.13 Providing and laying Reinforced cement concrete of M30 grade for cum 10,152 58 58
approach slab including reinforcement and formwork all complete as per
drawings and Technical specifications and as
directed by the Engineer-in-charge.
Construction of precast RCC railing of M35 Grade, true to line and grade,
tolerance of vertical RCC post not to exceed 1 in 500, leaving adequate space
between vertical post for expansion, complete as per drawing and
7.14 Technical specifications and as directed by the Engineer-in-charge. m 2,179 - -
7.24 Providing and laying Pitching on slopes laid over prepared filter media cum 1,818 609 609
including boulder apron laid dry in front of toe of embankment
complete as per drawing and Technical
specifications
Flexible Apron :Construction of flexible apron 750 mm thick comprising of
7.25 loose stone boulders weighing not less than 40 kg cum 1,922 - -
beyond curtain wall.
Providing and fixing to the required profile and slope 1 layer of Fibre
Glass Reinforced Plastic sheet 2mm thick supported by MS angles of size
25x25x3mm at bottom and MS flats of size 25x3mm at top,fixed on MS
angle posts of size 50x50x3mm, 1.5m long placed at regular interval of
7.26 m 52,841 - -
2m centre to centre throughout the length, complete as per drawings and as
directed
by the Engineer.
7.27 Printing of Bridge No. and span arrangement of any shade with synthetic Nos 73 - -
enamel paint black or any other approved colour to give an even shade as
complete as per Technical specifications and
as directed by the Engineer-in-charge.
Providing and laying 65 mm wearing course on top of deck slab consisting
of 25 mm thick mastic asphalt wearing course and 40 mm thick Bituminous
concrete laid to required level and slope after cleaning the surface, including
providing antiskid surface with bitumen precoated finegrained hard stone
chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at an
approximate spacing of 10 cm center to center in both directions, pressed into
surface when the temperature of surfaces is not less than 1000C, protruding 1
7.28 mm to 4 mm over mastic surface, all complete as per clause 507 and 516. Sqm 945 3,300 3,300
abstract fig
table 10
Amount
amt %ge wr wa
- 0.00
- 0.00
- 0.00
8,241,438 8901090 4.13 6,070.23 9014292.1272
- 0.00
- 0.00
11,948,719 12906720.36 5.99 6070.23039 12239769.747
- 0.00
- 0.00
- 0.00
6,300,519 6802021.44 3.16 6070.23039 5926487.3331
77,957 81820.8 0.04 6070.23039 65558.488198
10,581,797 11424291.84 5.30 6570.23039 9593587.6044
- 0.00
- 0.00
- 0.00
40,273,335 41894055.84 19.44 47,810.00 23419250.4
18,053,999 18805349.68 8.73 47810 10491426.4
25,942,783 27014650 12.53 47810 14866997.6
49,500,000
49500000 22.97 93750 37125000
11,197,374
125000 8875000
11269475 5.23
- 0.00
- 0.00
824,250 824250 0.38 16485 576975
- 0.00
- 0.00
515,165 515165 0.24 10303.3 360615.5
- 0.00
- 0.00
-
0.00
- 0.00
- 0.00
586,278
6200 359600
588816 0.27
- 0.00
2885.4 1615824
1201.9 120190
171,700 171700 0.08
1352.4
- 0.00
877.1
- 0.00
11148.9 1226379
1,751,970 1751970 0.81
143.5 106907.5
152,725 152725 0.07
-
1138.9
0.00
1103.2 627720.8
1183.7
- 0.00
1,106,850
1272.6 775013.4
1107162 0.51
1345.4
- 0.00
36988.7
- 0.00
-
51.1
0.00
661.5 2182950
253,562,870 187292133.49
MATERIALS
ITEM UNIT QTY CEMENT METAL 40 METAL 20 METAL 12
CONST QTY C QTY C QTY C
METAL 12
QTY
RATE ANALYSIS OF GOVERNING ITEMS
pac1
S NO ITEM UNIT PACKG 1.00
QTY RATE
1 EARTH WORK CUM
MURUM
ROYALTY 1 75.00
land cost
CUTTING/LOADING
TRANSPORTATION 5 KM LEAD
SPREADING/LEVELLING
WATERING /COMPACTION
TOTAL
2 GSB CUM 1
rate of GSB at site from plant cum 1 880.00
trp to site 11 km
MIXING GSB/ROTAVATOR 1.21 10.00
GRADER 1.21 10.00
WATERNG/COMPACTION 1.21 10.00
CRUSHER CAPEX/OPERATIONS 1 -
TOTAL
3 WMM CUM
COST OF WMM AT SITE 1 900.00
trp to site 13 km
SPREADING 1.21 30.00
GRADER 1.21 20.00
COMPACTION 1.21 8.00
others 1 -
TOTAL/ CUM
4 DLC CUM
CEMENT BAGS 2.55 250.00
CEMENTANIOUS MATERIAL BAGS 0.45 100.00
AGGREGATES
METAL CUM 0.7 912.00
NATURAL SAND 50% 0 -
CRUSHED SAND 50% 0.5 912.00
royalty 1 140.00
ADMIXURES 1 25.00
WATER 1 20.00
PLANT COST( CAPEX AND OPERATION) 1 125.00
TRANSPORTATION 1.21 230.00
CURING 1 15.00
SPREADING/PAVOUR 1 110.00
COST/CUM
5 PQC/ M40 DESIGN MIX BAGS 6.12 250.00
CEMENT BAGS 1.08 100.00
CEMENTANIOUS MATERIAL
royalty CUM 1 140.00
METAL 0.9 912.00
NATURAL SAND 50% 0.25 1,519.43
CRUSHED SAND 50% 0.25 912.00
ADMIXURES 1 30.00
WATER 1 20.00
PLANT COST 1 -
TRANSPORTATION/LOADING 1.21 240.00
SPREADING/ SLIP FORM PAVOUR/COMPACTION 1 400.00
DOWELS KG 8 40.00
TOTAL PER CUM
880.00
200.00
6.00
7.00
8.00
-
1,101.00 1,130.00
900.00
200.00
10.00
10.00
10.00
70.00
1,200.00 RATES
1,200.00 1,230.00 murum
metal
4.4 crs sand
637.50 ns
45.00
638.40
- rubble
456.00 cement
140.00 steel
25.00
20.00 gsb
125.00 wmm
278.30
15.00
110.00
2,490.20 2,490.20 7.2
1,530.00
108.00
140.00
820.80
379.86
228.00 5
30.00
20.00
-
290.40
400.00
360.00
4,307.06 4,307.06
600.00
30.00
820.80
547.20
10.00
290.00
255.00
200.00
25.00
2,778.00 2,778.00
metal
900.00 rmc
30.00 Trp
820.80 pouring lab
547.20 loader
10.00 admix
250.00 cement
290.00 fly ash
200.00
25.00 m20 pouring mac
3,048.00 3,765.00 4001.25 shuttering/stg lab
shuttering/stg mat
1,400.00
30.00
820.80
455.83
273.60 tmt
540.00 steel
250.00 bwire
290.00 lab
250.00
25.00
4,310.23 4,310.23
1,375.00
75.00
820.80
455.83
273.60
1,440.00
250.00
290.00
300.00
25.00
750.00
6,055.23 6,055.23
1,600.00
80.00
820.80
455.83
273.60
2,000.00
250.00
290.00
300.00
25.00
6,070.23 6,070.23
43,260.00
560.00
5,000.00
48,820.00 47,810.00
50.00 50
125.00 125
450.00 450
3,400,000.00
1,000,000.00
1,000,000.00
7,200,000.00
1,800,000.00
2,480,000.00
676,000.00
400,000.00
17,956,000.00
10,773,600.00 load in structures if any
KAGE 3 LEADS
CH 48.52 TO 71.06 22.54
LEADS AVAILABLE AT LEAD TRP COST
MURUM 50 (3+5)/2 4 25 35 25
55
METAL 23
AT DHANDHUKA 58 (23+58)/2 40.5
LIMBDI 45 815.04 1200
NATURAL SAND 25 KM
CRUSH SAND
172
912 80
912
1519
570
250
47810
912
1012
125000
100000
125000
45000
30000 2.47 0
425000 8.33333333
22.7272727272727
170000 cum
2015.04
2200
777.39
2120.14
883.39