RO/MUM/MAH/Annual-Plan/2021-22 (Computer no.

196145)
Government of India
Ministry of Road Transport & Highways
(Zone-4 Section)
Transport Bhawan, 1, Parliament Street, New Delhi – 110 001

Dated: 22.06.2021
To,
The Chief Engineer-Regional Officer,
Regional Office (Maharashtra & Goa),
Ministry of Road Transport and Highway,
Konkan Bhawan, Mumbai.

Subject: Annual Plan FY 2021-22 for the State of Maharashtra.

Sir,

Please find enclosed the Annual Plan for the year 2021-22 for the State of Maharashtra
amounting to Rs. 26485.48 Cr which has been approved by the Competent Authority
presuming that none of the works shall be in DLP at the time of awarding.

2. It is requested to take further necessary action.

Encl: As above

Yours faithfully,

(Shweta Kumari)
Assistant Executive Engineer (Zone-IV)
For Director General (RD) & Special Secretary

Copy to: - Chief Engineer (NH), Public Work Department, Maharashtra.


Annual Plan for State of Maharashtra for FY 2021-22
Sr Divisio Length Cost
Category NH No Name of the Work
No n Km/No Rs in Cr
Spill over works from
A
Annual Plan 2021-22
Up-gradation to 2 lane/4 lane with paved
shoulder configuration for the work of Peth
Kolhap
1 166H Naka to Sangli Road, NH-166H, from Km 42.50 446
ur
0+000 to Km 42+500 (Design length = 42.5
km) on EPC mode.
Rehabilitation and Upgradation of Satana to
Mangrul (Chandwad) Section from km
2 Nashik 752G 37.14 331
64+000 to km 101+140 of NH- 752G under
EPC mode.
Rehabilitation and Up-gradation of Shewali
(Sakri)- Nandurbar section of the Road
N.H. No.753 B from Km.0/00 to 49/050
(excluding Km 0/300 to Km 4/500 & Km
3 Dhule 753B 32.36 218
13/485 to Km 25/975 - Design Chainage) to
2L+PS and additional bridge works at Km
13/915 (60 m) and Km 19/845 (70 m) on EPC
Mode.
Widening to 4 lane to section Beed City
portion in Km.43/000 to 54/000 section of
4 Latur 361F 6.00 65
NH 361F i.e. Loha-Gangakhed-Parali-Beed-
Kharwandi
Upgradation to 2L+PS from km 84/00 to km
5 Thane 61 15.00 138
101/00 of NH-61 Kalyan - Nirmal road.
Kolhap
6 548H Amboli ghat -Ajara- Sankheshwar 62.00 574
ur
Rehabilitation, upgradation and widening of
existing Highway to Rigid pavement 2L+PS of
NH 965DD starting Lonand - Shirval-Bhor-
965
7 Pune Mandangad-Pachral 59.00 310
DD
Section: Shindewadi phata to Varandah
Ghat (Dist. border) from Km 33/550 to
92/55.
Balance work in Rehabilition and up
Ratnagi gradation of existing two lane of NH-66 from
8 66 15.000 25.00
ri Km. 406/030 to Km 450/170 (Kalmath to
Zarap).
Design & execution of necessary protective
measures in Malshej ghat section of NH-61
9 Thane 61 i.e. Kalyan – Nirmal road in km 90+00 to 2.10 70
91+00 and 91+100 to 92+200 district
Thane.
271.1
2177.00
0
A
BOT Projects
(i)
4 laning of Talegaon Chakan Shikrapur
10 Pune 548D 54.00 1015
Km.0+000 to 54+000 on DBFOT ( Toll Basis).
753B Rehabilitation and Up-gradation of
11 Dhule & Dodwe(MH Border) - Taloda Road,section 277.00 5500
753BE of NH 753B and Prakasha -Shahada-
Shirpur - Chopda- Yaval-Savada-
Burhanpur Road, section of NH 753BE to
Four Lane section on DBFOT ( Toll Basis).
(Partially Tribal area)
Construction of Double-Tier Elevated
12 Pune 753F Corridor from Pune to Shirur Km.10+600 to 67.00 7200.00
77+200 on DBFOT ( Toll Basis)..
398.0
13715.00
0
669.1
Total of A 15892.00
0
B Four /six laning
(i) FS/Detailed Engineering 0.00 0.00
DPR for 4 laning of Mumbai-Pune NH-4 from
i Pune 4 Shilphata (Km 31/200) To Nigadi (Km 3.00
20/400)
Engaging a financial consultant to study the
Ii Pune 4 3.00
cash flow for NH 4 Mumbai – Pune section.
6.00
(ii) LA + Utility Shifting 0.00 0.00
(iii) Construction
4 laning to section of NH 160 i.e. starting
from its junction with NH 60 near Sinnar
connecting Shirdi-Ahmednagar-Kolgaon-
Daund-Baramati-Phaltan-Dahiwadi-Vita-
13 Pune 160 Tasgaon-Miraj-Chikodi terminating at 33.75 365.00
junction with NH 48 Dist Pune (Section
Undavadi Kadepathar to Baramati
Deshmukh chowk to Phaltan on NH965) on
EPC mode.
Four Lanning of Nagpur-Raipur N.H. - 6 in
14 Nagpur 53 Bhandara City from Km 492/200 to Km 5.80 70.00
498/00.
Upgradation of Existing of Four Lane road
with Cement Concrete Road (WT) in Km
15 Nagpur 53 4.71 75.00
0/800 to Km 2/250, 5/100 to Km 8/360 on
Nagpur - Amravati Road NH-53.
4 lanning of NH 753E from Khamgaon
16 Akola 753 E 2.74 50
junction to NH53 (Four /six laning).
Four laning of NH 543 from Khamari village
to Collector office Square ( CH 23/650 to
753 & 21/550) & NH 753 from Collector office
Nagpur 4.1 70
543 square to Fulchur Naka ( CH 44/400 to
42/400 ) in Gondia District in the State of
Maharashtra.
Construction of four lane Gondia West
NH
Nagpur Bypass including 2 ROB in Gondia District in 9 240
753
the State of Maharashtra
Construction of four lane Concrete Road
from km 8/400 to km 16/900 on NH 543
NH
Nagpur from Rawanwadi village ( Birsi Airport 8.5 150
543
Junction) to Balaghat T point in Gondia
district in State of Maharashtra.
68.60 1020.00
Total (B) 68.60 1020.00
C Bypasses
(i) FS/Detailed Engineering
DPR preparation under N.H Division Nagpur
for 1) Khindsi Bypass on NH 753 Mansar -
Ramtek - Tumsar - Tiroda - Gondia -
Balaghat - Sheoni upto N.H. 7 2) Nagbhid
753,3
Bypass (4.5 Km), Bramhapuri Bypass (5.5
53D,
Nagpur Km) on NH 353 D, Nagbhid Bramhapuri 40.50 3.5
353I,
Road. 3) Sindi Railway Bypass & ROB on
353C
Seldoh - Sindi Railway - Hamdapur -
Sewagram - Pavnar NH-353-I. 4)Four lane of
Gondia West Bypass 5) for Sakoli (1.2 Km),
Wadsa (5.1 Km), Armori Bypass (4.785 Km)
3.50
3.50

(ii) LA
Land Acquisation for Arvi Bypass (7.44 Km)
21 Nagpur 347A on Wardha Pulgaon Rohana Arvi Ashti 7.47 22.00
Haturna Warud Multai Road
Land Acquisation for Sindi Bypass on Wadi
Hingna T Point Issasani Mihan Gumgaon
22 Nagpur 353I Salaidhaba Butibori MIDC Takalghat Asola 6.00 27.00
Seldoh Sindi Railway Hamdapur Sewagram
Pavnar on N.H. 361
Land Acquisation for Nagbhid Bypass (4.5
23 Nagpur 353D Km), Bramhapuri Bypass (5.5 Km) on 10.00 22.50
Nagbhid Bramhapuri Road.
Land acquisition for upgradation to
24 Nagpur 753 Two/Four lane with paved shoulder of 9.00 15.00
Gondia West Bypass
Amrava Land Aquistion for Morshi Bypass to Two
25 353K 7.50 50.5
ti lane with paved shoulder on NH 353K
Amrava Land Aquistion for Warud Bypass to Two
26 353K 10.00 67.5
ti lane with paved shoulder on NH 353K
Land Acquisation for Khindsi Bypass on
27 Nagpur 753, Mansar - Ramtek - Tumsar - Tiroda - Gondia 2.50 15.00
- Balaghat - Sheoni upto N.H. 7
Land Aquistion for Chandurbazar Bypass &
Amrava
28 353J Udkhed Realignment to Two lane with 8.73 67
ti
paved shoulder on NH 353J
Land Aquisition for Barshitakli Bypass on
29 Akola 161 A 3.10 15.3
NH 161 A . ( L.A. Length = 2.30 Km)
LA for Malegaon bypass on kusumba
30 Nashik 160H 8.00 15.5
Malegaon NH160H km. 0+000 to 8+000.
Pre-construction expenditure for LA &
Nanded 63 7.00 65
Utilities for Degloor city Bypass Road
79.30 382.30

(iii) Construction
Gadchi Construction of Mul bypass 6 km of NH 930
32 930 6 75
roli with ROB
6.00 75.00
Total (C) 460.80
D ROBs/ RUBs
(i) FS/Detailed Engineering
Consultancy Services for Preparation of
Detailed Project report for Double tier
33 Pune 753F Elevated Corridor Flyover Bridge on various 50.70 20.00
places from Wagholi to Shirur on NH753F for
Chainage 13/300 to 64/300
20.00
(ii) LA
Land Acquisation for Umred - Bhiwapur -
34 Nagpur 353D 1.50 10.00
Kargaon ROB
Land Acqusiition for Construction of Railway
Over bridge at LC Gate No.6 at Km 284/3-4
in Daund Manmad railway line (DD-MNR)
35 Nashik 548D Crossing at Ch 116/700 of Talegaon 0.90 5
shikrapur Nhavara Shrigonda jamkhed Road
NH-548D. (Near Limpangaon ) in
Ahmednagar District (Length - 0.90 Km.)
Pre construction expenditure for LA and
Widening of Existing ROB in Udgir city
36 Nanded 50 0.71 30.00
portion stretch length 0.710 Km of NH 50
Km 97/190 including land Acquisition.
Pre construction expenditure for LA and
Widening of Existing ROB in Udgir city
37 Nanded 63 0.600 25.00
portion stretch length 0600 Km of NH 63
including land Acquisition.
70.00
(iii) Construction
Construction of Umred - Bhiwapur - Kargaon
38 Nagpur 353D 35.00
ROB
Construction at ROB at km 131/770 of NH-63
39 Latur 63 30
near Ashtamode
1) Construction of Underpass in Km. 470/00
Ratnagi banda Sawantwadi on NH-66 Panvel Mahad
40 66 20
ri Panji Road NH-66 (Zarap Patradevi 4 lane
road) in the state of Maharashtra
2) Construction of Flyover in Km. 468/500 to
Ratnagi
41 66 469/100 Banda on NH 66 Panvel Mahad 80
ri
Panjim Road
3) Construction of overpass in Km.
451/300to 451/900 near village Nemale on
Ratnagi
42 66 NH-66 Panvel Mahad Panji Road NH-66 20
ri
(Zarap Patradevi 4 lane road) in the state of
Maharashtra
4) Construction of vehicular under pass at
Ratnagi
43 66 Km 51/800 (old 215/000)near chiplun on 20
ri
Panvel mahad Panji NH 66
ROB near Akkalkot Railway Station on NH-
44 Solapur 548B 30
548B
45 Solapur 465 ROB at km 76/00 on NH-465 Tilati Gate 30
46 Solapur 465 ROB at km 67/500 on NH-465 Aherwadi Gate 30
Construction of ROB at km 179+065 and
47 Solapur 548C 90
181+726 and VUP at km 181+650 on NH-548C

Construction of Railway Over bridge Navhara


48 Nashik 548D 30
Adhalgaon Section of NH-548D
Widening and improvement with footpath of
49 Nanded 61 Existing ROB on Bhokar bypass of NH 61 km 30.00
128/400
Construction of ROB over LC No. 20A at Ch
53 &
50 Akola 24/813 km at the junction of NH 53 and NH 120
161H
161H for Jalgaon Jamod to Nandura Road.
Construction of Railway Over bridge at
Special Gate No 115 at level Crossing at Ch
126/180 of jalgaon Bhadgaon Chalisgaon
51 Nashik 753 J Nandgaon Manmad Road NH753J. (Near 30
Shani Mandir ) in Nashik District in the State
of Maharashtrain NH753J. (Length - 0.850
Km.)
Construction of Railway over bridge on
Aurangabd Jalna Jintur road NH 752I in
Nanded 752I 0.9 60
section Shiradshahapur to wasamat at LC no
165 B at ch 60.700
Total for new RoB 655.00
Total (D) 745.00
E Missing link/New NHs
20KMs
for
(i) Preparation of DPR for missing link of NH
353C, DPR,36
FS/Detaile 130D ch 84/0 to 104/0 and Submission of
Gadchi 130D, 4 KMs
53 d Forest Clearance proposals for NH 353C, NH 2.000
roli 930 & for
Engineerin 130D, NH 930 & NH 543 in Gadchiroli district
543 forest
g (150+104+60+50=364km)
propos
al
2.00
Land Acquisation for N.H 247 in section
Kamptee to Gumthala & Kuhi to Umred
54 (ii) LA Nagpur 247 35.50 45.00
Road along with Mohadara ROB & Umred
Bypass.
Land Acquistion, Forest Diversion and other
Variou
55 Pre Construction activity for NIP 2022-23 3594
s NHs
and 2023-24 and 2024-25
3639.00
(iii) Construction
0.00 0.00
Total (E) 3641.00
Widening to two lane with
F
Paved shoulder
(i) FS/Detailed Engineering
DPR for rehabilitation and upgradation of
56 Thane 61 Kalyan Nirmal road NH-61 in km 15/200 to 68.80 3.00
84/000 in the state of Maharashtra.
3.0
57 (ii) LA Thane 61 Land acquisition for rehabilitation and 68.80 250.00
upgradation of Kalyan Nirmal road NH-61 in
km 15/200 to 84/000.
LA for construction of 2 lane with paved
shoulders rigid pavement from Design Km
Kolhap 30.670 (End of Karul ghat) to Design
58 166G 35.33 60
ur Km66.00 (Kale) section on Talere –
Gaganbawada – Kolhapur road (NH-166G) on
EPC mode.
310.00
Upgradation of Sakoli-Wadsa-Armori-
Gadchiroli-Ashti-Allapalli-Sironcha road NH
353C in km 182/350 to km 227/000 and
321/000 to 322/500 (Section from Ashti to
(iii)
Gadchi Mosam & sironcha to NH 63) along with
59 Constructi 353C 46.15 500.000
roli construction of Major Bridge a/c Dina river
on
@ Ch. 211/347 (140m length) and
Choudampalli Nallah @ Ch. 189/527 (45m
length) in Gadchiroli District in the State of
Maharashtra on EPC mode.
Upgradation of Umred -Chimur-Khadsangi-
Warora Road NH-353E, Chimur to Khadsangi
Section from Km 52+700 to 60+600 Length
Gadchi 6.70 KM ( excluding Animal Underpass & its
60 353E 6.70 70.000
roli approaches from Km 53+410 to 54+610
Length 1.20 Km ) to two lane with paved
shoulder configuration in Chandrapur
District on EPC mode .
Rehabilitation and upgradation of length in
61 Akola 461 B Risod town from Km 36 /845 to 39/340 & 5.20 45
Km 41/520 to 44/220 to 2L+PS
Rehabilitation and Upgradation of NH 752-I
Jintur to Shirad Shahapur Km 258/300 to
62 Nanded 752-I 48.50 415
Km 306/800 to Two Lane with Paved
Shoulders on EPC basis
Rehabilitation and Up-gradation of National
Highway 548DG starting from its junction
548 with NH548D near Nhavra and terminating at
63 Pune 25.00 220
DG junction NH 65 near Choufula Section:
Nhavra to Choufula to 2L + Paved Shoulder
/ 4 L rigid pavement configuration.
Rehabilitation and Up-gradation of existing
2 lane flexible pavement to 2 lane with
paved shoulders rigid pavement from
Kolhap Devasu to Amboli Junction(Design Ch
64 548H 29.31 226
ur 71/530) section of Newly declared NH No
548H Road Network with NH-66 near Banda-
Amboli-Ajara-Gadhinjlaj to NH-48 near
Sankeshwar on (EPC) Mode
Rehabilitation and Up-gradation of
Talegaon Dabhade - Chakan -Shikrapur -
Nhavare- Srigonda - Jalgaon - Jamkhed -
65 Nashik 548 D Patoda - Manjarsumba - Kaij - 13.40 135
Ambajogai - Kingaon and terminating at its
junction with NH-361 near Chakur Road NH
548 D in Km. 195/375 to 208/775 (Section
Jamkhed to Sautada ) to 2L+PS on EPC
Basis.
Rehabilitation and Up-gradation of
Malegaon (Near Junction form NH-3),
connecting Kusumba, Lamkani, Dondaicha,
66 Dhule 160H Nimgul, Sarangkheda and Shahada (Near 28.50 290
Junction of NH 752 G) Road NH 160 H (
Section Dondaicha to Shahada) in Km.
96/500 to 125/000 to 2L+PS on EPC Mode.
Rehabilitation and Up-gradation of Khetia-
Shahada-Prakasha-Kolde-Nandurbar-
Khandbara-Visarwadi-Sakri-Pimpalner-
67 Dhule 752G Satana-Deola-Chandwad-Manmad-Shirdi 25.00 242.00
Road NH 752 G in Km. 75/00 to 100/00
(Section Visarwadi to Kalamba Village) to
to 2L+PS on EPC Mode.
Strengthening in km 60.400 to Km 66.600 &
Km 73/600 to 81/600 (Rajewadi Phata to
Varandh Ghat) of NH 965DD starting from its
965 junction with NH-965DD near Lonand and
68 Pen 14.200 25.00
DD connecting Andori, Shiwal, Bhor,Ati, Mahad,
Mandangad terminating at Pachral (with
connection to birth place of Baba Saheb
Ambedkar).
Strenghtening & widening to Malegaon
Kusumba Dondaicha to Junction of NH 752G
69 Dhule 160H near Shahada road, NH 160 H ,(Section 55.000 60.00
Kusumba to Dondaicha ) in km42/00 to
97/00.

Strengthening to section Gangakhed to


Kingaon section of NH 752K i.e. Parbhani -
Gangakhed - Isad - Kingaon - Gharani-
70 Latur 752K 65 95.00
Nalegaon- Aari Mode- Latur- Nitur- Nilanga -
Bhalki road NH 752K and Km 36/00 to
73/500 Km 78/00 to 106/800.

Strengthening to Rajur Dabhadi Talegaon


Aurang
71 752H Palphata design ch. km. 0+00 to 46+440 on 46.44 60
abad
EPC Mode
Rehabilitation/Upgradation of New Highway
to 2L+PS from Rajur to Jalna KM 17+00 to
72 Jalna 753H 42+00 section of NH 753H i.e. Sillod-- 25.00 250
bhokardan-kumbhari fata-Rajur-jalna on EPC
mode.
Gondia- MP/MH Border [Km 16.9 - Km 0/00]
73 Nagpur 543 17 210
2 lane with paved shoulder
74 Nanded 161A Mudkhed to Nanded 22 200
75 Akola 161G Balapur - Shegaon 22 170
Rehabilitation and upgradation with rigid
pavement in km.353.00 to 363.500 (section.
76 Nashik 752G 23.00 150
Manmad to Savalivihir- 4 lane) of NH 752G in
the State of Maharashtra .
690.2 3363
4
690.2
Total (F) 3676
4
Widening to two lane with
G
Geometric improvements
H Strengthening

Strengthening of section of Karad Tasgaon


Road NH-266 i.e. from Km. 5/120 to 5/460,
Kolhap
77 266 Km.27/600 to 43/400, Km.52/000 to 53/400 19.370 21.00
ur
and Km. 57/000 to 58/830 (in stretches) in
Sangli District.
Strenghtening to Solapur-Vijapur Road in
78 52 7.600 18.00
Solapur Km 2/400 to 10/00 .
26.97 39.00

Strenghening of Sakoli - Lakhandur - Wadsa -


Armori - Gadchiroli -Chamorshi - Ashti -
Allapalli - Sironcha Road NH 353C (Section
Gadchi Armori to Gadchiroli) from Km 85/000 to
79 353C 13.65 21.000
roli 91/000, Km. 97/000 to 98/000, Km. 100/000
to 103/000, Km. 104/000 to 106/500, Km.
112/500 to 113/650 (Length = 13.650 Km) in
the state of Maharashtra.
Strenghening of CG Border-Murumgaon -
dhanora-Gadchiroli-Mul -Chandrapur- road
Gadchi NH 930 section Dhawali to Rajoli &
80 930 24.00 31.000
roli Pandharsala to Mohadongri km 150/00 to
163/00 & 171/00 to 182/00. in the state of
Maharashtra.
Widening and Strengthning of Bhramapuri-
Gadchi Wadsa-Kurkheda-Korchi NH 543in km 424/00
81 543 7.00 30.000
roli to 431/000 (Gurnoli to Shankarpur section)
in the State of Maharashtra
Strenthening of Nagpur Hyderabad road NH
82 Nagpur 44 (7) 44(7) in Km 0/00 to 2/200 and KM 9/500 to 7.29 16
14/585 district Nagpur.
Strengthening to Talegaon - Arvi - Pulgaon -
Wardha Road NH-347A km 106/375 to Km
Nagpur 347A 10.00 10
116/375 (Local Chainage Km 43/00 to Km
53/00) in Wardha District
88.91 108.00
115.8
Total (H) 147.00
8
Short-term maintenance contract for 2
Improvement of Riding
I years for sections included under NIP 500.00 100.00
quality
2023-24 @ 10 lakhs per km per year
Total for (I) 100.00
Paved shoulder with
J
strengthening
Widening /Reconstruction of
K
Culverts
Rehabilitation & reconstruction of CD
84 Thane 160A 5.00
works/Minor bridges in Km. 197/000 to
217/700 of Sinnar-Ghoti-Trambakeshwar-
Jawhar-Palghar Road NH-160A, Dist.
Palghar.
Road Safety works on Sinnar-Ghoti-
Trambakeshwar-Jawhar-Palghar Road NH-
85 Thane 160A 5.50
160A from Km. 110/000 to 217/700 Dist.
Palghar.
Widening and Construction of Culverts,
86 Nashik 160A Bridge of Ghoti Trimbak Jawhar road 9 6.00
N.H.160 A in km 77/00 to 86/00
Widening and reconstruction of H.P.drain
and construction of Retaining wall, repairs
87 Nashik 953 of protection wall in Saputara ghat in km 3 3.00
104/00 to 107/00 of Saputara Sarad Vani
Pimpalgaon Road .
Reconstruction/ Repairs to Selected 35 Nos
Culverts in Km 0/00 to Km 118/430 on Culvert
Shewali Nijampur Chadwel Nandurbar s&7
88 Dhule 753B 3.00
Taloda Akkalkuwa to Gujrat State Border Nos
Road NH753B, in the Dhule and Nandurbar Minor
Districts. Bridges
Total (K) 22.50
L Renewal
0.00 0.00
M Miscellaneous
(i) Road safety work including
way side amenities & Toll
Plaza
Construction of road safety work such as
protection wall in stretches due to high
emabankment along with reconstruction of
approaches of Culverts & Bridges from Km
118/300 to 118/400 near Morchul, in
Gadchi stretches from km 148/143 to 148/157,
89 930 1.50 4.0
roli 148/167 to 148/182, 148/203 to 148/214,
148/454 to 148/466, 148/525 to 148/545,
148/942 to 148/960, 148/987 to 149/050,
149/015 to 149/041, 149/670 to 149/695,
159/400 near Kanhartola river bridge in
Gadchiroli district
Construction of Water Channel in Shinde
Village at Slab Culvert Km. 194/200 of Pune
90 Nashik 60 0.97 4.0
Nashik Road NH60 (Old NH-50) (Section-
Shinde Village) in Nashik District
8.00
(ii) Road work, protection
work , culverts , drain ,
consultancy work
Construction of PUP on Pune Nashik Road
NH 60 (Near Mohdari Village) in Nashik
91 Nashik 60 0.400 15.00
District in the State of Maharashtrain NH-
60. (Length - 0.30 Km.)
Providing RCC Drain in villages
Amrava 353J Chandurbazar,Ridhapur,Jamapur,Talegaon 4.13 15.55
ti Mohna,Khanapur,Udkhed,Kolvihir, on NH 353
J in Km 0/000 to Km 53/719, Length
53.719 Km, District Amravati in the State
of Maharashtra.
30.55
(iii)Survey Investigation ,
repairs and rehabilitation ,
minor bridges

Total (M) 38.55


Major
N
bridges
(i)Reconst Reconstruction of Major bridge at Raita km
93 ruction / Thane 61 16/500 and Dhaniwali km 34/800 on Kalyan 2 Nos. 50.00
widening Nirmal road NH-61.
Construction of two 2 lane major bridges at
km 406/070 (63.00 Rmt) on Service Road for
Ratnagi
94 66 Janavali Bridge in kankavali dist.sindhudurg 2.00 50.00
ri
on four laned Panvel Mahad Panjim Road
NH 66.
Construction of Major Bridge A/c Kanhan
River and Pench River including approaches
and Khapa Bypass (2.4 Km) on Bhandara
95 Nagpur 753 3.50 130.00
Khat Ramtek Mansar Mauli Nayakund
Parseoni Saoner NH-753 in the state of
Maharashtra. (AMDI-SAONER SECTION)
Construction of Major Bridge A/ C
Wainganga river on Km. 132/00 (Near
96 Nagpur 353D 1.00 125.00
Armori) on Nagpur Umred Nagbhid Armori
Road
Construction of Major Bridge Km 709/500
Across Kanhan River Near Kanhan on
97 Nagpur 7 (44) Nagpur - jabalpur Road Section of NH-7 (44), 1.00 85.00
Taluka Parseoni and Kamptee in Nagpur
District
Construction of Major bridge (Peth ) on
548
98 Akola Chikhali Khamgaon road. ( A/C Painganga 1.23 20
CC
River)
460.00
(ii)
Rehabilita
tion
1)Preparation of Detailed Project Report for
Construction of Major Bridge A/c Kanhan
River and Pench River including approaches
753,3
and Khapa Bypass (2.4 Km)NH-753 (AMDI-
53D,
SAONER SECTION) 2) Construction of Major
7
Nagpur Bridge A/ C Wainganga river on Km. 132/00 6.50 1.50
(44),5
(Near Armori) on Nagpur Umred Nagbhid
43,
Armori Road 3) Construction of Major Bridge
130D
Km 709/500 Across Kanhan River Near
Kanhan on Nagpur - jabalpur Road Section of
NH-7 (44), Taluka Parseoni and Kamptee.

Land Acquisition for Construction of Major


100 (iii) LA Nagpur 7 1.00 21
Bridge Km 709/500 Across Kanhan River
Near Kanhan on Nagpur - jabalpur Road
Section of NH-7, Taluka Parseoni and
Kamptee in Nagpur District in the state of
maharashtra
Land Acquisation for construction of Major
Bridge A/c Kanhan River and Pench River
including approaches and Khapa Bypass (2.4
101 Nagpur 753 Km) on Bhandara Khat Ramtek Mansar Mauli 3.50 20
Nayakund Parseoni Saoner NH-753 in the
state of Maharashtra. (AMDI-SAONER
SECTION)
Land acquisition for Construction of Major
Bridge A/ C Wainganga river on Km. 132/00
102 Nagpur 353D 1.00 10
(Near Armori) on Nagpur Umred Nagbhid
Armori Road
Rehabilitation and repairs to beam and
deck slab of RPB No 371/1 at railway km
103 Dhule 753J 1.00 1.00
371/3-5 (Pachora ROB) on NH 753J in the
state of Maharashtra.
53.50
Total (N) 513.50
Minor
O
bridges
Construction of High Level Minor Bridge at
Gadchi
104 543 Km 405/800 across Lendhari Nallah near 0.03 3.00
roli
Jambhulkheda on NH 543
Construction of Major Bridge Across
Gadchi
105 130D Gundenoor Nalla on Alapalli Bhamragarh to 0.80 10.00
roli
State Border at ch 84/00
Construction of 6 Nos. of Minor Bridges on
Allapalli-Bhamragad-Laheri-Binagunda-
Naraynpur National Highway NH 130D
Gadchi
130D (Allapalli to Bhamragd section) at ch. 9/200 0.23 35
roli
km, 14/200 km, 32/600 km, 34/200 km,
43/400 km And 46/400 km in Gadchiroli
District in the State Of Maharashtra.
Total (O) 48.00
P Road Safety & Environment
(i) Improvement to accident
prone spots (providing crash
barrier, retaining wall etc)
Road Safety work on P.M.P. Road N.H.-66
from Km. 450.170 to 471.300 (Zarap
Ratnagi
107 66 Patradevi Section) providing median 21.130 3.00
ri
plantation filling cultivatied soil & painting
of median.
Providing and constructing safety measures
at various locations to road connecting NH-
108 Pune 761 61- Belhe- Alkuti- Devibhoyre- Nighoj-Shirur 49.081 2.00
and terminating at NH 753F in Pune District,
NH-761 km 0/00 to 49/081
Construction of road safety work such as
109 465 retaining wall in stretches due to high 0.200 2.00
Solapur
embakment from in Km.15/200 to 15/400
Near Kurul Km.39/800 to 40/00 Near
Yelegaon NH 465.
Providing Plantation & safety measures on
Nagpur 44 Nagpur Hydrabad road NH -44 in Km 9/200 5.3 85.00
to 14/600 in state of Maharashtra
Construction of additional VUP, approach
road junctions in Anjangaon Surji city and
Akola 548C bus shelter & bus bays in villages on Akot- 0.500 9.00
Anjangaon section of NH-548C as one time
improvement in the State of Maharashtra.
Construction of service road as traffic safety
measures at pilgrimage centre, Bahiram,
additional approach road junctions and bus
Akola 548C shelter & bus bays in Paratwada city and 1.000 20.00
villages on Anjangaon-Betul (State Border)
section of NH-548C as one time
improvement in the State of Maharashtra.
121.00
(ii) Black spot improvement
Providing traffic safety measures, protective
measures and geometrical improvements at
necessary location (especially in Torangan
113 Nashik 160A Ghat and Mhasuli Ghat) in section of Sinner- 14.0 2.50
Ghoti-Trimbakeshwar-Palghar Road NH 160A
from Km.74/500 to Km 85/500 and
Km.103/00 to Km.106/00.
Providing traffic safety measures, protective
measures and geometrical improvements at
necessary location (especially in
114 Nashik 953 sarad,Hatgad Ghat) in section of Sarad- 5.5 1.50
Saputara-Vani Road NH 953 from Km.104/00
to Km 106/500 and Km.114/00 to
Km.117/00.
Providing safety measures in Km. 2/00 to
38/00 and 55/00 to 70/00 including
115 Nashik 561 5.00
construction of bridge at Km. 66/500 on
Ahmednagar-Jamkhed Road-NH-561.
Work of Improvement of Black Spot in Km
ch. 6+00,7+165 & 8+200 (Design
Chainage)including carrying out survey
Nagpur 753 0.8 10.00
investigation & Land Aquisition of Mansar -
Salaikhurd Section of Kohmara - Gondia -
Tirora - Tumsar - Ramtek - Mansar Road
19.00
Variou Consultancy Services for Forest Clearance of
117 (iii) Misc 10
s NHS NHs in Maharahstra
Construction of Office Buildeing for CE RO
118 Misc. 25
and RPAO MoRTH Mumbai including LA cost
35
Total (P) 175.00
Grand Total 1544 26485.48

*****