10) Request For Information

This document is a request for information (RFI) log for a construction project. It contains two open RFIs, one with an expedited priority regarding the status of plans and specifications, and another with a critical priority needing clarification on intended door height in the plans. The RFI log tracks the RFI number, current status, priority, description, who requested and is assigned to the RFI, and dates for when it was requested, required by, and responded to.

Uploaded by

kerwin jay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views2 pages

10) Request For Information

This document is a request for information (RFI) log for a construction project. It contains two open RFIs, one with an expedited priority regarding the status of plans and specifications, and another with a critical priority needing clarification on intended door height in the plans. The RFI log tracks the RFI number, current status, priority, description, who requested and is assigned to the RFI, and dates for when it was requested, required by, and responded to.

Uploaded by

kerwin jay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Prime Contractor:

Project Name: Request For Information Log


Project Manager:

Project Description:

Current Date Date Date


RFI # Priority Request Description Requested By Assigned To Notes
Status Requested Required Responded

001 Open Expedited Status of Plans & Specifications Prime Contractor Project Manager

002 Open Critical Need clarification on plans for intended door height Prime Contractor Architect