Structural Calcs For AHU Platform

This document contains structural design calculations for a proposed air handling unit (AHU) platform for a new facility in Binan, Laguna, Philippines. It outlines the codes and standards that will be followed, design criteria including loads, materials and analysis methods. Load combinations are considered. 3D views and load diagrams will be presented in subsequent sections.

Uploaded by

Ferdiv Toloski
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
116 views98 pages

Structural Calcs For AHU Platform

This document contains structural design calculations for a proposed air handling unit (AHU) platform for a new facility in Binan, Laguna, Philippines. It outlines the codes and standards that will be followed, design criteria including loads, materials and analysis methods. Load combinations are considered. 3D views and load diagrams will be presented in subsequent sections.

Uploaded by

Ferdiv Toloski
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 98

STRUCTURAL DESIGN

CALCULATION
OF

Proposed AHU Platform


VISHAY BIÑAN MOSFETS NEW FACILITY
(LTI Complex, Biñan, Laguna)

Prepared by:

MERVIN C. ARCE
Civil/Structural Engineer
PRC No. 068796
PTR No. 174094
Date Issued 10 January 2022
Place Issued City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

1.0 CODES AND STANDARDS

The structural installation shall comply with Philippine Codes and regulations and
relevant international standards. Details are given below.

2.0 STRUCTURAL

2.1 Design
a. NSCP 2015: National Structural Code of the Philippines
b. AISC: American Institute of Steel Construction – Manual of Steel
Construction

2.2 Structural Steel


a. ASTM A36:Standard specifications for Rolled Steel Plates,
Shapes, Sheet Piling and Bars for Structural use
b. ASTM A307:Anchor Bolts, regular low-carbon steel bolts and nuts
c. ASTM A325/490:Anchor Bolts for structural connections
d. AWS D1.1:Structural Welding Code-Steel
e. ANSI/AWS D1.1:Conformance of Welder Qualification Test
Requirement

3.0 DESIGN CRITERIA – STRUCTURAL

3.1 Materials

A. Structural steelwork shall be Grade 36 (ASTM A36).

3.2 Material Densities

Steel 77.00 KN/m3

3.3 Design Loads


The following design loadings will generally be adopted:

A. Live Loads
USE OR OCCUPANCY kPa
Manufacturing (Light Load) 6.0 kPa (125 psf)

3.4 Lateral Loads

A. Wind Loads
Design Code : NSCP 2015/ASCE7-02
Wind Pressure Zone : Zone II
Basic Wind Speed : 250 kph

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

Velocity Pressure, q : 47.3x10-6 Kz Kzt V2 Iw


Importance Factor, Iw : 1.15
Exposure Category : C
Design Wind Pressure,P : P = q G Cp – qh (GCpi)

B. Load Combinations
The structural elements will be checked and designed to resist the
most critical forces under the following load combinations:

For Load Resistance Factor Design of Steel


a. Dead Load & Live Load
1.4D
1.2D + 1.6L (Factored Load)

b. Dead Load + Live Load + Seismic Load


1.2D + 1.0E + f1L
0.9D + 1.0E

3.5 Deflection Criteria

A. Vertical Deflection of Beams and Slabs due to Gravity Loads

Total Deflection (D + L) < Span/240 up to 25mm maximum


Live Load Deflection < Span/360

Incremental Deflection after < Span/500 or 20mm, whichever is


lesser

3.6 Analysis

A. General
The analysis is carried out in accordance with the Uniform Building
Code (UBC) 1997 / National Structural Code of the Philippines (NSCP)
2010. A three dimensional model will be used in the analysis using
STAAD PRO V8.

B. Vertical Load Analysis


Vertical load analysis will be carried out on the basis of the loads
given in 3.4

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

4.0 LOAD CASE AND LOAD COMBINATIONS

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

5.0 3D VIEW AND LOADING DIAGRAM

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

6.0 DESIGN OUTPUT FILE

****************************************************
* *
* STAAD.Pro *
* Version 2007 Build 04 *
* Proprietary Program of *
* Research Engineers, Intl. *
* Date= FEB 28, 2022 *
* Time= 22:48:27 *
* *
* USER ID: asep *
****************************************************

1. STAAD SPACE DXF IMPORT OF AHU VISHAY.DXF


INPUT FILE: AHU Platform Vishay R8 LFRD with 6kPa LL With Column.STD
2. START JOB INFORMATION
3. ENGINEER DATE 24-FEB-22
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. UNIT METER KN
7. JOINT COORDINATES
8. 1 0.472519 4.44611 10.8736; 2 7.46751 4.44611 10.8736
9. 3 0.472519 4.44611 8.02363; 4 0.472519 -0.053894 10.8736

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

10. 6 14.2755 -0.053894 10.8736; 7 14.2755 4.44611 10.8736


11. 8 21.4565 -0.053894 10.8736; 9 21.4565 4.44611 10.8736
12. 11 28.4515 4.44611 10.8736; 12 7.46751 4.44611 8.02363
13. 13 14.2755 4.44611 8.02363; 14 21.4565 4.44611 8.02363
14. 15 28.4515 4.44611 8.02363; 16 0.472519 4.44611 4.87363
15. 17 7.46751 4.44611 4.87363; 18 14.2755 4.44611 4.87363
16. 19 21.4565 4.44611 4.87363; 20 28.4515 4.44611 4.87363
17. 21 0.472519 4.44611 1.21763; 22 7.46751 4.44611 1.21763
18. 23 14.2755 4.44611 1.21763; 24 21.4565 4.44611 1.21763
19. 25 28.4515 4.44611 1.21763; 26 0.472519 4.44611 0.217628
20. 27 7.46751 4.44611 0.217628; 28 14.2755 4.44611 0.217628
21. 29 21.4565 4.44611 0.217628; 30 28.4515 4.44611 0.217628
22. 31 29.9515 4.44611 8.02363; 32 29.9515 4.44611 4.87363
23. 33 29.9515 4.44611 1.21763; 34 0.472519 -0.053894 4.87363
24. 35 0.472519 -0.053894 0.217628; 36 7.46751 -0.053894 0.217628
25. 37 14.2755 -0.053894 0.217628; 38 21.4565 -0.053894 0.217628
26. 39 28.4515 -0.053894 0.217628; 40 1.47252 4.44611 8.02363
27. 41 1.47252 4.44611 4.87363; 42 1.47252 4.44611 1.21763
28. 43 2.47252 4.44611 8.02363; 44 2.47252 4.44611 4.87363
29. 45 2.47252 4.44611 1.21763; 46 3.47252 4.44611 8.02363
30. 47 3.47252 4.44611 4.87363; 48 3.47252 4.44611 1.21763
31. 49 4.47252 4.44611 8.02363; 50 4.47252 4.44611 4.87363
32. 51 4.47252 4.44611 1.21763; 52 5.47252 4.44611 8.02363
33. 53 5.47252 4.44611 4.87363; 54 5.47252 4.44611 1.21763
34. 55 6.47252 4.44611 8.02363; 56 6.47252 4.44611 4.87363
35. 57 6.47252 4.44611 1.21763; 58 8.46751 4.44611 8.02363
36. 59 8.46751 4.44611 4.87363; 60 8.46751 4.44611 1.21763
37. 61 9.46751 4.44611 8.02363; 62 9.46751 4.44611 4.87363
38. 63 9.46751 4.44611 1.21763; 64 10.4675 4.44611 8.02363
39. 65 10.4675 4.44611 4.87363; 66 10.4675 4.44611 1.21763
40. 67 11.4675 4.44611 8.02363; 68 11.4675 4.44611 4.87363
41. 69 11.4675 4.44611 1.21763; 70 12.4675 4.44611 8.02363
42. 71 12.4675 4.44611 4.87363; 72 12.4675 4.44611 1.21763
43. 73 13.4675 4.44611 8.02363; 74 13.4675 4.44611 4.87363
44. 75 13.4675 4.44611 1.21763; 76 15.2755 4.44611 8.02363
45. 77 15.2755 4.44611 4.87363; 78 15.2755 4.44611 1.21763
46. 79 16.2755 4.44611 8.02363; 80 16.2755 4.44611 4.87363
47. 81 16.2755 4.44611 1.21763; 82 17.2755 4.44611 8.02363
48. 83 17.2755 4.44611 4.87363; 84 17.2755 4.44611 1.21763
49. 85 18.2755 4.44611 8.02363; 86 18.2755 4.44611 4.87363
50. 87 18.2755 4.44611 1.21763; 88 19.2755 4.44611 8.02363
51. 89 19.2755 4.44611 4.87363; 90 19.2755 4.44611 1.21763
52. 91 20.2755 4.44611 8.02363; 92 20.2755 4.44611 4.87363
53. 93 20.2755 4.44611 1.21763; 94 21.2755 4.44611 8.02363
54. 95 21.2755 4.44611 4.87363; 96 21.2755 4.44611 1.21763
55. 97 22.4565 4.44611 8.02363; 98 22.4565 4.44611 4.87363

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

56. 99 22.4565 4.44611 1.21763; 100 23.4565 4.44611 8.02363


57. 101 23.4565 4.44611 4.87363; 102 23.4565 4.44611 1.21763
58. 103 24.4565 4.44611 8.02363; 104 24.4565 4.44611 4.87363
59. 105 24.4565 4.44611 1.21763; 106 25.4565 4.44611 8.02363
60. 107 25.4565 4.44611 4.87363; 108 25.4565 4.44611 1.21763
61. 109 26.4565 4.44611 8.02363; 110 26.4565 4.44611 4.87363
62. 111 26.4565 4.44611 1.21763; 112 27.4565 4.44611 8.02363
63. 113 27.4565 4.44611 4.87363; 114 27.4565 4.44611 1.21763
64. 115 29.4515 4.44611 8.02363; 116 29.4515 4.44611 4.87363
65. 117 29.4515 4.44611 1.21763; 119 7.46751 3.44611 0.217628
66. 121 14.2755 3.44611 0.217628; 123 21.4565 3.44611 0.217628
67. 125 28.4515 3.44611 0.217628; 126 21.4565 3.44611 10.8736
68. 129 21.4565 4.44611 9.8736; 130 14.2755 3.44611 10.8736
69. 131 14.2755 4.44611 9.8736; 134 7.4675 -0.053894 10.8736
70. 135 7.4675 3.44611 10.8736; 136 7.46751 4.44611 9.8736
71. 137 28.4515 -0.053894 10.8736; 138 28.4515 3.44611 10.8736
72. 139 28.4515 4.44611 9.8736; 140 0.472519 4.44611 7.42363
73. 141 1.47252 4.44611 7.42363; 142 7.46751 4.44611 7.42363
74. 143 8.46751 4.44611 7.42363; 144 14.2755 4.44611 7.42363
75. 145 15.2755 4.44611 7.42363; 146 21.4565 4.44611 7.42363
76. 147 22.4565 4.44611 7.42363; 148 28.4515 4.44611 7.42363
77. 149 29.4515 4.44611 7.42363; 150 6.47252 4.44611 7.42363
78. 151 5.47252 4.44611 7.42363; 152 4.47252 4.44611 7.42363
79. 153 3.47252 4.44611 7.42363; 154 2.47252 4.44611 7.42363
80. 155 13.4675 4.44611 7.42363; 156 12.4675 4.44611 7.42363
81. 157 11.4675 4.44611 7.42363; 158 10.4675 4.44611 7.42363
82. 159 9.46751 4.44611 7.42363; 160 21.2755 4.44611 7.42363
83. 161 20.2755 4.44611 7.42363; 162 19.2755 4.44611 7.42363
84. 163 18.2755 4.44611 7.42363; 164 17.2755 4.44611 7.42363
85. 165 16.2755 4.44611 7.42363; 166 27.4565 4.44611 7.42363
86. 167 26.4565 4.44611 7.42363; 168 25.4565 4.44611 7.42363
87. 169 24.4565 4.44611 7.42363; 170 23.4565 4.44611 7.42363
88. 171 29.9515 4.44611 7.42363; 172 0.472519 4.44611 6.82363
89. 173 1.47252 4.44611 6.82363; 174 7.46751 4.44611 6.82363
90. 175 8.46751 4.44611 6.82363; 176 14.2755 4.44611 6.82363
91. 177 15.2755 4.44611 6.82363; 178 21.4565 4.44611 6.82363
92. 179 22.4565 4.44611 6.82363; 180 28.4515 4.44611 6.82363
93. 181 29.4515 4.44611 6.82363; 182 6.47252 4.44611 6.82363
94. 183 5.47252 4.44611 6.82363; 184 4.47252 4.44611 6.82363
95. 185 3.47252 4.44611 6.82363; 186 2.47252 4.44611 6.82363
96. 187 13.4675 4.44611 6.82363; 188 12.4675 4.44611 6.82363
97. 189 11.4675 4.44611 6.82363; 190 10.4675 4.44611 6.82363
98. 191 9.46751 4.44611 6.82363; 192 21.2755 4.44611 6.82363
99. 193 20.2755 4.44611 6.82363; 194 19.2755 4.44611 6.82363
100. 195 18.2755 4.44611 6.82363; 196 17.2755 4.44611 6.82363
101. 197 16.2755 4.44611 6.82363; 198 27.4565 4.44611 6.82363

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

102. 199 26.4565 4.44611 6.82363; 200 25.4565 4.44611 6.82363


103. 201 24.4565 4.44611 6.82363; 202 23.4565 4.44611 6.82363
104. 203 29.9515 4.44611 6.82363; 204 0.472519 4.44611 6.22363
105. 205 1.47252 4.44611 6.22363; 206 7.46751 4.44611 6.22363
106. 207 8.46751 4.44611 6.22363; 208 14.2755 4.44611 6.22363
107. 209 15.2755 4.44611 6.22363; 210 21.4565 4.44611 6.22363
108. 211 22.4565 4.44611 6.22363; 212 28.4515 4.44611 6.22363
109. 213 29.4515 4.44611 6.22363; 214 6.47252 4.44611 6.22363
110. 215 5.47252 4.44611 6.22363; 216 4.47252 4.44611 6.22363
111. 217 3.47252 4.44611 6.22363; 218 2.47252 4.44611 6.22363
112. 219 13.4675 4.44611 6.22363; 220 12.4675 4.44611 6.22363
113. 221 11.4675 4.44611 6.22363; 222 10.4675 4.44611 6.22363
114. 223 9.46751 4.44611 6.22363; 224 21.2755 4.44611 6.22363
115. 225 20.2755 4.44611 6.22363; 226 19.2755 4.44611 6.22363
116. 227 18.2755 4.44611 6.22363; 228 17.2755 4.44611 6.22363
117. 229 16.2755 4.44611 6.22363; 230 27.4565 4.44611 6.22363
118. 231 26.4565 4.44611 6.22363; 232 25.4565 4.44611 6.22363
119. 233 24.4565 4.44611 6.22363; 234 23.4565 4.44611 6.22363
120. 235 29.9515 4.44611 6.22363; 236 0.472519 4.44611 5.62363
121. 237 1.47252 4.44611 5.62363; 238 7.46751 4.44611 5.62363
122. 239 8.46751 4.44611 5.62363; 240 14.2755 4.44611 5.62363
123. 241 15.2755 4.44611 5.62363; 242 21.4565 4.44611 5.62363
124. 243 22.4565 4.44611 5.62363; 244 28.4515 4.44611 5.62363
125. 245 29.4515 4.44611 5.62363; 246 6.47252 4.44611 5.62363
126. 247 5.47252 4.44611 5.62363; 248 4.47252 4.44611 5.62363
127. 249 3.47252 4.44611 5.62363; 250 2.47252 4.44611 5.62363
128. 251 13.4675 4.44611 5.62363; 252 12.4675 4.44611 5.62363
129. 253 11.4675 4.44611 5.62363; 254 10.4675 4.44611 5.62363
130. 255 9.46751 4.44611 5.62363; 256 21.2755 4.44611 5.62363
131. 257 20.2755 4.44611 5.62363; 258 19.2755 4.44611 5.62363
132. 259 18.2755 4.44611 5.62363; 260 17.2755 4.44611 5.62363
133. 261 16.2755 4.44611 5.62363; 262 27.4565 4.44611 5.62363
134. 263 26.4565 4.44611 5.62363; 264 25.4565 4.44611 5.62363
135. 265 24.4565 4.44611 5.62363; 266 23.4565 4.44611 5.62363
136. 267 29.9515 4.44611 5.62363; 268 0.472519 4.44611 5.02363
137. 269 1.47252 4.44611 5.02363; 270 7.46751 4.44611 5.02363
138. 271 8.46751 4.44611 5.02363; 272 14.2755 4.44611 5.02363
139. 273 15.2755 4.44611 5.02363; 274 21.4565 4.44611 5.02363
140. 275 22.4565 4.44611 5.02363; 276 28.4515 4.44611 5.02363
141. 277 29.4515 4.44611 5.02363; 278 6.47252 4.44611 5.02363
142. 279 5.47252 4.44611 5.02363; 280 4.47252 4.44611 5.02363
143. 281 3.47252 4.44611 5.02363; 282 2.47252 4.44611 5.02363
144. 283 13.4675 4.44611 5.02363; 284 12.4675 4.44611 5.02363
145. 285 11.4675 4.44611 5.02363; 286 10.4675 4.44611 5.02363
146. 287 9.46751 4.44611 5.02363; 288 21.2755 4.44611 5.02363
147. 289 20.2755 4.44611 5.02363; 290 19.2755 4.44611 5.02363

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

148. 291 18.2755 4.44611 5.02363; 292 17.2755 4.44611 5.02363


149. 293 16.2755 4.44611 5.02363; 294 27.4565 4.44611 5.02363
150. 295 26.4565 4.44611 5.02363; 296 25.4565 4.44611 5.02363
151. 297 24.4565 4.44611 5.02363; 298 23.4565 4.44611 5.02363
152. 299 29.9515 4.44611 5.02363; 300 0.472519 4.44611 4.42363
153. 301 1.47252 4.44611 4.42363; 302 7.46751 4.44611 4.42363
154. 303 8.46751 4.44611 4.42363; 304 14.2755 4.44611 4.42363
155. 305 15.2755 4.44611 4.42363; 306 21.4565 4.44611 4.42363
156. 307 22.4565 4.44611 4.42363; 308 28.4515 4.44611 4.42363
157. 309 29.4515 4.44611 4.42363; 310 6.47252 4.44611 4.42363
158. 311 5.47252 4.44611 4.42363; 312 4.47252 4.44611 4.42363
159. 313 3.47252 4.44611 4.42363; 314 2.47252 4.44611 4.42363
160. 315 13.4675 4.44611 4.42363; 316 12.4675 4.44611 4.42363
161. 317 11.4675 4.44611 4.42363; 318 10.4675 4.44611 4.42363
162. 319 9.46751 4.44611 4.42363; 320 21.2755 4.44611 4.42363
163. 321 20.2755 4.44611 4.42363; 322 19.2755 4.44611 4.42363
164. 323 18.2755 4.44611 4.42363; 324 17.2755 4.44611 4.42363
165. 325 16.2755 4.44611 4.42363; 326 27.4565 4.44611 4.42363
166. 327 26.4565 4.44611 4.42363; 328 25.4565 4.44611 4.42363
167. 329 24.4565 4.44611 4.42363; 330 23.4565 4.44611 4.42363
168. 331 29.9515 4.44611 4.42363; 332 0.472519 4.44611 3.82363
169. 333 1.47252 4.44611 3.82363; 334 7.46751 4.44611 3.82363
170. 335 8.46751 4.44611 3.82363; 336 14.2755 4.44611 3.82363
171. 337 15.2755 4.44611 3.82363; 338 21.4565 4.44611 3.82363
172. 339 22.4565 4.44611 3.82363; 340 28.4515 4.44611 3.82363
173. 341 29.4515 4.44611 3.82363; 342 6.47252 4.44611 3.82363
174. 343 5.47252 4.44611 3.82363; 344 4.47252 4.44611 3.82363
175. 345 3.47252 4.44611 3.82363; 346 2.47252 4.44611 3.82363
176. 347 13.4675 4.44611 3.82363; 348 12.4675 4.44611 3.82363
177. 349 11.4675 4.44611 3.82363; 350 10.4675 4.44611 3.82363
178. 351 9.46751 4.44611 3.82363; 352 21.2755 4.44611 3.82363
179. 353 20.2755 4.44611 3.82363; 354 19.2755 4.44611 3.82363
180. 355 18.2755 4.44611 3.82363; 356 17.2755 4.44611 3.82363
181. 357 16.2755 4.44611 3.82363; 358 27.4565 4.44611 3.82363
182. 359 26.4565 4.44611 3.82363; 360 25.4565 4.44611 3.82363
183. 361 24.4565 4.44611 3.82363; 362 23.4565 4.44611 3.82363
184. 363 29.9515 4.44611 3.82363; 364 0.472519 4.44611 3.22363
185. 365 1.47252 4.44611 3.22363; 366 7.46751 4.44611 3.22363
186. 367 8.46751 4.44611 3.22363; 368 14.2755 4.44611 3.22363
187. 369 15.2755 4.44611 3.22363; 370 21.4565 4.44611 3.22363
188. 371 22.4565 4.44611 3.22363; 372 28.4515 4.44611 3.22363
189. 373 29.4515 4.44611 3.22363; 374 6.47252 4.44611 3.22363
190. 375 5.47252 4.44611 3.22363; 376 4.47252 4.44611 3.22363
191. 377 3.47252 4.44611 3.22363; 378 2.47252 4.44611 3.22363
192. 379 13.4675 4.44611 3.22363; 380 12.4675 4.44611 3.22363
193. 381 11.4675 4.44611 3.22363; 382 10.4675 4.44611 3.22363

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

194. 383 9.46751 4.44611 3.22363; 384 21.2755 4.44611 3.22363


195. 385 20.2755 4.44611 3.22363; 386 19.2755 4.44611 3.22363
196. 387 18.2755 4.44611 3.22363; 388 17.2755 4.44611 3.22363
197. 389 16.2755 4.44611 3.22363; 390 27.4565 4.44611 3.22363
198. 391 26.4565 4.44611 3.22363; 392 25.4565 4.44611 3.22363
199. 393 24.4565 4.44611 3.22363; 394 23.4565 4.44611 3.22363
200. 395 29.9515 4.44611 3.22363; 396 0.472519 4.44611 2.62363
201. 397 1.47252 4.44611 2.62363; 398 7.46751 4.44611 2.62363
202. 399 8.46751 4.44611 2.62363; 400 14.2755 4.44611 2.62363
203. 401 15.2755 4.44611 2.62363; 402 21.4565 4.44611 2.62363
204. 403 22.4565 4.44611 2.62363; 404 28.4515 4.44611 2.62363
205. 405 29.4515 4.44611 2.62363; 406 6.47252 4.44611 2.62363
206. 407 5.47252 4.44611 2.62363; 408 4.47252 4.44611 2.62363
207. 409 3.47252 4.44611 2.62363; 410 2.47252 4.44611 2.62363
208. 411 13.4675 4.44611 2.62363; 412 12.4675 4.44611 2.62363
209. 413 11.4675 4.44611 2.62363; 414 10.4675 4.44611 2.62363
210. 415 9.46751 4.44611 2.62363; 416 21.2755 4.44611 2.62363
211. 417 20.2755 4.44611 2.62363; 418 19.2755 4.44611 2.62363
212. 419 18.2755 4.44611 2.62363; 420 17.2755 4.44611 2.62363
213. 421 16.2755 4.44611 2.62363; 422 27.4565 4.44611 2.62363
214. 423 26.4565 4.44611 2.62363; 424 25.4565 4.44611 2.62363
215. 425 24.4565 4.44611 2.62363; 426 23.4565 4.44611 2.62363
216. 427 29.9515 4.44611 2.62363; 428 0.472519 4.44611 2.02363
217. 429 1.47252 4.44611 2.02363; 430 7.46751 4.44611 2.02363
218. 431 8.46751 4.44611 2.02363; 432 14.2755 4.44611 2.02363
219. 433 15.2755 4.44611 2.02363; 434 21.4565 4.44611 2.02363
220. 435 22.4565 4.44611 2.02363; 436 28.4515 4.44611 2.02363
221. 437 29.4515 4.44611 2.02363; 438 6.47252 4.44611 2.02363
222. 439 5.47252 4.44611 2.02363; 440 4.47252 4.44611 2.02363
223. 441 3.47252 4.44611 2.02363; 442 2.47252 4.44611 2.02363
224. 443 13.4675 4.44611 2.02363; 444 12.4675 4.44611 2.02363
225. 445 11.4675 4.44611 2.02363; 446 10.4675 4.44611 2.02363
226. 447 9.46751 4.44611 2.02363; 448 21.2755 4.44611 2.02363
227. 449 20.2755 4.44611 2.02363; 450 19.2755 4.44611 2.02363
228. 451 18.2755 4.44611 2.02363; 452 17.2755 4.44611 2.02363
229. 453 16.2755 4.44611 2.02363; 454 27.4565 4.44611 2.02363
230. 455 26.4565 4.44611 2.02363; 456 25.4565 4.44611 2.02363
231. 457 24.4565 4.44611 2.02363; 458 23.4565 4.44611 2.02363
232. 459 29.9515 4.44611 2.02363; 460 0.472519 4.44611 1.42363
233. 461 1.47252 4.44611 1.42363; 462 7.46751 4.44611 1.42363
234. 463 8.46751 4.44611 1.42363; 464 14.2755 4.44611 1.42363
235. 465 15.2755 4.44611 1.42363; 466 21.4565 4.44611 1.42363
236. 467 22.4565 4.44611 1.42363; 468 28.4515 4.44611 1.42363
237. 469 29.4515 4.44611 1.42363; 470 6.47252 4.44611 1.42363
238. 471 5.47252 4.44611 1.42363; 472 4.47252 4.44611 1.42363
239. 473 3.47252 4.44611 1.42363; 474 2.47252 4.44611 1.42363

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

240. 475 13.4675 4.44611 1.42363; 476 12.4675 4.44611 1.42363


241. 477 11.4675 4.44611 1.42363; 478 10.4675 4.44611 1.42363
242. 479 9.46751 4.44611 1.42363; 480 21.2755 4.44611 1.42363
243. 481 20.2755 4.44611 1.42363; 482 19.2755 4.44611 1.42363
244. 483 18.2755 4.44611 1.42363; 484 17.2755 4.44611 1.42363
245. 485 16.2755 4.44611 1.42363; 486 27.4565 4.44611 1.42363
246. 487 26.4565 4.44611 1.42363; 488 25.4565 4.44611 1.42363
247. 489 24.4565 4.44611 1.42363; 490 23.4565 4.44611 1.42363
248. 491 29.9515 4.44611 1.42363
249. MEMBER INCIDENCES
250. 1 1 2; 2 1 3; 3 4 1; 5 6 130; 6 8 126; 8 2 7; 9 7 9; 10 9 11; 11 3 40
251. 12 12 58; 13 13 76; 14 14 97; 15 16 41; 16 17 59; 17 18 77; 18 19 98; 19 3
140
252. 20 2 136; 21 12 142; 22 7 131; 23 13 144; 24 9 129; 25 14 146; 26 11 139
253. 27 15 148; 28 21 42; 29 22 60; 30 23 78; 31 24 99; 32 17 302; 33 16 300
254. 34 18 304; 35 19 306; 36 20 308; 37 21 26; 38 22 27; 39 23 28; 40 24 29
255. 41 25 30; 42 31 171; 43 32 331; 44 25 117; 45 20 116; 46 15 115; 47 34 16
256. 48 35 26; 49 36 119; 50 37 121; 51 38 123; 52 39 125; 53 40 141; 54 41 301
257. 55 43 154; 56 44 314; 57 46 153; 58 47 313; 59 49 152; 60 50 312; 61 52 151
258. 62 53 311; 63 55 150; 64 56 310; 65 58 143; 66 59 303; 67 61 159; 68 62 319
259. 69 64 158; 70 65 318; 71 67 157; 72 68 317; 73 70 156; 74 71 316; 75 73 155
260. 76 74 315; 77 76 145; 78 77 305; 79 79 165; 80 80 325; 81 82 164; 82 83 324
261. 83 85 163; 84 86 323; 85 88 162; 86 89 322; 87 91 161; 88 92 321; 89 94 160
262. 90 95 320; 91 97 147; 92 98 307; 93 100 170; 94 101 330; 95 103 169
263. 96 104 329; 97 106 168; 98 107 328; 99 109 167; 100 110 327; 101 112 166
264. 102 113 326; 103 115 149; 104 116 309; 105 55 12; 106 52 55; 107 49 52
265. 108 46 49; 109 43 46; 110 40 43; 111 73 13; 112 70 73; 113 67 70; 114 64 67
266. 115 61 64; 116 58 61; 117 94 14; 118 91 94; 119 88 91; 120 85 88; 121 82 85
267. 122 79 82; 123 76 79; 124 112 15; 125 109 112; 126 106 109; 127 103 106
268. 128 100 103; 129 97 100; 130 56 17; 131 53 56; 132 50 53; 133 47 50; 134 44
47
269. 135 41 44; 136 74 18; 137 71 74; 138 68 71; 139 65 68; 140 62 65; 141 59 62
270. 142 95 19; 143 92 95; 144 89 92; 145 86 89; 146 83 86; 147 80 83; 148 77 80
271. 149 113 20; 150 110 113; 151 107 110; 152 104 107; 153 101 104; 154 98 101
272. 155 57 22; 156 54 57; 157 51 54; 158 48 51; 159 45 48; 160 42 45; 161 75 23
273. 162 72 75; 163 69 72; 164 66 69; 165 63 66; 166 60 63; 167 96 24; 168 93 96
274. 169 90 93; 170 87 90; 171 84 87; 172 81 84; 173 78 81; 174 114 25; 175 111
114
275. 176 108 111; 177 105 108; 178 102 105; 179 99 102; 180 117 33; 181 116 32
276. 182 115 31; 187 119 27; 188 22 119; 189 121 28; 190 23 121; 191 123 29
277. 192 24 123; 193 125 30; 194 25 125; 195 126 9; 198 129 14; 200 126 129
278. 201 130 7; 202 131 13; 203 130 131; 205 134 135; 206 135 2; 207 136 12
279. 208 135 136; 209 137 138; 210 138 11; 211 139 15; 212 138 139; 213 140 172
280. 214 141 173; 215 140 141; 216 142 174; 217 143 175; 218 142 143; 219 144 176
281. 220 145 177; 221 144 145; 222 146 178; 223 147 179; 224 146 147; 225 148 180
282. 226 149 181; 227 148 149; 228 150 182; 229 150 142; 230 151 183; 231 151 150

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

283. 232 152 184; 233 152 151; 234 153 185; 235 153 152; 236 154 186; 237 154 153
284. 238 141 154; 239 155 187; 240 155 144; 241 156 188; 242 156 155; 243 157 189
285. 244 157 156; 245 158 190; 246 158 157; 247 159 191; 248 159 158; 249 143 159
286. 250 160 192; 251 160 146; 252 161 193; 253 161 160; 254 162 194; 255 162 161
287. 256 163 195; 257 163 162; 258 164 196; 259 164 163; 260 165 197; 261 165 164
288. 262 145 165; 263 166 198; 264 166 148; 265 167 199; 266 167 166; 267 168 200
289. 268 168 167; 269 169 201; 270 169 168; 271 170 202; 272 170 169; 273 147 170
290. 274 171 203; 275 149 171; 276 172 204; 277 173 205; 278 172 173; 279 174 206
291. 280 175 207; 281 174 175; 282 176 208; 283 177 209; 284 176 177; 285 178 210
292. 286 179 211; 287 178 179; 288 180 212; 289 181 213; 290 180 181; 291 182 214
293. 292 182 174; 293 183 215; 294 183 182; 295 184 216; 296 184 183; 297 185 217
294. 298 185 184; 299 186 218; 300 186 185; 301 173 186; 302 187 219; 303 187 176
295. 304 188 220; 305 188 187; 306 189 221; 307 189 188; 308 190 222; 309 190 189
296. 310 191 223; 311 191 190; 312 175 191; 313 192 224; 314 192 178; 315 193 225
297. 316 193 192; 317 194 226; 318 194 193; 319 195 227; 320 195 194; 321 196 228
298. 322 196 195; 323 197 229; 324 197 196; 325 177 197; 326 198 230; 327 198 180
299. 328 199 231; 329 199 198; 330 200 232; 331 200 199; 332 201 233; 333 201 200
300. 334 202 234; 335 202 201; 336 179 202; 337 203 235; 338 181 203; 339 204 236
301. 340 205 237; 341 204 205; 342 206 238; 343 207 239; 344 206 207; 345 208 240
302. 346 209 241; 347 208 209; 348 210 242; 349 211 243; 350 210 211; 351 212 244
303. 352 213 245; 353 212 213; 354 214 246; 355 214 206; 356 215 247; 357 215 214
304. 358 216 248; 359 216 215; 360 217 249; 361 217 216; 362 218 250; 363 218 217
305. 364 205 218; 365 219 251; 366 219 208; 367 220 252; 368 220 219; 369 221 253
306. 370 221 220; 371 222 254; 372 222 221; 373 223 255; 374 223 222; 375 207 223
307. 376 224 256; 377 224 210; 378 225 257; 379 225 224; 380 226 258; 381 226 225
308. 382 227 259; 383 227 226; 384 228 260; 385 228 227; 386 229 261; 387 229 228
309. 388 209 229; 389 230 262; 390 230 212; 391 231 263; 392 231 230; 393 232 264
310. 394 232 231; 395 233 265; 396 233 232; 397 234 266; 398 234 233; 399 211 234
311. 400 235 267; 401 213 235; 402 236 268; 403 237 269; 404 236 237; 405 238 270
312. 406 239 271; 407 238 239; 408 240 272; 409 241 273; 410 240 241; 411 242 274
313. 412 243 275; 413 242 243; 414 244 276; 415 245 277; 416 244 245; 417 246 278
314. 418 246 238; 419 247 279; 420 247 246; 421 248 280; 422 248 247; 423 249 281
315. 424 249 248; 425 250 282; 426 250 249; 427 237 250; 428 251 283; 429 251 240
316. 430 252 284; 431 252 251; 432 253 285; 433 253 252; 434 254 286; 435 254 253
317. 436 255 287; 437 255 254; 438 239 255; 439 256 288; 440 256 242; 441 257 289
318. 442 257 256; 443 258 290; 444 258 257; 445 259 291; 446 259 258; 447 260 292
319. 448 260 259; 449 261 293; 450 261 260; 451 241 261; 452 262 294; 453 262 244
320. 454 263 295; 455 263 262; 456 264 296; 457 264 263; 458 265 297; 459 265 264
321. 460 266 298; 461 266 265; 462 243 266; 463 267 299; 464 245 267; 465 268 16
322. 466 269 41; 467 268 269; 468 270 17; 469 271 59; 470 270 271; 471 272 18
323. 472 273 77; 473 272 273; 474 274 19; 475 275 98; 476 274 275; 477 276 20
324. 478 277 116; 479 276 277; 480 278 56; 481 278 270; 482 279 53; 483 279 278
325. 484 280 50; 485 280 279; 486 281 47; 487 281 280; 488 282 44; 489 282 281
326. 490 269 282; 491 283 74; 492 283 272; 493 284 71; 494 284 283; 495 285 68
327. 496 285 284; 497 286 65; 498 286 285; 499 287 62; 500 287 286; 501 271 287
328. 502 288 95; 503 288 274; 504 289 92; 505 289 288; 506 290 89; 507 290 289

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

329. 508 291 86; 509 291 290; 510 292 83; 511 292 291; 512 293 80; 513 293 292
330. 514 273 293; 515 294 113; 516 294 276; 517 295 110; 518 295 294; 519 296 107
331. 520 296 295; 521 297 104; 522 297 296; 523 298 101; 524 298 297; 525 275 298
332. 526 299 32; 527 277 299; 528 300 332; 529 301 333; 530 300 301; 531 302 334
333. 532 303 335; 533 302 303; 534 304 336; 535 305 337; 536 304 305; 537 306 338
334. 538 307 339; 539 306 307; 540 308 340; 541 309 341; 542 308 309; 543 310 342
335. 544 310 302; 545 311 343; 546 311 310; 547 312 344; 548 312 311; 549 313 345
336. 550 313 312; 551 314 346; 552 314 313; 553 301 314; 554 315 347; 555 315 304
337. 556 316 348; 557 316 315; 558 317 349; 559 317 316; 560 318 350; 561 318 317
338. 562 319 351; 563 319 318; 564 303 319; 565 320 352; 566 320 306; 567 321 353
339. 568 321 320; 569 322 354; 570 322 321; 571 323 355; 572 323 322; 573 324 356
340. 574 324 323; 575 325 357; 576 325 324; 577 305 325; 578 326 358; 579 326 308
341. 580 327 359; 581 327 326; 582 328 360; 583 328 327; 584 329 361; 585 329 328
342. 586 330 362; 587 330 329; 588 307 330; 589 331 363; 590 309 331; 591 332 364
343. 592 333 365; 593 332 333; 594 334 366; 595 335 367; 596 334 335; 597 336 368
344. 598 337 369; 599 336 337; 600 338 370; 601 339 371; 602 338 339; 603 340 372
345. 604 341 373; 605 340 341; 606 342 374; 607 342 334; 608 343 375; 609 343 342
346. 610 344 376; 611 344 343; 612 345 377; 613 345 344; 614 346 378; 615 346 345
347. 616 333 346; 617 347 379; 618 347 336; 619 348 380; 620 348 347; 621 349 381
348. 622 349 348; 623 350 382; 624 350 349; 625 351 383; 626 351 350; 627 335 351
349. 628 352 384; 629 352 338; 630 353 385; 631 353 352; 632 354 386; 633 354 353
350. 634 355 387; 635 355 354; 636 356 388; 637 356 355; 638 357 389; 639 357 356
351. 640 337 357; 641 358 390; 642 358 340; 643 359 391; 644 359 358; 645 360 392
352. 646 360 359; 647 361 393; 648 361 360; 649 362 394; 650 362 361; 651 339 362
353. 652 363 395; 653 341 363; 654 364 396; 655 365 397; 656 364 365; 657 366 398
354. 658 367 399; 659 366 367; 660 368 400; 661 369 401; 662 368 369; 663 370 402
355. 664 371 403; 665 370 371; 666 372 404; 667 373 405; 668 372 373; 669 374 406
356. 670 374 366; 671 375 407; 672 375 374; 673 376 408; 674 376 375; 675 377 409
357. 676 377 376; 677 378 410; 678 378 377; 679 365 378; 680 379 411; 681 379 368
358. 682 380 412; 683 380 379; 684 381 413; 685 381 380; 686 382 414; 687 382 381
359. 688 383 415; 689 383 382; 690 367 383; 691 384 416; 692 384 370; 693 385 417
360. 694 385 384; 695 386 418; 696 386 385; 697 387 419; 698 387 386; 699 388 420
361. 700 388 387; 701 389 421; 702 389 388; 703 369 389; 704 390 422; 705 390 372
362. 706 391 423; 707 391 390; 708 392 424; 709 392 391; 710 393 425; 711 393 392
363. 712 394 426; 713 394 393; 714 371 394; 715 395 427; 716 373 395; 717 396 428
364. 718 397 429; 719 396 397; 720 398 430; 721 399 431; 722 398 399; 723 400 432
365. 724 401 433; 725 400 401; 726 402 434; 727 403 435; 728 402 403; 729 404 436
366. 730 405 437; 731 404 405; 732 406 438; 733 406 398; 734 407 439; 735 407 406
367. 736 408 440; 737 408 407; 738 409 441; 739 409 408; 740 410 442; 741 410 409
368. 742 397 410; 743 411 443; 744 411 400; 745 412 444; 746 412 411; 747 413 445
369. 748 413 412; 749 414 446; 750 414 413; 751 415 447; 752 415 414; 753 399 415
370. 754 416 448; 755 416 402; 756 417 449; 757 417 416; 758 418 450; 759 418 417
371. 760 419 451; 761 419 418; 762 420 452; 763 420 419; 764 421 453; 765 421 420
372. 766 401 421; 767 422 454; 768 422 404; 769 423 455; 770 423 422; 771 424 456
373. 772 424 423; 773 425 457; 774 425 424; 775 426 458; 776 426 425; 777 403 426
374. 778 427 459; 779 405 427; 780 428 460; 781 429 461; 782 428 429; 783 430 462

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

375. 784 431 463; 785 430 431; 786 432 464; 787 433 465; 788 432 433; 789 434 466
376. 790 435 467; 791 434 435; 792 436 468; 793 437 469; 794 436 437; 795 438 470
377. 796 438 430; 797 439 471; 798 439 438; 799 440 472; 800 440 439; 801 441 473
378. 802 441 440; 803 442 474; 804 442 441; 805 429 442; 806 443 475; 807 443 432
379. 808 444 476; 809 444 443; 810 445 477; 811 445 444; 812 446 478; 813 446 445
380. 814 447 479; 815 447 446; 816 431 447; 817 448 480; 818 448 434; 819 449 481
381. 820 449 448; 821 450 482; 822 450 449; 823 451 483; 824 451 450; 825 452 484
382. 826 452 451; 827 453 485; 828 453 452; 829 433 453; 830 454 486; 831 454 436
383. 832 455 487; 833 455 454; 834 456 488; 835 456 455; 836 457 489; 837 457 456
384. 838 458 490; 839 458 457; 840 435 458; 841 459 491; 842 437 459; 843 460 21
385. 844 461 42; 845 460 461; 846 462 22; 847 463 60; 848 462 463; 849 464 23
386. 850 465 78; 851 464 465; 852 466 24; 853 467 99; 854 466 467; 855 468 25
387. 856 469 117; 857 468 469; 858 470 57; 859 470 462; 860 471 54; 861 471 470
388. 862 472 51; 863 472 471; 864 473 48; 865 473 472; 866 474 45; 867 474 473
389. 868 461 474; 869 475 75; 870 475 464; 871 476 72; 872 476 475; 873 477 69
390. 874 477 476; 875 478 66; 876 478 477; 877 479 63; 878 479 478; 879 463 479
391. 880 480 96; 881 480 466; 882 481 93; 883 481 480; 884 482 90; 885 482 481
392. 886 483 87; 887 483 482; 888 484 84; 889 484 483; 890 485 81; 891 485 484
393. 892 465 485; 893 486 114; 894 486 468; 895 487 111; 896 487 486; 897 488 108
394. 898 488 487; 899 489 105; 900 489 488; 901 490 102; 902 490 489; 903 467 490
395. 904 491 33; 905 469 491
396. ELEMENT INCIDENCES SHELL
397. 183 21 22 12 3; 184 22 23 13 12; 185 23 24 14 13; 186 24 33 31 14
398. ELEMENT PROPERTY
399. 183 TO 186 THICKNESS 0.0045
400. DEFINE MATERIAL START
401. ISOTROPIC CONCRETE
402. E 2.17185E+007
403. POISSON 0.17
404. DENSITY 23.5616
405. ALPHA 1E-005
406. DAMP 0.05
407. ISOTROPIC STEEL
408. E 2.05E+008
409. POISSON 0.3
410. DENSITY 76.8195
411. ALPHA 1.2E-005
412. DAMP 0.03
413. END DEFINE MATERIAL
414. MEMBER PROPERTY AMERICAN
415. 3 47 TO 52 187 189 191 193 PRIS YD 0.4 ZD 0.4
416. MEMBER PROPERTY AMERICAN
417. 5 6 195 201 205 206 209 210 TABLE ST W18X71
418. 1 8 TO 10 TABLE ST W8X24
419. 53 TO 104 214 217 220 223 226 228 230 232 234 236 239 241 243 245 247 250 -

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

420. 252 254 256 258 260 263 265 267 269 271 277 280 283 286 289 291 293 295 297
-
421. 299 302 304 306 308 310 313 315 317 319 321 323 326 328 330 332 334 340 343
-
422. 346 349 352 354 356 358 360 362 365 367 369 371 373 376 378 380 382 384 386
-
423. 389 391 393 395 397 403 406 409 412 415 417 419 421 423 425 428 430 432 434
-
424. 436 439 441 443 445 447 449 452 454 456 458 460 466 469 472 475 478 480 482
-
425. 484 486 488 491 493 495 497 499 502 504 506 508 510 512 515 517 519 521 523
-
426. 529 532 535 538 541 543 545 547 549 551 554 556 558 560 562 565 567 569 571
-
427. 573 575 578 580 582 584 586 592 595 598 601 604 606 608 610 612 614 617 619
-
428. 621 623 625 628 630 632 634 636 638 641 643 645 647 649 655 658 661 664 667
-
429. 669 671 673 675 677 680 682 684 686 688 691 693 695 697 699 701 704 706 708
-
430. 710 712 718 721 724 727 730 732 734 736 738 740 743 745 747 749 751 754 756
-
431. 758 760 762 764 767 769 771 773 775 781 784 787 790 793 795 797 799 801 803
-
432. 806 808 810 812 814 817 819 821 823 825 827 830 832 834 836 838 844 847 850
-
433. 853 856 858 860 862 864 866 869 871 873 875 877 880 882 TABLE ST C5X9
434. 884 886 888 890 893 895 897 899 901 TABLE ST C5X9
435. 11 TO 14 28 TO 31 44 TO 46 105 TO 129 155 TO 182 TABLE ST W8X24
436. 15 TO 18 130 TO 154 TABLE ST W12X35
437. 20 TO 27 32 34 TO 36 38 TO 41 198 202 207 211 216 219 222 225 279 282 285 -
438. 288 342 345 348 351 405 408 411 414 468 471 474 477 531 534 537 540 594 597
-
439. 600 603 657 660 663 666 720 723 726 729 783 786 789 792 846 849 852 -
440. 855 TABLE ST W16X67
441. 188 190 192 194 200 203 208 212 TABLE ST W8X24
442. 2 19 33 37 213 276 339 402 465 528 591 654 717 780 843 TABLE ST W8X24
443. 215 218 221 224 227 229 231 233 235 237 238 240 242 244 246 248 249 251 253
-
444. 255 257 259 261 262 264 266 268 270 272 273 275 278 281 284 287 290 292 294
-
445. 296 298 300 301 303 305 307 309 311 312 314 316 318 320 322 324 325 327 329
-
446. 331 333 335 336 338 341 344 347 350 353 355 357 359 361 363 364 366 368 370
-

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

447. 372 374 375 377 379 381 383 385 387 388 390 392 394 396 398 399 401 404 407
-
448. 410 413 416 418 420 422 424 426 427 429 431 433 435 437 438 440 442 444 446
-
449. 448 450 451 453 455 457 459 461 462 464 467 470 473 476 479 481 483 485 487
-
450. 489 490 492 494 496 498 500 501 503 505 507 509 511 513 514 516 518 520 522
-
451. 524 525 527 530 533 536 539 542 544 546 548 550 552 553 555 557 559 561 563
-
452. 564 566 568 570 572 574 576 577 579 581 583 585 587 588 590 593 596 599 602
-
453. 605 607 609 611 613 615 616 618 620 622 624 626 627 629 631 633 635 637 639
-
454. 640 642 644 646 648 650 651 653 656 659 662 665 668 670 672 674 676 678 679
-
455. 681 683 685 687 689 690 692 694 696 698 700 702 703 705 707 709 711 713 714
-
456. 716 719 722 725 728 731 733 735 737 739 741 742 744 746 748 750 752 753 755
-
457. 757 759 761 763 765 766 768 770 772 774 776 777 779 782 TABLE ST L20204
458. 785 788 791 794 796 798 800 802 804 805 807 809 811 813 815 816 818 820 822
-
459. 824 826 828 829 831 833 835 837 839 840 842 845 848 851 854 857 859 861 863
-
460. 865 867 868 870 872 874 876 878 879 881 883 885 887 889 891 892 894 896 898
-
461. 900 902 903 905 TABLE ST L20204
462. 42 43 274 337 400 463 526 589 652 715 778 841 904 TABLE ST W8X24
463. CONSTANTS
464. BETA 90 MEMB 5 6 195 201 205 206 209 210
465. BETA 45 MEMB 215 218 221 224 227 229 231 233 235 237 238 240 242 244 246 248
-
466. 249 251 253 255 257 259 261 262 264 266 268 270 272 273 275 278 281 284 287
-
467. 290 292 294 296 298 300 301 303 305 307 309 311 312 314 316 318 320 322 324
-
468. 325 327 329 331 333 335 336 338 341 344 347 350 353 355 357 359 361 363 364
-
469. 366 368 370 372 374 375 377 379 381 383 385 387 388 390 392 394 396 398 399
-
470. 401 404 407 410 413 416 418 420 422 424 426 427 429 431 433 435 437 438 440
-
471. 442 444 446 448 450 451 453 455 457 459 461 462 464 467 470 473 476 479 481
-

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

472. 483 485 487 489 490 492 494 496 498 500 501 503 505 507 509 511 513 514 516
-
473. 518 520 522 524 525 527 530 533 536 539 542 544 546 548 550 552 553 555 557
-
474. 559 561 563 564 566 568 570 572 574 576 577 579 581 583 585 587 588 590 593
-
475. 596 599 602 605 607 609 611 613 615 616 618 620 622 624 626 627 629 631 633
-
476. 635 637 639 640 642 644 646 648 650 651 653 656 659 662 665 668 670 672 674
-
477. 676 678 679 681 683 685 687 689 690 692 694 696 698 700 702 703 705 707 709
-
478. 711 713 714 716 719 722 725 728 731 733 735 737 739 741 742 744 746 748 750
-
479. 752 753 755 757 759 761 763 765 766 768 770 772 774 776 777 779 782
480. BETA 45 MEMB 785 788 791 794 796 798 800 802 804 805 807 809 811 813 815 816
-
481. 818 820 822 824 826 828 829 831 833 835 837 839 840 842 845 848 851 854 857
-
482. 859 861 863 865 867 868 870 872 874 876 878 879 881 883 885 887 889 891 892
-
483. 894 896 898 900 902 903 905
484. MATERIAL CONCRETE MEMB 3 47 TO 52 187 189 191 193
485. MATERIAL STEEL MEMB 1 2 5 6 8 TO 46 53 TO 186 188 190 192 194 195 198 200 -
486. 201 TO 203 205 TO 905
487. SUPPORTS
488. 4 34 TO 39 FIXED
489. 6 8 134 137 PINNED
490. MEMBER RELEASE
491. 188 190 192 194 200 203 208 212 START MX MY
492. 188 190 192 194 200 203 208 212 END MX MY
493. 37 TO 41 END MX MY
494. 2 33 215 218 221 224 227 229 231 233 235 237 238 240 242 244 246 248 249 251
-
495. 253 255 257 259 261 262 264 266 268 270 272 273 275 278 281 284 287 290 292
-
496. 294 296 298 300 301 303 305 307 309 311 312 314 316 318 320 322 324 325 327
-
497. 329 331 333 335 336 338 341 344 347 350 353 355 357 359 361 363 364 366 368
-
498. 370 372 374 375 377 379 381 383 385 387 388 390 392 394 396 398 399 401 404
-
499. 407 410 413 416 418 420 422 424 426 427 429 431 433 435 437 438 440 442 444
-
500. 446 448 450 451 453 455 457 459 461 462 464 467 470 473 476 479 481 483 485
-

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

501. 487 489 490 492 494 496 498 500 501 503 505 507 509 511 513 514 516 518 520
-
502. 522 524 525 527 530 533 536 539 542 544 546 548 550 552 553 555 557 559 561
-
503. 563 564 566 568 570 572 574 576 577 579 581 583 585 587 588 590 593 596 599
-
504. 602 605 607 609 611 613 615 616 618 620 622 624 626 627 629 631 633 635 637
-
505. 639 640 642 644 646 648 650 651 653 656 659 662 665 668 670 672 674 676 678
-
506. 679 681 683 685 687 689 690 692 694 696 698 700 702 703 705 707 709 711 713
-
507. 714 716 719 722 725 728 731 733 735 737 739 741 742 744 746 748 750 752 753
-
508. 755 757 759 761 763 765 766 768 770 772 774 776 777 START MX MY
509. 779 782 785 788 791 794 796 798 800 802 804 805 807 809 811 813 815 816 818
-
510. 820 822 824 826 828 829 831 833 835 837 839 840 842 845 848 851 854 857 859
-
511. 861 863 865 867 868 870 872 874 876 878 879 881 883 885 887 889 891 892 894
-
512. 896 898 900 902 903 905 START MX MY
513. 215 218 221 224 227 229 231 233 235 237 238 240 242 244 246 248 249 251 253
-
514. 255 257 259 261 262 264 266 268 270 272 273 275 278 281 284 287 290 292 294
-
515. 296 298 300 301 303 305 307 309 311 312 314 316 318 320 322 324 325 327 329
-
516. 331 333 335 336 338 341 344 347 350 353 355 357 359 361 363 364 366 368 370
-
517. 372 374 375 377 379 381 383 385 387 388 390 392 394 396 398 399 401 404 407
-
518. 410 413 416 418 420 422 424 426 427 429 431 433 435 437 438 440 442 444 446
-
519. 448 450 451 453 455 457 459 461 462 464 465 467 470 473 476 479 481 483 485
-
520. 487 489 490 492 494 496 498 500 501 503 505 507 509 511 513 514 516 518 520
-
521. 522 524 525 527 530 533 536 539 542 544 546 548 550 552 553 555 557 559 561
-
522. 563 564 566 568 570 572 574 576 577 579 581 583 585 587 588 590 593 596 599
-
523. 602 605 607 609 611 613 615 616 618 620 622 624 626 627 629 631 633 635 637
-
524. 639 640 642 644 646 648 650 651 653 656 659 662 665 668 670 672 674 676 678
-

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

525. 679 681 683 685 687 689 690 692 694 696 698 700 702 703 705 707 709 711 713
-
526. 714 716 719 722 725 728 731 733 735 737 739 741 742 744 746 748 750 752 753
-
527. 755 757 759 761 763 765 766 768 770 772 774 776 777 779 END MX MY
528. 782 785 788 791 794 796 798 800 802 804 805 807 809 811 813 815 816 818 820
-
529. 822 824 826 828 829 831 833 835 837 839 840 842 845 848 851 854 857 859 861
-
530. 863 865 867 868 870 872 874 876 878 879 881 883 885 887 889 891 892 894 896
-
531. 898 900 902 903 905 END MX MY
532. DEFINE UBC LOAD
533. ZONE 0.4 I 1 RWX 12 RWZ 12 STYP 2 CT 0.05 NA 1.2 NV 1.6
534. SELFWEIGHT 1
535. FLOOR WEIGHT
536. YRANGE 4 5 FLOAD -0.48 XRANGE 0.1 30 ZRANGE 1 8.5 GY
537. LOAD 1 SEISMIC LOAD X DIRECTION
538. UBC LOAD X 1
539. LOAD 2 SEISMIC LOAD Z DIRECTION
540. UBC LOAD Z 1
541. LOAD 3 DEAD LOAD
542. SELFWEIGHT Y -1
543. ONEWAY LOAD
544. YRANGE 4 5 ONE -0.48 XRANGE 0.1 30 ZRANGE 1 8.5 GY
545. *YRANGE 4 5 ONE -2.02 XRANGE 0.1 30 ZRANGE 1 8.5 GY
546. LOAD 4 LIVE LOAD
547. ONEWAY LOAD
548. YRANGE 4 5 ONE -6 XRANGE 0.1 30 ZRANGE 1 8.5 GY
549. *YRANGE 4 5 ONE -2.02 XRANGE 0.1 30 ZRANGE 1 8.5 GY
550. LOAD COMB 5 DL + LL (SERVICE LOAD)
551. 3 1.0 4 1.0
552. LOAD COMB 6 1.4DL (DEAD LOAD)
553. 3 1.4
554. LOAD COMB 7 1.2DL PLUS 1.6LL (1.2DL+1.6LL)
555. 3 1.2 4 1.6
556. LOAD COMB 8 1.2DL PLUS 0.5LL (1.2DL+0.5LL)
557. 3 1.2 4 0.5
558. LOAD COMB 9 1.2DL PLUS 1.0EQX PLUS 0.5LL (1.2DL+1.0EQX+0.5LL)
559. 3 1.2 1 1.0 4 0.5
560. LOAD COMB 10 1.2DL PLUS 1.0EQZ (1.2DL+1.0EQZ+0.5LL)
561. 3 1.2 2 1.0 4 0.5
562. LOAD COMB 11 0.9DL PLUS 1.0EQX (0.9DL+1.0EQX)
563. 3 0.9 1 1.0
564. LOAD COMB 12 0.9DL PLUS 1.0EQZ (0.9DL+1.0EQZ)
565. 3 0.9 2 1.0

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

566. PERFORM ANALYSIS

P R O B L E M S T A T I S T I C S
-----------------------------------

NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS = 481/ 899/ 11

SOLVER USED IS THE OUT-OF-CORE BASIC SOLVER

ORIGINAL/FINAL BAND-WIDTH= 450/ 45/ 270 DOF


TOTAL PRIMARY LOAD CASES = 4, TOTAL DEGREES OF FREEDOM = 2832
SIZE OF STIFFNESS MATRIX = 765 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE = 21.7/ 24674.7 MB

***********************************************************
* *
* X DIRECTION : Ta = 0.154 Tb = 0.354 Tuser = 0.000 *
* T = 0.154, LOAD FACTOR = 1.000 *
* UBC TYPE = 97 *
* UBC FACTOR V = 0.1000 x 436.55 = 43.65 KN *
* *
***********************************************************

***********************************************************
* *
* Z DIRECTION : Ta = 0.154 Tb = 0.225 Tuser = 0.000 *
* T = 0.154, LOAD FACTOR = 1.000 *
* UBC TYPE = 97 *
* UBC FACTOR V = 0.1000 x 436.55 = 43.65 KN *
* *
***********************************************************

567. LOAD LIST 3 TO 12


568. PARAMETER 1
569. CODE AISC UNIFIED
570. CHECK CODE MEMB 2 11 TO 46 53 TO 182 188 190 192 194 198 200 202 203 207 208
-
571. 211 TO 905

STAAD.PRO CODE CHECKING - (AISC-360-05-LRFD)


********************************************

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

MEMBER TABLE
RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================

2 ST W8X24 (AISC SECTIONS)


PASS Clause H1/2 0.483 7
19.47 C 0.00 37.84 0.00
11 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.337 7
-8.50 T 0.43 -27.11 1.00
12 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.732 7
-15.40 T 1.02 58.81 0.00
13 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.661 7
-15.53 T 0.92 52.98 0.00
14 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.740 7
-6.67 T 0.91 60.14 0.00
16 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.724 7
28.43 C 0.43 131.98 0.00
17 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.930 7
17.74 C 0.37 171.54 0.00
19 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.418 7
-1.94 T 2.35 -29.11 0.00
20 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.648 7
-251.27 T -0.97 283.89 1.00
21 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.471 7
43.77 C 8.03 -191.01 0.60
22 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.674 7
-258.47 T -0.94 295.76 1.00
23 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.458 7
35.17 C 7.62 -187.28 0.60
24 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.737 7
-282.16 T -1.03 323.30 1.00

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

MEMBER TABLE
RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================

25 ST W16X67 (AISC SECTIONS)


PASS Clause H1/2 0.487 7
44.39 C 7.17 -201.99 0.60
26 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.480 7
-182.19 T 0.35 211.88 1.00
27 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.286 7
77.87 C 3.02 -118.63 0.60
28 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.418 7
0.35 C 0.33 -34.59 1.00
29 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.926 7
6.45 C 0.64 76.62 0.00
30 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.747 7
5.73 C 0.61 61.51 0.00
31 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.921 7
4.52 C 0.31 77.21 0.00

33 ST W8X24 (AISC SECTIONS)


PASS Clause H1/2 0.352 7
5.22 C 0.00 29.67 0.00

36 ST W16X67 (AISC SECTIONS)


PASS Clause H1/2 0.724 7
72.27 C -8.75 -306.46 0.00
37 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.458 7
-1.41 T -7.22 -19.32 0.00

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE
RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================

38 ST W16X67 (AISC SECTIONS)


PASS Clause H1/2 0.398 7

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

-232.98 T -9.15 136.29 0.00


39 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.401 7
-231.98 T -9.07 137.96 0.00
40 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.417 7
-251.54 T -9.00 144.17 0.00
41 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.220 7
-141.04 T -8.25 62.66 0.00
42 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.100 7
-3.18 T 3.05 -0.13 0.00
43 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.189 7
-2.50 T -2.13 -10.16 0.00
44 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.590 7
-10.47 T 6.31 32.69 0.00
45 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.534 7
0.10 C 3.72 35.29 0.00
46 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.447 7
-10.23 T 2.61 30.52 0.00
53 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.320 7
-1.29 T 0.03 -4.93 0.60
55 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.308 7
0.21 C 0.04 -4.69 0.60

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE
RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================

57 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.320 7
0.02 C 0.05 -4.88 0.60
59 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.335 7
0.06 C 0.05 -5.13 0.60
60 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.968 7

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

0.05 C -0.14 14.75 0.00


61 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.361 7
-0.43 T 0.04 -5.53 0.60
62 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.876 7
-0.65 T -0.11 13.44 0.00
63 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.366 7
1.53 C 0.04 -5.64 0.60
64 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.655 7
2.92 C -0.04 10.24 0.00
65 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.392 7
2.05 C 0.05 -5.97 0.60
66 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.551 7
2.12 C -0.08 8.36 0.00
67 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.403 7
-0.52 T 0.04 -6.23 0.60
68 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.622 7
-0.55 T -0.04 9.75 0.00
69 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.396 7
0.08 C 0.04 -6.14 0.60
70 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.599 7
0.04 C -0.04 9.43 0.00

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE
RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================

71 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.394 7
0.07 C 0.04 -6.10 0.60
72 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.604 7
0.03 C -0.03 9.58 0.00
73 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.401 7

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

-0.53 T 0.04 -6.22 0.60


74 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.646 7
-0.67 T -0.03 10.21 0.00
75 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.354 7
1.88 C 0.04 -5.41 0.60
76 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.438 7
3.59 C 0.00 6.96 0.00
77 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.385 7
1.85 C 0.05 -5.87 0.60
78 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.590 7
1.98 C -0.06 9.11 0.00
79 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.390 7
-0.48 T 0.04 -6.04 0.60
80 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.681 7
-0.51 T -0.03 10.80 0.00
81 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.383 7
0.08 C 0.04 -5.94 0.60
82 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.660 7
0.04 C -0.02 10.51 0.00
83 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.384 7
0.04 C 0.04 -5.97 0.60
84 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.652 7
0.05 C -0.01 10.45 0.00
85 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.387 7
-0.16 T 0.04 -6.01 0.60

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE
RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================

86 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.645 7

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

-0.39 T -0.01 10.34 0.00


87 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.398 7
0.16 C 0.03 -6.21 0.60
88 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.611 7
1.00 C 0.00 9.80 0.00
89 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.199 7
8.74 C 0.04 -2.75 0.60
90 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.260 7
12.13 C -0.04 -3.69 0.45
91 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.386 7
2.28 C 0.03 -5.95 0.60
92 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.522 7
2.55 C -0.02 8.25 0.00
93 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.390 7
-0.56 T 0.01 -6.18 0.60
94 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.646 7
-0.59 T 0.05 10.12 0.00
95 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.377 7
0.10 C 0.00 -6.05 0.60
96 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.641 7
0.07 C 0.07 9.91 0.00
97 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.374 7
0.07 C 0.00 -6.00 0.60
98 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.661 7
0.06 C 0.09 10.14 0.00
99 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.381 7
-0.87 T -0.01 -6.04 0.60
100 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.703 7
-1.05 T 0.08 10.81 0.00

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

101 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.372 7
4.94 C -0.03 -5.67 0.60
102 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.645 7
6.44 C 0.10 9.65 0.00
103 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.273 7
-1.33 T 0.08 -3.88 0.60
104 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.538 7
1.88 C -0.27 7.04 0.00
105 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.721 7
-8.23 T 0.68 59.03 0.99
106 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.227 7
-8.33 T -0.05 -18.81 0.00
107 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.460 7
-8.34 T -0.06 -38.57 0.00
108 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.550 7
-8.35 T -0.02 -46.28 0.00
109 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.550 7
-8.36 T 0.03 -46.27 1.00
110 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.506 7
-8.39 T 0.10 -42.33 1.00
111 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.657 7
-15.14 T 0.79 53.05 0.81
112 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.258 7
-15.24 T -0.34 20.36 1.00
113 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.268 7
-15.29 T -0.06 -21.92 0.00
114 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.276 7
-15.35 T -0.06 -22.62 0.25

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

115 ST W8X24 (AISC SECTIONS)


PASS Clause H1/2 0.272 7
-15.40 T -0.01 -22.42 1.00

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

116 ST W8X24 (AISC SECTIONS)


PASS Clause H1/2 0.236 7
-15.44 T -0.51 18.02 0.00
117 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.763 7
-15.17 T 1.51 60.09 0.18
118 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.614 7
-15.26 T 0.00 51.46 1.00
119 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.195 7
-15.33 T -0.02 -15.89 0.00
120 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.352 7
-15.40 T -0.08 -29.06 0.00
121 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.354 7
-15.47 T -0.05 -29.34 0.50
122 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.347 7
-15.52 T -0.02 -28.75 1.00
123 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.186 7
-15.57 T 0.03 -15.04 1.00
124 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.477 7
-5.11 T 3.56 30.69 0.99
125 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.338 7
-5.57 T 0.02 -28.47 0.00
126 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.453 7
-5.89 T -0.11 -37.98 0.00
127 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.452 7
-6.19 T 0.07 -37.97 1.00

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

128 ST W8X24 (AISC SECTIONS)


PASS Clause H1/2 0.403 7
-6.45 T -0.01 -33.95 1.00
129 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.204 7
-6.64 T -0.72 15.12 0.00
130 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.747 7
44.77 C 1.19 131.85 0.99

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

131 ST W12X35 (AISC SECTIONS)


PASS Clause H1/2 0.409 7
45.54 C 0.00 -73.77 0.00
132 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.617 7
45.89 C -0.06 -112.29 0.00
133 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.617 7
46.46 C -0.07 -112.29 1.00
134 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.583 7
47.35 C 0.01 -106.14 1.00
135 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.311 7
49.09 C 0.18 -54.30 1.00
136 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.960 7
27.08 C 1.43 171.79 0.81
137 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.382 7
27.67 C -0.42 67.94 1.00
138 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.426 7
27.81 C -0.09 -77.54 0.00
139 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.478 7
28.03 C -0.11 -87.25 0.00
140 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.476 7
28.20 C -0.04 -87.25 1.00

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

141 ST W12X35 (AISC SECTIONS)


PASS Clause H1/2 0.306 7
28.43 C 0.02 -55.42 1.00
143 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.883 7
16.78 C 0.19 163.50 1.00
144 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.245 7
17.11 C -0.02 -44.78 0.00

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE
RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================

145 ST W12X35 (AISC SECTIONS)


PASS Clause H1/2 0.466 7
17.29 C -0.11 -85.68 0.00
146 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.464 7
17.47 C -0.04 -85.70 0.75
147 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.458 7
17.60 C -0.05 -84.38 1.00
148 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.257 7
17.77 C -0.34 45.50 0.00
149 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.367 7
7.22 C -0.45 -66.40 0.00
150 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.693 7
8.33 C 0.01 -129.35 0.00
151 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.804 7
8.82 C -0.19 -149.25 0.00
152 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.802 7
9.25 C 0.09 -149.24 1.00
153 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.682 7
9.59 C -0.01 -127.20 1.00
154 ST W12X35 (AISC SECTIONS)
PASS Clause H1/2 0.342 7
9.95 C -0.02 -63.36 1.00

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

155 ST W8X24 (AISC SECTIONS)


PASS Clause H1/2 0.907 7
1.48 C -0.07 76.75 0.99
156 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.263 7
1.30 C 0.04 -22.19 0.00
157 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.566 7
1.06 C 0.00 -48.03 0.00
158 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.691 7
0.81 C 0.05 -58.50 0.00
159 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.691 7
0.50 C -0.06 -58.50 1.00

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

160 ST W8X24 (AISC SECTIONS)


PASS Clause H1/2 0.637 7
0.24 C 0.04 -54.00 1.00
161 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.730 7
7.24 C 0.06 61.52 0.81
162 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.285 7
7.08 C -0.17 23.43 1.00
163 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.313 7
6.99 C -0.01 -26.26 0.00
164 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.315 7
6.99 C -0.06 -26.28 0.92
165 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.309 7
6.91 C -0.09 -25.69 1.00
166 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.319 7
6.80 C -0.17 26.38 0.00
167 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.913 7
6.61 C 0.15 76.90 0.18

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

168 ST W8X24 (AISC SECTIONS)


PASS Clause H1/2 0.797 7
6.33 C -0.19 66.88 1.00
169 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.213 7
6.20 C 0.04 -17.75 0.00
170 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.415 7
6.22 C -0.02 -34.94 0.00
171 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.423 7
6.25 C -0.04 -35.57 0.17
172 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.425 7
6.18 C -0.10 -35.57 1.00
173 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.236 7
6.08 C -0.03 -19.67 1.00
174 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.454 7
5.74 C -2.12 32.56 0.99

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

175 ST W8X24 (AISC SECTIONS)


PASS Clause H1/2 0.444 7
4.54 C 0.14 -37.15 0.00
176 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.563 7
4.40 C -0.03 -47.56 0.00
177 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.564 7
4.49 C -0.05 -47.57 1.00
178 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.493 7
4.58 C -0.11 -41.35 1.00
179 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.268 7
4.68 C -0.33 21.68 0.00
180 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.134 7
-6.49 T -1.35 7.49 0.00

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

181 ST W8X24 (AISC SECTIONS)


PASS Clause H1/2 0.068 7
2.40 C -1.25 2.32 0.00
182 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.136 7
-10.61 T -4.09 -0.11 0.50
188 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.969 7
547.66 C 0.00 37.99 1.41
190 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.958 7
540.83 C 0.00 37.63 1.41
194 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.573 7
317.16 C 0.00 23.14 1.41
198 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.769 7
134.32 C -1.03 350.53 0.00
200 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.953 7
592.54 C 0.00 31.96 0.00
202 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.704 7
122.97 C -0.94 320.66 0.00

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

203 ST W8X24 (AISC SECTIONS)


PASS Clause H1/2 0.873 7
542.73 C 0.00 29.29 0.00
207 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.676 7
119.69 C -0.97 307.69 0.00
208 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.851 7
528.23 C 0.00 28.62 0.00
211 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.502 7
86.36 C 0.35 229.83 0.00
212 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.613 7
381.81 C 0.00 20.51 0.00

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

213 ST W8X24 (AISC SECTIONS)


PASS Clause H1/2 0.305 7
-2.07 T 1.20 -22.58 0.00
214 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.381 7
-1.12 T 0.01 -6.03 0.60
215 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.568 7
-0.70 T -0.54 -0.28 0.50
216 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.586 7
44.15 C 3.33 -263.03 0.60
217 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.528 7
1.80 C 0.01 -8.41 0.60
218 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.624 7
-1.66 T 0.00 0.58 0.00
219 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.584 7
35.56 C 2.95 -264.36 0.60
220 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.514 7
1.63 C 0.01 -8.20 0.60
221 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.598 7
-1.74 T 0.00 0.55 0.00
222 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.627 7
45.73 C 2.53 -285.39 0.60
ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

223 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.524 7
2.01 C 0.00 -8.38 0.60
224 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.657 7
-2.28 T 0.00 0.60 0.00
225 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.383 7
78.46 C 1.56 -170.16 0.60

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

226 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.336 7
-1.77 T 0.00 -5.37 0.60
227 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.673 7
3.14 C 0.00 0.60 0.00
228 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.491 7
1.31 C 0.02 -7.74 0.60
229 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.585 7
-0.70 T 0.00 0.55 0.99
230 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.457 7
-0.35 T 0.01 -7.27 0.60
231 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.497 7
-0.62 T -0.54 -0.22 0.50
232 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.410 7
0.04 C 0.01 -6.51 0.60
233 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.492 7
-0.66 T -0.54 -0.21 0.50
234 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.378 7
0.01 C 0.01 -6.01 0.60
235 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.516 7
-0.71 T -0.54 -0.23 0.50
236 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.354 7
0.19 C 0.01 -5.62 0.60
237 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.514 7
-0.76 T -0.54 -0.23 0.50

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

238 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.489 7
-0.78 T -0.54 -0.21 0.50

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

239 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.488 7
1.59 C 0.03 -7.67 0.60
240 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.499 7
-1.67 T 0.00 0.46 0.81
241 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.541 7
-0.41 T 0.01 -8.62 0.60
242 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.517 7
-1.57 T -0.54 -0.23 0.50
243 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.532 7
0.03 C 0.02 -8.47 0.60
244 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.478 7
-1.57 T -0.54 -0.19 0.50
245 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.536 7
0.05 C 0.02 -8.54 0.60
246 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.503 7
-1.55 T -0.54 -0.21 0.50
247 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.546 7
-0.45 T 0.02 -8.68 0.60
248 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.484 7
-1.54 T -0.54 -0.20 0.50
249 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.498 7
-1.54 T -0.54 -0.21 0.50
250 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.271 7
7.56 C 0.03 -4.03 0.60
251 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.594 7
-1.83 T 0.00 0.55 0.18
252 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.545 7
0.22 C 0.01 -8.69 0.60

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

FX MY MZ LOCATION
=======================================================================

253 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.504 7
-1.73 T -0.54 -0.21 0.50
254 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.518 7
-0.16 T 0.01 -8.26 0.60
255 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.473 7
-1.69 T -0.54 -0.19 0.50
256 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.514 7
0.03 C 0.01 -8.19 0.60
257 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.496 7
-1.66 T -0.54 -0.21 0.50
258 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.510 7
0.05 C 0.01 -8.13 0.60
259 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.508 7
-1.63 T -0.54 -0.22 0.50
260 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.520 7
-0.41 T 0.02 -8.28 0.60
261 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.489 7
-1.62 T -0.54 -0.20 0.50
262 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.499 7
-1.62 T -0.54 -0.21 0.50
263 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.503 7
4.67 C 0.03 -7.84 0.60
264 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.606 7
-3.93 T 0.00 0.54 0.99
265 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.520 7
-0.79 T 0.01 -8.29 0.60
266 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.543 7
-3.36 T -0.54 -0.24 0.50
267 ST C5X9 (AISC SECTIONS)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

PASS Clause H1/2 0.518 7


0.04 C 0.01 -8.27 0.60

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

268 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.517 7
-3.01 T -0.54 -0.22 0.50
269 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.523 7
0.07 C 0.01 -8.36 0.60
270 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.529 7
-2.69 T -0.54 -0.23 0.50
271 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.537 7
-0.48 T 0.01 -8.56 0.60
272 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.501 7
-2.43 T -0.54 -0.21 0.50
273 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.508 7
-2.24 T -0.54 -0.21 0.50
274 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.095 7
-3.14 T 0.11 -7.64 0.60
275 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.084 7
3.61 C 0.00 0.05 0.50
276 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.181 7
-2.26 T 0.42 -14.13 0.00
277 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.382 7
-0.90 T 0.02 -6.03 0.00
278 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.598 7
-0.48 T -0.53 -0.32 0.42
279 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.712 7
44.68 C -1.17 -330.63 0.60
280 ST C5X9 (AISC SECTIONS)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

PASS Clause H1/2 0.532 7


1.43 C 0.02 -8.41 0.00
281 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.686 7
-0.82 T 0.00 0.64 0.00
282 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.728 7
36.13 C -1.63 -337.34 0.60

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

283 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.518 7
1.30 C 0.02 -8.20 0.00
284 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.654 7
-1.01 T 0.00 0.61 0.00
285 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.787 7
48.56 C -1.60 -364.50 0.60
286 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.528 7
1.60 C 0.02 -8.38 0.00
287 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.755 7
-2.07 T 0.00 0.70 0.00
288 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.479 7
79.28 C -1.13 -217.10 0.60
289 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.341 7
-2.53 T -0.01 -5.37 0.00
290 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.720 7
0.30 C 0.00 0.68 0.00
291 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.488 7
0.98 C 0.02 -7.74 0.00
292 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.633 7
-0.50 T 0.00 0.59 0.99
293 ST C5X9 (AISC SECTIONS)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

PASS Clause H1/2 0.459 7


-0.24 T 0.02 -7.27 0.00
294 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.512 7
-0.52 T -0.54 -0.23 0.50
295 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.410 7
0.00 T 0.02 -6.51 0.00
296 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.486 7
-0.51 T -0.54 -0.21 0.50
297 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.379 7
0.00 C 0.02 -6.01 0.00

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

298 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.512 7
-0.50 T -0.54 -0.23 0.50
299 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.354 7
0.17 C 0.01 -5.62 0.00
300 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.504 7
-0.48 T -0.54 -0.22 0.50
301 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.472 7
-0.47 T -0.54 -0.19 0.50
302 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.483 7
1.13 C 0.01 -7.67 0.00
303 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.583 7
-0.82 T 0.00 0.54 0.81
304 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.542 7
-0.23 T 0.02 -8.62 0.00
305 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.533 7
-0.85 T -0.54 -0.25 0.50
306 ST C5X9 (AISC SECTIONS)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

PASS Clause H1/2 0.532 7


-0.01 T 0.02 -8.47 0.00
307 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.467 7
-0.85 T -0.54 -0.19 0.50
308 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.537 7
0.02 C 0.02 -8.54 0.00
309 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.500 7
-0.86 T -0.54 -0.22 0.50
310 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.545 7
-0.33 T 0.02 -8.68 0.00
311 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.476 7
-0.86 T -0.54 -0.19 0.50
312 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.511 7
-0.86 T -0.54 -0.23 0.50

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

313 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.294 7
4.97 C 0.00 -4.62 0.60
314 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.900 7
-1.01 T 0.00 0.84 0.18
315 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.545 7
0.33 C 0.01 -8.69 0.00
316 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.534 7
-1.03 T -0.54 -0.25 0.50
317 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.519 7
-0.15 T 0.02 -8.26 0.00
318 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.467 7
-1.04 T -0.54 -0.18 0.50
319 ST C5X9 (AISC SECTIONS)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

PASS Clause H1/2 0.514 7


0.01 C 0.02 -8.19 0.00
320 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.489 7
-1.04 T -0.54 -0.21 0.50
321 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.511 7
0.01 C 0.02 -8.13 0.00
322 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.504 7
-1.04 T -0.54 -0.22 0.50
323 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.519 7
-0.29 T 0.01 -8.28 0.00
324 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.480 7
-1.04 T -0.54 -0.20 0.50
325 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.508 7
-1.04 T -0.54 -0.22 0.50
326 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.498 7
4.28 C 0.01 -7.84 0.00
327 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.670 7
-1.76 T 0.00 0.62 0.99

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

328 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.521 7
-0.66 T 0.01 -8.29 0.00
329 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.552 7
-1.89 T -0.54 -0.26 0.50
330 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.518 7
0.00 C 0.01 -8.27 0.00
331 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.507 7
-1.97 T -0.54 -0.22 0.50
332 ST C5X9 (AISC SECTIONS)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

PASS Clause H1/2 0.524 7


0.03 C 0.01 -8.36 0.00
333 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.528 7
-2.03 T -0.54 -0.23 0.50
334 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.536 7
-0.35 T 0.01 -8.56 0.00
335 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.494 7
-2.07 T -0.54 -0.20 0.50
336 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.525 7
-2.09 T -0.54 -0.23 0.50
337 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.122 7
-2.89 T -0.21 -9.62 0.60
338 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.107 7
0.19 C 0.00 0.10 0.50
339 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.111 7
-2.52 T -0.35 8.39 0.60
340 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.218 7
-0.59 T 0.00 3.49 0.60
341 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.610 7
-0.54 T -0.53 -0.33 0.42
342 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.883 7
45.13 C -6.19 -393.85 0.60

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

343 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.457 7
1.11 C 0.00 -7.32 0.00
344 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.644 7
0.15 C 0.00 0.61 0.00
345 ST W16X67 (AISC SECTIONS)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

PASS Clause H1/2 0.907 7


36.60 C -6.08 -406.26 0.60
346 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.436 7
1.02 C -0.01 -6.97 0.00
347 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.609 7
-0.10 T 0.00 0.57 0.00
348 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.976 7
51.30 C -5.62 -439.35 0.60
349 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.457 7
1.23 C -0.01 -7.30 0.00
350 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.708 7
-0.35 T 0.00 0.67 0.00
351 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.590 7
80.00 C -3.98 -259.49 0.60
352 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.286 7
-3.13 T -0.01 -4.48 0.00
353 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.677 7
-0.25 T 0.00 0.64 0.00
354 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.394 7
0.71 C -0.01 -6.30 0.00
355 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.590 7
-0.74 T 0.00 0.55 0.99
356 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.324 7
-0.14 T 0.00 -5.19 0.00
357 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.508 7
-0.74 T -0.54 -0.22 0.50

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

358 ST C5X9 (AISC SECTIONS)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

PASS Clause H1/2 0.261 7


-0.04 T -0.01 -4.17 0.00
359 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.487 7
-0.72 T -0.54 -0.21 0.50
360 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.212 7
0.00 C -0.01 -3.39 0.00
361 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.511 7
-0.69 T -0.54 -0.23 0.50
362 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.233 7
0.13 C 0.00 3.75 0.60
363 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.502 7
-0.64 T -0.54 -0.22 0.50
364 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.454 7
-0.59 T -0.54 -0.17 0.50
365 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.428 7
0.74 C -0.01 -6.80 0.00
366 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.538 7
0.12 C 0.00 0.51 0.81
367 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.447 7
-0.06 T -0.01 -7.17 0.00
368 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.520 7
0.12 C -0.54 -0.24 0.50
369 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.445 7
-0.05 T -0.01 -7.11 0.00
370 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.462 7
0.13 C -0.54 -0.19 0.50
371 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.450 7
-0.02 T -0.01 -7.21 0.00
372 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.496 7
0.14 C -0.54 -0.22 0.50

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

373 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.456 7
-0.22 T -0.01 -7.30 0.00
374 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.473 7
0.14 C -0.54 -0.20 0.50
375 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.502 7
0.14 C -0.54 -0.22 0.50
376 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.298 7
2.39 C -0.02 -4.62 0.25
377 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.861 7
-0.14 T 0.00 0.81 0.18
378 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.459 7
0.48 C -0.01 -7.35 0.00
379 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.529 7
-0.15 T -0.54 -0.25 0.50
380 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.423 7
-0.16 T -0.01 -6.76 0.00
381 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.454 7
-0.15 T -0.54 -0.18 0.50
382 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.417 7
0.00 T -0.01 -6.67 0.00
383 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.483 7
-0.14 T -0.54 -0.21 0.50
384 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.413 7
-0.03 T -0.01 -6.60 0.00
385 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.496 7
-0.13 T -0.54 -0.22 0.50
386 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.419 7

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

-0.19 T -0.01 -6.69 0.00


387 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.472 7
-0.12 T -0.54 -0.20 0.50

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

388 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.493 7
-0.11 T -0.54 -0.22 0.50
389 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.414 7
3.93 C -0.01 -6.50 0.00
390 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.623 7
-0.52 T 0.00 0.58 0.99
391 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.420 7
-0.54 T -0.01 -6.71 0.00
392 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.538 7
-0.49 T -0.54 -0.25 0.50
393 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.426 7
-0.03 T -0.01 -6.81 0.00
394 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.498 7
-0.46 T -0.54 -0.22 0.50
395 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.434 7
-0.01 T -0.01 -6.94 0.00
396 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.517 7
-0.42 T -0.54 -0.24 0.50
397 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.445 7
-0.23 T -0.01 -7.11 0.00
398 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.482 7
-0.39 T -0.54 -0.20 0.50
399 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.506 7

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

-0.37 T -0.54 -0.23 0.50


400 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.145 7
-2.75 T -0.65 -10.44 0.60
401 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.077 7
-0.22 T 0.00 0.07 0.50
402 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.269 7

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE
RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================

403 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.896 7
-0.17 T -0.03 14.23 0.60
404 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.608 7
-0.77 T -0.53 -0.33 0.42
406 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.377 7
0.96 C -0.07 5.65 0.60
407 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.549 7
1.29 C 0.00 0.50 0.00
409 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.417 7
0.90 C -0.06 6.35 0.60
410 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.516 7
0.73 C 0.00 0.48 0.00
412 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.372 7
1.05 C -0.07 5.56 0.60
413 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.578 7
0.52 C 0.00 0.54 0.00
414 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.691 7
80.41 C -6.71 -297.53 0.60
415 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.324 7
-3.21 T -0.02 5.00 0.60

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

416 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.565 7
0.89 C 0.00 0.52 0.00
417 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.490 7
0.60 C -0.08 7.43 0.60
418 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.481 7
-0.09 T 0.00 0.45 0.99
419 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.677 7
-0.09 T -0.09 10.39 0.60
420 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.485 7
-0.15 T -0.54 -0.21 0.50
421 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.761 7
-0.07 T -0.09 11.72 0.60
422 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.489 7
-0.25 T -0.54 -0.21 0.50
423 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.849 7
0.01 C -0.09 13.12 0.60
424 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.505 7
-0.39 T -0.54 -0.22 0.50
425 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.900 7
0.03 C -0.09 13.99 0.60
426 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.501 7
-0.54 T -0.54 -0.22 0.50
427 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.490 7
-0.71 T 0.00 0.46 0.00
428 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.305 7
0.57 C -0.06 4.56 0.60

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

429 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.418 7
1.46 C 0.00 0.38 0.81
430 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.478 7
0.06 C -0.07 7.29 0.60

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

431 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.510 7
1.44 C -0.54 -0.21 0.50
432 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.448 7
-0.09 T -0.07 6.79 0.60
433 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.483 7
1.41 C -0.54 -0.19 0.50
434 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.440 7
-0.04 T -0.07 6.65 0.60
435 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.511 7
1.37 C -0.54 -0.22 0.50
436 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.454 7
-0.17 T -0.07 6.88 0.60
437 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.494 7
1.33 C -0.54 -0.20 0.50
438 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.498 7
1.30 C -0.54 -0.20 0.50
439 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.294 7
1.22 C -0.03 -4.51 0.00
440 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.534 7
0.89 C 0.00 0.50 0.18
441 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.450 7
0.64 C -0.06 6.87 0.60

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

442 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.508 7
0.89 C -0.54 -0.22 0.50
443 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.489 7
-0.19 T -0.06 7.49 0.60
444 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.457 7
0.87 C -0.54 -0.17 0.50
445 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.497 7
-0.01 T -0.07 7.61 0.60

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

446 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.494 7
0.83 C -0.54 -0.21 0.50
447 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.501 7
-0.05 T -0.07 7.67 0.60
448 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.503 7
0.80 C -0.54 -0.22 0.50
449 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.513 7
-0.14 T -0.06 7.88 0.60
450 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.485 7
0.76 C -0.54 -0.20 0.50
451 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.481 7
0.73 C -0.54 -0.20 0.50
452 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.456 7
3.76 C -0.06 6.89 0.60
453 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.514 7
1.12 C 0.00 0.47 0.99
454 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.521 7
-0.48 T -0.08 7.89 0.60

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

455 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.527 7
1.04 C -0.54 -0.24 0.50
456 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.488 7
-0.06 T -0.09 7.32 0.60
457 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.513 7
0.92 C -0.54 -0.22 0.50
458 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.474 7
-0.04 T -0.09 7.10 0.60
459 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.523 7
0.78 C -0.54 -0.24 0.50
460 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.479 7
-0.17 T -0.08 7.23 0.60

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

461 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.493 7
0.66 C -0.54 -0.21 0.50
462 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.488 7
0.56 C -0.54 -0.20 0.50
463 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.145 7
-2.95 T -0.64 -10.44 0.00
464 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.135 7
0.87 C 0.00 0.12 0.00
465 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.309 7
-3.16 T 0.00 26.14 0.15
467 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.415 7
-0.87 T -0.33 -0.23 0.42
469 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.537 7
0.93 C -0.05 8.31 0.15

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

470 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.337 7
2.19 C 0.00 0.29 0.00
472 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.580 7
0.89 C -0.04 9.07 0.15
473 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.329 7
1.21 C 0.00 0.30 0.00

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

 475 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.537 7
1.02 C -0.07 8.21 0.15
476 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.335 7
-0.23 T 0.00 0.31 0.00
477 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.713 7
80.52 C -7.20 -306.37 0.15
478 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.581 7
-3.04 T 0.38 7.01 0.15
479 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.328 7
2.23 C 0.00 0.28 0.00
480 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.705 7
0.59 C -0.19 10.19 0.15
481 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.343 7
4.22 C 0.00 0.27 0.99
482 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.874 7
-0.09 T -0.11 13.40 0.15
483 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.345 7
3.52 C -0.34 -0.13 0.50
484 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.965 7
-0.10 T -0.13 14.75 0.15

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

485 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.366 7
3.48 C -0.34 -0.15 0.50

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

487 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.371 7
3.32 C -0.34 -0.15 0.50

489 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.361 7
2.95 C -0.34 -0.15 0.50
490 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.370 7
1.79 C 0.00 0.33 0.00
491 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.495 7
0.56 C -0.18 6.92 0.15
492 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.259 7
3.29 C 0.00 0.21 0.81
493 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.667 7
0.09 C -0.10 10.17 0.15
494 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.325 7
2.62 C -0.34 -0.12 0.50
495 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.636 7
-0.12 T -0.11 9.58 0.15
496 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.336 7
2.52 C -0.34 -0.13 0.50
497 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.623 7
-0.06 T -0.10 9.44 0.15
498 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.350 7
2.33 C -0.34 -0.15 0.50
499 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.641 7

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

-0.17 T -0.10 9.72 0.15


500 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.342 7
2.21 C -0.34 -0.14 0.50

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

501 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.322 7
2.05 C -0.34 -0.12 0.50
502 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.203 7
1.40 C -0.06 -2.87 0.00
503 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.226 7
2.51 C 0.00 0.20 0.00
504 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.650 7
0.71 C -0.12 9.73 0.15
505 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.304 7
2.07 C 0.00 0.26 0.00
506 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.681 7
-0.22 T -0.11 10.32 0.15
507 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.305 7
1.72 C -0.34 -0.11 0.50
508 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.687 7
-0.02 T -0.10 10.45 0.15
509 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.333 7
1.52 C -0.34 -0.14 0.50
510 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.686 7
-0.07 T -0.09 10.51 0.15
511 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.338 7
1.33 C -0.34 -0.15 0.50
512 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.701 7

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

-0.15 T -0.09 10.76 0.15


513 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.326 7
1.23 C -0.34 -0.14 0.50
514 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.302 7
1.08 C -0.34 -0.11 0.50
515 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.705 7
3.73 C -0.28 9.60 0.15

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

516 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.328 7
3.36 C -0.34 -0.11 0.50
517 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.744 7
-0.48 T -0.20 10.78 0.15
518 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.353 7
1.97 C -0.34 -0.15 0.50
519 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.703 7
-0.08 T -0.20 10.14 0.15
520 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.356 7
1.30 C -0.34 -0.16 0.50
521 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.679 7
-0.05 T -0.17 9.91 0.15
522 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.350 7
0.69 C -0.34 -0.17 0.50
523 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.685 7
-0.17 T -0.16 10.08 0.15
524 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.325 7
0.22 C -0.34 -0.15 0.50
525 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.295 7

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

-0.25 T -0.34 -0.12 0.50


526 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.138 7
-3.20 T -0.53 -10.14 0.15
527 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.149 7
-0.67 T 0.00 0.14 0.00
528 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.247 7
4.81 C -0.32 19.91 0.00
529 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.478 7
0.56 C 0.00 7.65 0.00
530 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.603 7
-0.47 T -0.46 -0.35 0.42

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

531 ST W16X67 (AISC SECTIONS)


PASS Clause H1/2 0.917 7
43.09 C -8.59 -401.20 0.00
532 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.437 7
1.92 C -0.02 -6.85 0.60
533 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.554 7
2.31 C 0.00 0.49 0.00
534 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.942 7
33.92 C -7.50 -417.98 0.00
535 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.408 7
1.80 C -0.03 -6.38 0.60
536 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.539 7
1.69 C 0.00 0.49 0.00
538 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.434 7
2.34 C -0.03 -6.77 0.60
539 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.578 7

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

1.00 C 0.00 0.53 0.00


540 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.635 7
72.67 C -7.10 -270.24 0.00
541 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.217 7
1.84 C -0.03 -3.30 0.60
542 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.509 7
-1.53 T 0.00 0.47 0.00
543 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.350 7
2.73 C -0.02 -5.48 0.60
544 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.532 7
1.30 C 0.00 0.49 0.99
545 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.321 7
-0.60 T -0.02 -5.05 0.60

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

546 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.464 7
1.37 C -0.48 -0.20 0.50
547 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.345 7
0.02 C -0.02 5.44 0.00
548 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.450 7
1.21 C -0.48 -0.19 0.50
549 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.421 7
0.04 C -0.01 6.73 0.00
550 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.455 7
0.94 C -0.48 -0.20 0.50
551 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.469 7
-0.30 T 0.01 7.51 0.00
552 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.447 7

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

0.56 C -0.48 -0.20 0.50


553 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.429 7
0.10 C 0.00 0.40 0.00
554 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.390 7
3.35 C -0.02 -6.11 0.60
555 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.466 7
1.91 C 0.00 0.42 0.81
556 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.471 7
-0.58 T -0.02 -7.43 0.60
557 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.475 7
2.10 C -0.48 -0.20 0.50
558 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.467 7
0.00 C -0.02 -7.39 0.60
559 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.444 7
2.17 C -0.48 -0.17 0.50
560 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.473 7
0.03 C -0.02 -7.48 0.60

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

561 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.462 7
2.26 C -0.48 -0.19 0.50
562 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.485 7
-0.50 T -0.02 -7.68 0.60
563 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.454 7
2.32 C -0.48 -0.18 0.50
564 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.471 7
2.37 C -0.48 -0.20 0.50
565 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.273 7

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

11.73 C -0.02 -3.99 0.55


566 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.431 7
1.14 C 0.00 0.40 0.18
567 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.442 7
1.02 C -0.02 -6.96 0.60
568 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.422 7
1.25 C -0.48 -0.16 0.50
569 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.448 7
-0.39 T -0.02 -7.06 0.60
570 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.432 7
1.37 C -0.48 -0.17 0.50
571 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.430 7
0.05 C -0.02 -6.78 0.60
572 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.445 7
1.48 C -0.48 -0.18 0.50
573 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.426 7
0.02 C -0.02 -6.72 0.60
574 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.454 7
1.58 C -0.48 -0.19 0.50
575 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.440 7
-0.47 T -0.02 -6.93 0.60

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

576 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.444 7
1.66 C -0.48 -0.18 0.50
577 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.454 7
1.72 C -0.48 -0.19 0.50
578 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.381 7

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

6.24 C -0.02 -5.89 0.60


579 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.496 7
-0.79 T 0.00 0.46 0.99
580 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.439 7
-1.00 T -0.02 -6.92 0.60
581 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.475 7
-0.34 T -0.48 -0.23 0.50
582 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.442 7
0.05 C -0.02 -6.98 0.60
583 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.452 7
0.02 C -0.48 -0.21 0.50
584 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.453 7
0.05 C -0.02 -7.15 0.60
585 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.460 7
0.38 C -0.48 -0.21 0.50
586 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.472 7
-0.54 T -0.02 -7.44 0.60
587 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.443 7
0.69 C -0.48 -0.19 0.50
588 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.451 7
0.94 C -0.48 -0.20 0.50
589 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.175 7
-2.69 T -1.23 -11.40 0.00
590 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.125 7
-0.89 T 0.00 0.11 0.00

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

591 ST W8X24 (AISC SECTIONS)


PASS Clause H1/2 0.112 7

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

4.57 C -0.33 8.41 0.00


592 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.494 7
0.82 C -0.01 -7.90 0.60
593 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.651 7
-0.37 T -0.53 -0.37 0.42
594 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.690 7
43.91 C -4.06 -309.56 0.00
595 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.673 7
1.39 C -0.01 -10.75 0.60
596 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.824 7
1.19 C 0.00 0.76 0.00
597 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.718 7
34.83 C -4.56 -322.28 0.00
598 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.654 7
1.30 C -0.01 -10.41 0.60
599 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.800 7
0.93 C 0.00 0.74 0.00
600 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.780 7
43.70 C -4.58 -350.52 0.00
601 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.668 7
1.75 C -0.02 -10.61 0.60
602 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.892 7
-0.20 T 0.00 0.84 0.00
603 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.506 7
73.68 C -4.46 -218.10 0.00
604 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.363 7
1.04 C 0.00 -5.81 0.60
605 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.772 7
-0.29 T 0.00 0.73 0.00

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

606 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.605 7
2.21 C 0.00 -9.68 0.60
607 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.804 7
-0.51 T 0.00 0.75 0.99
608 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.646 7
-0.47 T -0.01 -10.36 0.60
609 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.560 7
-0.52 T -0.54 -0.27 0.50
610 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.566 7
0.00 T 0.00 -9.09 0.60
611 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.491 7
-0.53 T -0.54 -0.21 0.50
612 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.517 7
0.04 C 0.00 -8.31 0.60
613 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.507 7
-0.51 T -0.54 -0.22 0.50
614 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.496 7
-0.31 T 0.00 -7.97 0.60
615 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.498 7
-0.48 T -0.54 -0.22 0.50
616 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.477 7
-0.41 T -0.54 -0.20 0.50
617 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.586 7
2.67 C 0.00 -9.37 0.60
618 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.784 7
1.26 C 0.00 0.73 0.81
619 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.761 7
-0.40 T -0.01 -12.22 0.60

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

620 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.586 7
1.24 C -0.54 -0.29 0.50

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

621 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.744 7
-0.02 T -0.01 -11.95 0.60
622 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.487 7
1.24 C -0.54 -0.20 0.50
623 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.747 7
0.01 C 0.00 -12.01 0.60
624 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.505 7
1.22 C -0.54 -0.21 0.50
625 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.770 7
-0.36 T 0.00 -12.38 0.60
626 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.491 7
1.21 C -0.54 -0.20 0.50
627 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.565 7
1.21 C -0.54 -0.27 0.50
628 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.274 7
9.54 C -0.03 -4.00 0.00
629 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.970 7
0.94 C 0.00 0.91 0.18
630 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.712 7
0.93 C -0.01 -11.41 0.60
631 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.513 7
0.94 C -0.54 -0.22 0.50
632 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.738 7
-0.33 T -0.01 -11.81 0.60

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

633 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.512 7
0.95 C -0.54 -0.22 0.50
634 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.716 7
0.03 C -0.01 -11.47 0.60
635 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.492 7
0.94 C -0.54 -0.20 0.50

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

636 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.712 7
0.00 T -0.01 -11.42 0.60
637 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.504 7
0.93 C -0.54 -0.21 0.50
638 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.736 7
-0.33 T -0.01 -11.80 0.60
639 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.487 7
0.93 C -0.54 -0.20 0.50
640 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.554 7
0.94 C -0.54 -0.26 0.50
641 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.630 7
5.70 C 0.00 -10.00 0.60
642 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.782 7
-0.08 T 0.00 0.74 0.99
643 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.737 7
-0.86 T -0.01 -11.79 0.60
644 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.583 7
-0.11 T -0.54 -0.30 0.50
645 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.725 7
0.02 C -0.01 -11.62 0.60

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

646 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.505 7
-0.15 T -0.54 -0.23 0.50
647 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.733 7
0.03 C -0.01 -11.75 0.60
648 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.513 7
-0.17 T -0.54 -0.23 0.50
649 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.762 7
-0.39 T -0.01 -12.21 0.60
650 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.487 7
-0.18 T -0.54 -0.21 0.50

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

651 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.554 7
-0.19 T -0.54 -0.27 0.50
652 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.165 7
-2.48 T -0.62 -12.22 0.00
653 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.123 7
-0.38 T 0.00 -0.11 0.00
654 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.117 7
4.45 C 0.29 -8.97 0.60
655 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.620 7
0.90 C 0.01 -9.92 0.60
656 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.654 7
-0.27 T -0.54 -0.37 0.50
657 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.461 7
45.11 C -0.56 -213.32 0.00
658 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.708 7
0.60 C 0.00 -11.37 0.60

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

659 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.999 7
0.45 C 0.00 0.94 0.00
660 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.485 7
36.21 C -1.45 -222.26 0.00
661 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.694 7
0.54 C 0.00 -11.15 0.60
662 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.972 7
0.30 C 0.00 0.91 0.00
663 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.537 7
47.88 C -2.14 -243.48 0.00
664 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.700 7
0.87 C -0.01 -11.21 0.60
666 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.365 7
75.12 C -1.71 -161.26 0.00
667 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.396 7
-0.41 T 0.00 -6.36 0.60
668 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.941 7
-0.17 T 0.00 0.89 0.00
669 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.669 7
1.42 C 0.02 -10.60 0.60
670 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.990 7
-0.31 T 0.00 0.93 0.99
671 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.736 7
-0.25 T 0.01 -11.79 0.60
672 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.597 7
-0.29 T -0.54 -0.31 0.50
673 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.673 7
-0.03 T 0.01 -10.76 0.60
674 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.486 7
-0.29 T -0.54 -0.21 0.50
675 ST C5X9 (AISC SECTIONS)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

PASS Clause H1/2 0.638 7


0.01 C 0.01 -10.21 0.60
676 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.510 7
-0.28 T -0.54 -0.23 0.50
677 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.629 7
-0.24 T 0.01 -10.04 0.60
678 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.497 7
-0.27 T -0.54 -0.22 0.50
679 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.512 7
-0.27 T -0.54 -0.23 0.50
680 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.622 7
1.65 C 0.02 -9.84 0.60
681 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.998 7
0.46 C 0.00 0.94 0.81
682 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.818 7
-0.15 T 0.01 -13.11 0.60
683 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.627 7
0.48 C -0.53 -0.34 0.58

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

684 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.796 7
-0.04 T 0.01 -12.76 0.60
685 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.476 7
0.48 C -0.54 -0.19 0.50
686 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.799 7
-0.02 T 0.01 -12.79 0.60
687 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.496 7
0.48 C -0.54 -0.21 0.50
688 ST C5X9 (AISC SECTIONS)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

PASS Clause H1/2 0.825 7


-0.15 T 0.01 -13.20 0.60
689 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.477 7
0.47 C -0.54 -0.19 0.50
690 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.593 7
0.47 C -0.54 -0.30 0.50
691 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.228 7
6.15 C -0.02 -3.39 0.00
693 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.765 7
0.73 C 0.01 -12.24 0.60
694 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.526 7
0.29 C -0.54 -0.24 0.50
695 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.793 7
-0.22 T 0.01 -12.74 0.60
696 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.528 7
0.31 C -0.54 -0.24 0.50
697 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.774 7
0.01 C 0.01 -12.43 0.60

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

698 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.482 7
0.31 C -0.54 -0.20 0.50
699 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.772 7
-0.03 T 0.01 -12.39 0.60
700 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.498 7
0.31 C -0.54 -0.22 0.50
701 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.798 7
-0.12 T 0.01 -12.80 0.60
702 ST L20204 (AISC SECTIONS)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

PASS Clause H1/2 0.477 7


0.32 C -0.54 -0.20 0.50
703 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.587 7
0.32 C -0.54 -0.30 0.50
704 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.686 7
4.91 C 0.02 -10.84 0.60
705 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.966 7
-0.62 T 0.00 0.91 0.99
706 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.796 7
-0.65 T 0.00 -12.79 0.60
707 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.625 7
-0.60 T -0.54 -0.34 0.50
708 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.780 7
-0.01 T 0.01 -12.53 0.60
709 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.505 7
-0.60 T -0.54 -0.22 0.50
710 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.785 7
0.00 C 0.01 -12.61 0.60
711 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.517 7
-0.60 T -0.54 -0.23 0.50
712 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.815 7
-0.17 T 0.01 -13.09 0.60

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

713 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.486 7
-0.60 T -0.54 -0.20 0.50
714 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.600 7
-0.60 T -0.53 -0.32 0.42
715 ST W8X24 (AISC SECTIONS)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

PASS Clause H1/2 0.150 7


-1.87 T -0.30 -11.83 0.00
716 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.326 7
-0.13 T 0.00 -0.31 0.00
717 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.200 7
4.37 C 0.76 -14.74 0.60
718 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.623 7
0.91 C 0.02 -9.92 0.00
719 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.648 7
-0.02 T -0.54 -0.36 0.50
720 ST W16X67 (AISC SECTIONS)
PASS Clause G 0.285 7
46.40 C 5.38 -6.30 0.60
721 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.715 7
-0.24 T 0.02 -11.37 0.00
723 ST W16X67 (AISC SECTIONS)
PASS Clause G 0.294 7
37.67 C 5.10 -8.41 0.60
724 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.699 7
-0.27 T 0.02 -11.15 0.00

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

726 ST W16X67 (AISC SECTIONS)


PASS Clause G 0.317 7
52.49 C 4.66 -13.79 0.60
727 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.702 7
-0.06 T 0.01 -11.21 0.00
729 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.228 7
76.64 C 0.78 -99.43 0.00
730 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.400 7
-1.99 T -0.01 -6.36 0.00
731 ST L20204 (AISC SECTIONS)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

PASS Clause H1/2 0.977 7


-0.02 T 0.00 0.92 0.00
732 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.660 7
0.58 C 0.00 -10.60 0.00
734 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.737 7
-0.03 T 0.01 -11.79 0.00
735 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.600 7
0.00 T -0.53 -0.32 0.58
736 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.673 7
-0.06 T 0.01 -10.76 0.00
737 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.485 7
-0.01 T -0.54 -0.21 0.50
738 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.639 7
-0.01 T 0.01 -10.21 0.00

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

739 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.514 7
-0.01 T -0.54 -0.24 0.50
740 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.627 7
-0.16 T 0.01 -10.04 0.00
741 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.501 7
-0.02 T -0.54 -0.22 0.50
742 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.529 7
-0.02 T -0.54 -0.25 0.50
743 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.613 7
0.57 C 0.00 -9.84 0.00
745 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.818 7
0.10 C 0.01 -13.11 0.00
746 ST L20204 (AISC SECTIONS)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

PASS Clause H1/2 0.633 7


0.25 C -0.53 -0.35 0.58
747 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.796 7
-0.06 T 0.01 -12.76 0.00
748 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.473 7
0.25 C -0.54 -0.19 0.50
749 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.798 7
-0.06 T 0.01 -12.79 0.00
750 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.493 7
0.25 C -0.54 -0.21 0.50
751 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.824 7
0.08 C 0.01 -13.20 0.00
752 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.472 7
0.24 C -0.54 -0.19 0.50

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

753 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.593 7
0.24 C -0.53 -0.31 0.42
754 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.167 7
2.39 C -0.01 -2.58 0.00
756 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.761 7
0.52 C 0.00 -12.24 0.00
757 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.527 7
0.03 C -0.54 -0.25 0.50
758 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.794 7
-0.10 T 0.01 -12.74 0.00
759 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.527 7
0.03 C -0.54 -0.25 0.50
760 ST C5X9 (AISC SECTIONS)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

PASS Clause H1/2 0.774 7


-0.02 T 0.01 -12.43 0.00
761 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.479 7
0.04 C -0.54 -0.20 0.50
762 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.772 7
-0.06 T 0.01 -12.39 0.00
763 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.498 7
0.04 C -0.54 -0.22 0.50
764 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.797 7
0.10 C 0.01 -12.80 0.00
765 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.474 7
0.04 C -0.54 -0.20 0.50
766 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.592 7
0.04 C -0.53 -0.32 0.42

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

767 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.681 7
4.07 C -0.01 -10.84 0.00
769 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.796 7
-0.43 T 0.01 -12.79 0.00
770 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.635 7
-1.22 T -0.53 -0.35 0.58
771 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.779 7
-0.04 T 0.00 -12.53 0.00
772 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.509 7
-1.23 T -0.54 -0.22 0.50
773 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.785 7
-0.03 T 0.00 -12.61 0.00
774 ST L20204 (AISC SECTIONS)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

PASS Clause H1/2 0.523 7


-1.24 T -0.54 -0.24 0.50
775 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.814 7
0.08 C 0.00 -13.09 0.00
776 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.490 7
-1.24 T -0.54 -0.20 0.50
777 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.612 7
-1.24 T -0.53 -0.33 0.42
778 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.120 7
-1.17 T -0.07 -10.01 0.00
779 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.366 7
-0.05 T 0.00 -0.34 0.00
780 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.257 7
4.30 C 1.15 -18.55 0.60
781 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.519 7
0.95 C 0.03 -8.18 0.00

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

782 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.615 7
0.16 C -0.54 -0.33 0.50
783 ST W16X67 (AISC SECTIONS)
PASS Clause G 0.298 7
47.39 C 8.01 104.36 0.60
784 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.557 7
-0.86 T 0.04 -8.74 0.00
785 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.903 7
0.49 C 0.00 0.85 0.00
786 ST W16X67 (AISC SECTIONS)
PASS Clause G 0.306 7
38.78 C 8.55 105.27 0.60
787 ST C5X9 (AISC SECTIONS)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

PASS Clause H1/2 0.549 7


-0.88 T 0.03 -8.62 0.00
788 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.872 7
0.29 C 0.00 0.82 0.00
789 ST W16X67 (AISC SECTIONS)
PASS Clause G 0.330 7
56.22 C 9.52 108.58 0.60
790 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.548 7
-0.76 T 0.03 -8.62 0.00
791 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.993 7
-1.67 T 0.00 0.92 0.00
792 ST W16X67 (AISC SECTIONS)
PASS Clause G 0.193 7
77.82 C 1.83 39.08 0.60
793 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.320 7
-3.11 T 0.01 -5.02 0.00
794 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.877 7
2.49 C 0.00 0.80 0.00
795 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.522 7
-0.05 T 0.02 -8.29 0.00
796 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.901 7
0.05 C 0.00 0.85 0.99

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

797 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.589 7
0.14 C 0.03 -9.32 0.00
798 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.563 7
0.05 C -0.54 -0.28 0.50
799 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.548 7
-0.08 T 0.02 -8.68 0.00
800 ST L20204 (AISC SECTIONS)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

PASS Clause H1/2 0.491 7


0.08 C -0.54 -0.21 0.50
801 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.529 7
-0.03 T 0.02 -8.38 0.00
802 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.521 7
0.11 C -0.54 -0.24 0.50
803 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.525 7
-0.10 T 0.03 -8.30 0.00
804 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.514 7
0.13 C -0.54 -0.23 0.50
805 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.529 7
0.14 C -0.54 -0.25 0.50
806 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.475 7
-0.24 T 0.01 -7.56 0.00
807 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.860 7
0.45 C 0.00 0.81 0.81
808 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.637 7
0.31 C 0.03 -10.09 0.00
809 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.589 7
0.45 C -0.54 -0.30 0.50
810 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.620 7
-0.08 T 0.03 -9.83 0.00
811 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.478 7
0.45 C -0.54 -0.20 0.50

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

812 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.621 7
-0.09 T 0.03 -9.85 0.00
813 ST L20204 (AISC SECTIONS)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

PASS Clause H1/2 0.497 7


0.47 C -0.54 -0.21 0.50
814 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.639 7
0.24 C 0.03 -10.13 0.00
815 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.477 7
0.48 C -0.54 -0.20 0.50
816 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.556 7
0.48 C -0.54 -0.27 0.50
817 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.114 7
-0.73 T 0.01 -1.78 0.00
819 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.594 7
0.41 C 0.02 -9.44 0.00
820 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.512 7
0.24 C -0.54 -0.23 0.50
821 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.620 7
-0.03 T 0.02 -9.85 0.00
822 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.508 7
0.23 C -0.54 -0.23 0.50
823 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.608 7
-0.04 T 0.02 -9.64 0.00
824 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.487 7
0.25 C -0.54 -0.21 0.50
825 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.606 7
-0.09 T 0.02 -9.62 0.00
ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

826 ST L20204 (AISC SECTIONS)


PASS Clause H1/2 0.503 7
0.27 C -0.54 -0.22 0.50
827 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.624 7

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

0.26 C 0.02 -9.90 0.00


828 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.483 7
0.28 C -0.54 -0.20 0.50
829 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.560 7
0.28 C -0.54 -0.28 0.50
830 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.532 7
3.45 C 0.01 -8.43 0.00
831 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.862 7
-1.67 T 0.00 0.80 0.99
832 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.620 7
-0.27 T 0.01 -9.89 0.00
833 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.601 7
-1.72 T -0.54 -0.31 0.50
834 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.608 7
-0.06 T 0.02 -9.70 0.00
835 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.516 7
-1.71 T -0.54 -0.23 0.50
836 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.612 7
-0.06 T 0.02 -9.74 0.00
837 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.527 7
-1.70 T -0.54 -0.24 0.50
838 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.633 7
0.25 C 0.02 -10.08 0.00
839 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.497 7
-1.69 T -0.54 -0.21 0.50
840 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.574 7
-1.69 T -0.54 -0.28 0.50

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

841 ST W8X24 (AISC SECTIONS)


PASS Clause H1/2 0.088 7
-0.74 T 1.70 -2.89 0.50
842 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.234 7
2.57 C 0.00 -0.20 0.00
843 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.271 7
4.28 C 1.26 -19.40 0.21
844 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.185 7
0.98 C 0.05 -2.66 0.00
845 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.385 7
0.48 C -0.37 -0.19 0.50
846 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.376 7
47.77 C 8.58 143.38 0.21
847 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.187 7
-1.07 T 0.05 -2.73 0.00
848 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.507 7
1.23 C 0.00 0.46 0.00
849 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.387 7
39.17 C 9.68 145.25 0.21
850 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.187 7
-1.07 T 0.05 -2.71 0.00
851 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.479 7
1.05 C 0.00 0.44 0.00
852 ST W16X67 (AISC SECTIONS)
PASS Clause H1/2 0.416 7
57.53 C 11.45 151.47 0.21
853 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.187 7
-0.98 T 0.05 -2.70 0.00
854 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.519 7
-0.52 T 0.00 0.49 0.00
855 ST W16X67 (AISC SECTIONS)
PASS Clause G 0.201 7
78.24 C 0.17 64.72 0.21

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

856 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.311 7
-3.36 T 0.78 0.27 0.21
857 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.483 7
5.15 C 0.00 0.39 0.00
858 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.177 7
-0.26 T 0.04 -2.61 0.00
859 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.500 7
-0.39 T 0.00 0.47 0.99
860 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.204 7
0.18 C 0.05 -3.01 0.00
861 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.343 7
-0.27 T -0.37 -0.15 0.50
862 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.196 7
-0.10 T 0.05 -2.87 0.00
863 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.351 7
-0.07 T -0.37 -0.16 0.50
864 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.192 7
-0.05 T 0.05 -2.80 0.00
865 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.378 7
0.13 C -0.37 -0.19 0.50
866 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.190 7
-0.11 T 0.05 -2.78 0.00
867 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.383 7
0.40 C -0.37 -0.19 0.50
868 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.377 7
0.63 C -0.37 -0.18 0.50

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

869 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.159 7
-0.50 T 0.03 -2.37 0.00
870 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.419 7
0.64 C 0.00 0.39 0.81

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

871 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.216 7
0.37 C 0.05 -3.19 0.00
872 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.355 7
0.74 C -0.37 -0.16 0.50
873 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.214 7
-0.11 T 0.05 -3.16 0.00
874 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.339 7
0.79 C -0.37 -0.14 0.50
875 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.214 7
-0.11 T 0.05 -3.16 0.00
876 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.353 7
0.75 C -0.37 -0.16 0.50
877 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.217 7
0.28 C 0.05 -3.21 0.00
878 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.339 7
0.79 C -0.37 -0.14 0.50
879 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.339 7
0.88 C -0.37 -0.14 0.50
880 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.049 7
-1.81 T 0.02 -0.61 0.00
881 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.523 7
0.50 C 0.00 0.49 0.18

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

882 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.201 7
0.41 C 0.05 -2.95 0.00
883 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.307 7
0.69 C -0.37 -0.11 0.50
884 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.214 7
-0.03 T 0.05 -3.15 0.00
885 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.331 7
0.77 C -0.37 -0.13 0.50

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

886 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.212 7
-0.05 T 0.05 -3.12 0.00
887 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.350 7
0.69 C -0.37 -0.15 0.50
888 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.212 7
-0.11 T 0.05 -3.11 0.00
889 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.362 7
0.62 C -0.37 -0.17 0.50
890 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.215 7
0.30 C 0.05 -3.16 0.00
891 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.349 7
0.65 C -0.37 -0.15 0.50
892 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.350 7
0.71 C -0.37 -0.15 0.50
893 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.171 7
3.24 C 0.00 -2.66 0.00
894 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.456 7
-1.60 T 0.00 0.42 0.99

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

895 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.206 7
-0.24 T 0.03 -3.15 0.00
896 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.373 7
-0.41 T -0.37 -0.18 0.50
897 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.207 7
-0.08 T 0.03 -3.13 0.00
898 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.364 7
-0.29 T -0.37 -0.17 0.50
899 ST C5X9 (AISC SECTIONS)
PASS Clause H1/2 0.210 7
-0.08 T 0.04 -3.14 0.00
900 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.370 7
-0.41 T -0.37 -0.18 0.50

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

901 ST C5X9 (AISC SECTIONS)


PASS Clause H1/2 0.215 7
0.29 C 0.04 -3.20 0.00
902 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.348 7
-0.53 T -0.37 -0.16 0.50
903 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.342 7
-0.67 T -0.37 -0.15 0.50
904 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.093 7
-0.71 T 2.85 -0.18 0.21
905 ST L20204 (AISC SECTIONS)
PASS Clause H1/2 0.051 7
1.16 C 0.00 0.04 0.50

572. PARAMETER 2
573. CODE AISC UNIFIED
574. CHECK CODE MEMB 1 5 8 TO 10 201 205 206 209 210

STAAD.PRO CODE CHECKING - (AISC-360-05-LRFD)

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

********************************************

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE
RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX MY MZ LOCATION
=======================================================================

1 ST W8X24 (AISC SECTIONS)


PASS Clause H1/2 0.092 9
-6.96 T 0.35 4.48 6.99
5 ST W18X71 (AISC SECTIONS)
PASS Clause H1/2 0.968 7
237.62 C -1.46 430.37 3.50
8 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.069 9
-5.12 T 0.59 2.78 6.81
9 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.077 9
-2.91 T 0.59 3.20 7.18
10 ST W8X24 (AISC SECTIONS)
PASS Clause H1/2 0.069 9
-0.66 T 0.59 2.85 7.00
201 ST W18X71 (AISC SECTIONS)
PASS Clause H1/2 0.796 7
-148.49 T -1.46 401.08 0.00
205 ST W18X71 (AISC SECTIONS)
PASS Clause H1/2 0.948 7
235.90 C -2.00 418.37 3.50
206 ST W18X71 (AISC SECTIONS)
PASS Clause H1/2 0.780 7
-140.17 T -2.00 389.75 0.00
209 ST W18X71 (AISC SECTIONS)
PASS Clause H1/2 0.691 7
163.79 C -1.96 303.20 3.50
210 ST W18X71 (AISC SECTIONS)
PASS Clause H1/2 0.572 7
-107.62 T -1.96 282.69 0.00

*********** END OF THE STAAD.Pro RUN ***********

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

PROPOSED AHU PLATFORM FOR VISHAY MOSFET


PROJECT: NEW FACILITY
DESIGN OF
SUBJECT: FOOTINGS
01-
Mar-
D A T E: 22

DEVELOPMENT LENGTH of column


rebars (hooked) Ldh
fc' = 3 fy = 60 ksi
db = 16 mm Ldh = 13.80 in

DESIGN DATA:
fc' = 3 fy = 60 ksi
Depth of embedment from
NGL 3.94 ft
Soil fill above NGL 3.94 ft
Allow soil bearing
cap 2.50 ksf
ON DIMENSIONS
Length L (column F) is perpendicular to the
bending
axis.
FOOTING: F1
B L T
FTG DIMENSIONS: 1.90 m 1.90 m 0.40 m
6.23 ft 6.23 ft x 15.744 in
COL DIMENSIONS: 0.50 m 0.50 m
19.68 in 19.68 in
COL. ECCENTRICITY FROM
FTG CL 0.00 ft
DEPTH OF EMBEDMENT FROM
NAT. GRD. 3.94 ft
SOIL FILL ABOVE NAT. GRD 3.94 ft
ALLOWABLE SOIL
PRESSURE q: 2.50 3.33 ksf

LOADS :
Col. DL
Basic Axial,k Moment,ftk = 8.53 kips (37.93kN)
Ftg. wt.
DL 42.25 0.00 = 7.64
LL (122.78 kN) 27.60 0.00 Soil wt. = 26.08

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

SL (2.23
kN) 0.50 0.00 -
kips
42.25 (187.93kN)

Combination Axial,k Moment,ftk e (ft)


1 D+L 69.86 0.00 0.000
2 D+L+S 70.36 0.00 0.000

SOIL PRESSURES:

Combination q1,ksf q2,ksf L or 3m,ft


1 2.40 1.80 6.23
2 2.42 1.81 6.23
Net factored soil pressures: Avg net qu 0.35 ksf

Combination qu1,ksf qu(ctr),ksf qu(face),ksf qu(@d/2),ksf qu(@d),ksf


1 2.79 2.32 2.45 2.52 2.59
2 2.12 1.76 1.85 1.91 1.97

NOTE:
q1 & q2 is less 2.40 <
than qallow 2.50 Footing size is OK

qunet @ d/2 & 2.59 <


qunet @ d is less 3.33 Footing size is OK
than qallow stress
increase

MATERIALS:
Concrete fc' 3 ksi Rebars fy 60 ksi
SHEAR:
Eff. depth 11.80 in SHEAR & CAP. 2-WAY (half) 1-WAY
x1 31.48 in Vu 41.33 k 22.04 k
y1 31.48 in ØVn 138.34 k 82.16 k
Bo 125.92 in
FLEXURAL
REBARS:
ß = L/S = 1.00 2/(1+ß) = 1.00
SHORT
LONG DIRECTION: Lcant,ft 2.30 ft DIRECTION: Lcant 2.30 ft
MuL Comb1/Comb2 43.99 kft 33.32 kft MuS = 5.70 kft

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

Asmin flex/temp 2.94 in² 2.12 in² Asmin flex/temp 2.94 in² 2.12 in²
Nbars - Bar Nbars - Bar
dia 10 - 16 mmø dia 10 - 16 mmø
Bar
Bar spacing 7.86 in spacing 7.86 in
As /
As / percentage 3.11 in² 0.35% percentage 3.11 in² 0.35%
ØMn = 158.52 kft 0.98 in ØMn = 158.52 kft 0.98 in
Dev.
Dev. length: 13.65 in 15.11 in length: 13.65 in 15.11 in

NOTE:
287.52
ØMn is greater > 287.52 >
than Mu 66.48 Rebar diameter is OK 12.58 Rebar diameter is O

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

PROPOSED AHU PLATFORM FOR VISHAY MOSFET


PROJECT: NEW FACILITY
DESIGN OF
SUBJECT: FOOTINGS
01-
Mar-
D A T E: 22

DEVELOPMENT LENGTH of column rebars


(hooked) Ldh
fc' = 3 fy = 60 ksi
db = 16 mm Ldh = 13.80 in

DESIGN DATA:
fc' = 3 fy = 60 ksi
Depth of embedment from
NGL 3.94 ft
Soil fill above
NGL 3.94 ft
Allow soil
bearing cap 2.50 ksf
ON
DIMENSIONS
Length L (column F) is perpendicular to the bending
axis.
FOOTING: F1
B L T
FTG DIMENSIONS: 1.90 m 1.90 m 0.40 m
6.23 ft 6.23 ft x 15.744 in
COL DIMENSIONS: 0.50 m 0.50 m
19.68 in 19.68 in
COL. ECCENTRICITY FROM
FTG CL 0.00 ft
DEPTH OF EMBEDMENT FROM NAT.
GRD. 3.94 ft
SOIL FILL ABOVE NAT. GRD 3.94 ft
ALLOWABLE SOIL PRESSURE q: 2.50 3.33 ksf

LOADS :
Col. DL
Basic Axial,k Moment,ftk = 8.53 kips (37.93kN)
Ftg. wt.
DL 42.25 0.00 = 7.64

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

LL (122.78 kN) 27.60 0.00 Soil wt. = 26.08


SL (2.23 kN) 0.50 0.00 -
kips
42.25 (187.93kN)
Combination Axial,k Moment,ftk e (ft)
1 D+L 69.86 0.00 0.000
2 D+L+S 70.36 0.00 0.000

SOIL PRESSURES:

Combination q1,ksf q2,ksf L or 3m,ft


1 2.40 1.80 6.23
2 2.42 1.81 6.23
Net factored soil pressures: Avg net qu 0.35

Combination qu1,ksf qu(ctr),ksf qu(face),ksf qu(@d/2),ksf qu(@d),ksf


1 2.79 2.32 2.45 2.52 2.59
2 2.12 1.76 1.85 1.91 1.97

NOTE:
q1 & q2 is less
than qallow 2.40 < 2.50 Footing size is OK

qunet @ d/2 & 2.59 < 3.33 Footing size is OK


qunet @ d is less
than qallow stress
increase

MATERIALS:
Concrete fc' 3 ksi Rebars fy 60 ksi
SHEAR:
Eff. depth 11.80 in SHEAR & CAP. 2-WAY (half) 1-WAY
x1 31.48 in Vu 41.33 k 22.04
y1 31.48 in ØVn 138.34 k 82.16
Bo 125.92 in
FLEXURAL
REBARS:
ß = L/S = 1.00 2/(1+ß) = 1.00
SHORT
LONG DIRECTION: Lcant,ft 2.30 ft DIRECTION: Lcant 2.30
MuL Comb1/Comb2 43.99 kft 33.32 kft MuS = 5.70 kft
Asmin flex/temp 2.94 in² 2.12 in² Asmin flex/temp 2.94 in² 2.12

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

Nbars - Bar Nbars - Bar


dia 10 - 16 mmø dia 10 - 16
Bar
Bar spacing 7.86 in spacing 7.86 in
As /
As / percentage 3.11 in² 0.35% percentage 3.11 in² 0.35%
ØMn = 158.52 kft 0.98 in ØMn = 158.52 kft 0.98
Dev.
Dev. length: 13.65 in 15.11 in length: 13.65 in 15.11

NOTE:
ØMn is greater 287.52 > 287.52 >
than Mu 66.48 Rebar diameter is OK 12.58 Rebar diam

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila
Project : PROPOSED AHU PLATFORM FOR VISHAY BINAN
MOSFETS NEW FACILITY
Location : LTI COMPLEX, BINAN, LAGUNA
Subject : AHU PLATFORM DESIGN CALCULATIONS
Date : FEBRUARY 2022

Mervin C. Arce, Civil Engineer


PRC Reg. No. 68796
PTR No. 174094
Issued on 10 January 2022 at City of Manila