81. The focal point of all quality control should be:
Behavioural and Allied Sciences
A. Price focus
Brand Management
B. Cost Focus
Business Communication
C. Customer Focus
Business Economics D. Manufacturing Focus
Business Environment View answer
Business Ethics and Governance
Correct answer: (C)
Customer Focus
Business Law
Business Mathematics
82. The key process input variables (KPIV) and key process output variables are developed during the ______________ phase.
Business Statistics
A. Define
Computers In Management B. Analyze
C. Measure
Cost and Managerial Accounting
D. Improve
E-Business
View answer
English Language
Correct answer: (C)
Entrepreneurship Management
Measure
Financial Management
83. An unbiased dice is rolled once. The probability of getting a number greater than 4 is:
Human Resource Management
Insurance and Risk Management A. ¼
B. 1/6
Management Information Systems
C. ½
Marketing Management D. 1/3
Media Planning View answer
Operations Research
Correct answer: (D)
Organisational Behavior 1/3
Principles and Practices of
84. Which of the following statement is false:
Management
Production and Operations A. Important step of strategic quality management is identification of those dimensions in which the organization will compete
Management
B. Selection of suppliers should be based on quality, schedule, and cost, rather than on cost alone
System Analysis and Design C. All of the individuals in the organization must have an understanding of the basic tools of quality improvement
D. Manufacturing Unit should be the unit focusing on Quality Improvement among all units in an organization
Total Quality Management
View answer
Correct answer: (D)
Manufacturing Unit should be the unit focusing on Quality Improvement among all units in an organization
85. Cause and Effect Diagram can be used in the ______________ and ______________ step of DMAIC.
A. Define, Measure
B. Analyze, Control
C. Analyze, Improve
D. Define, Improve
View answer
https://www.mbamcq.com/total-quality-management/9.php 1/3
01/03/2022, 09:09 Total Quality Management Multiple choice Questions and Answers. Page 9.
Correct answer: (C)
Analyze, Improve
86. Which of the following is false regarding when acceptance sampling is useful:
A. When testing is destructive
B. When 100% inspection cost is very low
C. When there are potentially serious product liability risk
D. When 100% inspection is not technically feasible
View answer
Correct answer: (B)
When 100% inspection cost is very low
87. Let p0 be the incoming fraction defective and p1 be the outgoing fraction defective (Assume both p1 and p0 is greater than
0). If rectifying inspection is performed then:
A. P0<p1
B. P1<p0
C. None of the above
D. Cannot be determined
View answer
Correct answer: (B)
P1<p0
88. A company wants to measure the length of a fan as a part of its quality control exercise. The type of data collected will be:
A. Variable
B. Attribute
C. Cannot be determined
D. None of the above
View answer
Correct answer: (B)
Attribute
89. If only ______________ causes of variation are present, the output of a process forms a distribution that is table over time and is
predictable.
A. Assignable
B. Non-Random
C. Natural
D. Cannot be said
View answer
Correct answer: (C)
Natural
90. For an x bar chart, β risk can be defined as:
A. The probability of detecting the shift in process mean from μo (in control value) to μ1
B. The probability of not detecting the shift in process mean from μ0 (in control value) to μ1
C. The probability of detecting the shift in process range from μ0 (in control value) to μ1
D. The probability of not detecting the shift in process range from μ0 (in control value) to μ1
View answer
https://www.mbamcq.com/total-quality-management/9.php 2/3
01/03/2022, 09:09 Total Quality Management Multiple choice Questions and Answers. Page 9.
Correct answer: (B)
The probability of not detecting the shift in process mean from μ0 (in control value) to μ1