Index For Safe Work Method Statements (CIVIL/FIT-OUT WORK)
Index For Safe Work Method Statements (CIVIL/FIT-OUT WORK)
1 Marking of layout
2 Excavation work
3 PCC work
4 RCC work
5 Formwork/Shuttering work
6 Column casting work
7 Construction of wall/Brick work
8 Roofing work
9 Plaster work
10 Fixing of Door and Window
11 Plumbing work
12 Tiles laying work
13 Painting/Epoxy work
14 Ceiling board installation work
15 Scaffolding Erection work
16 Lifting of materials
17 Tank concrete work
18 Sheet pile foundation procedure
19 Water proofing work
20 Carpentering work
21 Glazing panel installation work
22 Gypsum board work
23 Demolition work of existing boundary wall
24 Pre-cast concrete boundary wall work
25 Road paving work
26 Road line-marking work
27 Underground draining piping work
28 PEB structure work
29 Pathway work
30 Core cutting
31 Rolling shutter installation
Index for Safe work method statements (ELECTRICAL WORK)
1 Cable tray installation work
2 Cable pulling/laying work
3 Ear thing and Grounding work
4 Pre-commissioning and commissioning of DB’s
5 Lighting protection system commissioning
6 Installation of high voltage cables above and underground
7 Installation of GI conduit
8 Installation of diesel generator set
9 Installation of transformers
10 Installation and termination of LV/HV cables
11 Installation and testing of bus-bar