Masteremaco N 202: Description Priming
Masteremaco N 202: Description Priming
Masteremaco N 202: Description Priming
A single component cementitious blowhole filler and levelling mortar for cosmetic repairs to new
construction
DESCRIPTION PRIMING
MasterEmaco N 202 is a combination of The substrate should be thoroughly soaked, to a
Portland cement, well graded sands and special saturated but surface dry condition prior to
additives. application of the MasterEmaco N 202.
When mixed with water MasterEmaco N 202
produces a smooth cementitious paste ideally MIXING
suited to filling of small surface defects and It is recommended that only full bags of 25 kg are
blowholes thin layers of up to 3 mm maximum. mixed.
MasterEmaco N 202 should be mixed by
TYPICAL APPLICATIONS mechanical means with a slow speed drill and
Surface leveling and blowhole filling for all spiral paddle.
concrete elements such as The required amount of gauging water should be
Beams, columns, and walls in high rise placed in the mixing bucket and the
buildings MasterEmaco N 202 powder added and mixed
Columns, Piers and cross beams on for approximately 3 minutes until a smooth,
highway structures creamy and lump free consistency is achieved.
Cooling towers and chimneys and other The water additions shall be a maximum of 6 L
industrial structures per 25 kg bag.
SURFACE PREPARATION
All areas to be treated must be clean, sound and
free from all dirt dust, loose material and any oil
or grease which would impair adhesion.
MasterEmaco® N 202
MBS_CC-UAE/Em_N202_10_06/v3/03_17/v4/09_19/v5/02_21
The technical information and application advice given in this Master Builders Solutions publication are based on
STATEMENT OF the present state of our best scientific and practical knowledge. As the information herein is of a general nature, no
RESPONSIBILITY assumption can be made as to a product's suitability for a particular use or application and no warranty as to its
accuracy, reliability or completeness either expressed or implied is given other than those required by law. The user
is responsible for checking the suitability of products for their intended use.
Field service where provided does not constitute supervisory responsibility. Suggestions made by Master Builders
NOTE Solutions either orally or in writing may be followed, modified or rejected by the owner, engineer or contractor since
they, and not Master Builders Solutions, are responsible for carrying out procedures appropriate to a specific
application.