Earth Resistance Step Touch Test Procedure
Earth Resistance Step Touch Test Procedure
Earth Resistance Step Touch Test Procedure
# E-ST-TP- 001
Earth Resistance, Step & Touch
Date: 20/10/2019 Test Procedure
Rev.0
1. Introduction:
The scope of this document is to provide guidance on testing earth resistance,
step & touch voltage on site with testing equipment (MPC 5/50 Getest from
Circutor-Spain).
2. Test Guidelines:
In order to preform the step & touch test in the substation, The points with high
chance to be effected during faults will be tested.
Around 15 points will be tested such as:
Main door entrance, outer fence, internal fences, main building entrance doors,
Storage area if exist, power transformer main body and overhead line gantry.
3. Test sitting:
4. Test results:
Between 0 to 250 mv
Page 1 of 4
DOC. # E-ST-TP- 001
Earth Resistance, Step & Touch
Date: 20/10/2019 Test Procedure
Rev.0
5. Test Method:
3. Connect the power supply cable and switch the device on.
8. Once the test is finished the results of the test will be displayed on the phone
results screen.
9. Repeat all steps for the next tested points.
10. Save the results and transfer it to a computer with a USB cable.
(fig.1)
Page 2 of 4
DOC. # E-ST-TP- 001
Earth Resistance, Step & Touch
Date: 20/10/2019 Test Procedure
Rev.0
(fig.2)
Page 3 of 4
DOC. # E-ST-TP- 001
Earth Resistance, Step & Touch
Date: 20/10/2019 Test Procedure
Rev.0
1. Connect the measuring cables (yellow-green) to the Getest voltage terminals with
earth pick and another cable to the earth be tested. (See figure No.3)
Note: Arrange the earth pick15 meter at least apart from the other.
2. Connect the injection cables (two red) to the Getest voltage terminals with
auxiliary earthing and another cable to the earth be tested. (See figure No.3)
(fig.3)
Page 4 of 4