Use of Hot Mix Plant On Bituminous Construction Works On NHs

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Government of India

, ,. Mfaistry of Road Transport & Highways

Transport Bhawan.
../ 1, Sansad Mara.
·~ .. New lklhi·l 10 001

No. RW· 2401 l/01/200~·Mcch Dated 2t 11 Oct 20t)1

To.
1. All Chief Engineers of the States and Union Territories. dealing with National Highways.
2. The Director General Border Roads, Seema Sadak Bhawan, Delhi Cantt, New 0ell;1
3. "!"he Chalnnan, National Highways Authority of India (NHAJ), New Delhi
4. Th: Secretary General, Indian Roads Congress, New Delhi
5. The Director, Indian Academy of Highway Engineers, Noida

Subject: Use of Hot Mix Plant on Bituminous Construction Work! on N11tion1I Highways

Sir.
The use of Hot Mix Plant on National Highways and other related Issues have been reviewed by
the Ministry, to improve the quality. The following decisions have been taken.

(a) Use of Batcb type Hot Mix Plant

I.. Use of Batch type Hot Mix Plant has been made mandatory, w.e.fOl.04.2013 for all kinds of
original bituminous works [except for the States in the hilly region, LWE (Left Wing
Extremist Affected Areas) projects and the North Eastern States where the Chief Engineer of
the concerned Project Zone in this Ministry mny decide at the time of sanctioning the
estimates on case to cnsc basis].

l
ii. In.the intervening period i.e. from 01.04.2012 to 31.03.2013. the use of Batch type Hot Mix
Plant to be made mandatory on projects where the cost of Bitwninous works ls gr.cater than
Rs 25 Cr [except for the States in the hilly region, LWE (Left Wini Extremist Affo~led Areas)
projects and the North Eastern States where the Chief Engineer of the concerned Project 1..onc
may decide at the time of sanctioning the estimates on case to case basisl

. (b) Us5( of Double Barrel tyoe Prum Mix Pinnt


.. ,
\'

1·hcDouble Barrel Drum type Hot Mix Plant to be used where there is Use- of reclaimed
Asphnltic/bitwninous pavement .Alternatively, any other Plant which has the technology/
. provision for the use of reclaimed Aspha.ltic/bituminous pavement with the virgin material rnay
be used. ·

Page 1 of2
"" . .
---- --~-

'' '
(c) The laying temperature of the mix required at the site should be the criteria for deciding the lead
·of the plant. To ensure this temperature, automatic temperature measurement with GPS alona
with video camera or any other suitable technology may be adopted. ,__,

Yours sincerely, ~ .•

w~~
(K.C.~
Executive:: F..nglnccr (Mech)
For Director General (Road Development) &SS

Copy to;

1. All the Tcchnical Officers in the Ministry of Road Transport & Highways

vt: All Ros and ELOs

'•