Review Contract Plans, Specs. and Standard Drawings for SUBBASE COURSE (Section 304).
Review Pay Item in Contract dealing with SUBBASE (Item No.304.xxxx).
Determine locations in Plans for all subbase placement (Full Depth Construction limits).
Materials YES NO
Subbase is placed in maximum layers of 15 inches and minimum layers of 6 inches (304-3.02).
Subbase is compacted as per section 203-3.12 Compaction (304-3.03).
Subbase course does not extend above or below true grade by more than 1/4"(304-3.05).