SUMBA ISLAND, Indonesia

Download as pdf or txt
Download as pdf or txt
You are on page 1of 21

KYUDENKO EMS

SUMBA ISLAND, Indonesia


Corporate Profile

Company name Kyudenko Corporation

Established December 1, 1944

Capital ¥12,550 million

Head office Fukuoka city

Number of Consolidated: 9,843 persons


employees (March 31, 2018)

2
Integrated Utilities Engineering Service

Heating,
Electrical Ventilation and
Construction Air Conditioning
Mechanical
Work Installation Work
Power
Distribution Line
Work

3
Major Projects
Ashikita Mega-Solar Project
Nanatsu Island Mega SP Station

17MW

70MW
Saga OuchiCho Mega-Solar Project

Makurazaki
TaiwanMega-Solar Project
On water Mega-Solar
Project

4 7MW
5MW 17MW
Features of
KYUDENKO EMS
Renewable Energy
Efficiency of Renewable Energ

100% Maximum

Energy Resource
EMS
Energy Management System
Stable Supply
Multiple of electricity
ON-Grid&OFF-Grid
24h
OK
6
Generated Power

Time

Ordinary power generation system from renewable energy


7
Solar Power amount Supply electricity amount

Generated Power Supplied Power

Stable Supply!

Time Time
DC Fluctuating Voltage
DC/AC Inverter

BATTERY lead-storage battery


DC 380V Controller For cycle use

8 DC 380V Conversion-BUS DC 380V


Transmit Electricity Trend Graph

Solar Radiation
Transmission Power ①+②

Output waveform from EMS ①

Output waveform from EMS ②

9
Stable Supply!
OFF-Grid Model
@Nagasaki
JAPAN
Sasebo-City, Nagasaki

11
30kW 5kW×2set

EMS
Energy Management System

Administrative Building
(Lighting & Air Conditioner) EV Charger

Lift Pump for Sewage Pump


12
Household Water
ON-Grid Model
@Sumba Is.
Indonesia
SUMBA ISLAND Bilacenge PLTS

14
Work together with BPPT
Battery System 1 Battery System 2
(Discharge) (Charge) Day 1
Grid Connection Main: System 1
Main: Electricity
Sub: System 2
from System 1
PV System 1
(Peak & Base Load)
(Main)

EMS
Energy Management
System
PV System 2 Sub: Electricity
from System 1 Household
(Sub)
(Peak)

Mini Hydro Power


(Base Load) GRID
@SUMBA ISLAND

Diesel Engine
15
(Base Load)
Battery System 1 Battery System 2
(Charge) (Discharge) Day 2
Main: System 2
Main: Electricity Grid Connection
from System 2 Sub: System 1
PV System 1 (Peak & Base Load)
(Sub)

EMS
Energy Management
System
Sub: Electricity
PV System 2 from System 1 Household
(Main) (Peak)

Mini Hydro Power


(Base Load) GRID
@SUMBA ISLAND

Diesel Engine
16
(Base Load)
ON-Grid Model
For
EV
Work together with BPPT
Battery System 1 Battery System 2
(Discharge) (Charge & Demand) EV Charge at 9:30 Main: System 1
Grid Connection Sub: System 2
Main: Electricity
from System 1
PV System 1
(Peak & Base Load)
(Main)

EMS
Energy Management
System
PV System 2 Sub: Electricity
from System 1 Household
(Sub)
(Peak & Demand)
Charge

Mini Hydro Power


(Base Load) GRID Electricity
@SUMBA ISLAND from System 2 EV Charger
(Demand)

Diesel Engine
18
(Base Load)
Battery System 1 Battery System 2
(Discharge) (Charge & Demand) EV Charge at 9:30 Main: System 1
EMS Output of a day Sub: System 2
with Mobility 9:30
PV System 1
(Main) Sub: Electricity 200kW Sub: System 2
Battery Management
from System 2
Unit 1 &2 (Peak & Demand) 100kW
Main: System 1

9:00 12:00 15:00


PV System 2 PV Inverter
(Sub) Smart Meter

Charge
Smart Power Manager

GRID Electricity
EMS @SUMBA ISLAND from System 2 EV Charger
(Demand)

Smart Meter Controller


19
Summary
1 Achieve 24-hour power supply by using low-cost lead storage
battery system.
2 Efficiently manage multiple power sources such as solar, wind,
and small water power generation.
3 Meet various customer needs from 100% eco power supply to a
combination with diesel power generation giving importance to
stable supply.
4 Contribute to CO2 reduction as a complementary power source
for diesel power generators.
5 Provide technical training for Operation & Maintenance.
6 Provide 100% eco power supply for Electric Mobility.
20
Thank you