TEST REPORT FOR FEEDER PROTECTION RELAY.

DATE: 13.11.2020 SHEET NO.1 OF 3

PROJECT : SHUTDOWN - RETROFITTING


END CUSTOMER : M/S.HYUNDAI MOTOR INDIA LIMITED- CHENNAI

1. NAME PLATE DETAILS:

BOARD NAME : 11KV SUBSTATION

FEEDER NAME : OG TO BOILER & COMPRESSOR AREA

PANEL NO : 04

RELAY MAKE : ABB

MODEL NO : REJ 601

SI.NO : 1VYV91391271

CT RATIO : 600/1 A

ORDER CODE : REJ601BD446NC1NH

2. MEASUREMENT:
Inject current in the relay as per the table below. Observe the reading on the relay display, in
primary values.

INJECTED SECONDARY MEASURED PRIMARY VALUES IN RELAY


VALUES
REF CURRENT (A) PHASE CT
(A)
R 1.0 IL1 600.0
Y 1.0 IL2 599.8
B 1.0 IL3 599.2

Approved/Checked By
COMPANY TESTED BY SNIPE WITNESS & APPROVED BY ABB
Name: Mr. R. VIGNESH Mr.P.KATHIRESAN

Sign:

Date: 13.11.2020 13.11.2020


:
TEST REPORT FOR FEEDER PROTECTION RELAY.

DATE: 13.11.2020 SHEET NO.2 OF 3

PROJECT : SHUTDOWN - RETROFITTING


END CUSTOMER : M/S.HYUNDAI MOTOR INDIA LIMITED- CHENNAI

3. OVER CURRENT PROTECTION: I> (51)

I Set =1.0*In Curve=NI TMS=0.6 Sec


INJECTED CURRENT(A) SET TIME (sec) OPERATED TIME (sec)
REF 2 times 5 times 2 times 5 times 2 times 5 times
R 2.0 5.0 6.017 2.568 6.034 2.582
Y 2.0 5.0 6.017 2.568 6.034 2.582
B 2.0 5.0 6.017 2.568 6.034 2.582
4. OVER CURRENT PROTECTION: I>> (51)

I Set=4.0×In DT=0.2 Sec


REF INJECTED CURRENT(A) SET TIME (sec) OPERATED TIME (ms)
R 4.01 0.200 0.222
Y 4.01 0.200 0.222
B 4.01 0.200 0.222

5. OVER CURRENT PROTECTION: I> >>(50)

I Set=6.0×In DT=0.03 Sec


REF INJECTED CURRENT(A) SET TIME (sec) OPERATED TIME (ms)
R 6.01 0.030 0.056
Y 6.01 0.030 0.056
B 6.01 0.030 0.056

6. EARTH FAULT PROTECTION: I0> (51N)

Approved/Checked By
COMPANY TESTED BY SNIPE WITNESS & APPROVED BY ABB
Name: Mr. R. VIGNESH Mr.P.KATHIRESAN

Sign:

Date: 13.11.2020 13.11.2020


:
TEST REPORT FOR FEEDER PROTECTION RELAY.

DATE: 13.11.2020 SHEET NO.3 OF 3

PROJECT : SHUTDOWN - RETROFITTING


END CUSTOMER : M/S.HYUNDAI MOTOR INDIA LIMITED- CHENNAI

I0 Set =0.2*In Curve=NI TMS=0.3 Sec


INJECTED CURRENT(A) SET TIME (sec) OPERATED TIME (sec)
REF 2 times 5 times 2 times 5 times 2 times 5 times
R-N 0.4 1.0 3.009 1.284 3.084 1.313
Y-N 0.4 1.0 3.009 1.284 3.096 1.313
B-N 0.4 1.0 3.009 1.284 3.098 1.313
7. EARTH FAULT PROTECTION: I0>> (50N)

I0 Set=0.4×In DT=0.3 Sec


REF INJECTED CURRENT(A) SET TIME (sec) OPERATED TIME (sec)
R-N 0.4 0.300 0.364
Y-N 0.4 0.300 0.369
B-N 0.4 0.300 0.358

8. INTERNAL FUNCTIONAL TESTS:

LED Checked OK
Binary inputs are checked OK
Binary outputs are checked OK
Measurements Checked in Relay Display OK
Alarm and trip function checked OK
86-Lockout trip checked OK
9. USING KIT DETAILS:
Name of the Sec. Injection Kit: Omicron-CMC 356 (Sr No: =NB223W)

10. REMARKS:
Working as per the scheme configuration.
Relay Found Healthy.

Approved/Checked By
COMPANY TESTED BY SNIPE WITNESS & APPROVED BY ABB
Name: Mr. R. VIGNESH Mr.P.KATHIRESAN

Sign:

Date: 13.11.2020 13.11.2020


: