wds-4860 Manual
wds-4860 Manual
wds-4860 Manual
Email: [email protected]
Web: www.wdsbga.com
Shenzhen Wisdomshow Technology Co., Ltd Property in Copyright
1
Introduction
Respected customers, thank you very much for using our Touch Screen BGA
Rework Station 。
The main features of WDS-4 860 Touch Screen BGA Rework Station :
1 ) Linear slider is adopted, so all the three axles (X, Y, and Z) can do fine
tuning and quick location with perfect positioning accuracy and speedily
maneuverability;
2
Shenzhen Wisdomshow Technology Co., ltd is an electronic technique
company which precedes multi-aspect managements including innovating,
production, and selling and trade services.
Thanks to its location in the western district of Bao’an, we can take the
advantage of the international airport, shore line and container terminal to
face modern business opportunities.
3
Index
Item Page
4
7. Equipment Maintenance 18-18
一、Installation requirements
5
4、No dust, floating fibrous and metal particles work environment 。
二、Technical parameter
Total Power 4800W
Upper Heating Power 800W
Lower Heating Power Second zone:1200W, Third zone: IR
2700W
Power Supply AC 220V±10% 50/60HZ
Overall Dimension L635*W600*H560mm
Locating Mode V-shape card slot, PCB holder can be
adjustable
by X and Y axes with universal jigs.
Temperature Controlling K-type thermocouple closed loop
control, independent temperature
control, precision up to ±3 degree
6
PCB Size Max 410*370mm, Min 20*20mm
Electrical Material High sensitive temperature control
module, Delta PLC, Touch Screen
made-in Taiwan
7
11 01
le
12 02
13 03
14 04
15 05
16 06
17 07
18 08
19 09
20 10
(二)Function Introduction
Ordinal Name Usage Operation ways
number
The upper heaters Y
Adjust the upper heaters Dextral to back, left spin
1 axis regulating
Y axis position forward
handle
The upper heater Z Adjust the upper heater Dextral to upside, left spin to
2
axis regulating z axis position the downside
Upper heating when Adjust through Z axis
3 Upper heater
soldering BGA regulating handle
8
4 Light
5 Thermocouple
socket
The lower heater Adjust the lower heater From adjustment to the PCB
6
height height suitable location
7 regulatingindicator
Running handle Point when working
8 light
Lighting button
9 Running button
10 Scram button
Cool down PCB board
11 Cross flow fan
after soldering
12 PCB layer board Upbear PCB board
Ensure hot air focus on
13 Upper nozzle
the bga
14 Article support slider Lock screw and upbear
15 Lower nozzle PCB
16 PCB AL Bar Supporting article
17 locknut support
Fix layerslider
board
18 Upper breeze The left-right rotating, to
adjustment External temperature adjust the size of wind
19 Thermocouple port
testing
20 Touch Screen Operation controlling
9
The first picture after the touch screen lighted
10
Screen Name: Main Window (English )
Current Select: Press and setting the heating temperature parameters (as followed
picture)
12
管理员:Administrator (choose this and click)
Password : 8888 (after press this password press OK then will appear the
followed picture )
13
Password: this bottom can change the password u want to set
Delecte: delete the current temperature parameter curve
Save: to save the input parameters.
Apply : after you change the temperature parameter then download the current
temperature curve and press save ,Download the setting parameters to the current
parameters
Choose: choose the temperature parameter to the current parameter to heating
五、Instructions of external
temperature testing thermocouple
(二)Thermocouple installation
1 、 Check the thermocouple lines having the following phenomenon or, such
as scratching and broken line 。
2 、 Put the thermocouple line plug into the external thermocouple socket
according to the positive and passive identification 。
3 、 After right installation , the current testing temperature of thermocouple
will be displayed on the touch screen :“actual measurement”
Picture 29 Picture 30
3 、 Adjust head related adjustment button , make the part that will be heated
above the wind cover(Shown as picture 30)。
4 、 Adjust the head heater ’up-down adjustment button , the distance between
wind cover edge and PCB about 3-5mm 。
5 、 When soldering and desoldering , that is to say upper and lower heater
begin to heat 。
6 、 At this time, the red, yellow and green curves will be displayed on the
external testing temperature curve screen of the touch screen.
7、External thermocouple actual temperature curve (Green)。
8、Upper heater internal thermocouple actual temperature curve (Red)。
9、Lower heater internal thermocouple actual temperature curve (Yellow)。
六、Reballing Process
1. Put the BGA that need to reball onto the bottom of the adjustable BGA
Reball Kit, adjust two sliders without spring to fix BGA.
2. Chose suitable stencil according to the BGA size .fix the stencil on the
header and lock 4 M3 screw, then cover the top. adjust the 4 screw on
17
the bottom to suit the height of the BGA.
3. Observe the alignment situation between the stencil hole and the BGA
soldering point, if misplace, please adjust again .
4. Lock two fixed slider without spring, take away the BGA and painted thin
a layer of BGA solder paste, then put it to the kit and cover the top.
5. Put into suitable BGA Solder Ball ,then shake the reball kit lightly, to
ensure every soldering point has the ball, then put out the needless part .
6. Place the reball kit on the flat table ,take away top cover, take away the
BGA carefully.
7. To fix the solder ball can be through our bga rework station or soldering
iron , to heat the BGA Solder Ball on the BGA ,soldering the ball to the
BGA, last reballing is over !
七、Maintenance
In order to guarantee the machine function and prolong service life of the
machine, during usage, we have to do some maintenance on the system
regularly as follows
18
heater and shaft.
八、Safety caution
!( 一 ) Power of the machine is AC220V ,working temperature is up to
400℃,may damage the machine because of the incorrect operation,even
endanger the safety of the operator 。 So must strictly comply with the
following items:
2、No operation under that environment such as Inflammable and explosive liquids or
gases;after power on ,no combustible to touch the high temperature area and
19
metal components,or cause fire and blast easily ;
3、To avoid high temperature burns,no touching on the high temperature area when
operating;
20
IR
preheatin 180
g
Constant
Preheatin Warming Soldering Soldering
temperat Cooling
g period 1 2
ure
Upper
160 185 210 225 235 215
heating
Constant
temperat 30s 30s 35s 40s 20s 15s
ure time
Lower
160 185 210 225 235 215
heating
Constant
temperat 30s 30s 35s 40s 20s 15s
ure time
Slope 3.0 3.0 3.0 3.0 3.0 3.0
IR
preheatin 185
g
38*38 BGA soldering temperature setting:
21
Lead-free temperature curve soldering
Constant
Preheatin Warming Soldering Soldering
temperat Cooling
g period 1 2
ure
Upper
165 190 225 245 250 235
heating
Constant
temperat 30s 30s 35s 45s 25s 15s
ure time
Lower
165 190 225 245 250 235
heating
Constant
temperat 30s 30s 35s 45s 25s 15s
ure time
Slope 3.0 3.0 3.0 3.0 3.0 3.0
IR
preheatin 210
g
22
31*31 BGA soldering temperature setting:
Constant
Preheatin Warming Soldering Soldering
temperat Cooling
g period 1 2
ure
Upper
165 190 220 240 245 235
heating
Constant
temperat 30s 30s 35s 40s 20s 15s
ure time
Lower
165 190 220 240 245 235
heating
Constant
temperat 30s 30s 35s 40s 20s 15s
ure time
Slope 3.0 3.0 3.0 3.0 3.0 3.0
IR
preheatin 210
g
23