Calculation: Pt. Abb Sakti Industri

This document provides sizing calculations for capacitive voltage transformers (CVTs) for a 150kV customer substation. It calculates lead resistances, instrument burdens, and total connected burdens for CVT cores serving busbar metering, a spare core, and line differential protection. The maximum cable length from the CVTs to the control room is 150 meters. It selects CVTs with burdens of 50VA and 30VA to meet the calculated total connected burdens of up to 8,753VA.

Uploaded by

Anto Damanik
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
238 views

Calculation: Pt. Abb Sakti Industri

This document provides sizing calculations for capacitive voltage transformers (CVTs) for a 150kV customer substation. It calculates lead resistances, instrument burdens, and total connected burdens for CVT cores serving busbar metering, a spare core, and line differential protection. The maximum cable length from the CVTs to the control room is 150 meters. It selects CVTs with burdens of 50VA and 30VA to meet the calculated total connected burdens of up to 8,753VA.

Uploaded by

Anto Damanik
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

PT.

ABB SAKTI INDUSTRI

CALCULATION

Project :

GI 150kV PELANGGAN
PT. STAR AJIBARANG PURWOKERTO

Title :

CVT SIZING CALCULATION

Reference Drawing :

SLD START-EM-PRJ-001

Rev No Date Remarks Prepare Check Approve


PT. ABB SAKTI INDUSTRI GI 150kV PELANGGAN BUSBAR
PT. STAR AJIBARANG PURWOKERTO

CVT SIZING CALCULATION


SELECTION OF PARAMETER OF CAPACITIVE VOLTAGE TRANSFORMER FOR BUSBAR

Maxsimum cable route length CVT to relay panel located in switcyard control building 150 meters

Core 1
Purpose Metering
Rasio 150√3/0.1√3 kV
Primary Voltage Vpn 150000 V
Secodary Voltage Vsn 100 V
Accuracy Class 0,2
Burrden 50 VA
Conductor Cross-section 4 mm²
Conductor Material Copper
Number or runs Per phase 1
Conductor Unit Resisctance 4,61 Ω/km
lead Resistance at 20⁰C CF+CT Rc 5,61
Rc = xR
lead Resistance at 70⁰C CF+WT
Two way lead loop Resistance RL 7,753 VA

Instrument Connected & Their Burdens


Digital Metering 1 VA

Total Connected Burden to the CVT = Cable burden + Meter's Burden = 8,753 VA

Page : 1 of 2
PT. ABB SAKTI INDUSTRI GI 150kV PELANGGAN BUSBAR
PT. STAR AJIBARANG PURWOKERTO

Maxsimum cable route length CVT to relay panel located in switcyard control building 150 meters

Core 2
Purpose Spare
Rasio 150√3/0.1√3 kV
Primary Voltage Vpn 150000 V
Secodary Voltage Vsn 100 V
Accuracy Class 3P
Burrden 50 VA
Conductor Cross-section 4 mm²
Conductor Material Copper
Number or runs Per phase 1
Conductor Unit Resisctance 4,61 Ω/km
lead Resistance at 20⁰C CF+CT Rc 5,61 Ω
Rc = xR
lead Resistance at 70⁰C CF+WT
lead loop Resistance RL 7,753 VA

Instrument Connected & Their Burdens


Metering Relay Burden 1 VA

Total Connected Burden to the CVT = Cable burden + Meter's Burden = 8,753 VA

Page : 2 of 2
PT. ABB SAKTI INDUSTRI GI 150kV PELANGGAN BAY OVER HEAD LINE
PT. STAR AJIBARANG PURWOKERTO

CVT SIZING CALCULATION


SELECTION OF PARAMETER OF CAPACITIVE VOLTAGE TRANSFORMER FOR BAY OVER HEAD LINE

Maxsimum cable route length CVT to relay panel located in switcyard control building 150 meters

Core 1
Purpose Metering
Rasio 150√3/0.1√3 kV
Primary Voltage Vpn 150000 V
Secodary Voltage Vsn 100 V
Accuracy Class 0,2
Burrden 30 VA
Conductor Cross-section 4 mm²
Conductor Material Copper
Number or runs Per phase 1
Conductor Unit Resisctance 4,61 Ω/km
lead Resistance at 20⁰C CF+CT Rc 5,61 Ω
Rc = xR
lead Resistance at 70⁰C CF+WT
Two way lead loop Resistance Rl 7,753 VA

Instrument Connected & Their Burdens


Metering 1 VA

Total Connected Burden to the CVT = Cable burden + Meter's Burden = 8,753 VA

Page : 1 of 2
PT. ABB SAKTI INDUSTRI GI 150kV PELANGGAN BAY OVER HEAD LINE
PT. STAR AJIBARANG PURWOKERTO

Maxsimum cable route length CVT to relay panel located in switcyard control building 150 meters

Core 2
Purpose Line Differential
Rasio 150√3/0.1√3 kV
Primary Voltage Vpn 150000 V
Secodary Voltage Vsn 100 V
Accuracy Class 3P
Burrden 30 VA
Conductor Cross-section 4 mm²
Conductor Material Copper
Number or runs Per phase 1
Conductor Resisctance at 4,61 Ω/km
lead Resistance at 20⁰C CF+CT Rc 5,61
Rc = xR
lead Resistance at 70⁰C CF+WT
Two way lead loop Resistance Rl 7,753 VA

Instrument Connected & Their Burdens


RED 670 0,15 VA

Total Connected Burden to the CVT = Cable burden + Meter's Burden = 7,903 VA

Page : 2 of 2
PT. ABB SAKTI INDUSTRI GI 150kV PELANGGAN
PT. STAR AJIBARANG PURWOKERTO

CVT SIZING CALCULATION


SELECTION OF PARAMETER OF CAPACITIVE VOLTAGE TRANSFORMER FOR BUSBAR

Parameters of CVT Bay OHL

Calculated Total Burden


winding No. CVT Ratio Class Selected Burden(VA) Device
(VA)

1 (150√3)/(0.1√3)kV 0,2 30 8,753 Metering


2 (150√3)/(0.1√3)kV 3P 30 7,903 RED 670

Parameters of CVT Busbar

Calculated Total Burden


winding No. CVT Ratio Class Selected Burden(VA) Device
(VA)

1 (150√3)/(0.1√3)kV 0,2 50 8,75 Metering


2 (150√3)/(0.1√3)kV 3P 50 8,75 N/A

Page : 1 of 1