Calculation: Pt. Abb Sakti Industri
Calculation: Pt. Abb Sakti Industri
CALCULATION
Project :
GI 150kV PELANGGAN
PT. STAR AJIBARANG PURWOKERTO
Title :
Reference Drawing :
SLD START-EM-PRJ-001
Maxsimum cable route length CVT to relay panel located in switcyard control building 150 meters
Core 1
Purpose Metering
Rasio 150√3/0.1√3 kV
Primary Voltage Vpn 150000 V
Secodary Voltage Vsn 100 V
Accuracy Class 0,2
Burrden 50 VA
Conductor Cross-section 4 mm²
Conductor Material Copper
Number or runs Per phase 1
Conductor Unit Resisctance 4,61 Ω/km
lead Resistance at 20⁰C CF+CT Rc 5,61
Rc = xR
lead Resistance at 70⁰C CF+WT
Two way lead loop Resistance RL 7,753 VA
Total Connected Burden to the CVT = Cable burden + Meter's Burden = 8,753 VA
Page : 1 of 2
PT. ABB SAKTI INDUSTRI GI 150kV PELANGGAN BUSBAR
PT. STAR AJIBARANG PURWOKERTO
Maxsimum cable route length CVT to relay panel located in switcyard control building 150 meters
Core 2
Purpose Spare
Rasio 150√3/0.1√3 kV
Primary Voltage Vpn 150000 V
Secodary Voltage Vsn 100 V
Accuracy Class 3P
Burrden 50 VA
Conductor Cross-section 4 mm²
Conductor Material Copper
Number or runs Per phase 1
Conductor Unit Resisctance 4,61 Ω/km
lead Resistance at 20⁰C CF+CT Rc 5,61 Ω
Rc = xR
lead Resistance at 70⁰C CF+WT
lead loop Resistance RL 7,753 VA
Total Connected Burden to the CVT = Cable burden + Meter's Burden = 8,753 VA
Page : 2 of 2
PT. ABB SAKTI INDUSTRI GI 150kV PELANGGAN BAY OVER HEAD LINE
PT. STAR AJIBARANG PURWOKERTO
Maxsimum cable route length CVT to relay panel located in switcyard control building 150 meters
Core 1
Purpose Metering
Rasio 150√3/0.1√3 kV
Primary Voltage Vpn 150000 V
Secodary Voltage Vsn 100 V
Accuracy Class 0,2
Burrden 30 VA
Conductor Cross-section 4 mm²
Conductor Material Copper
Number or runs Per phase 1
Conductor Unit Resisctance 4,61 Ω/km
lead Resistance at 20⁰C CF+CT Rc 5,61 Ω
Rc = xR
lead Resistance at 70⁰C CF+WT
Two way lead loop Resistance Rl 7,753 VA
Total Connected Burden to the CVT = Cable burden + Meter's Burden = 8,753 VA
Page : 1 of 2
PT. ABB SAKTI INDUSTRI GI 150kV PELANGGAN BAY OVER HEAD LINE
PT. STAR AJIBARANG PURWOKERTO
Maxsimum cable route length CVT to relay panel located in switcyard control building 150 meters
Core 2
Purpose Line Differential
Rasio 150√3/0.1√3 kV
Primary Voltage Vpn 150000 V
Secodary Voltage Vsn 100 V
Accuracy Class 3P
Burrden 30 VA
Conductor Cross-section 4 mm²
Conductor Material Copper
Number or runs Per phase 1
Conductor Resisctance at 4,61 Ω/km
lead Resistance at 20⁰C CF+CT Rc 5,61
Rc = xR
lead Resistance at 70⁰C CF+WT
Two way lead loop Resistance Rl 7,753 VA
Total Connected Burden to the CVT = Cable burden + Meter's Burden = 7,903 VA
Page : 2 of 2
PT. ABB SAKTI INDUSTRI GI 150kV PELANGGAN
PT. STAR AJIBARANG PURWOKERTO
Page : 1 of 1