Pengerang Integrated Complex (PIC) Project Overview
Pengerang Integrated Complex (PIC) Project Overview
Project Overview
Pengerang Integrated Complex (PIC)
Project Overview
The Pengerang Integrated Complex (PIC), previously known as the Refinery and
Petrochemical Integrated Development (RAPID), located on 6,239 ac/ 2,524.84 ha
of land at Pengerang in Southwest of Johor, is one of the major downstream oil
and gas developments in Malaysia. One (1) of the Project Proponents of the PIC
is PETRONAS Refinery and Petrochemical Corporation (PRPC), a subsidiary of
Petroliam Nasional Berhad (PETRONAS). The main facilities in PIC include a
Refinery, Petrochemical Plants (PETCHEM), the Central Utility Facilities (CUF) and
offsite storage and facilities.
ORGANISATION CHART (PMT ENV. TEAM 2019)
PRPC
Head of HSSE
PMT
Noor Suhailah Othman
Env. Assistant
Sr. Env. Officer Sr. Env. Officer
RC PetChem & UIO
Liyana Muakal
Ibnil Ab Wahid Nur Ain Nurry
Asilah Mohd Irfan Amin TBA Nur Hamziah Farhan Nur ‘Arifa Bahari
Najib
Pengerang Refining & Petrochemical (PRefChem)
Project Overview
Pengerang Refining And Petrochemical (PRefChem) is a strategic alliance of two of the world’s largest
and most successful national oil companies - Petroliam Nasional Berhad (PETRONAS), the national oil
company of Malaysia, and Saudi Aramco, the national oil company of Saudi Arabia. Together, we
form an equal partnership in two joint ventures, namely Pengerang Refining Company Sdn. Bhd.
(formerly known as PRPC Refinery & Cracker Sdn Bhd) and Pengerang Petrochemical Company Sdn.
Bhd. (formerly known as PRPC Polymers Sdn Bhd).
PREFCHEM ORGANISATION CHART (HSSE TEAM)
UNITS IN REFINERY & CRACKER
The updated refinery process area, Contractor; CCSM, P1; SEG, P2; TRSA, P3;
Petrofac, P4; Toyo, P5; Punj Lloyd, P22; CMI, P28 and CPP, P30.
Below, comprises the following units:
• Crude Distillation Unit (CDU); • Hydrogen Collection and Distribution Unit
• Atmospheric Reside Desulphurisation Unit (HCDU);
(ARDS); • Refinery Pressure Swing Adsorption (RPSA);
• Kerosene Hydrotreating (KHT); • 2nd Stage Cracked Naptha Hydrotreating Unit
• Diesel Hydrotreating (DHT); (CNHT 2);
• Residue Fluidized Catalytic Cracking (RFCC); • C5/C6 Isomerisation Unit (ISOM);
• LPG Treating Unit (LTU); • Etherification Unit Tertiary-Armyl-Methyl-Ether
• Cracked Naphtha Hydrotreating (CNHT); (TAME);
• Naphtha Hydrotreating (NHT); • Tankages for EURO 5 MOGAS Units;
• Continuous Catalytic Reformer (CCR); • Additional Olefin Storage;
• Saturated Gas Plant (SGP); • Liquid Sulphur Storage Unit (LSSU);
• Hydrogen Production Unit (HPU); • Sulphur Solidification Unit (SSU);
• Amine Regeneration Unit (ARU); • Vapour Recovery Unit (VRU); and
• Sour Water Stripping (SWS); • Gasoline Blending Unit (GBU).
• Sulphur Recovery Unit and Tail Gas
Treating Unit (SRU);
Project is progressing well and to achieve RAPID COD by 01st October 2019. Overall
PIC project achieved 98.31% as of Feb’19
Open
Open
ENVIRONMENTAL REQUIREMENTS
Pre-commisioning
• Chemical cleaning of pipes;
• Oil flushing;
• Steam blowing;
• Post hydrotest line cleaning;
• Gross leak test;
• Housekeeping;
• Temporary utilities facilities (generator set, air compressor and pump);
Comissioning
• Rotating equipment run test;
• Comissioning and service test of utilities;
• Refractory drying out and boil out of boiler;
• Catalyst and chemical loading;
• Degreasing;
• Inerting;
• Leak test;
• Housekeeping; and
• Temporary utilities facilities (generator set, air compressor and pump).
Sour Gas and Sour LPG Sweet Gas and Sweet LPG
SGP
MTBE Petro-
SCU
(SCC) chemical
ABB EL3060
(6 unit)
Kerosene
KHT
Py Diesel
Full-Range Naphtha
C9+ material
Fuji ZRE
Crude (1 unit)
CDU
Diesel
DHT Off Gas C4 Mix
Propylene
MTBE