Pengerang Integrated Complex (PIC) Project Overview

The Pengerang Integrated Complex (PIC) is a major downstream oil and gas development located in Pengerang, Johor, Malaysia. It includes a refinery, petrochemical plants, central utility facilities, and offsite storage. The main facilities are owned by different joint venture companies between Petronas and other partners. The project involves constructing and commissioning various oil refining and petrochemical units. Environmental requirements that must be met include obtaining approval conditions, implementing pollution prevention plans, and conducting environmental monitoring and management. Commissioning activities will include equipment testing, utilities commissioning, and catalyst loading before full operations begin in 2020.

Uploaded by

deKay Resources
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
524 views14 pages

Pengerang Integrated Complex (PIC) Project Overview

The Pengerang Integrated Complex (PIC) is a major downstream oil and gas development located in Pengerang, Johor, Malaysia. It includes a refinery, petrochemical plants, central utility facilities, and offsite storage. The main facilities are owned by different joint venture companies between Petronas and other partners. The project involves constructing and commissioning various oil refining and petrochemical units. Environmental requirements that must be met include obtaining approval conditions, implementing pollution prevention plans, and conducting environmental monitoring and management. Commissioning activities will include equipment testing, utilities commissioning, and catalyst loading before full operations begin in 2020.

Uploaded by

deKay Resources
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 14

Pengerang Integrated Complex (PIC)

Project Overview
Pengerang Integrated Complex (PIC)
Project Overview
The Pengerang Integrated Complex (PIC), previously known as the Refinery and
Petrochemical Integrated Development (RAPID), located on 6,239 ac/ 2,524.84 ha
of land at Pengerang in Southwest of Johor, is one of the major downstream oil
and gas developments in Malaysia. One (1) of the Project Proponents of the PIC
is PETRONAS Refinery and Petrochemical Corporation (PRPC), a subsidiary of
Petroliam Nasional Berhad (PETRONAS). The main facilities in PIC include a
Refinery, Petrochemical Plants (PETCHEM), the Central Utility Facilities (CUF) and
offsite storage and facilities.
ORGANISATION CHART (PMT ENV. TEAM 2019)

PRPC

Head of HSSE

Saifuddin Shah Sowkkatali

Head of Environment &


Social Performance

PMT
Noor Suhailah Othman

PMT HSE Director

Head of Environment Head of Environment Head of Environment Zaini


(Refinery & Cracker) (PetChem) (UIO)

PMT Env. Manager


Irwan Hamdan TBA TBA
Ibnil Ab Wahid

Env. Assistant
Sr. Env. Officer Sr. Env. Officer
RC PetChem & UIO
Liyana Muakal
Ibnil Ab Wahid Nur Ain Nurry

Sr. Env. Env Officer Env. Officer


Env. Officer Env. Officer Env. Officer Env. Officer
Officer PETCHEM & (iU&I & SM)
(RC) (Petchem) (I&O) (Site Mgmt.)
(RC) Al I&O
Aizat

Asilah Mohd Irfan Amin TBA Nur Hamziah Farhan Nur ‘Arifa Bahari
Najib
Pengerang Refining & Petrochemical (PRefChem)
Project Overview
Pengerang Refining And Petrochemical (PRefChem) is a strategic alliance of two of the world’s largest
and most successful national oil companies - Petroliam Nasional Berhad (PETRONAS), the national oil
company of Malaysia, and Saudi Aramco, the national oil company of Saudi Arabia. Together, we
form an equal partnership in two joint ventures, namely Pengerang Refining Company Sdn. Bhd.
(formerly known as PRPC Refinery & Cracker Sdn Bhd) and Pengerang Petrochemical Company Sdn.
Bhd. (formerly known as PRPC Polymers Sdn Bhd).
PREFCHEM ORGANISATION CHART (HSSE TEAM)
UNITS IN REFINERY & CRACKER

The updated refinery process area, Contractor; CCSM, P1; SEG, P2; TRSA, P3;
Petrofac, P4; Toyo, P5; Punj Lloyd, P22; CMI, P28 and CPP, P30.
Below, comprises the following units:
• Crude Distillation Unit (CDU); • Hydrogen Collection and Distribution Unit
• Atmospheric Reside Desulphurisation Unit (HCDU);
(ARDS); • Refinery Pressure Swing Adsorption (RPSA);
• Kerosene Hydrotreating (KHT); • 2nd Stage Cracked Naptha Hydrotreating Unit
• Diesel Hydrotreating (DHT); (CNHT 2);
• Residue Fluidized Catalytic Cracking (RFCC); • C5/C6 Isomerisation Unit (ISOM);
• LPG Treating Unit (LTU); • Etherification Unit Tertiary-Armyl-Methyl-Ether
• Cracked Naphtha Hydrotreating (CNHT); (TAME);
• Naphtha Hydrotreating (NHT); • Tankages for EURO 5 MOGAS Units;
• Continuous Catalytic Reformer (CCR); • Additional Olefin Storage;
• Saturated Gas Plant (SGP); • Liquid Sulphur Storage Unit (LSSU);
• Hydrogen Production Unit (HPU); • Sulphur Solidification Unit (SSU);
• Amine Regeneration Unit (ARU); • Vapour Recovery Unit (VRU); and
• Sour Water Stripping (SWS); • Gasoline Blending Unit (GBU).
• Sulphur Recovery Unit and Tail Gas
Treating Unit (SRU);
Project is progressing well and to achieve RAPID COD by 01st October 2019. Overall
PIC project achieved 98.31% as of Feb’19

Open
Open
ENVIRONMENTAL REQUIREMENTS

Pengerang Refining Company Sdn Bhd is committed to implementing the control/


mitigation measures specified in the EIA, the EIA Approval Conditions (COA) set by the
DOE and applicable environmental legislation and guidelines. This section provides a
summary of the environmental requirements with which Pengerang Refining Company
Sdn Bhd and/ or its Contractors must comply throughout the project lifecycle:

• EIA Approval Conditions (COA)


• Land Disturbing Pollution Prevention and Mitigation Measures (LD-P2M2)
Document;
• Pollution prevention and mitigation measures (P2M2) to be implemented for
construction and commissioning phase as specified in the EIA;
• Water pollution control monitoring;
• Control of air pollution, noise nuisance and vibration disturbance;
• Waste Management Plan;
• ERP; and
• Abandonment and Closure Plan.
Project Activities for Commissioning Phase

Activities involved in the commissioning phase include:

Pre-commisioning
• Chemical cleaning of pipes;
• Oil flushing;
• Steam blowing;
• Post hydrotest line cleaning;
• Gross leak test;
• Housekeeping;
• Temporary utilities facilities (generator set, air compressor and pump);

Comissioning
• Rotating equipment run test;
• Comissioning and service test of utilities;
• Refractory drying out and boil out of boiler;
• Catalyst and chemical loading;
• Degreasing;
• Inerting;
• Leak test;
• Housekeeping; and
• Temporary utilities facilities (generator set, air compressor and pump).

Upon completion of testing and commissioning, full operation of Pengerang


Refining Company Sdn Bhd is expected by March 2020. It is envisaged that the
Pengerang Refining Company Sdn Bhd Plants will be in operation for 25 years,
after which the decision on future operation will be made.
Pengerang Refining & Petrochemical (PRefChem)
Pengerang Refining Company Coverage
Refinery Process Flow

Sour Gas and Sour LPG Sweet Gas and Sweet LPG
SGP
MTBE Petro-
SCU
(SCC) chemical
ABB EL3060
(6 unit)
Kerosene
KHT

Py Diesel
Full-Range Naphtha
C9+ material
Fuji ZRE
Crude (1 unit)
CDU
Diesel
DHT Off Gas C4 Mix
Propylene

Emerson Fuji ZRE


XStream X2GP (1 unit)
(2 unit) Reformate
NHT CCR

MTBE

ARDS RFCC CNHT Mogas


LCN, MCN, blend C7+
Emerson SICK MAIHAK HCN
XStream X2GP MCS 100E HW
Fuji ZRE (4 unit) (2 unit)
(3 unit) Slurry Fuel Oil PyOil
H2S Blending
H2 Sulphur
HPU SRU
Servomax
SERVOPRO 4900 Equipped with CEMS
(3 unit)