0% found this document useful (0 votes)
289 views2 pages

Waterproofing Quote

This document is a quotation from Ensura Building Services to waterproof particleboard flooring underneath bathroom and ensuite vanity units in Unit 57 of Brentford Outlook Courts. The original scope of work included waterproofing 5 square meters of particleboard flooring under each vanity unit for a total of $687.50 including GST. Upon removal of the old vanities, it was noted that the original builder did not properly waterproof or install compressed sheeting underlay. The quotation provides the waterproofing, but no warranty can be given since the previous work was done by others. The quotation is valid for 30 days.

Uploaded by

Sagar Samant
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
289 views2 pages

Waterproofing Quote

This document is a quotation from Ensura Building Services to waterproof particleboard flooring underneath bathroom and ensuite vanity units in Unit 57 of Brentford Outlook Courts. The original scope of work included waterproofing 5 square meters of particleboard flooring under each vanity unit for a total of $687.50 including GST. Upon removal of the old vanities, it was noted that the original builder did not properly waterproof or install compressed sheeting underlay. The quotation provides the waterproofing, but no warranty can be given since the previous work was done by others. The quotation is valid for 30 days.

Uploaded by

Sagar Samant
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Ensura Building Services

PO Box 5445
Stafford Heights, QLD 4053
Phone: 1300 667 846
Fax: 1300 667 511
[email protected]
ABN: 81 164 836 819
QBCC Lic: 1261565

8 December 2021

Brentford Outlook Cts 50353


Unit 57
31-35 Brentford Rd
RICHLANDS QLD 4077

RE: Brentford Outlook Cts 50353 -


Unit 57 , 31-35 Brentford Rd, RICHLANDS 4077 QLD

CLAIM NO: CRS20153338


REF NO: QLD-2109-0772
JOB NO: 17923

QUOTE NO: QTE-17923-6

QUOTATION
Additional quotation to carry out work to waterproof particleboard flooring underneath upstairs
bathroom and ensuite vanity units to unit 57 is as follows:

Original Scope Of Work:

6-1 Unit 57 - Upstairs Bathroom (2.6m x 1.8m) (5.00 Square Meter)


6-1-1 Supply and install new waterproofing membrane to particleboard floor $312.50
underneath vanity unit, in accordance with Australian Standards
AS3740.

6-2 Unit 57 - Upstairs Ensuite (2.1m x 2.3m) (5.00 Square Meter)


6-2-1 Supply and install new waterproofing membrane to particleboard floor $312.50
underneath vanity unit, in accordance with Australian Standards
AS3740.

TOTAL (EX. GST) $625.00


GST $62.50
TOTAL (INC. GST) $687.50

Please Note:

During the removal of the damaged upstairs bathroom and ensuite vanity units we noted the
particleboard sub flooring has not been waterproofed. It appears the original building contractor has
installed the vanities and then waterproofed, bedded and tiled up to the vanity units.

We also noted there is no compressed sheeting floor tile underlay and the waterproofing has been
applied to the particleboard, which is not recommended.
Job No: 17923
We have quoted to waterproof the particleboard subfloor underneath the vanity units but we are
unable to provide Form 16 warranty as the waterproofing and tiling has been completed by others.

This quotation stands for thirty (30) days only.

Yours faithfully,

Scott Cameron
Operations Manager
0455 291 726