0% found this document useful (0 votes)
275 views7 pages

Production Integration - Component Consumption and Receipt in Warehouse (1VB)

Uploaded by

agv
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
275 views7 pages

Production Integration - Component Consumption and Receipt in Warehouse (1VB)

Uploaded by

agv
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

Production Integration - Component

Consumption and Receipt in Warehouse (1VB)


Scenario Overview
This process is used to integrate warehouse execution with Production operations using the Advanced
Production Integration functionality. The warehouse execution for Production Orders is based on the
Production Material Request (PMR) document. The PMR contains the information of component
materials and quantities, which are needed for production.
This scenario enable synchronization of the material flows between warehouse and production, and can
improve inventory visibility and control as material movements are posted in real time in the warehouse.
Components are staged from the warehouse to the production supply area for manufacturing operations,
and then are consumed from the production supply area. Finished goods are Goods Receipt and putaway
is completed as they arrive on a conveyor line from production into the warehouse.
Benefits

Integrate process between warehouse and production by executing Production Supply and Production
Receipt EWM
Space usage optimization of PSA via staging planning and PSA clearing
Process Steps
Create Production Release Check Production Create Staging Check Staging
Production Orders Material Requests Plan Staging Warehouse Tasks Warehouse Orders
Orders

Perform Staging to Create Crate Part Material Check Goods


Confirm Production movement posting Check Status of
Production Supply Replenishment Consumption at
Orders for Production PMR
Area Warehouse Task PSA
Consumption

Confirm Warehouse Check Goods


Clear the Create Warehouse task, Pallets moved Perform the Goods Create Putaway
Production Supply movement posting Confirm Putaway
Task to Narrow Aisle Receipt from task of Finished
Area Goods to Bulk Area for Production Warehouse tasks
Storage Production
Goods Receipt
Resource and Queues- Production Integration
Y011
Q: YO-N01-001
Narrow Aisle Storage (NA) YR-N01-001
Aisle-1, AA – YN01 Y001
Res: YHLTR01-1 Consp. Res:YOP-1
Handover Point for Res: YLLTR-1
Y011 Res: YHLTR02-1
Narrow Aisle Storage
Narrow Aisle Storage (NA) Q: YO-N02-001
Q: YO-001-061 Y061
Aisle- 2, AA-YN02 YR-N02-001
YR-001-061

Production Supply

Q: YO-N01-061
YR-N01-061
Y915
Y051, Aisle - 1 Goods Receipt
GR. Res:REC-1 in Production
Picking Area for Narrow Res: YLLTR-1
Aisle Storage, AA-YN01
Y051, Aisle - 2 Q: YO-N02-061
Res: YLLTR-1
Picking Area for Narrow YR-N02-061 Q: YI-915-042
Aisle Storage, AA-YN02

Y042
Bulk Storage B
(No Partial Pallets)
Fiori Tiles
Create Production Manage Production Warehouse Monitor Stage for Test RF
Order Orders Production Environment

Replenish Stock Display Production Confirm Production Clear Production


Order Order Operation Supply Area
Thank You

You might also like