1. FOUNDATIONS
a) They shall generally be taken 950mm min. below
existing ground level after removal of organic
layer and all excavations to be confirmed by the
Engineer before concrete blinding is laid.
300X350mm BEAM 01
b) Weak pockets of bearing strata to be dug
out and filled with 1:4:8 mass concrete.
T1
6-
15
0c c) Backfill material to be approved Murram and
T1 /c T1
6- 6 -0
15 T1 1- compacted in 200mm max layers to 95% MDD
0c (V 15
/c ar
yi
0c 2. CONCRETE MIXES
B1 ng /c
(V le B1 a) Mass Concrete to have a minimum works cube
a ry ng
T1 in th 25mm
g s,
6- le 40
15 ng -4 max.aggregate size
0c th 3)
/c s,
T1 4 4- b) Reinforced concrete to have a min.works cube
T1 (V 47
6-
7)
15 ar )
10
yi
0c ng
2-
max.aggregate size.
8
s, /c le
B1 ng
th
th 3. REINFORCEMENT
ng
(V s,
le
ar 48
y
g
g 1)
y
ar
le
ng 300X350mm BEAM 01 300X350mm BEAM 01 be square twisted cold formed bars to BS4461and
(V
T1 th
B2
T1 02 06
T2
6- -1 -3
/c
150 5 0c 9)
0c
/c
B1
6-
(V
ar marked "R" on these dwgs
yi
n g
le 4. MINIMUM COVER TO ALL STEEL IN
ng
th a) Raft Foundations = 50mm
T1 s,
6- 06
05 -3 b) Beams = 50mm
-1 9)
5 0c c) Plinth walls = 50mm
T1
6- /c
04 T1 5. GENERAL
-1
300X350mm BEAM 01
50
T1 c/ a) This drawing shall be read in conjunction with the
6- c
03 T1
-1 relevant Engineering drawings.
50
c/
c b) All dimensions are in metric millimetres.
B1 T1
6-
01
-1
50 c) All dimensions to be confirmed on site.
c /c
B1
CLIENT
7 Top RC slab to
C
Separate PROJECT:
Detail
Consultancy Services for Engineering Supervision for
Construction Works for Bududa-Nabweya Phase II, Lirima
200
24R8-117-150
24R8-117-150
T16-150-108 NF
3600
T16-200-109
SGI Studio Galli Ingeneria S.r.l.
Head office:
250 T16-40-150 T1 Via della Provvidenza, 15
T16-05-150 B1 35030 Sarmeola di Rubano (PD) Italy
T16-04-150 T1 T16-44-150 B1 Tel. +39 049 89 76 844 - Fax +39 049 89 76 784
Ground Level Ground Level
T16-150-108 FF T16-150-108 FF T16-03-150 B1
T16-150-108 NF REVISIONS :
375
T16-150-108 NF
6T16-111 6T16-113 6T16-115 No Date Description
T16-04-150 T1
T16-200-82 T2&B2
T16-03-150 B1 T16-150-01 B1
WATER BAR
T16-06-150 B1 T16-02-150 B1
300
2250 2250
50
200
existing ground level after removal of organic
R8-145-200c/c layer and all excavations to be confirmed by the
350
R8-147-150c/c Engineer before concrete blinding is laid.
150
300X350mm BEAM 01
b) Weak pockets of bearing strata to be dug
2T16-144 3T16-146 out and filled with 1:4:8 mass concrete.
T16-200
B2&T2 relevant Engineering drawings.
75mm C15 CONCRETE BLINDING
b) All dimensions are in metric millimetres.
WELL COMPACTED MURRAM IN LAYERS NOT
EXCEEDING 200mm
c) All dimensions to be confirmed on site.
APPROVED INLET
SEALANT T12 TRIMMER
BARS
APPROVED WATERSTOP
APPROVED
SEALANT PROJECT:
APPROVED WATERSTOP Consultancy Services for Engineering Supervision for
Construction Works for Bududa-Nabweya Phase II, Lirima
HORIZONTAL CONSTRUCTION JOINT DETAIL TYPICAL INLET DETAIL Phase II and Bukwo Phase II Gravity Flow Schemes
CONSTRUCTION OF LIRIMA GRAVITY FLOW SCHEME PHASE 2
T12-118-200 T1
7
C CONSULTANTS
T12-118-200 B1 T12-118-200 T2&B2
200
to Separate JOINT DETAIL Tel. +39 049 89 76 844 - Fax +39 049 89 76 784
ORD
AUG 2017
NOTES
1. FOUNDATIONS
a) They shall generally be taken 950mm min. below
REINFORCEMENT BAR BENDING SCHEDULE TO BS 4466 REINFORCEMENT BAR BENDING SCHEDULE TO BS 4466 existing ground level after removal of organic
BAR TYPE NO. OF NO. IN TOTAL BAR SHAPE BAR SHAPE layer and all excavations to be confirmed by the
A B C D E BAR TYPE NO. OF NO. IN TOTAL BAR SHAPE BAR SHAPE
MEMBER MARK SIZE MEMBERS EACH NO. LENGTH CODE A B C D E Engineer before concrete blinding is laid.
MEMBER MARK SIZE MEMBERS EACH NO. LENGTH CODE
BASE b) Weak pockets of bearing strata to be dug
01 T16 01 378 378 1825 34 800 150 750 150 150
32 T16 01 04 04 1000 01 1000 out and filled with 1:4:8 mass concrete.
02 T16 01 122 122 1500 26 550 150 800 150 c) Backfill material to be approved Murram and
33 T16 01 04 04 695 01 695
compacted in 200mm max layers to 95% MDD
03 T16 01 04 04 2800 21 150 2550 150 2. CONCRETE MIXES
40 T16 01 04 04 7900 21 150 7645 150
a) Mass Concrete to have a minimum works cube
04 T16 01 04 04 2000 21 150 1750 150 25mm
41 T16 01 04 04 7875 21 150 7630 150
max.aggregate size
05 T16 01 04 04 900 21 150 650 150 b) Reinforced concrete to have a min.works cube
42 T16 01 04 04 7900 21 150 7645 150
max.aggregate size.
3. REINFORCEMENT
(a) High yield bars, designated on these drawings to
be square twisted cold formed bars to BS4461and
are marked "T" on these dwgs
REINFORCEMENT BAR BENDING SCHEDULE TO BS 4466
b) Mild steel bars, designated on these drawings to
BAR TYPE NO. OF NO. IN TOTAL BAR SHAPE BAR SHAPE be round cold formed bars to BS4483and are
A B C D E
MEMBER MARK SIZE MEMBERS EACH NO. LENGTH CODE
marked "R" on these dwgs
4. MINIMUM COVER TO ALL STEEL IN
133 T12 01 08 08 8150 21 150 7900 150
a) Raft Foundations = 50mm
b) Beams = 50mm
134 T12 01 08 08 7825 21 150 7475 150
c) Plinth walls = 50mm
5. GENERAL
135 T12 01 08 08 7475 21 150 7230 150
a) This drawing shall be read in conjunction with the
relevant Engineering drawings.
136 T12 01 08 08 7100 21 150 6840 150
b) All dimensions are in metric millimetres.
137 T12 01 08 08 6650 21 150 6400 150 c) All dimensions to be confirmed on site.
PROJECT:
145 R8 12 03 36 1075 51 300 150 115 115
Consultancy Services for Engineering Supervision for
BEAM Construction Works for Bududa-Nabweya Phase II, Lirima
146 T16 01 06 06 10150 21 150 9900 150 Phase II and Bukwo Phase II Gravity Flow Schemes
CONSTRUCTION OF LIRIMA GRAVITY FLOW SCHEME PHASE 2
147 R8 01 46 46 1175 51 300 200 115 115
WALL CONSULTANTS
148 T16 01 72 72 9325 11 150 9200
REVISIONS :
No Date Description
300X350mm BEAM 01
Engineer before concrete blinding is laid.
T1
6- b) Weak pockets of bearing strata to be dug
15
0c out and filled with 1:4:8 mass concrete.
T1 /c
6- T1
15 T1
0c (V 6 c) Backfill material to be approved Murram and
/c a ry -0
B1 i 1-
ng 15 compacted in 200mm max layers to 95% MDD
(V le 0c
ar n gt /c 2. CONCRETE MIXES
yi hs B1
T1 n g
6- le ,3 a) Mass Concrete to have a minimum works cube
1 ng 2-
50 35
c th ) 25mm
/c s,
T1 3 6-
T1 (V 39 max.aggregate size
6- ar )
6)
1 yi
-9
50 ng b) Reinforced concrete to have a min.works cube
67
c/
c le
s,
th B1 ng
ng
(V th
s,
le
ar 4 max.aggregate size.
g
y 0-
in
in 66
y
g
ar
le ) 3. REINFORCEMENT
(V
ng
T1
B2
6- th 300X350mm BEAM 01 300X350mm BEAM 01 (a) High yield bars, designated on these drawings to
s,
&
T1 02
T2
06
6- -1 -3 be square twisted cold formed bars to BS4461and
c
1 50
/
50 1)
0c
c c /c
20
B1 B1
T1
(V
ar b) Mild steel bars, designated on these drawings to
yi
ng be round cold formed bars to BS4483and are
T1 le
6- ng
05 marked "R" on these dwgs
-1 th
5 s,
T1 0c 06 4. MINIMUM COVER TO ALL STEEL IN
6- /c -3
T1 04 T1 1)
6- -1 a) Raft Foundations = 50mm
03 50
- c /c b) Beams = 50mm
15
0c T1
/ c c) Plinth walls = 50mm
300X350mm BEAM 01
B1
T1
6-
5. GENERAL
01
-1 a) This drawing shall be read in conjunction with the
50
c/ relevant Engineering drawings.
c
B1
b) All dimensions are in metric millimetres.
CLIENT
PROJECT:
Consultancy Services for Engineering Supervision for
Construction Works for Bududa-Nabweya Phase II, Lirima
200
7 Top RC slab to
C Phase II and Bukwo Phase II Gravity Flow Schemes
Separate
Detail
CONSTRUCTION OF LIRIMA GRAVITY FLOW SCHEME PHASE 2
Ground Level
200
24R8-106-150
24R8-106-150
No Date Description
Ground Level Ground Level
T16-150-97 FF T16-150-97 FF
T16-150-97 NF
T16-150-97 NF
T16-04-150 T1
T16-03-150 B1
6T16-100
T16-06-150 B1
6T16-102
T16-200-67 T2&B2
6T16-104
T16-150-01 B1
WATER BAR
DRAIN SECTION D-D
T16-02-150 B1
DETAILED ENGINEERING DESIGN
300
DRAWING TITLE
2000
2000
151m³ BUKUSU STORAGE TANK
50
200
existing ground level after removal of organic
layer and all excavations to be confirmed by the
350
R8-133-150c/c
300X350mm BEAM 01
R8-131-200c/c Engineer before concrete blinding is laid.
150
b) Weak pockets of bearing strata to be dug
max.aggregate size.
3. REINFORCEMENT
300X350mm BEAM 01 300X350mm BEAM 01 (a) High yield bars, designated on these drawings to
WELL GRADED BACKFILL
T16-150 NF COMPACTED IN LAYERS be square twisted cold formed bars to BS4461and
T16-150 FF NOT EXCEEDING 200mm are marked "T" on these dwgs
T12-200c/c B2 (Varying lengths, 107-129)
b) Mild steel bars, designated on these drawings to
R10 CLIPS @ 1m
SPACING be round cold formed bars to BS4483and are
marked "R" on these dwgs
4. MINIMUM COVER TO ALL STEEL IN
T16-200 T2 a) Raft Foundations = 50mm
150 dia PERFORATED b) Beams = 50mm
PIPE ENCASED IN c) Plinth walls = 50mm
300X350mm BEAM 01
GRANULAR BACKFILL
T16-150 B1 5. GENERAL
T16-200 T16-150 T1 a) This drawing shall be read in conjunction with the
B2&T2 relevant Engineering drawings.
75mm C15 CONCRETE BLINDING
b) All dimensions are in metric millimetres.
WELL COMPACTED MURRAM IN LAYERS NOT
EXCEEDING 200mm
c) All dimensions to be confirmed on site.
APPROVED INLET
SEALANT T12 TRIMMER
BARS
APPROVED WATERSTOP
APPROVED
SEALANT PROJECT:
APPROVED WATERSTOP Consultancy Services for Engineering Supervision for
Construction Works for Bududa-Nabweya Phase II, Lirima
HORIZONTAL CONSTRUCTION JOINT DETAIL TYPICAL INLET DETAIL Phase II and Bukwo Phase II Gravity Flow Schemes
CONSTRUCTION OF LIRIMA GRAVITY FLOW SCHEME PHASE 2
T12-107-200 T1
7
C CONSULTANTS
T12-107-200 B1 T12-107-200 T2&B2
200
to Separate JOINT DETAIL Tel. +39 049 89 76 844 - Fax +39 049 89 76 784
BAR TYPE BAR BAR SHAPE Engineer before concrete blinding is laid.
NO. OF NO. IN TOTAL SHAPE
A B C D E
MEMBER MARK SIZE MEMBERS EACH NO. LENGTH CODE b) Weak pockets of bearing strata to be dug
REINFORCEMENT BAR BENDING SCHEDULE TO BS 4466
out and filled with 1:4:8 mass concrete.
68 T16 01 04 04 9350 21 150 9090 150 BAR TYPE NO. OF NO. IN TOTAL BAR SHAPE BAR SHAPE
A B C D E c) Backfill material to be approved Murram and
MEMBER MARK SIZE MEMBERS EACH NO. LENGTH CODE
69 T16 01 04 04 9325 21 150 9065 150 compacted in 200mm max layers to 95% MDD
108 T12 01 08 08 9150 21 150 8890 150 2. CONCRETE MIXES
70 T16 01 04 04 9275 21 150 9020 150 a) Mass Concrete to have a minimum works cube
109 T12 01 08 08 9125 21 150 8865 150 25mm
71 T16 01 04 04 9200 21 150 8960 150 max.aggregate size
110 T12 01 08 08 9075 21 150 8820 150
b) Reinforced concrete to have a min.works cube
72 T16 01 04 04 9125 21 150 8880 150
111 T12 01 08 08 9000 21 150 8755 150
max.aggregate size.
73 T16 01 04 04 8900 21 150 8660 150 3. REINFORCEMENT
112 T12 01 08 08 8925 21 150 8675 150
(a) High yield bars, designated on these drawings to
74 T16 01 04 04 8775 21 150 8525 150 be square twisted cold formed bars to BS4461and
113 T12 01 08 08 8825 21 150 8575 150 are marked "T" on these dwgs
75 T16 01 04 04 8625 21 150 8365 150
114 T12 01 08 08 8700 21 150 8450 150 b) Mild steel bars, designated on these drawings to
be round cold formed bars to BS4483and are
76 T16 01 04 04 8425 21 150 8185 150
115 marked "R" on these dwgs
T12 01 08 08 8550 21 150 8310 150
4. MINIMUM COVER TO ALL STEEL IN
77 T16 01 04 04 8225 21 150 7980 150
a) Raft Foundations = 50mm
116 T12 01 08 08 8400 21 150 8145 150
b) Beams = 50mm
78 T16 01 04 04 8000 21 150 7745 150
c) Plinth walls = 50mm
117 T12 01 08 08 8200 21 150 7960 150
5. GENERAL
79 T16 01 04 04 7750 21 150 7490 150
a) This drawing shall be read in conjunction with the
118 T12 01 08 08 8000 21 150 7750 150
relevant Engineering drawings.
81 T16 01 04 04 7450 21 150 7200 150
119 T12 01 08 08 7750 21 150 7510 150 b) All dimensions are in metric millimetres.
82 T16 01 04 04 7125 21 150 6875 150 c) All dimensions to be confirmed on site.
120 T12 01 08 08 7500 21 150 7245 150
83 T16 01 04 04 6750 21 150 6510 150
CLIENT
121 T12 01 08 08 7200 21 150 6945 150
84 T16 01 04 04 6350 21 150 6095 150
122 T12 01 08 08 6850 21 150 6605 150 THE REPUBLIC OF UGANDA
85 T16 01 04 04 5875 21 150 5625 150 MINISTRY OF WATER AND ENVIRONMENT
123 T12 01 08 08 6475 21 150 6225 150 DIRECTORATE OF WATER DEVELOPMENT
86 T16 01 04 04 5325 21 150 5085 150 CO-FINANCED BY