NOTES

1. FOUNDATIONS
a) They shall generally be taken 950mm min. below
existing ground level after removal of organic
layer and all excavations to be confirmed by the
Engineer before concrete blinding is laid.

300X350mm BEAM 01
b) Weak pockets of bearing strata to be dug
out and filled with 1:4:8 mass concrete.
T1
6-
15
0c c) Backfill material to be approved Murram and
T1 /c T1
6- 6 -0
15 T1 1- compacted in 200mm max layers to 95% MDD
0c (V 15
/c ar
yi
0c 2. CONCRETE MIXES
B1 ng /c
(V le B1 a) Mass Concrete to have a minimum works cube
a ry ng
T1 in th 25mm
g s,
6- le 40
15 ng -4 max.aggregate size
0c th 3)
/c s,
T1 4 4- b) Reinforced concrete to have a min.works cube
T1 (V 47
6-

7)
15 ar )

10
yi
0c ng

2-
max.aggregate size.
8
s, /c le
B1 ng
th

th 3. REINFORCEMENT
ng

(V s,
le

ar 48
y
g

in -8 (a) High yield bars, designated on these drawings to


in

g 1)
y
ar

le
ng 300X350mm BEAM 01 300X350mm BEAM 01 be square twisted cold formed bars to BS4461and
(V

T1 th
B2

6- s, are marked "T" on these dwgs


&

T1 02 06
T2

6- -1 -3
/c

150 5 0c 9)
0c

c /c b) Mild steel bars, designated on these drawings to


20

/c
B1
6-

B1 be round cold formed bars to BS4483and are


T1

(V
ar marked "R" on these dwgs
yi
n g
le 4. MINIMUM COVER TO ALL STEEL IN
ng
th a) Raft Foundations = 50mm
T1 s,
6- 06
05 -3 b) Beams = 50mm
-1 9)
5 0c c) Plinth walls = 50mm
T1
6- /c
04 T1 5. GENERAL
-1

300X350mm BEAM 01
50
T1 c/ a) This drawing shall be read in conjunction with the
6- c
03 T1
-1 relevant Engineering drawings.
50
c/
c b) All dimensions are in metric millimetres.
B1 T1
6-
01
-1
50 c) All dimensions to be confirmed on site.
c /c
B1
CLIENT

THE REPUBLIC OF UGANDA


MINISTRY OF WATER AND ENVIRONMENT
RC BASE PLAN LAYOUT RC TOP SLAB LAYOUT DIRECTORATE OF WATER DEVELOPMENT

DESIGN PHILOSOPHY CO-FINANCED BY


200

7 Top RC slab to
C
Separate PROJECT:
Detail
Consultancy Services for Engineering Supervision for
Construction Works for Bududa-Nabweya Phase II, Lirima
200

200 6T16-112 6T16-114 6T16-116


Phase II and Bukwo Phase II Gravity Flow Schemes
CONSTRUCTION OF LIRIMA GRAVITY FLOW SCHEME PHASE 2
Ground Level
T16-150-109 FF T16-150-109 FF
CONSULTANTS
T16-150-109 NF T16-150-109 NF T16-150-108 NF
24R8-117-150

24R8-117-150

24R8-117-150

T16-150-108 NF
3600

T16-200-109
SGI Studio Galli Ingeneria S.r.l.
Head office:
250 T16-40-150 T1 Via della Provvidenza, 15
T16-05-150 B1 35030 Sarmeola di Rubano (PD) Italy
T16-04-150 T1 T16-44-150 B1 Tel. +39 049 89 76 844 - Fax +39 049 89 76 784
Ground Level Ground Level
T16-150-108 FF T16-150-108 FF T16-03-150 B1
T16-150-108 NF REVISIONS :
375

T16-150-108 NF
6T16-111 6T16-113 6T16-115 No Date Description
T16-04-150 T1
T16-200-82 T2&B2
T16-03-150 B1 T16-150-01 B1
WATER BAR
T16-06-150 B1 T16-02-150 B1
300

2250 2250
50

300 300 4500 4500 300 300 DETAILED ENGINEERING DESIGN


DRAWING TITLE
9000
DRAIN SECTION D-D 191m³ SIBANGA STORAGE TANK
STRUCTURAL DETAILS

SECTION A-A SCALE


1:30
DRAWING No.
SGI-MWE-RWD-LIR-5.4.1
SURVEYED DESIGNED
ORD
DRAWN CHECKED
niko ORD
DATE APPROVED
AUG 2017 ORD
NOTES
1. FOUNDATIONS
2T16-144 3T16-146 a) They shall generally be taken 950mm min. below

200
existing ground level after removal of organic
R8-145-200c/c layer and all excavations to be confirmed by the

350
R8-147-150c/c Engineer before concrete blinding is laid.

150
300X350mm BEAM 01
b) Weak pockets of bearing strata to be dug
2T16-144 3T16-146 out and filled with 1:4:8 mass concrete.

c) Backfill material to be approved Murram and


200 250 compacted in 200mm max layers to 95% MDD
2. CONCRETE MIXES
a) Mass Concrete to have a minimum works cube
25mm
NOTCHED BEAM SECTION RC BEAM SECTION max.aggregate size

b) Reinforced concrete to have a min.works cube

T12-200c/c T1 (Varying lengths, 118-143)


T12-200c/c B1 (Varying lengths, 118-143)

T12-200c/c T2 (Varying lengths, 118-143) max.aggregate size.


3. REINFORCEMENT
(a) High yield bars, designated on these drawings to
WELL GRADED BACKFILL
T16-150 NF COMPACTED IN LAYERS be square twisted cold formed bars to BS4461and
300X350mm BEAM 01 300X350mm BEAM 01 T16-150 FF NOT EXCEEDING 200mm are marked "T" on these dwgs

b) Mild steel bars, designated on these drawings to


R10 CLIPS @ 1m
T12-200c/c B2 (Varying lengths, 118-143)
SPACING be round cold formed bars to BS4483and are
marked "R" on these dwgs
4. MINIMUM COVER TO ALL STEEL IN
T16-200 T2 a) Raft Foundations = 50mm
150 dia PERFORATED b) Beams = 50mm
PIPE ENCASED IN c) Plinth walls = 50mm
GRANULAR BACKFILL
T16-150 B1 5. GENERAL
T16-150 T1 a) This drawing shall be read in conjunction with the
300X350mm BEAM 01

T16-200
B2&T2 relevant Engineering drawings.
75mm C15 CONCRETE BLINDING
b) All dimensions are in metric millimetres.
WELL COMPACTED MURRAM IN LAYERS NOT
EXCEEDING 200mm
c) All dimensions to be confirmed on site.

TYPICAL SECTION THROUGH RC WALL TYPICAL SECTION ALONG RC WALL CLIENT

THE REPUBLIC OF UGANDA


MINISTRY OF WATER AND ENVIRONMENT
REINFORCEMENT DIRECTORATE OF WATER DEVELOPMENT
RC TOP SLAB LAYOUT BARS CO-FINANCED BY

APPROVED INLET
SEALANT T12 TRIMMER
BARS
APPROVED WATERSTOP

APPROVED
SEALANT PROJECT:
APPROVED WATERSTOP Consultancy Services for Engineering Supervision for
Construction Works for Bududa-Nabweya Phase II, Lirima
HORIZONTAL CONSTRUCTION JOINT DETAIL TYPICAL INLET DETAIL Phase II and Bukwo Phase II Gravity Flow Schemes
CONSTRUCTION OF LIRIMA GRAVITY FLOW SCHEME PHASE 2

T12-118-200 T1
7
C CONSULTANTS
T12-118-200 B1 T12-118-200 T2&B2
200

SGI Studio Galli Ingeneria S.r.l.


VERTICAL CONSTRUCTION Head office:
Via della Provvidenza, 15
Notched Beam 35030 Sarmeola di Rubano (PD) Italy

to Separate JOINT DETAIL Tel. +39 049 89 76 844 - Fax +39 049 89 76 784

300 Detail 4375 250 4375 300 REVISIONS :


No Date Description

RC TOP SLAB SECTION


3T16-146 3T16-146 3T16-146 3T16-146 6T16-102
DETAILED ENGINEERING DESIGN
14R8-147-150c/c 14R8-147-150c/c R8-106-150c/c DRAWING TITLE
13R8-147-150c/c 13R8-147-150c/c 191m³ SIBANGA STORAGE TANK
STRUCTURAL DETAILS
3T16-146 3T16-146 3T16-146 3T16-146
250 SCALE DRAWING No.
SGI-MWE-RWD-LIR-5.4.2
1:75,1:15,1:40
200 300 2125 250 2000 250 2000 250 2125 300 200 SURVEYED DESIGNED
ORD
DRAWN CHECKED

RC BEAM ELEVATION RC COLUMN SECTION DATE


niko
APPROVED
ORD

ORD
AUG 2017
NOTES
1. FOUNDATIONS
a) They shall generally be taken 950mm min. below
REINFORCEMENT BAR BENDING SCHEDULE TO BS 4466 REINFORCEMENT BAR BENDING SCHEDULE TO BS 4466 existing ground level after removal of organic
BAR TYPE NO. OF NO. IN TOTAL BAR SHAPE BAR SHAPE layer and all excavations to be confirmed by the
A B C D E BAR TYPE NO. OF NO. IN TOTAL BAR SHAPE BAR SHAPE
MEMBER MARK SIZE MEMBERS EACH NO. LENGTH CODE A B C D E Engineer before concrete blinding is laid.
MEMBER MARK SIZE MEMBERS EACH NO. LENGTH CODE
BASE b) Weak pockets of bearing strata to be dug
01 T16 01 378 378 1825 34 800 150 750 150 150
32 T16 01 04 04 1000 01 1000 out and filled with 1:4:8 mass concrete.

02 T16 01 122 122 1500 26 550 150 800 150 c) Backfill material to be approved Murram and
33 T16 01 04 04 695 01 695
compacted in 200mm max layers to 95% MDD
03 T16 01 04 04 2800 21 150 2550 150 2. CONCRETE MIXES
40 T16 01 04 04 7900 21 150 7645 150
a) Mass Concrete to have a minimum works cube
04 T16 01 04 04 2000 21 150 1750 150 25mm
41 T16 01 04 04 7875 21 150 7630 150
max.aggregate size
05 T16 01 04 04 900 21 150 650 150 b) Reinforced concrete to have a min.works cube
42 T16 01 04 04 7900 21 150 7645 150

06 T16 01 04 04 3680 01 3680 max.aggregate size.


43 T16 01 04 04 7875 21 150 7630 150
3. REINFORCEMENT
07 T16 01 04 04 3665 01 3665 (a) High yield bars, designated on these drawings to
44 T16 01 04 04 7900 23 150 7645 150
be square twisted cold formed bars to BS4461and
08 T16 01 04 04 3645 01 3645 are marked "T" on these dwgs
45 T16 01 04 04 7875 23 150 7630 150
b) Mild steel bars, designated on these drawings to
09 T16 01 04 04 3590 01 3590
46 T16 01 04 04 7900 23 150 7645 150 be round cold formed bars to BS4483and are
marked "R" on these dwgs
10 T16 01 04 04 3555 01 3555
47 T16 01 04 04 7875 23 150 7630 150 4. MINIMUM COVER TO ALL STEEL IN
a) Raft Foundations = 50mm
11 T16 01 04 04 3515 01 3515
48 T16 01 02 02 10300 21 150 10060 150 b) Beams = 50mm
c) Plinth walls = 50mm
12 T16 01 04 04 3470 01 3470
49 T16 01 02 02 10275 21 150 10030 150 5. GENERAL
a) This drawing shall be read in conjunction with the
13 T16 01 04 04 3425 01 3425
50 T16 01 02 02 10250 21 150 9990 150 relevant Engineering drawings.

14 T16 01 04 04 3370 01 3370 b) All dimensions are in metric millimetres.


51 T16 01 02 02 10200 21 150 9940 150
c) All dimensions to be confirmed on site.
15 T16 01 04 04 3310 01 3310
52 T16 01 02 02 10050 21 150 9810 150
CLIENT
16 T16 01 04 04 3245 01 3245
53 T16 01 02 02 9975 21 150 9735 150

17 T16 01 04 04 3175 01 3175 THE REPUBLIC OF UGANDA


54 T16 01 02 02 9900 21 150 9645 150
MINISTRY OF WATER AND ENVIRONMENT
18 T16 01 04 04 3100 01 3100 DIRECTORATE OF WATER DEVELOPMENT
55 T16 01 02 02 9800 21 150 9550 150
CO-FINANCED BY

19 T16 01 04 04 3015 01 3015


56 T16 01 02 02 9700 21 150 9440 150

20 T16 01 04 04 2925 01 2925


57 T16 01 02 02 9575 21 150 9325 150

21 T16 01 04 04 2825 01 2825


58 T16 01 02 02 9450 21 150 9195 150 PROJECT:
Consultancy Services for Engineering Supervision for
22 T16 01 04 04 2810 01 2810 Construction Works for Bududa-Nabweya Phase II, Lirima
59 T16 01 02 02 9300 21 150 9050 150
Phase II and Bukwo Phase II Gravity Flow Schemes
23 T16 01 04 04 2610 01 2610
60 T16 01 02 02 9150 21 150 8900 150 CONSTRUCTION OF LIRIMA GRAVITY FLOW SCHEME PHASE 2

24 T16 01 04 04 2485 01 2485 CONSULTANTS


61 T16 01 02 02 8975 21 150 8730 150

25 T16 01 04 04 2355 01 2355


62 T16 01 02 02 8775 21 150 8530 150
SGI Studio Galli Ingeneria S.r.l.
26 T16 01 04 04 2210 01 2210 Head office:
63 T16 01 02 02 8600 21 150 8355 150 Via della Provvidenza, 15
35030 Sarmeola di Rubano (PD) Italy
Tel. +39 049 89 76 844 - Fax +39 049 89 76 784
27 T16 01 04 04 2055 01 2055
64 T16 01 02 02 8400 21 150 8145 150
REVISIONS :
28 T16 01 04 04 1885 01 1885 No Date Description
65 T16 01 02 02 8175 21 150 7920 150

29 T16 01 04 04 1700 01 1700


66 T16 01 02 02 7925 21 150 7675 150

30 T16 01 04 04 1490 01 1490


67 T16 01 02 02 7650 21 150 7410 150 DETAILED ENGINEERING DESIGN
31 T16 01 04 04 1260 01 1260 DRAWING TITLE
68 T16 01 02 02 7375 21 150 7125 150
191m³ SIBANGA STORAGE TANK
STRUCTURAL DETAILS - BAR BENDING SCHEDULE

SCALE DRAWING No.


SGI-MWE-RWD-LIR-5.4.3
NTS
SURVEYED DESIGNED
ORD
DRAWN CHECKED
niko ORD
DATE APPROVED
AUG 2017 ORD
NOTES
1. FOUNDATIONS
REINFORCEMENT BAR BENDING SCHEDULE TO BS 4466 REINFORCEMENT BAR BENDING SCHEDULE TO BS 4466 a) They shall generally be taken 950mm min. below
BAR TYPE NO. OF NO. IN TOTAL BAR SHAPE BAR SHAPE existing ground level after removal of organic
A B C D E BAR TYPE NO. OF NO. IN TOTAL BAR SHAPE BAR SHAPE
MEMBER MARK SIZE MEMBERS EACH NO. LENGTH CODE A B C D E layer and all excavations to be confirmed by the
MEMBER MARK SIZE MEMBERS EACH NO. LENGTH CODE
Engineer before concrete blinding is laid.
69 T16 01 02 02 7050 21 150 6810 150
100 T16 01 04 04 5300 21 150 5055 150 b) Weak pockets of bearing strata to be dug
70 T16 01 02 02 6725 21 150 6470 150 out and filled with 1:4:8 mass concrete.
101 T16 01 04 04 4550 21 150 4305 150
c) Backfill material to be approved Murram and
71 T16 01 02 02 6350 21 150 6100 150 compacted in 200mm max layers to 95% MDD
102 T16 01 04 04 3600 21 150 3345 150
2. CONCRETE MIXES
72 T16 01 02 02 5685 21 150 5925 150 a) Mass Concrete to have a minimum works cube
103 T16 01 04 04 2150 21 150 1910 150
25mm
73 T16 01 02 02 5475 21 150 5225 150 WALL max.aggregate size
108 T16 01 376 376 1475 11 400 1100
b) Reinforced concrete to have a min.works cube
74 T16 01 02 02 4950 21 150 4700 150
109 T16 01 376 376 3900 11 150 3775
max.aggregate size.
75 T16 01 02 02 4350 21 150 4090 150 COLUMN
111 T16 02 06 12 1375 11 400 1000 3. REINFORCEMENT
(a) High yield bars, designated on these drawings to
76 T16 01 02 02 3600 21 150 3345 150
112 T16 02 06 12 3975 11 150 3835 be square twisted cold formed bars to BS4461and
are marked "T" on these dwgs
77 T16 01 02 02 2600 21 150 2355 150
113 T16 01 06 06 1450 11 400 1075 b) Mild steel bars, designated on these drawings to
82 T16 01 04 04 10350 21 150 10100 150 be round cold formed bars to BS4483and are
114 T16 01 06 06 4000 11 150 3875 marked "R" on these dwgs
83 T16 01 04 04 10350 21 150 10090 150 4. MINIMUM COVER TO ALL STEEL IN
115 T16 02 06 12 1375 11 400 1000 a) Raft Foundations = 50mm
84 T16 01 04 04 10325 21 150 10065 150 b) Beams = 50mm
116 T16 02 06 12 3975 11 150 3835 c) Plinth walls = 50mm
85 T16 01 04 04 10275 21 150 10030 150 5. GENERAL
117 R8 05 24 120 725 75 200 100 a) This drawing shall be read in conjunction with the
86 T16 01 04 04 10225 21 150 9970 150 TOP relevant Engineering drawings.
SLAB 118 T12 01 04 04 10150 21 150 9900 150
b) All dimensions are in metric millimetres.
87 T16 01 04 04 10150 21 150 9900 150
119 T12 01 08 08 10150 21 150 9890 150 c) All dimensions to be confirmed on site.

88 T16 01 04 04 10050 21 150 9810 150


120 T12 01 08 08 10125 21 150 9865 150 CLIENT

89 T16 01 04 04 9950 21 150 9705 150


121 T12 01 08 08 10075 21 150 9825 150
THE REPUBLIC OF UGANDA
90 T16 01 04 04 9825 21 150 9585 150 MINISTRY OF WATER AND ENVIRONMENT
122 T12 01 08 08 10025 21 150 9770 150
DIRECTORATE OF WATER DEVELOPMENT
91 T16 01 04 04 9700 21 150 9440 150 CO-FINANCED BY
123 T12 01 08 08 9950 21 150 9695 150

92 T16 01 04 04 9525 21 150 9280 150


124 T12 01 08 08 9850 21 150 9605 150

93 T16 01 04 04 9350 21 150 9100 150


125 T12 01 08 08 9750 21 150 9500 150

94 T16 01 04 04 9150 21 150 8900 150 PROJECT:


126 T12 01 08 08 9625 21 150 9375 150 Consultancy Services for Engineering Supervision for
Construction Works for Bududa-Nabweya Phase II, Lirima
95 T16 01 04 04 8925 21 150 8675 150 Phase II and Bukwo Phase II Gravity Flow Schemes
127 T12 01 08 08 9475 21 150 9230 150
CONSTRUCTION OF LIRIMA GRAVITY FLOW SCHEME PHASE 2
96 T16 01 04 04 8675 21 150 8425 150
128 T12 01 08 08 9325 21 150 9065 150
CONSULTANTS
97 T16 01 04 04 8400 21 150 8145 150
129 T12 01 08 08 9125 21 150 8880 150

98 T16 01 04 04 8100 21 150 7840 150


130 T12 01 08 08 8925 21 150 8670 150 SGI Studio Galli Ingeneria S.r.l.
Head office:
Via della Provvidenza, 15
99 T16 01 04 04 7750 21 150 7500 150 35030 Sarmeola di Rubano (PD) Italy
131 T12 01 08 08 8700 21 150 8440 150 Tel. +39 049 89 76 844 - Fax +39 049 89 76 784

100 T16 01 04 04 7375 21 150 7125 150


132 T12 01 08 08 8425 21 150 8185 150 REVISIONS :
No Date Description
101 T16 01 04 04 6950 21 150 6700 150

102 R8 01 04 04 6475 21 150 6225 150

103 T16 01 04 04 5925 21 150 5685 150 DETAILED ENGINEERING DESIGN


DRAWING TITLE
191m³ SIBANGA STORAGE TANK
STRUCTURAL DETAILS - BAR BENDING SCHEDULE

SCALE DRAWING No.


SGI-MWE-RWD-LIR-5.4.4
NTS
SURVEYED DESIGNED
ORD
DRAWN CHECKED
niko ORD
DATE APPROVED
AUG 2017 ORD
REINFORCEMENT BAR BENDING SCHEDULE TO BS 4466
NOTES
1. FOUNDATIONS
a) They shall generally be taken 950mm min. below
existing ground level after removal of organic
layer and all excavations to be confirmed by the
Engineer before concrete blinding is laid.

b) Weak pockets of bearing strata to be dug


out and filled with 1:4:8 mass concrete.

c) Backfill material to be approved Murram and


compacted in 200mm max layers to 95% MDD
2. CONCRETE MIXES
a) Mass Concrete to have a minimum works cube
25mm
max.aggregate size

b) Reinforced concrete to have a min.works cube

max.aggregate size.
3. REINFORCEMENT
(a) High yield bars, designated on these drawings to
be square twisted cold formed bars to BS4461and
are marked "T" on these dwgs
REINFORCEMENT BAR BENDING SCHEDULE TO BS 4466
b) Mild steel bars, designated on these drawings to
BAR TYPE NO. OF NO. IN TOTAL BAR SHAPE BAR SHAPE be round cold formed bars to BS4483and are
A B C D E
MEMBER MARK SIZE MEMBERS EACH NO. LENGTH CODE
marked "R" on these dwgs
4. MINIMUM COVER TO ALL STEEL IN
133 T12 01 08 08 8150 21 150 7900 150
a) Raft Foundations = 50mm
b) Beams = 50mm
134 T12 01 08 08 7825 21 150 7475 150
c) Plinth walls = 50mm
5. GENERAL
135 T12 01 08 08 7475 21 150 7230 150
a) This drawing shall be read in conjunction with the
relevant Engineering drawings.
136 T12 01 08 08 7100 21 150 6840 150
b) All dimensions are in metric millimetres.
137 T12 01 08 08 6650 21 150 6400 150 c) All dimensions to be confirmed on site.

138 T12 01 08 08 6150 21 150 5900 150


CLIENT

139 T12 01 08 08 5575 21 150 5325 150


THE REPUBLIC OF UGANDA
140 T12 01 08 08 4900 21 150 4650 150 MINISTRY OF WATER AND ENVIRONMENT
DIRECTORATE OF WATER DEVELOPMENT
141 T12 01 08 08 4075 21 150 3820 150 CO-FINANCED BY

142 T12 01 08 08 2950 21 150 2700 150


NOTCHED
BEAM 144 T16 12 04 48 650 21 150 400 150

PROJECT:
145 R8 12 03 36 1075 51 300 150 115 115
Consultancy Services for Engineering Supervision for
BEAM Construction Works for Bududa-Nabweya Phase II, Lirima
146 T16 01 06 06 10150 21 150 9900 150 Phase II and Bukwo Phase II Gravity Flow Schemes
CONSTRUCTION OF LIRIMA GRAVITY FLOW SCHEME PHASE 2
147 R8 01 46 46 1175 51 300 200 115 115
WALL CONSULTANTS
148 T16 01 72 72 9325 11 150 9200

149 T16 01 36 36 6200 01 6200


SGI Studio Galli Ingeneria S.r.l.
Head office:
Via della Provvidenza, 15
35030 Sarmeola di Rubano (PD) Italy
Tel. +39 049 89 76 844 - Fax +39 049 89 76 784

REVISIONS :
No Date Description

DETAILED ENGINEERING DESIGN


DRAWING TITLE
191m³ SIBANGA STORAGE TANK
STRUCTURAL DETAILS - BAR BENDING SCHEDULE

SCALE DRAWING No.


SGI-MWE-RWD-LIR-5.4.4
NTS
SURVEYED DESIGNED
ORD
DRAWN CHECKED
niko ORD
DATE APPROVED
AUG 2017 ORD
NOTES
1. FOUNDATIONS
a) They shall generally be taken 950mm min. below
existing ground level after removal of organic
layer and all excavations to be confirmed by the

300X350mm BEAM 01
Engineer before concrete blinding is laid.
T1
6- b) Weak pockets of bearing strata to be dug
15
0c out and filled with 1:4:8 mass concrete.
T1 /c
6- T1
15 T1
0c (V 6 c) Backfill material to be approved Murram and
/c a ry -0
B1 i 1-
ng 15 compacted in 200mm max layers to 95% MDD
(V le 0c
ar n gt /c 2. CONCRETE MIXES
yi hs B1
T1 n g
6- le ,3 a) Mass Concrete to have a minimum works cube
1 ng 2-
50 35
c th ) 25mm
/c s,
T1 3 6-
T1 (V 39 max.aggregate size
6- ar )

6)
1 yi

-9
50 ng b) Reinforced concrete to have a min.works cube

67
c/
c le
s,
th B1 ng
ng
(V th
s,
le

ar 4 max.aggregate size.
g

y 0-
in

in 66
y

g
ar

le ) 3. REINFORCEMENT
(V

ng
T1
B2

6- th 300X350mm BEAM 01 300X350mm BEAM 01 (a) High yield bars, designated on these drawings to
s,
&

T1 02
T2

06
6- -1 -3 be square twisted cold formed bars to BS4461and
c

1 50
/

50 1)
0c

c c /c
20

/c are marked "T" on these dwgs


6-

B1 B1
T1

(V
ar b) Mild steel bars, designated on these drawings to
yi
ng be round cold formed bars to BS4483and are
T1 le
6- ng
05 marked "R" on these dwgs
-1 th
5 s,
T1 0c 06 4. MINIMUM COVER TO ALL STEEL IN
6- /c -3
T1 04 T1 1)
6- -1 a) Raft Foundations = 50mm
03 50
- c /c b) Beams = 50mm
15
0c T1
/ c c) Plinth walls = 50mm

300X350mm BEAM 01
B1
T1
6-
5. GENERAL
01
-1 a) This drawing shall be read in conjunction with the
50
c/ relevant Engineering drawings.
c
B1
b) All dimensions are in metric millimetres.

c) All dimensions to be confirmed on site.

CLIENT

RC BASE PLAN LAYOUT RC TOP SLAB LAYOUT


DESIGN PHILOSOPHY THE REPUBLIC OF UGANDA
MINISTRY OF WATER AND ENVIRONMENT
DIRECTORATE OF WATER DEVELOPMENT
CO-FINANCED BY

PROJECT:
Consultancy Services for Engineering Supervision for
Construction Works for Bududa-Nabweya Phase II, Lirima
200

7 Top RC slab to
C Phase II and Bukwo Phase II Gravity Flow Schemes
Separate
Detail
CONSTRUCTION OF LIRIMA GRAVITY FLOW SCHEME PHASE 2
Ground Level
200

200 6T16-101 6T16-103 6T16-105 CONSULTANTS


T16-150-97 NF
T16-150-98 FF
T16-150-97 NF
T16-150-98 FF

T16-150-98 NF T16-150-98 NF SGI Studio Galli Ingeneria S.r.l.


Head office:
T16-32-150 T1
24R8-106-150

24R8-106-150

24R8-106-150

Via della Provvidenza, 15


T16-05-150 B1
3600

35030 Sarmeola di Rubano (PD) Italy


T16-04-150 T1 T16-36-150 B1 Tel. +39 049 89 76 844 - Fax +39 049 89 76 784
T16-200-134
250 T16-03-150 B1
REVISIONS :
375

No Date Description
Ground Level Ground Level
T16-150-97 FF T16-150-97 FF

T16-150-97 NF
T16-150-97 NF
T16-04-150 T1
T16-03-150 B1
6T16-100

T16-06-150 B1
6T16-102
T16-200-67 T2&B2
6T16-104

T16-150-01 B1
WATER BAR
DRAIN SECTION D-D
T16-02-150 B1
DETAILED ENGINEERING DESIGN
300

DRAWING TITLE
2000
2000
151m³ BUKUSU STORAGE TANK
50

300 300 4000 4000 300 300 STRUCTURAL DETAILS


8000
SCALE DRAWING No.
SGI-MWE-RWD-LIR-5.5.1
SECTION A-A SURVEYED
1:30
DESIGNED
ORD
DRAWN CHECKED
niko ORD
DATE APPROVED
AUG 2017 ORD
NOTES
1. FOUNDATIONS
a) They shall generally be taken 950mm min. below
2T16-130 3T16-132

200
existing ground level after removal of organic
layer and all excavations to be confirmed by the

350
R8-133-150c/c

300X350mm BEAM 01
R8-131-200c/c Engineer before concrete blinding is laid.

150
b) Weak pockets of bearing strata to be dug

2T16-130 3T16-132 out and filled with 1:4:8 mass concrete.

c) Backfill material to be approved Murram and


250 compacted in 200mm max layers to 95% MDD
200
2. CONCRETE MIXES
a) Mass Concrete to have a minimum works cube
RC BEAM SECTION 25mm

NOTCHED BEAM SECTION max.aggregate size

T12-200c/c B1 (Varying lengths, 107-129)

T12-200c/c T1 (Varying lengths, 107-129)


T12-200c/c T2 (Varying lengths, 107-129) b) Reinforced concrete to have a min.works cube

max.aggregate size.
3. REINFORCEMENT
300X350mm BEAM 01 300X350mm BEAM 01 (a) High yield bars, designated on these drawings to
WELL GRADED BACKFILL
T16-150 NF COMPACTED IN LAYERS be square twisted cold formed bars to BS4461and
T16-150 FF NOT EXCEEDING 200mm are marked "T" on these dwgs
T12-200c/c B2 (Varying lengths, 107-129)
b) Mild steel bars, designated on these drawings to
R10 CLIPS @ 1m
SPACING be round cold formed bars to BS4483and are
marked "R" on these dwgs
4. MINIMUM COVER TO ALL STEEL IN
T16-200 T2 a) Raft Foundations = 50mm
150 dia PERFORATED b) Beams = 50mm
PIPE ENCASED IN c) Plinth walls = 50mm
300X350mm BEAM 01

GRANULAR BACKFILL
T16-150 B1 5. GENERAL
T16-200 T16-150 T1 a) This drawing shall be read in conjunction with the
B2&T2 relevant Engineering drawings.
75mm C15 CONCRETE BLINDING
b) All dimensions are in metric millimetres.
WELL COMPACTED MURRAM IN LAYERS NOT
EXCEEDING 200mm
c) All dimensions to be confirmed on site.

TYPICAL SECTION THROUGH RC WALL TYPICAL SECTION ALONG RC WALL CLIENT

RC TOP SLAB LAYOUT


THE REPUBLIC OF UGANDA
MINISTRY OF WATER AND ENVIRONMENT
REINFORCEMENT DIRECTORATE OF WATER DEVELOPMENT
BARS CO-FINANCED BY

APPROVED INLET
SEALANT T12 TRIMMER
BARS
APPROVED WATERSTOP

APPROVED
SEALANT PROJECT:
APPROVED WATERSTOP Consultancy Services for Engineering Supervision for
Construction Works for Bududa-Nabweya Phase II, Lirima
HORIZONTAL CONSTRUCTION JOINT DETAIL TYPICAL INLET DETAIL Phase II and Bukwo Phase II Gravity Flow Schemes
CONSTRUCTION OF LIRIMA GRAVITY FLOW SCHEME PHASE 2

T12-107-200 T1
7
C CONSULTANTS
T12-107-200 B1 T12-107-200 T2&B2
200

SGI Studio Galli Ingeneria S.r.l.


VERTICAL CONSTRUCTION Head office:
Via della Provvidenza, 15
Notched Beam 35030 Sarmeola di Rubano (PD) Italy

to Separate JOINT DETAIL Tel. +39 049 89 76 844 - Fax +39 049 89 76 784

300 Detail 3875 250 3875 300 REVISIONS :


No Date Description
RC TOP SLAB SECTION

3T16-132 3T16-132 3T16-132 3T16-132 6T16-102


DETAILED ENGINEERING DESIGN
12R8-133-150c/c 12R8-133-150c/c R8-106-150c/c DRAWING TITLE
11R8-133-150c/c 11R8-133-150c/c 151m³ BUKUSU STORAGE TANK
STRUCTURAL DETAILS
3T16-132 3T16-132 3T16-132 3T16-132
250 SCALE DRAWING No.
SGI-MWE-RWD-LIR-5.5.2
1:75,1:15,1:40
200 300 1875 250 1750 250 1750 250 1875 300 200 SURVEYED DESIGNED
ORD
DRAWN CHECKED

RC BEAM ELEVATION RC COLUMN SECTION DATE


niko
APPROVED
ORD

AUG 2017 ORD


NOTES
1. FOUNDATIONS
a) They shall generally be taken 950mm min. below
existing ground level after removal of organic
REINFORCEMENT BAR BENDING SCHEDULE TO BS 4466 REINFORCEMENT BAR BENDING SCHEDULE TO BS 4466 layer and all excavations to be confirmed by the
BAR TYPE NO. OF NO. IN TOTAL BAR SHAPE BAR SHAPE Engineer before concrete blinding is laid.
A B C D E BAR TYPE NO. OF NO. IN TOTAL BAR SHAPE BAR SHAPE
MEMBER MARK SIZE MEMBERS EACH NO. LENGTH CODE A B C D E
MEMBER MARK SIZE MEMBERS EACH NO. LENGTH CODE b) Weak pockets of bearing strata to be dug
BASE
01 T16 01 378 378 1825 34 800 150 750 150 150 out and filled with 1:4:8 mass concrete.
32 T16 01 04 04 6900 21 150 6645 150
c) Backfill material to be approved Murram and
02 T16 01 122 122 1500 26 550 150 800 150 compacted in 200mm max layers to 95% MDD
33 T16 01 04 04 6875 21 150 6630 150
2. CONCRETE MIXES
03 T16 01 04 04 2800 21 150 2550 150 a) Mass Concrete to have a minimum works cube
34 T16 01 04 04 6900 21 150 6645 150
25mm
04 T16 01 04 04 2000 21 150 1750 150 max.aggregate size
35 T16 01 04 04 6875 21 150 6630 150
b) Reinforced concrete to have a min.works cube
05 T16 01 04 04 900 21 150 650 150
36 T16 01 04 04 6900 23 150 6645 150
max.aggregate size.
06 T16 01 02 02 3200 01 3200
37 T16 01 04 04 6875 23 150 6630 150 3. REINFORCEMENT
(a) High yield bars, designated on these drawings to
07 T16 01 04 04 3195 01 3195
38 T16 01 04 04 6900 23 150 6645 150 be square twisted cold formed bars to BS4461and
are marked "T" on these dwgs
08 T16 01 04 04 3190 01 3190
39 T16 01 04 04 6875 23 150 6630 150
b) Mild steel bars, designated on these drawings to
09 T16 01 04 04 3175 01 3175 be round cold formed bars to BS4483and are
40 T16 01 02 02 9275 21 150 9020 150
marked "R" on these dwgs
10 T16 01 04 04 3160 01 3160 4. MINIMUM COVER TO ALL STEEL IN
41 T16 01 02 02 9225 21 150 8975 150
a) Raft Foundations = 50mm
11 T16 01 04 04 3135 01 3135 b) Beams = 50mm
42 T16 01 02 02 9175 21 150 8920 150
c) Plinth walls = 50mm
12 T16 01 04 04 3110 01 3110 5. GENERAL
43 T16 01 02 02 9100 21 150 8855 150
a) This drawing shall be read in conjunction with the
13 T16 01 04 04 3075 01 3075 relevant Engineering drawings.
44 T16 01 02 02 9025 21 150 8785 150
b) All dimensions are in metric millimetres.
14 T16 01 04 04 3040 01 3040
45 T16 01 02 02 8950 21 150 8485 150 c) All dimensions to be confirmed on site.

15 T16 01 04 04 2995 01 2995


46 T16 01 02 02 8850 21 150 8365 150
CLIENT

16 T16 01 04 04 2945 01 2945


47 T16 01 02 02 8725 21 150 8485 150
THE REPUBLIC OF UGANDA
17 T16 01 04 04 2890 01 2890
48 T16 01 02 02 8275 21 150 8230 150 MINISTRY OF WATER AND ENVIRONMENT
DIRECTORATE OF WATER DEVELOPMENT
18 T16 01 04 04 2830 01 2830 CO-FINANCED BY
40 T16 01 02 02 8175 21 150 7925 150

19 T16 01 04 04 2765 01 2765


49 T16 01 02 02 7800 21 150 7555 150

20 T16 01 04 04 2690 01 2690


50 T16 01 02 02 7600 21 150 7350 150

21 T16 01 04 04 2610 01 2610 PROJECT:


51 T16 01 02 02 7375 21 150 7120 150 Consultancy Services for Engineering Supervision for
22 T16 01 04 04 2320 01 2320
Construction Works for Bududa-Nabweya Phase II, Lirima
52 T16 01 02 02 6850 21 150 6605 150 Phase II and Bukwo Phase II Gravity Flow Schemes
23 T16 01 04 04 2210 01 2210 CONSTRUCTION OF LIRIMA GRAVITY FLOW SCHEME PHASE 2
53 T16 01 02 02 6550 21 150 6310 150
CONSULTANTS
24 T16 01 04 04 2135 01 2135
54 T16 01 02 02 6225 21 150 5985 150

25 T16 01 04 04 2085 01 2085


55 T16 01 02 02 5875 21 150 5625 150 SGI Studio Galli Ingeneria S.r.l.
Head office:
26 T16 01 04 04 1950 01 1950 Via della Provvidenza, 15
56 T16 01 02 02 5475 21 150 5225 150 35030 Sarmeola di Rubano (PD) Italy
Tel. +39 049 89 76 844 - Fax +39 049 89 76 784

27 T16 01 04 04 1805 01 1805


57 T16 01 02 02 5025 21 150 4775 150 REVISIONS :
No Date Description
28 T16 01 04 04 1640 01 1640
58 T16 01 02 02 4500 21 150 4260 150

29 T16 01 04 04 1460 01 1460


59 T16 01 02 02 3900 21 150 3650 150

30 T16 01 04 04 1260 01 2160 DETAILED ENGINEERING DESIGN


60 T16 01 02 02 3150 21 150 2890 150
DRAWING TITLE
31 T16 01 04 04 1035 01 1035
67 T16 01 04 04 9350 21 150 9100 150
151m³ BUKUSU STORAGE TANK
STRUCTURAL DETAILS - BAR BENDING SCHEDULE

SCALE DRAWING No.


SGI-MWE-RWD-LIR-5.5.3
NTS
SURVEYED DESIGNED
ORD
DRAWN CHECKED
niko ORD
DATE APPROVED
AUG 2017 ORD
NOTES
1. FOUNDATIONS
a) They shall generally be taken 950mm min. below
existing ground level after removal of organic
REINFORCEMENT BAR BENDING SCHEDULE TO BS 4466 layer and all excavations to be confirmed by the

BAR TYPE BAR BAR SHAPE Engineer before concrete blinding is laid.
NO. OF NO. IN TOTAL SHAPE
A B C D E
MEMBER MARK SIZE MEMBERS EACH NO. LENGTH CODE b) Weak pockets of bearing strata to be dug
REINFORCEMENT BAR BENDING SCHEDULE TO BS 4466
out and filled with 1:4:8 mass concrete.
68 T16 01 04 04 9350 21 150 9090 150 BAR TYPE NO. OF NO. IN TOTAL BAR SHAPE BAR SHAPE
A B C D E c) Backfill material to be approved Murram and
MEMBER MARK SIZE MEMBERS EACH NO. LENGTH CODE
69 T16 01 04 04 9325 21 150 9065 150 compacted in 200mm max layers to 95% MDD
108 T12 01 08 08 9150 21 150 8890 150 2. CONCRETE MIXES
70 T16 01 04 04 9275 21 150 9020 150 a) Mass Concrete to have a minimum works cube
109 T12 01 08 08 9125 21 150 8865 150 25mm
71 T16 01 04 04 9200 21 150 8960 150 max.aggregate size
110 T12 01 08 08 9075 21 150 8820 150
b) Reinforced concrete to have a min.works cube
72 T16 01 04 04 9125 21 150 8880 150
111 T12 01 08 08 9000 21 150 8755 150
max.aggregate size.
73 T16 01 04 04 8900 21 150 8660 150 3. REINFORCEMENT
112 T12 01 08 08 8925 21 150 8675 150
(a) High yield bars, designated on these drawings to
74 T16 01 04 04 8775 21 150 8525 150 be square twisted cold formed bars to BS4461and
113 T12 01 08 08 8825 21 150 8575 150 are marked "T" on these dwgs
75 T16 01 04 04 8625 21 150 8365 150
114 T12 01 08 08 8700 21 150 8450 150 b) Mild steel bars, designated on these drawings to
be round cold formed bars to BS4483and are
76 T16 01 04 04 8425 21 150 8185 150
115 marked "R" on these dwgs
T12 01 08 08 8550 21 150 8310 150
4. MINIMUM COVER TO ALL STEEL IN
77 T16 01 04 04 8225 21 150 7980 150
a) Raft Foundations = 50mm
116 T12 01 08 08 8400 21 150 8145 150
b) Beams = 50mm
78 T16 01 04 04 8000 21 150 7745 150
c) Plinth walls = 50mm
117 T12 01 08 08 8200 21 150 7960 150
5. GENERAL
79 T16 01 04 04 7750 21 150 7490 150
a) This drawing shall be read in conjunction with the
118 T12 01 08 08 8000 21 150 7750 150
relevant Engineering drawings.
81 T16 01 04 04 7450 21 150 7200 150
119 T12 01 08 08 7750 21 150 7510 150 b) All dimensions are in metric millimetres.
82 T16 01 04 04 7125 21 150 6875 150 c) All dimensions to be confirmed on site.
120 T12 01 08 08 7500 21 150 7245 150
83 T16 01 04 04 6750 21 150 6510 150
CLIENT
121 T12 01 08 08 7200 21 150 6945 150
84 T16 01 04 04 6350 21 150 6095 150
122 T12 01 08 08 6850 21 150 6605 150 THE REPUBLIC OF UGANDA
85 T16 01 04 04 5875 21 150 5625 150 MINISTRY OF WATER AND ENVIRONMENT
123 T12 01 08 08 6475 21 150 6225 150 DIRECTORATE OF WATER DEVELOPMENT
86 T16 01 04 04 5325 21 150 5085 150 CO-FINANCED BY

124 T12 01 08 08 6050 21 150 5795 150


87 T16 01 04 04 4700 21 150 4440 150
125 T12 01 08 08 5550 21 150 5300 150
88 T16 01 04 04 3900 21 150 3650 150
126 T12 01 08 08 4975 21 150 4720 150
PROJECT:
89 T16 01 04 04 2825 21 150 2580 150 Consultancy Services for Engineering Supervision for
127 T12 01 08 08 4275 21 150 4020 150
WALL Construction Works for Bududa-Nabweya Phase II, Lirima
97 T16 01 376 376 1475 11 400 1100 Phase II and Bukwo Phase II Gravity Flow Schemes
128 T12 01 08 08 3375 21 150 3130 150
CONSTRUCTION OF LIRIMA GRAVITY FLOW SCHEME PHASE 2
98 T16 01 376 376 3900 11 150 3775
129 T12 01 08 08 2025 21 150 1785 150 CONSULTANTS
COLUMN
100 T16 02 06 12 1375 11 400 1000 NOTCHED
BEAM 130 T16 12 04 48 650 21 150 400 150
101 T16 02 06 12 3975 11 150 3835 SGI Studio Galli Ingeneria S.r.l.
131 R8 12 03 36 1075 51 300 150 115 115 Head office:
Via della Provvidenza, 15
102 T16 01 06 06 1450 11 400 1075 BEAM 35030 Sarmeola di Rubano (PD) Italy
Tel. +39 049 89 76 844 - Fax +39 049 89 76 784
132 T16 01 06 06 9150 21 150 8900 150
103 T16 01 06 06 4000 11 150 3875 REVISIONS :
133 R8 01 46 46 1175 51 300 200 115 115 No Date Description
104 T16 02 06 12 1375 11 400 1000 WALL
134 T16 01 72 72 9325 11 150 9200
105 T16 02 06 12 3975 11 150 3835
135 T16 01 36 36 6200 01 3000
DETAILED ENGINEERING DESIGN
106 R8 05 24 120 725 75 200 100
DRAWING TITLE
TOP
SLAB 107 T12 01 04 04 9150 21 150 8900 150 151m³ BUKUSU STORAGE TANK
STRUCTURAL DETAILS - BAR BENDING SCHEDULE

SCALE DRAWING No.


SGI-MWE-RWD-LIR-5.5.4
NTS
SURVEYED DESIGNED
ORD
DRAWN CHECKED
niko ORD
DATE APPROVED
AUG 2017 ORD