ANDHRA PRADESH POWER DEVELOPMENT COMPANY LIMITED

SRI DAMODARAM SANJEEVAIAH THERMAL POWER STATION

From To
Station Fire Officer, The Chief Engineer/ O&M,
O/o Executive Engineer/FM, SDSTPS
SDSTPS

Sir,

Sub: SDSTPS –Adm & MM circle – Fire & Safety Division – AMC of fire
tender AP26TB3369 -Estimate Submitted-Early sanction and release of
PO- Requested - Reg.

Ref: PR 1300041656

It is to submit that the AMC for fire tender AP26TB3369 is to be entered. The
repair works will be take-up as and when required. The proposed works in the estimate are very
much essential to keep the fire tender road worthy. The estimate for an amount of Rs 77,900/- is
enclosed herewith for early sanction, please.

Enclosures:1) Estimate yours faithfully,

(T.Narendra Babu)

Submitted to the Superintending Engineer/Adm& MM/SDSTPS/Nelaturu for further


necessary action please.

Executive Engineer/FM
SDSTPS

Report to Accompany
Estimate Amount: Rs. 77900-00

The estimate envisages for Rs. 77900-00 (Rupees Seventy-Seven Thousand Nine
hundred only) towards annual maintenance of Fire tender AP26TB3369. The estimate is
submitted for early sanction and release of PO as per the procedure in vogue. The estimated rates
are based on earlier POs 4900032497, 4900032498, 4900032500. Repair works to Fire tender
AP26TB3369 by engaging external agency on AMC basis is very much essential to keep the fire
tender road worthy.
PR no
130004165
6
Total
Sl.No Description Rate Qty amount

1 Four wheels greasing 5200.00 1 5200.00


All oils, filters changing and
2 Valve checking 5500.00 1 5500.00
All electrical works
3 checking and rectification 3200.00 1 3200.00
Clutch plates and springs
4 checking and repair 4300.00 1 4300.00
5 6 Door Locks replacement 5400.00 1 5400.00
6 Break inspection and repair 1100.00 1 1100.00
Water Tank rubber
7 painting- Inside 8500.00 1 8500.00
Rear pump Accelerator
8 repair 2500.00 1 2500.00
9 Officer side mirror change 600.00 1 600.00
10 Wipers set 1200.00 2 2400.00
11 Siren 2000.00 1 2000.00
Windshield beading , 20000.0
12 tinkering works 0 1 20000.00
13 Vacuum booster repair 3500.00 1 3500.00
Leaf spring plates 10000.0
14 reconditioning- front 0 1 10000.00
Joint cross checking , bolts
15 replacement 1500.00 1 1500.00
Water servicing and
16 greasing 2200.00 1 2200.00
Grand total 77,900.00
Executive Engineer/FM SFO/SDSTPS
SDSTPS